03 Architectural 03.20.25.pdf

PDF 13 MB Posted

Attached to
Y1DA-- Improve Patient Privacy 4B Project# 652-14-106 Federal contract opportunity
Solicitation number
36C24625B0006
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

The architectural document is a detailed set of construction drawings for a patient privacy improvement project at the Hunter Holmes McGuire VA Medical Center in Richmond, Virginia. The drawings comprehensively illustrate renovation plans for the fourth floor, focusing on upgrading patient rooms, toilets, corridors, and support spaces. Key design elements include:

The renovation involves installing new metal stud walls, gypsum wall board, ceiling systems, and finishes across approximately 11 patient rooms, staff areas, and support spaces. Specific improvements include patient lift tracks, medical headwalls, new flooring, wall cladding, paint treatments, corner guards, and crash rails. The project is fully sprinklered and designed to enhance patient privacy, with careful attention to wall ratings, acoustic considerations, and accessibility requirements. The drawings provide extensive technical details on wall construction, equipment placement, finish materials, and room-specific configurations.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA-- Improve Patient Privacy 4B Project# 652-14-106, newest first.
File Type Posted
36C24625B0006 0007.docx DOCX document
RFI Reponses 3.pdf PDF
VA 10 90 00 Ceiling Mounted Patient Lift System.pdf PDF
36C24625B0006 0006.docx DOCX document
087100 Door Hardware_Add 1.pdf PDF
RFI Reponses 2.pdf PDF
18-083 AI601.pdf PDF
04-Structural.pdf PDF
Hardware Materials BOD.pdf PDF
M-601.pdf PDF
36C24625B0006 0005.docx DOCX document
36C24625B0006 0001_UPDATED.pdf PDF
36C24625B0006 0003_UPDATED.pdf PDF
36C24625B0006 0002_UPDATED.pdf PDF
36C24625B0006 0004.docx DOCX document
36C24625B0006 0003.docx DOCX document
S04_Site Visit Sign-in Sheet_4B.pdf PDF
4B Signage Package.pdf PDF
RFI Responses_Improve 4B.pdf PDF
SECTION 10 90 00 Ceiling Mounted Patient Lift System.pdf PDF
36C24625B0006 0002.docx DOCX document
36C24625B0006 0001.docx DOCX document
36C24625B0006_1.docx DOCX document
05-PLUMB_R.pdf PDF
03 Architectural_R.pdf PDF
Combined Specs Richmond 4B_R.pdf PDF
08-LOW VOLTAGE AND FIRE ALARM_R.pdf PDF
07- ELECTRICAL_r.pdf PDF
02 HA_R.pdf PDF
01-General_100 Bid Docs_r.pdf PDF
Drawings Index and Specifications Table of Contents.pdf PDF
Wage Determination.pdf PDF
06-MECH_R.pdf PDF
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION.docx DOCX document
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING_CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx DOCX document
05-FP_R.pdf PDF
04 Structural_R.pdf PDF
Contractor EMR Certification Form 2023_4B.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VARIES

3 5/8" METAL STUD W/ ONE LAYER OF 5/8" GWB ON EXTERIOR ROOM SIDE AND TWO LAYERS OF 5/8" GWB ON

PATIENT ROOM SIDE CARRIED TO UNDERSIDE OF STRUCTURE; ONE LAYER OF GWB (AT EXPOSED TO VIEW

SIDE) FOR TYPE A1sim SMOKE PARTITION CHASE WALL. SEAL WITH ACOUSTICAL SEALANT, TYP. AND PROVIDE

SOUND ATTENUATION BLANKETS.

(SMOKE PARTITION, NON-RATED); STC 55

3 5/8" METAL STUD @ 16" O.C. W/ SOUND ATTENUATION BLANKETS AND 5/8" TYPE 'X' GWB ON

BOTH SIDES TO UNDERSIDE OF STRUCTURE. SEAL WITH ACOUSTICAL SEALANT.

(UL DES. 425 1-HR RATED SMOKE BARRIER); STC 50

FIELD VERIFY WALL DEPTH AND USE APPROPRIATE METAL STUD SIZE TO MATCH AND ALIGN

FINISHES TO ADJACENT EXISTING WALL. PROVIDE SOUND ATTENUATION BLANKETS AND 5/8"

TYPE 'X' GWB ON BOTH SIDES OF METAL STUD TO UNDERSIDE OF STRUCTURE. SEAL WITH

FLEXIBLE SEALANT.

(UL DES. 425 1-HR RATED SMOKE BARRIER); STC 50

5/8" TYPE 'X' GWB ON METAL

STUDS @ 16" O.C.

BASE, AS SCHEDULED.

CEILING AS SCHEDULED.

5/8" TYPE 'X' GWB ON BOTH SIDES OF METAL

STUDS @ 16" O.C.; CARRY TO UNDERSIDE OF

STRUCTURE ABOVE.

FINISHED FLOOR.

VARIES

5/8" GWB ON METAL

STUDS @ 16" O.C.

BASE, AS SCHEDULED.

UNDERSIDE OF STRUCTURE

CEILING AS SCHEDULED

5/8" GWB ON BOTH SIDES OF METAL STUDS.

(REPLACE GWB WITH CEMENTITIOUS BACKER

BOARD WHERE TILE OR SSM FINISH OCCURS;

ADDITIONAL LAYER OF GWB AT CORRIDOR

SIDE, TYP.)

FINISHED FLOOR.

DEFLECTION TRACK

SOUND ATTENUATION BLANKETS

SOUND ATTENUATION BLANKETS.

SEALANT, TYP.

SECTION: HEAD

PLAN:

SECTION: SILL

SECTION: HEAD

PLAN:

SECTION: SILL

SECTION: HEAD

PLAN:

SECTION: SILL

SECTION: HEAD

PLAN:

SECTION: SILL

SECTION: HEAD

PLAN:

SECTION: SILL

ACOUSTICAL SEALANT

TYPICAL NOTE:

1. FOR AREAS WITH CERAMIC WALL TILES

AND/OR SOLID SURFACE SHOWER WALL PANEL,

USE 5/8" CEMENTITIOUS BACKER BOARD IN LIEU

OF GWB. SEE FINISH SCHEDULE AND INTERIOR

ELEVATIONS FOR LOCATIONS.

2. USE 5/8" MOISTURE RESISTANT GWB ABOVE

TILE WAINSCOT AT WET AREAS, TYP.

CERAMIC WALL TILE OR SSM SHOWER WALL PANEL

WHERE OCCURS (SHOWN DASHED).

SECTION: HEAD

PLAN:

SECTION: SILL

3 5/8" (B1)

6" (B2)

5/8" GWB ON METAL

STUDS @ 16" O.C.

BASE, AS SCHEDULED.

UNDERSIDE OF STRUCTURE

CEILING AS SCHEDULED

FINISHED FLOOR.

DEFLECTION TRACK

SOUND ATTENUATION BLANKETS.

FIELD VERIFY WALL DEPTH AND USE APPROPRIATE METAL STUD SIZE TO MATCH AND ALIGN FINISHES TO

ADJACENT EXISTING WALL. PROVIDE SOUND ATTENUATION BLANKETS AND 5/8" GWB ON BOTH SIDES OF

METAL STUD TO UNDERSIDE OF STRUCTURE; (PROVIDE TWO LAYERS OF GWB AT CORRIDOR SIDE, TYP.).

SEAL WITH ACOUSTICAL SEALANT.

(SMOKE PARTITION, NON-RATED); STC 55

CERAMIC WALL TILE OR SSM SHOWER WALL PANEL

WHERE OCCURS.

5/8" GWB ON BOTH SIDES OF METAL STUDS.

(REPLACE GWB WITH CEMENTITIOUS BACKER

BOARD WHERE TILE OR SSM FINISH OCCURS,

TYPICAL).

3 5/8" METAL STUDS WITH BATT INSULATION AND ONE LAYER OF 5/8" GWB ON EXPOSED TO VIEW SIDE

OF CHASE WALL.

(NON-RATED); STC 39

3 5/8" METAL STUDS WITH BATT INSULATION AND ONE LAYER OF 5/8" CEMENTITIOUS BACKER BOARD

WHERE CERAMIC WALL TILE OR SSM SHOWER PANEL WAINSCOT IS SCHEDULED. USE MOISTURE

RESISTANT GWB ABOVE WAINSCOT.

(NON-RATED); STC 39

EXISTING WALL AND/OR

COLUMN TO REMAIN

CEILING AS SCHEDULED

5/8" MOISTURE RESISTANT GWB ABOVE TILE

WAINSCOT.

5/8" CEMENTITIOUS BACKER BOARD AS

SUBSTRATE WHERE TILE OCCURS.

CERAMIC WALL TILE WAINSCOT WHERE

OCCURS/SCHEDULED.

CERAMIC WALL TILE WHERE

OCCURS/SCHEDULED.

CERAMIC WALL TILE WHERE

OCCURS/SCHEDULED.

5/8" CEMENTITIOUS BACKER BOARD AS

SUBSTRATE WHERE TILE OCCURS.

EXISTING WALL AND/OR

COLUMN TO REMAIN

7/8" METAL HAT FURRING

7/8" METAL FURRING WITH BATT INSULATION AND ONE LAYER OF 5/8" GWB ON EXPOSED TO VIEW

SIDE. USE CEMENTITIOUS BACKER BOARD IN LIEU OF GWB WHERE WALL TILE OR SSM IS SCHEDULED.

ALIGN FINISHES WITH ADJACENT WALL, TYPICAL.

5/8" GWB LAMINATED DIRECTLY ON EXISTING CONCRETE COLUMN OR WALL.

3 5/8"

5/8" GWB (AT EXPOSED TO VIEW SIDE OF

CHASE WALL) ON METAL STUDS @ 16" O.C.;

(USE CEMENTITIOUS BACKER BOARD

WHERE CT OR SSM WAINSCOT OCCURS).

BASE, AS SCHEDULED.

UNDERSIDE OF STRUCTURE

CEILING AS SCHEDULED

3 5/8" METAL STUD W/ 5/8" GWB ON EXPOSED SIDE OF CHASE

WALL. (REPLACE GWB WITH CEMENTITIOUS BACKER BOARD

WHERE TILE OR SSM FINISH OCCURS, TYPICAL).

FINISHED FLOOR.

DEFLECTION TRACK

SOUND ATTENUATION BLANKETS

ACOUSTICAL SEALANT

CERAMIC WALL TILE OR SSM SHOWER WALL PANEL

WHERE OCCURS.

3 5/8" METAL STUD W/ 5/8" GWB ON BOTH SIDES, TYPICAL. REPLACE GWB WITH ONE LAYER

OF CEMENTITIOUS BACKER BOARD WHERE CERAMIC WALL TILE/SSM OCCURS. CARRY GWB

TO UNDERSIDE OF STRUCTURE.

(NON-RATED); STC 50

6" METAL STUD W/ 5/8" GWB ON BOTH SIDES, TYPICAL. REPLACE GWB WITH ONE LAYER OF

CEMENTITIOUS BACKER BOARD WHERE CERAMIC WALL TILE/SSM OCCURS. CARRY GWB TO

UNDERSIDE OF STRUCTURE.

(NON-RATED); STC 50

5/8" GWB LAMINATED ON EXISTING

COLUMN/WALL AT WALL TYPE F2 ONLY.

CT WALL OR SSM WALL CLADDING

CORRIDOR SIDE

C O

R R

I D

O R

S

I D

E

METAL STUD

6" HIGH X 16" GA SHEET METAL BLOCKING TO

BE LENGTH OF EQUIPMENT AND EXTEND TO

NEAREST STUD ON EITHER SIDE OF

EQUIPMENT - TYP. FOR BASE AND WALL

CABINETS, DOOR STOPS, CRASH RAIL, ETC.

WOOD BLOCKING IS NOT ACCEPTABLE.

5/8" GYPSUM WALL BOARD

EXISTING MASONRY WALL OR COLUMN

7/8" METAL HAT CHANNEL

6 HIGH X 16 GA SHEET METAL BLOCKING TO

BE LENGTH OF EQUIPMENT AND EXTEND TO

NEAREST STUD ON EITHER SIDE OF

EQUIPMENT - TYP. FOR BASE AND WALL

CABINETS, DOOR STOPS, CRASH RAIL, ETC.

WOOD BLOCKING IS NOT ACCEPTABLE.

5/8' GYPSUM WALL BOARD

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

TYPICAL DETAIL AT METAL SHEET

BLOCKING FOR INTERIOR PARTITIONS

Scale: 3" = 1'-0"

TYPICAL DETAIL AT METAL SHEET

BLOCKING FOR CONCRETE COLUMNS

Scale: 3" = 1'-0"

P

M

A-001

GTSDMM

WALL PARTITION TYPES AND

WALL BLOCKING DETAILS

FULLY SPRINKLERED

WALL/PARTITION TYPES

AutoCAD SHX Text

SCALE: 1" = 1'-0"

AutoCAD SHX Text 6"

AutoCAD SHX Text 1'

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text

SIM.

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text H, AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text M

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text Y

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text M

LIMIT OF WORK

12 1917 22

22w

16151413 20 2118

22e

17 20 211918 22

22w 22e

PHASE 1

TEMPORARY

STERILE PREP

LOCATION

PHASE 1 TEMPORARY TELEMETRY LOCATION

PHASE 1

TEMPORARY

NURSE'S STATION

LOCATION

X

W

Y

Z

AA

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. COORDINATE PHASING LIMITS AND WORK AS SHOWN ON GI102.

2. COORDINATE CONSTRUCTION ACCESS WITH VA COR IN

ACCORDANCE WITH PHASING LIMITS AS SHOWN ON GI102

BEFORE BEGINNING ANY WORK.

3. SEE ASBESTOS ABATEMENT DRAWINGS AND COORDINATE ALL

DEMOLITION WITH ABATEMENT CONTRACTOR.

4. ALL CEILINGS IN LIMIT OF WORK TO BE REMOVED EXCEPT

EXISTING NURSE'S STATION BULKHEAD AND THE EXISTING HAC

ROOM CEILINGS TO REMAIN.

5. REFER TO MECHANICAL, ELECTRICAL, PLUMBING AND FIRE

PROTECTION DRAWINGS FOR ADDITIONAL NOTES AND

LOCATION OF ADDITIONAL ITEMS TO BE REMOVED.

6. BEFORE BEGINNING WORK, THE CONTRACTOR SHALL PROVIDE

ALL NECESSARY SAFEGUARDS TO MAINTAIN ALL PARTS OF THE

PROJECT IN A SAFE CONDITION AT ALL TIMES DURING THE

PROCESS OF CONSTRUCTION AND TO PROTECT FROM DAMAGE

OF THOSE PORTIONS OF THE EXISTING BUILDING WHICH ARE TO

REMAIN. CONTRACTOR SHALL REPAIR DAMAGES CAUSED BY

DEMOLITION WORK.

7. WHERE DEMOLITION IS INDICATED ON THE DRAWINGS, OR

REQUIRED FOR INSTALLATION OF NEW CONSTRUCTION,

REMOVE EXISTING CONSTRUCTION AS REQUIRED TO PERFORM

THE WORK INDICATED. REMOVE SETTING BEDS AND INFILL

FLUSHED WITH ADJACENT CONCRETE SLAB.

8. PATCH ALL HOLES IN WALLS, FLOORS AND CEILING AND OTHER

PARTS OF THE STRUCTURE AFFECTED BY THIS CONTRACT.

HOLES SHALL BE FILLED, SEALED, PAINTED, CAULKED OR

PLUGGED NEATLY WITH ORIGINAL TYPE OF MATERIALS TO

MATCH THE EXISTING PART OF THE STRUCTURE AFFECTED.

9. REFER TO HAZARDOUS MATERIAL SURVEY REPORT. FOLLOW

PROPER ABATEMENT AND DISPOSAL PROCEDURES.

10. THE DEMOLITION PLAN DRAWINGS ARE INTENDED TO SHOW

THE GENERAL CONDITIONS, WHICH ARE EXPECTED TO OCCUR.

VERIFY ALL CONDITIONS BEFORE PROCEEDING WITH THE

DEMOLITION WORK IN ANY AREA, DEMOLITION OF DOORS,

WINDOWS, CABINETRY, FINISHES, PARTITIONS, OR ANY OTHER

NONSTRUCTURAL ITEMS REPORT SUCH DIFFERENCES TO THE

VA COR AND SECURE INSTRUCTIONS BEFORE PROCEEDING IN

THE AFFECTED AREA.

11. REMOVE ALL FURNISHINGS AND EQUIPMENT BEFORE START OF

ANY DEMOLITION WORK. COORDINATE DISPOSAL, STORAGE,

SALVAGE AND/OR RE-USE WITH THE VA COR.

12. CONTRACTOR SHALL PROVIDE ALL NECESSARY BARRICADES

AND OTHER FORMS OF PROTECTION AS REQUIRED TO

PROTECT PERSONNEL, OTHER TENANTS AND THE GENERAL

PUBLIC FROM INJURY DUE TO DEMOLITION WORK.

13. CONTRACTOR SHALL ENSURE THAT DEMOLITION WORK DOES

NOT INTERFERE WITH OR PROHIBIT THE CONTINUING

OCCUPATION OF THE ADJACENT BUILDING OPERATIONS. THIS

INCLUDES BUT IS NOT LIMITED TO THE SELECTIVE DEMOLITION

OF PARTITIONS, ELECTRICAL, PLUMBING, FIRE PROTECTION

AND MECHANICAL SYSTEMS. CONTRACTOR SHALL INFORM

OWNER (THRU THE COR) A MINIMUM OF 72 HOURS PRIOR TO

DEMOLITION ACTIVITIES THAT WILL AFFECT THE NORMAL

OPERATION OF THE BUILDING. COORDINATE A SCHEDULE WITH

THE COR.

14. INTERIOR WALLS WITHIN THE LIMITS OF CONSTRUCTION THAT

ARE TO REMAIN SHALL NOT BE DISTURBED, EXCEPT TO SCRAPE

LOOSE PAINT AND PATCH AS NECESSARY. CLEAN/RESURFACE

AND PREPARE TO RECEIVE NEW PAINT TO MATCH ADJACENT

WALLS AND FINISHES.

Scale: 1/8" = 1'-0"

OVERALL FOURTH FLOOR DEMOLITION PLAN

0 4 8 16

NORTH

PLAN

P

M

AD101

GTSDMM

OVERALL FOURTH FLOOR

DEMOLITION PLAN

FULLY SPRINKLERED

DP

DP

DP

NOURISHMENT SINK AND

CASEWORK TEMPORARILY

RELOCATED DURING PHASE 1

DEMOLISH FINISHES

TO STUD BOTH SIDES

LEGEND:

TO BE DEMOLISHED

EXISTING TO REMAIN

AutoCAD SHX Text F.C.

AutoCAD SHX Text F.C.

AutoCAD SHX Text

BLK

AutoCAD SHX Text F.C.

AutoCAD SHX Text F.C.

AutoCAD SHX Text

BLK

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BREAK RM

AutoCAD SHX Text

TEAM RM-3

AutoCAD SHX Text

MEDICINE

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

1 BED ROOM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

2 BED RM

AutoCAD SHX Text

RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

1 BED

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

BRONCHOSCOPY

AutoCAD SHX Text

TEAM -2

AutoCAD SHX Text

I.V. TEAM

AutoCAD SHX Text

STAFF RM

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CLEAN

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

DIETICIAN

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

SOILED

AutoCAD SHX Text

CONGREGATE

AutoCAD SHX Text

BATH/SHOWER

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

NURSE STATION

AutoCAD SHX Text

AND CLERK

AutoCAD SHX Text

MEDICATION

AutoCAD SHX Text

PATIENT

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

NOURISHMENT

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

SATELLITE MED

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

EQUIP

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

1 BED ATIENT

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

1 BED

AutoCAD SHX Text

ANTE RM

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

4 BED RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

2 BED RM

AutoCAD SHX Text

1 BED RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

STEP-DOWN

AutoCAD SHX Text

CLEAN

AutoCAD SHX Text C4B-7

AutoCAD SHX Text 4B-165

AutoCAD SHX Text 4B-163

AutoCAD SHX Text 4B-164

AutoCAD SHX Text 4B-161

AutoCAD SHX Text 4B-159

AutoCAD SHX Text 4B-157

AutoCAD SHX Text 4B-158

AutoCAD SHX Text

RM

AutoCAD SHX Text 4B-155

AutoCAD SHX Text 4B-148

AutoCAD SHX Text 4B-147

AutoCAD SHX Text 4B-156

AutoCAD SHX Text 4B-149

AutoCAD SHX Text 4B-143

AutoCAD SHX Text 4B-144

AutoCAD SHX Text 4B-141

AutoCAD SHX Text 4B-142

AutoCAD SHX Text 4B-139

AutoCAD SHX Text 4B-140

AutoCAD SHX Text 4B-134

AutoCAD SHX Text 4B-135

AutoCAD SHX Text 4B-136

AutoCAD SHX Text 4B-145

AutoCAD SHX Text 4B-150

AutoCAD SHX Text 4B-146

AutoCAD SHX Text 4B-130

AutoCAD SHX Text 4B-127

AutoCAD SHX Text 4B-126

AutoCAD SHX Text 4B-123

AutoCAD SHX Text 4B-153

AutoCAD SHX Text 4B-120

AutoCAD SHX Text 4B-151

AutoCAD SHX Text 4B-152

AutoCAD SHX Text C4B-4

AutoCAD SHX Text C4B-3

AutoCAD SHX Text 4B-162

AutoCAD SHX Text 4B-113

AutoCAD SHX Text 4B-111

AutoCAD SHX Text 4B-110

AutoCAD SHX Text 4B-115

AutoCAD SHX Text 4B-114

AutoCAD SHX Text 4B-116

AutoCAD SHX Text 4B-117

AutoCAD SHX Text 4B-118

AutoCAD SHX Text 4B-119

AutoCAD SHX Text 4B-121

AutoCAD SHX Text 4B-122

AutoCAD SHX Text 4B-125

AutoCAD SHX Text 4B-124

AutoCAD SHX Text 4B-129

AutoCAD SHX Text 4B-128

AutoCAD SHX Text 4B-133

AutoCAD SHX Text 4B-131

AutoCAD SHX Text 4B-132

AutoCAD SHX Text C4B-5

AutoCAD SHX Text 4B-137

AutoCAD SHX Text 4B-138

AutoCAD SHX Text 4B-169

AutoCAD SHX Text 4B-168

AutoCAD SHX Text 4A-204A

AutoCAD SHX Text 4A-206

AutoCAD SHX Text 4B-166

AutoCAD SHX Text 4B-104

AutoCAD SHX Text 4B-112

AutoCAD SHX Text 4B-105

AutoCAD SHX Text C4B-2

AutoCAD SHX Text 4B-101

AutoCAD SHX Text 4B-100

AutoCAD SHX Text 4B-102

AutoCAD SHX Text 4B-103

AutoCAD SHX Text 4B-107

AutoCAD SHX Text 4B-106

AutoCAD SHX Text

DIETICIAN

AutoCAD SHX Text

PREP AREA

AutoCAD SHX Text

PHARMACY

AutoCAD SHX Text

NURSE

AutoCAD SHX Text

MGR

AutoCAD SHX Text

MEDICINE

AutoCAD SHX Text

BRONCHOSCOPY

AutoCAD SHX Text

ELECTROPHISIOLOGY

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text

DUMB

AutoCAD SHX Text

WAITER

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

1 BED

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

4 BED

AutoCAD SHX Text

2 BED

AutoCAD SHX Text

STORAGE/OFFICE

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

CLINICAL

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

4 BED PATIENT

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

MONITORING RM

AutoCAD SHX Text

TELEMETRY

AutoCAD SHX Text 4B-154

AutoCAD SHX Text

HAC

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

SVC

AutoCAD SHX Text

BAY

AutoCAD SHX Text

MECH

AutoCAD SHX Text

SVC BAY-G

AutoCAD SHX Text

EQUIP

AutoCAD SHX Text

CONVEYOR

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

TRASH

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

LINEN

AutoCAD SHX Text

FAMILY

AutoCAD SHX Text

WAITING

AutoCAD SHX Text

VISITORS

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

PULMONARY

AutoCAD SHX Text

FELLOWS

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

TEAM ROOM

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

MALE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

MALE

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

FEMALE

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

FEMALE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

ON CALL

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

STRETCH

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

STRETCH

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text H.A.C

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

ALCOVE

AutoCAD SHX Text

ALCOVE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

ALCOVE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

WAITING

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CHIEF

AutoCAD SHX Text

ELECTROPHYSIOLOGY

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CRITICAL CARE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

EP LAB

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

RECOVERY

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text 4A-109

AutoCAD SHX Text 4A-108

AutoCAD SHX Text 4A-106

AutoCAD SHX Text 4A-105

AutoCAD SHX Text 4A-104

AutoCAD SHX Text 4A-107

AutoCAD SHX Text 4A-110

AutoCAD SHX Text 4A-102

AutoCAD SHX Text 4A-101

AutoCAD SHX Text C4A-4

AutoCAD SHX Text C4A-5

AutoCAD SHX Text 4A-145

AutoCAD SHX Text 4A-142

AutoCAD SHX Text C4A-2

AutoCAD SHX Text 4A-159

AutoCAD SHX Text 4A-162

AutoCAD SHX Text 4A-189

AutoCAD SHX Text 4A-192

AutoCAD SHX Text 4A-191A

AutoCAD SHX Text 4A-191

AutoCAD SHX Text C4A-15

AutoCAD SHX Text 4A-199

AutoCAD SHX Text 4A-196

AutoCAD SHX Text 4A-197

AutoCAD SHX Text 4A-195

AutoCAD SHX Text 4A-198

AutoCAD SHX Text 4A-152

AutoCAD SHX Text 4A-154

AutoCAD SHX Text 4A-155

AutoCAD SHX Text C4A-8

AutoCAD SHX Text 4A-147

AutoCAD SHX Text 4A-148

AutoCAD SHX Text 4A-146

AutoCAD SHX Text 4A-153

AutoCAD SHX Text 4A-151

AutoCAD SHX Text 4A-144

AutoCAD SHX Text 4A-143

AutoCAD SHX Text C4A-16

AutoCAD SHX Text 4A-194

AutoCAD SHX Text 4A-193

AutoCAD SHX Text 4A-200

AutoCAD SHX Text 4A-149

AutoCAD SHX Text 4A-150

AutoCAD SHX Text

AutoCAD SHX Text C4A-1

AutoCAD SHX Text 4A-201

AutoCAD SHX Text 4A-100

AutoCAD SHX Text 34B-8

AutoCAD SHX Text 4A-204

AutoCAD SHX Text C4B-1

AutoCAD SHX Text

4A-205 TSC-2

AutoCAD SHX Text C4A-17

AutoCAD SHX Text 4A-202

AutoCAD SHX Text 4A-203

AutoCAD SHX Text

CARDIOLOGY

AutoCAD SHX Text

SOILED

AutoCAD SHX Text

PATIENT

AutoCAD SHX Text P-3

AutoCAD SHX Text P-2

AutoCAD SHX Text P-1

AutoCAD SHX Text

CM-1

AutoCAD SHX Text

DT-1

AutoCAD SHX Text P-4

AutoCAD SHX Text

TSC-2

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

INTERN

AutoCAD SHX Text

INTERN

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

CONVEYOR

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

PRESSURE

AutoCAD SHX Text

EMERGENCY

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

CARDIAC

AutoCAD SHX Text

PULMONARY

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

IV TEAM

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 4C-140

AutoCAD SHX Text 4C-141

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

PATIENT RM-14

AutoCAD SHX Text

PATIENT RM-13

AutoCAD SHX Text

OIT

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C4A-3

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text H, AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text M

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text Y

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text M

VHARICStileR Rectangle

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

X

W

Y

Z

AA

PATIENT RM-14

PATIENT RM-13

OIT

OFFICE

TOILET

4B-110T

TOILET

4B-111T

TOILET

4B-103T

TOILET

4B-104T

TOILET

4B-107T

TOILET

4B-109T

TOILET

4B-106T

TOILET

4B-101T

TOILET

4B-100T

LACTATION

4B-108A

TOILET

4B-105T

TOILET

4B-102T

1 BED

PATIENT RM

4B-113

TOILET

4B-113T

1 BED

PATIENT RM

4B-112

TOILET

4B-112T

1 BED

PATIENT RM

4B-118

TOILET

4B-118T

1 BED

PATIENT RM

4B-117

TOILET

4B-117T

1 BED

PATIENT RM

4B-120

TOILET

4B-120T

1 BED

PATIENT RM

4B-119

TOILET

4B-119T

TOILET

4B-114T

1 BED

PATIENT RM

4B-114

1 BED ISOLATION

PATIENT RM

4B-115A

1 BED

PATIENT RM

4B-116

TOILET

4B-115TTOILET

4B-116T

TOILET

4B-121T

CONVEYOR

ELEV

ELEV

OMNI CELL

OMNI CELL

EQUIPMENT

WARMING

CRASH CART

CRASH CART

EQUIPMENT

STAFF TOILET

4B-108B

1 BED

PATIENT RM

4B-121

TRAINING/

COUNSELING

4B-122

EQUIPMENT

STORAGE

4B-124A

OIT

4B-123

SOILED

UTILITY

4B-124B

TEAM

ROOM

4B-125

CLEAN LINEN

4B-126 NURSE

MANAGER

OFFICE

4B-127A

NURSE

STATION

4B-128

STAFF TOILET

4B-129

KT / OT

OFFICE

4B-130

PHYSICAL

THERAPY

4B-132A

ELECTRICAL

4B-132B

CORRIDOR

4B-124DISPATCH

4B-124C

HAC

4B-124D

LOCKERS

4B-124E

COUNSELING

OFFICE

4B-127B

NOURISH.

4B-127C

CORRIDOR

4B-127

CORRIDOR

4B-132

MEDICATION

4B-128A

TELEMETRY

4B-128B

HUB

4B-132D

STERILE SUPPLY

4B-133

TEAM

ROOM

4B-134

EQUIP

4A-204

CM-1

DT-1

P-4

TSC-2

PRESSURE

EMERGENCY

LIMIT OF WORK

CORRIDOR

4B-150S

CORRIDOR

4B-150N

NURSE COMPUTER

NURSE COMPUTER

ISOLATION RM

VESTIBULE

4B-115

CORRIDOR

CORRIDOR

C4A-2

C4A-17

CORRIDOR

C4A-3

16151413 21191817 2222w 22e12 20

17 20 211918 2222w 22e

ELEV

LOBBY

C4A-1

ELEV

P-3

ELEV

P-2

ELEV

P-1

EWF

EWF

STAIR

ELECTRICAL

4B-132C

6" 6"

MA

TC

H

LIN

E

MA

TC

H

LIN

E

'-4

1/ 2"

'-1

1 1 /2"

FV

FV

B1

B1

B1 B1

B1

D2

D2

D2

D1

D1

B1 B1

B1

D2 B1 B1

B1

D2 B1B1

B1

D2 B1 B1

B1

D2 B1B1

B1

D2 B1

B1

D2

B1B1

B1

D2

B1

B1 B2

B1 B1

B1

D2 B1B1

B1

D2 B1 B1

B1

D2

D1

D1

B1 B1

B1

D2 B1 B1

B1

D2 B1B1

B1

D2 B1 B1

B1

D2 B1B1

B1

D2 B1B1

B1

D2 B1 B1

B1

D2 B1B1

B1

D2 B1 B1

B1

D2

D2

B1

B2

B1

D2

D1

B1

B1

B1

B1

B1

B1

B1

B1

B2

B1

B2

A2

B1 B1

B1

B1

B1

B1

C2

C2

C2

C1 B1

B1

C2

D2

D2

D2

C2

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

321 4 5 6 7

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING AND FIRE

PROTECTION DRAWINGS FOR ADDITIONAL WORK AND NOTES.

2. PROVIDE/INSTALL NEW METAL STUD WALLS/PARTITION AND/OR

FURRING AS DESIGNATED. REFER TO PARTITION TYPES AND

DETAILS.

3. FOR WALLS AND OTHER ITEMS THAT ARE TO REMAIN (WITHIN

LIMITS OF 4B) REPAINT OR PROVIDE FINISHES TO MATCH

ADJACENT FINISHES. REPAINT WINDOW AND DOOR

TRIMS/FRAMES. REPLACE BASE AS REQUIRED -- SEE FINISH

SCHEDULE REPAINT / PATCH HOLES.

4. REFER TO SHEET AI401 FOR ENLARGED PLANS. REFER TO

SHEET AI501 FOR PLAN DETAILS.

5. ALL WALL PARTITIONS ARE A1 UNLESS NOTED OTHERWISE.

6. WHERE MECHANICAL DUCTS/PENETRATIONS AND/OR

EQUIPMENT, ETC. ARE BEING REMOVED, REPLACED,

RELOCATED AND/OR RESIZED, PROVIDE NEW SEALS AND

FLASHING AS NECESSARY. PATCH HOLES RESULTING FROM

THESE EQUIPMENT REMOVAL. COORDINATE COATING WITH

MECHANICAL DRAWINGS.

7. PATCH CONCRETE FLOOR AFFECTED BY THE REMOVAL OF

EXISTING WALLS AND OTHER ITEMS. CLEAN AND PREPARE TO

RECEIVE NEW FLOOR FINISH -- SEE FINISH SCHEDULE.

8. PROVIDE NECESSARY BLOCKING AND REINFORCEMENTS FOR

CABINETS, TOILET ACCESSORIES, DISPLAY BOARD, ETC.

22'-4" 25'-1 1/2" 25'-1 1/2" 22'-4" 22'-4" 25'-1 1/2" 25'-1 1/2" 22'-4" 22'-4" 25'-1 1/2"

'-4

'-1 1/

2"

'-1 1/

2"

'-4

Scale: 1/8" = 1'-0"1 OVERALL RENOVATION PLAN 0 4 8 16

NORTH

PLAN

12'-7 1/2" 7'-1 1/2" 9'-9" 12'-9" 12'-6 1/2" 12'-7" 12'-6 1/2" 12'-9" 13'-5" 8'-6 1/2" 8'-10 1/2" 13'-7" 12'-4 1/2" 12'-1 1/2"2" 2" 4"

6'-11" 6'-5" 1'-8"

8'-9" 6'-11 1/2" 4'-11 1/2" 1'-8" 5'-0 1/2" 6'-5"

7" 6'-4 1/2" 5'-0"

1'-8" 5'-0 1/2" 6'-5"

7" 6'-4 1/2" 5'-0"

1'-8" 5'-7 1/2" 6'-5"

9 1/2" 7'-10 1/2" 9'-7" 6'-11 1/2" 5'-10"

1'-8" 4'-10 1/2" 6'-5"

7" 6'-4 1/2" 5'-10 1/2"

2'-0 1/2" 14'-3 1/2" 7'-2 1/2"

2'-11" 20'-5"

2'-7 1/2" 10'-6" 12'-7" 15'-4 1/2" 6'-0"

1'-0"

14'-3 1/2" 7'-2 1/2" 23'-2 1/2" 9'-9" 28'-11" 4'-8 1/2" 1'-3 1/2"

10'-7 1/2" 6'-5" 4'-7 1/2" 1'-8"

5'-0 1/2" 6'-5" 7"

6'-4 1/2" 5'-0" 1'-8" 5'-0 1/2"

7" 6'-4 1/2" 5'-0"

1'-8" 6'-9 1/2" 6'-5" 7'-5 1/2"

1'-8" 8'-4" 6'-5" 5'-11 1/2"

1'-8" 5'-0 1/2" 6'-5"

7" 6'-4 1/2" 5'-8 1/2"

10'-7 1/2" 11'-10 1/2" 12'-6 1/2" 12'-7" 12'-6 1/2" 12'-7" 14'-0 1/2" 8'-2" 9'-4" 13'-2" 12'-6 1/2" 11'-11" 8"

8'- 1 1

/2" 9'-

4 1 /2"

3'- 4"

'-1

1/ 2"

FV

C2

1'-0"

'-8

'-6

FV

4'- 7 1

/2" 9'-

4 1 /2"

8 1/2"

8'- 5"

4'- 5"

FV

FV

ALIGN

ALIGN

9'-

1/ 2"

5'- 1"

8'-

1/ 2"

3'-

1/ 2"

135°

135°

FV

FV

2'-11"

3'- 7"

5'- 1"

5'- 1"

FV

3'- 7"

'-2

7'-

4 1 /2"

6'- 6"

FV

FV

'-6

3'-

4"

'-4 1/

2" 3'-

4"

ALIGN

FV

FV

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

2'- 2"

'-1

1 1 /2"

'-1

0 1 /2"

2 1/2"

6'- 5 1

/2" 6'-

2"

'-4 1/

2"

'-8

2 1/2"

FV

FV

2'-10 1/2"

8 1/2"4'-

1/ 2"

5'-

'-8

FV

FV

2 1/2"

'-4

4'-

0" 5'-

2'- 0"

'-9

8'-

5"

FV

FV

ALIGN

6'- 7"

4'- 2"

2 1/2"

FV

ALIGN

45°

6'-5"7'-11 1/2"

FV

'-1

1/ 2"

FV

'-5

1/ 2"

'-8

1/ 2"

6'-5"

AI101

GTSDMM

OVERALL FOURTH FLOOR

RENOVATION PLAN

FULLY SPRINKLERED

AL

IG

N

12'-7"

2'-0 1/2"

12'-5 1/2"

ALIGN

ALIGN

B1

549'-4"

'-0

2'-

1/

2"

4'-

0"

56'-10"

277'-2"

9'- 4"

7'-

4"

FV

1 BED

PATIENT RM

4B-111

1 BED

PATIENT RM

4B-110

1 BED

PATIENT RM

4B-109

1 BED

PATIENT RM

4B-108

1 BED

PATIENT RM

4B-107

1 BED

PATIENT RM

4B-106

1 BED

PATIENT RM

4B-105

1 BED

PATIENT RM

4B-104

1 BED

PATIENT RM

4B-103

1 BED

PATIENT RM

4B-102

1 BED

PATIENT RM

4B-101

1 BED

PATIENT RM

4B-102

ADDENDUM01 2/25/25

01 01

01 01

01 01 01

Docusign Envelope ID: 9784498C-AAA0-45FB-8F34-252723D5EB3F

2/25/2025

VHARICAnderJ Rectangle

VHARICAnderJ Line

VHARICAnderJ Line

VHARICAnderJ

PATIENT RM-14

PATIENT RM-13

OIT

OFFICE

CONVEYOR

ELEV

ELEV

EQUIP

4A-204

CM-1

DT-1

P-4

TSC-2

PRESSURE

EMERGENCY

LIMIT OF WORK

NURSE COMPUTER

NURSE COMPUTER

16151413 21191817 22

22w 22e

12 20

17 20 211918 22

22w 22e

ELEV

LOBBY

C4A-1

ELEV

P-3

ELEV

P-2

ELEV

P-1

EWF

EWF

STAIR

PATIENT ROOM

CEILING LIFT

TRACK, TYPICAL

BARRIATRIC

ROOM CEILING

LIFT TRACK

ISOLATION

ROOM CEILING

LIFT TRACK

EXISTING

BULKHEAD

AROUND

NURES'

STATION TO

REMAIN

TOILET

4B-110T

TOILET

4B-111T

TOILET

4B-103T

TOILET

4B-104T

TOILET

4B-107T

TOILET

4B-109T

TOILET

4B-106T

TOILET

4B-101T

TOILET

4B-100T

LACTATION

4B-108A

TOILET

4B-105T

TOILET

4B-102T

1 BED

PATIENT RM

4B-113

TOILET

4B-113T

1 BED

PATIENT RM

4B-112

TOILET

4B-112T

1 BED

PATIENT RM

4B-118

TOILET

4B-118T

1 BED

PATIENT RM

4B-117

TOILET

4B-117T

1 BED

PATIENT RM

4B-120

TOILET

4B-120T

1 BED

PATIENT RM

4B-119

TOILET

4B-119T

TOILET

4B-114T

1 BED

PATIENT RM

4B-114

1 BED ISOLATION

PATIENT RM

4B-115A

1 BED

PATIENT RM

4B-116

TOILET

4B-115T

TOILET

4B-116T

TOILET

4B-121T

STAFF TOILET

4B-108B

1 BED

PATIENT RM

4B-121

TRAINING/

COUNSELING

4B-122

EQUIPMENT

STORAGE

4B-124A

OIT

4B-123

SOILED

UTILITY

4B-124B

TEAM

ROOM

4B-125

CLEAN LINEN

4B-126

NURSE

MANAGER

OFFICE

4B-127A

NURSE

STATION

4B-128

STAFF TOILET

4B-129

KT / OT

OFFICE

4B-130

NURSES

OFFICE

4B-131

PHYSICAL

THERAPY

4B-132A

ELECTRICAL

4B-132B

CORRIDOR

4B-124

DISPATCH

4B-124C

HAC

4B-124D

LOCKERS

4B-124E

COUNSELING

OFFICE

4B-127B

NOURISH.

4B-127C

CORRIDOR

4B-127

CORRIDOR

4B-132

MEDICATION

4B-128A

TELEMETRY

4B-128B

HUB

4B-132D

STERILE SUPPLY

4B-133

TEAM

ROOM

4B-134

CORRIDOR

4B-150S

CORRIDOR

4B-150N

1 BED

PATIENT RM

4B-110

1 BED

PATIENT RM

4B-111

1 BED

PATIENT RM

4B-103

1 BED

PATIENT RM

4B-104

1 BED

PATIENT RM

4B-107

BREAK RM

4B-108

1 BED

PATIENT RM

4B-106

1 BED

PATIENT RM

4B-109

1 BED

PATIENT RM

4B-102

1 BED

BARRIATRIC

PATIENT RM

4B-101

1 BED

PATIENT RM

4B-100

1 BED

PATIENT RM

4B-105

ELECTRICAL

4B-132C

M

J

J

J

J

M

J

M

J

M

J M

J

M

J

M

J M

J

M

J

M

J

M

J

M

J

M

J

M

J

M

J

M

J

M

J

M

J

M

J

M

J

J

J

M

J

J

TOILET

4B-100T

TYP

AI111

AI111

AI111

AI111

AI111

AI111

AI111

AI111

AI111

AI111

AI111

X

W

Y

Z

AA

SUSP. ACOUSTICAL CEILING

TILE W/ TEGULAR EDGE

3 5/8" METAL STUD W/ 5/8"

GWB ON BOTH SIDES.

ELEV.

+8'-0" AFF

ELEV.

+7'-8" AFF

EXISTING INTERSTITIAL DECK

±10'-3" A.F.F. (FIELD VERIFY)

ELEV.

+8'-0" AFF

FIRE SAFING

SEALANT ON BOTH SIDES

AND AT ALL PENETRATIONS

DEFLECTION CHANNEL

FASTENED TO STRUCTURE -

PROVIDE FIRE SEALANT

/CAULKING TO MAINTAIN FIRE

RATING OF FLOOR/WALL

ASSEMBLIES, TYP.

3 5/8" METAL STUD W/ 5/8"

GWB TO 6" ABOVE CEILING.

SUSP. ACOUSTICAL

CEILING TILE AS SCHED.

EXISTING INTERSTITIAL DECK

±10'-3" A.F.F. (FIELD VERIFY)

GWB SOFFIT

6"

MATCH EXISTING

LIGHT FIXTURE AS SCHEDULED,

SEE ELECTRICAL DRAWINGS

EXISTING ELEV.

ELEV.

+8'-0" AFF

+7'-0" AFF

6"

NOTE:EXISTING FRAMING TO REMAIN. WRAP NEW

GYPSUM BOARD ON EXISTING FRAMING

3 5/8" METAL STUD W/

5/8" GWB TO 6" ABOVE

CEILING.

SUSP. ACOUSTICAL

CEILING TILE AS

SCHEDULED

ELEV.

+8'-0" AFF

EXISTING INTERSTITIAL DECK

±10'-3" A.F.F. (FIELD VERIFY)

GWB SOFFIT

ELEV.

+7'-2" AFF

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. REFER TO MECHANICAL, ELECTRICAL,

PLUMBING, TECHNOLOGY AND FIRE

PROTECTION DRAWINGS FOR ADDITIONAL

NOTES, TYPES AND LOCATIONS OF CEILING

FIXTURES.

2. GENERAL CONTRACTOR IS RESPONSIBLE FOR

COORDINATING DESIGN AND LOCATION OF

SPRINKLER HEADS. SPRINKLER HEADS SHALL

BE CENTERED ON THE CEILING TILE, TYPICAL.

3. CONTRACTOR SHALL COORDINATE HEIGHTS OF

ALL EQUIPMENT AND PIPING IN CEILING

PLENUMS TO ACHIEVE DESIRED CEILING

HEIGHTS.

4. CORRIDORS SHALL HAVE A CEILING HEIGHT OF

8'-0" A.F.F., TYPICAL. ALL OTHER ROOMS SHALL

HAVE A CEILING HEIGHT OF 9'-0" A.F.F. UNLESS

NOTED OTHERWISE ON THE PLANS AND

DETAILS. GYPSUM WALL BOARD SOFFITS AT

ALCOVES ARE AT 7'-6" A.F.F., U.N.O.

5. PATIENT LIFT CEILING TRACK SHALL BE

CENTERED WITH THE MEDICAL HEADWALL

SYSTEM AND THE PATIENT TOILET DOORS.

COORDINATE WITH THE PATIENT LIFT

MANUFACTURER.

6. EXISTING BULKEAD/SOFFIT AROUND NURSES'

STATION TO REMAIN. REPAINT AND PATCH TO

MATCH ADJACENT WALLS.

4' LED STRIP LIGHTS

RECESSED DOWNLIGHT

2'x2' LED LIGHT FIXTURE

1'x4' LED LIGHT FIXTURE

2'x4' LED LIGHT FIXTURE

RETURN AIR / EXHAUST GRILLE

WALL MOUNTED SCONCE

SUPPLY AIR DIFFUSER

CEILING LEGEND:

1'x4' LED WALL WASHER

ABV. WALL MOUNTED CABINETS

EXTENT OF DRYWALL SOFFITS

SEE ELECTRICAL AND MECHANICAL / PLUMBING

PLANS FOR SPECIFICATIONS AND DETAILS FOR

ALL FIXTURE TYPES

F

FIRE ALARM STROBES

SPEAKER

FIRE ALARM SPEAKER

SLOT SUPPLY AIR DIFFUSER

Scale: 1/8" = 1'-0"

OVERALL FOURTH FLOOR REFLECTED CEILING PLAN

0 4 8 16

NORTH

PLAN

S

FA

S

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

S

FA

SS

S

SSS S

S

S

S

SSSSSS

S

SS

S

S

S

FFF

F

F F

F

F

F

FF

F

F

F

F

F

F

F

P

M

AI111

GTSDMM

OVERALL FOURTH FLOOR

REFLECTED CEILING PLAN

FULLY SPRINKLERED

M

J

JUNCTION BOX

MANUAL DISCONNECT

CEILING DETAIL

Scale: 1 1/2" = 1'-0"

CORRIDOR TRANSITION,TYP

CEILING DETAIL

Scale: 1 1/2" = 1'-0"

CORRIDOR ALCOVE, TYP

CEILING DETAIL

Scale: 1 1/2" = 1'-0"

NURSES' STATION

AutoCAD SHX Text (R)

AutoCAD SHX Text

(EX)

AutoCAD SHX Text (R)

AutoCAD SHX Text

(EX)

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text H, AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text M

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text Y

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text M

VHARICAnderJ Rectangle

VHARICAnderJ Line

VHARICAnderJ Line

VHARICAnderJ

EXISTING ELECTRIC WATER

COOLER TO REMAIN

HYGIENIC VINYL

WALL CLADDING/

WAINSCOT

BEHIND EWC

ELEVATOR LOBBY NIC

HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

CORNER

GUARD

CORNER

GUARD

HANDRAIL

/BUMPER

CRASH

RAIL

RUBBER BASE

CORRIDOR

4B-150N BEYOND

CORRIDOR

4B-150S BEYOND

CORNER

GUARD

HANDRAIL

/BUMPER

CRASH

RAIL

RUBBER BASE

CORRIDOR

4B-150N BEYOND

CORRIDOR

4B-150S BEYOND

CORRIDOR

4B-150N BEYOND

CORRIDOR

4B-150S BEYOND

SSM3 TRANSACTION

COUNTERTOP

RESIN PANEL

(MATCH AREA

4D NURSES'

STATION)

6"

3'- 0"

2'-

" 8 1 /2"

2'- 4"

6"

CORRIDOR

4B-150N BEYOND

CORRIDOR

4B-150S BEYOND

CORNER GUARD

HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

EXISTING SPACE

PRESSURIZATION

MONITOR TO REMAIN

CORRIDOR

4B-150S BEYOND

CORRIDOR

4B-150N BEYOND

CORNER GUARD

HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

CORRIDOR

4B-150N BEYOND

CORRIDOR

4B-150S BEYOND

HANDRAIL

/BUMPER

CRASH

RAIL

RUBBER BASE

MATCH

LINE

NURSE

COMPUTER

AREA

CORNER

GUARD

HANDRAIL

/BUMPER

CRASH

RAIL

RUBBER BASE

MATCH

LINE

2'-

EWF

2'- 6"

CORNER GUARD

HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

CORRIDOR 4B-124

HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

CORNER

GUARD

MATCH LINE

CORRIDOR 4B-127

NURSE'S STATION

4B-128

EXISTING MEDICAL GAS

SYSTEM CONTROL VALVE

LOCATION TO REMAIN

EXISTING SOFFIT TO REMAIN

EQUIPMENT NICEQUIPMENT NIC

HANDRAIL/ BUMPER

CRASH RAIL

RUBBER BASE

CORNER GUARD

MATCH LINE

6"

2'- 4"

8"

2'-

3'- 6"

EXISTING MEDICAL GAS

SYSTEM CONTROL VALVE

LOCATION TO REMAIN

EXISTING SOFFIT TO REMAIN

EQUIPMENT NIC

CORRIDOR 4B-124 HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

CORNER

GUARD

CORNER GUARD

HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

CORNER

GUARD

HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

COLUMN

BEYOND

CORNER

GUARD

4'- 0"

FIRE EXTINGUISHER CABINET

MATCH

LINE

EQUIPMENT NIC

CORRIDOR 4B-132

HANDRAIL

/BUMPER

CRASH RAIL

CORNER

GUARD

HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

CORNER

GUARD

CORRIDOR

C4A-3 BEYOND

NURSE

COMPUTER

AREAHANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

CORNER

GUARD

2'-

2'- 6"

EWF

4'- 0"

FIRE EXTINGUISHER CABINET

HANDRAIL

/BUMPER

CRASH RAIL

RUBBER BASE

MATCH LINE

EXISTING MEDICAL GAS

SYSTEM SHUT OFF

VALVE LOCATION TO

REMAIN

CORRIDOR 4B-132

MATCH LINE

MATCH

LINE

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 4/24/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

100% Construction Documents

FULLY SPRINKLERED

Scale: 1/4" = 1'-0"1 EAST ELEVATION

CORRIDOR 4B-124

Scale: 1/4" = 1'-0"2 WEST ELEVATION

CORRIDOR 4B-124

Scale: 1/4" = 1'-0"3 EAST ELEVATION

CORRIDOR 4B-127

Scale: 1/4" = 1'-0"4 WEST ELEVATION

CORRIDOR 4B-127

Scale: 1/4" = 1'-0"5 EAST ELEVATION

CORRIDOR 4B-132

Scale: 1/4" = 1'-0"6 WEST ELEVATION

CORRIDOR 4B-132

Scale: 1/4" = 1'-0"7 EAST ELEVATION

CORRIDOR C4A-3

Scale: 1/4" = 1'-0"8 WEST ELEVATION

CORRIDOR C4A-3

Scale: 1/4" = 1'-0"9 NORTH ELEVATION

CORRIDOR 4B-150N

Scale: 1/4" = 1'-0"10 SOUTH ELEVATION

CORRIDOR C4A-17

Scale: 1/4" = 1'-0"11 NORTH ELEVATION

CORRIDOR 4B-150S

Scale: 1/4" = 1'-0"12 SOUTH ELEVATION

CORRIDOR C4A-2

Scale: 1/4" = 1'-0"13 NORTH ELEVATION

CORRIDOR C4A-17

Scale: 1/4" = 1'-0"14 SOUTH ELEVATION

CORRIDOR4B-150N

Scale: 1/4" = 1'-0"15 NORTH ELEVATION

CORRIDOR 4B-150N

Scale: 1/4" = 1'-0"16 SOUTH ELEVATION

CORRIDOR 4B-150N

Scale: 1/4" = 1'-0"17 NORTH ELEVATION

CORRIDOR C4A-2

Scale: 1/4" = 1'-0"18 SOUTH ELEVATION

CORRIDOR 4B-150S

Scale: 1/4" = 1'-0"19 NORTH ELEVATION

CORRIDOR 4B-150S

Scale: 1/4" = 1'-0"20 SOUTH ELEVATION

CORRIDOR 4B-150S

AI602

/2

8/

1:

:0

PM

AI201

GTSDMM

INTERIOR CORRIDOR ELEVATIONS

FULLY SPRINKLERED

PATIENT TOILET DOOR

WITH SPLIT HEADER

FRAME TO ALLOW

PATIENT LIFT PASSAGE

SOLID SURFACE MATERIAL (SSM1)

SHOWER WALL

PATIENT LIFT (**)

HOSPITAL BED (V.V.)

MED. HEADWALL

CORNER GUARD, TYP.

2'- 0" typ patient

PATIENT LIFT (**)

HOSPITAL BED (V.V.)

MED. HEADWALLCOLUMN

BEYOND

CORNER

GUARD,

TYP.

2'- 0"

PTD SD

2'-

MARKER BOARD (V.V.)

typ patient 2'-6"2'-0"2'-0"

18" IN PATIENT ROOMS 4B-100, 114, 115A, 116 AND 4B 121

CORNER

GUARD

3'-

4'-

6 1 /4"

2'-6"

PLASTIC LAMINATE

WORK COUNTER ON

SUPPORT BRACKETS

2'-6"

PLASTIC LAMINATE

WORK COUNTER ON

SUPPORT BRACKETS

SD

PL4

PL5

MV (V.V.)

PL5

PL4

REF

(V.V.)

PTD

8'-1" 2'-6" 3'-0" 2'-6"

2'-6" 3'-0" 2'-6"4"

2'- 6"

1'- 4"

2'- 6"

9" 2'-

1'- 8"

2'- 6"

7'- 0"

PL5

PL4

4"

AI301

AI301

AI301

AI301

AI301

AI301

2'-2 1/2"

VIF

12" DEEP WALL

CABINETS W/ SLOPED

TOP, TYP.

SD

PL4

PL5

Lactation

PTD

3'-0" 4"

2'- 6"

1'- 8"

2'- 2"

2'-

2'-

0" 2'-

2" 7'-

2"

AI301

AI301

4"

9" 3'-0"

2'-4"

VIF

12" DEEP WALL

CABINETS W/ SLOPED

TOP, TYP.

2-TIER LOCKERS NIC

2-TIER LOCKERS NIC

REF (V.V.) 2'-

2'-

0" 2'-

2"

2'-0"2'-0"3'-4"

SSM2

PL5

SD

S2

1'-1"

AI301

AI301

PL3

2'-3"

12" DEEP WALL

CABINETS W/

SLOPED TOP,

TYP.

VIF

2'-

2'-

0" 2'-

2"

12" DEEP WALL

CABINETS W/ SLOPED

TOP, TYP.

FLAKE ICE MACHINE

W/ DISPENSER (V.C.)

MV (V.V.)

PL4

3'-0"

AI301

AI301

SD

PL4

PL5

PTD

2'-6" 3'-0"

1'-0"2'-3"

9"

20" DEEP SHELF

FOR MICROWAVE,

TYPICAL.

PL5

VIF

2'-4"

Med North

SSM2

SD

PL4

PL5

PL4

1'-1"

REF

(V.V.)

PTD

2'-3" 1'-6" 2'-5"

7" 2'-3"2'-3"

4"

2'- 6"

4" 1'- 4"

2'- 6"

7" 2'-

1'- 8"

2'- 6"

9"

2'-

2'-

0" 2'-

2" 9"

2'-

2'-

0" 2'-

2" 9"

AI301

AI301

AI301

12" DEEP WALL

CABINETS W/

SLOPED TOP,

TYP.

VIF

3'-2 1/2"

CORNER

GUARD,

TYP.

COLUMN

BEYOND

Med East

1'-1"

SD

S2

SSM2

PL5

PL4PL4

2'-3"

3" 1'-0" 1'-3" 2'-3"

4"

2'- 6"

4" 1'- 4"

2'- 6"

1'-3"2'-4"

2'-

2'-

0" 2'-

2" 9"

2'-

1'-

8" 2'-

6" 9"7"

AI301

AI301

AI301

AI301

PTD

PL5

12" DEEP WALL

CABINETS W/ SLOPED

TOP, TYP.

MEDICAL

DISTRIBUTION

SYSTEM (V.V.)

VIF

3'-8"

HOSPITAL BED (V.V.)

CORNER

GUARD

SD

WARDROBE

CABINET, BEYOND

ANGLED REMOVABLE

SINK APRON

CL

7'- 0"

TY

PI

CA

L

7'-4" TYPICAL (U.N.O.)

WALL MOUNTED TV

1'- 6"

PATIENT LIFT TRACK

PTD SD

S1

2'-

3'-

4'- 6"

6"

PT-4

PT-2

PT-3

PATIENT LIFT (**)

HOSPITAL BED (V.V.)

MED. HEADWALLCOLUMN BEYOND

CORNER GUARD

2'- 0"

PTDSD

2'-

MARKER BOARD (V.V.)

3'-

4'-

6"

9" 2'-

1"

4"

7'- 0"

CORNER GUARD

PNEUMATIC TUBE

STATION

SSM2

PL4PL4

PL5PL5

PL4PL4 PL4 PL4

2'-3"

1'-0" 1'-3" 2'-3"

2'-3 1/2"

AI301

AI301

AI301

AI301

2'-3"

1'-0" 1'-3" 2'-3"

1'-3"

AI301

AI301

2'-3" 1'-3" 1'-3"

AI301

AI301

4"

9" 2'-

1"

4"

3'-

4'-

6 1 /4"

7'- 0"

MARKER BOARD (V.V.)

2'-8" 2'-0" 2'-0"

CL

7'- 0"

2'-3"

2'- 4"

1'- 6"

AI301

AI301

AI301

PL5

PL4

2'-6" 2'-6"

PL5

PL4

1'-9" 2"

1'-0"

2'-6" 2'-6" 2'-11"

12" DEEP WALL

CABINETS W/ SLOPED

TOP, TYP.

4"

2'- 6"

1'- 4"

2'- 6"

9" 2'-

1'- 8"

2'- 6"

4"

12" DEEP WALL

CABINETS W/ SLOPED

TOP, TYP.

VIF

PL5PL5PL5

PL4PL4PL4

AI301

AI301

AI301

2'-5" 2'-0" 2'-0" 2'-0" 5'-5 3/4"

1'-0" 1'-0" 2'-0" 2'-0" 5"

4"

2'- 6"

4"

1'- 4"

2'- 6"

9"

VIF

2'-

1'-

8" 2'-

6" 9"

12" DEEP WALL

CABINETS W/ SLOPED

TOP, TYP.

18" DEEP

ADJUSTABLE

SHELVES ON

STANDARDS AND

BRACKETS

18" DEEP ADJUSTABLE SHELVES

ON STANDARDS AND BRACKETS

soiled utility

WSF INTEGRAL BASE

CLINICAL SINK

2'-

2'- 6"

7'-0" TYPICAL (U.N.O.)

TO OF MED. HEADWALL

SD

HOSPITAL BED

MEDICAL HEADWALL, TYP.

- SEE 1/AI502

CL

CL

INTERIOR FACE OF

EXTERIOR WALL

PATIENT LIFT TRACK

WARDROBE

CABINET, BEYOND

ANGLED REMOVABLE

SINK APRON

1'- 6"

1'- 6"

CL

7'- 0"

TY

PI

CA

L

7'-4" TYPICAL (U.N.O.)

WALL MOUNTED TV

COLUMN BEYOND

1'- 6"

7'-0" TYPICAL (U.N.O.)

TO OF MED. HEADWALL

HOSPITAL BED

MEDICAL

HEADWALL, TYP.

- SEE 1/AI502

CL

CLINTERIOR FACE OF

EXTERIOR WALL

PATIENT LIFT TRACK

1'- 6"

1'- 6"

6'-2" TYPICAL (U.N.O.)

TO OF MED. HEADWALL

HOSPITAL BED

MEDICAL HEADWALL, TYP.

- SEE 1/AI502

CL

CL

INTERIOR FACE OF

EXTERIOR WALL

PATIENT LIFT TRACK

1'- 6"

1'- 6"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 4/24/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

100% Construction Documents

FULLY SPRINKLERED

SOUTH ELEVATION

NORTH ELEVATION SOUTH ELEVATION

NORTH ELEVATION

NORTH ELEVATION

EAST ELEVATION

WEST ELEVATION

WEST ELEVATION

NORTH ELEVATION

EAST ELEVATION

NORTH ELEVATION SOUTH ELEVATION

SOUTH ELEVATION WEST ELEVATION

EAST ELEVATION

SOUTH ELEVATION

NORTH ELEVATION

Scale: 1/4" = 1'-0"

EAST ELEVATION

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

NORTH ELEVATION

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

18 12 6

22 16

171319

WEST ELEVATIONWEST ELEVATION

NORTH ELEVATION

WEST ELEVATION

BARRIATRIC RM

BARRIATRIC RM

BARRIATRIC RM

ISOLATION VESTIBULE &

PATIENT ROOM

ISOLATION RM

ISOLATION RM

TELEMETRY RM

TELEMETRY RM

LACTATION RM

BREAK RM

TYPICAL PATIENT RM

TYPICAL PATIENT RM

MEDICATION RM

STERILE SUPPLY

STERILE SUPPLY

MEDICATION RM

NOURISHMENT RM

NOURISHMENT RM

CLEAN LINEN

CLEAN LINEN

NURSE'S STATION

LOCKERS

LOCKERS

AI402

NORTH ELEVATION

Scale: 1/4" = 1'-0"

SOILED UTILITY

/2

8/

1:

:1

PM

AI202

GTSDMM

INTERIOR ELEVATIONS

FULLY SPRINKLERED

EAST ELEVATION

Scale: 1/4" = 1'-0" TYPICAL PATIENT RM

WEST ELEVATION

Scale: 1/4" = 1'-0" TYPICAL PATIENT RM

X

WALL MOUNTED TV

DIALYSIS BOX, SEE

DETAIL 7/P-501

EAST ELEVATIONWEST ELEVATION

Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" BARRIATRIC RMISOLATION RM

2'- 9"

AutoCAD SHX Text

BRASS

AutoCAD SHX Text

FAUCETS

AutoCAD SHX Text

ANTIQUE

AutoCAD SHX Text K-118-4

AutoCAD SHX Text

MODELNUMBER

AutoCAD SHX Text

TRADENAME

AutoCAD SHX Text

PRODUCT

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

BRASS

AutoCAD SHX Text

FAUCETS

AutoCAD SHX Text

ANTIQUE

AutoCAD SHX Text K-118-4

AutoCAD SHX Text

MODELNUMBER

AutoCAD SHX Text

TRADENAME

AutoCAD SHX Text

PRODUCT

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

PTD

SD

MIRROR

PTD

SD

3'-

4'- 6"

MIRROR

PTD

3'-

4'- 6"

SD

MIRROR

3'-

4'- 6"

PTD

SD

12" MIN.

17" -19" FROM

FINISHED FLOOR

TO TOP OF SEAT

DISPENSER, TYPICAL

FO

RW

AR

D

RE

AC

H

" M

AX

SI

DE

R

EA

CH

" M

AX

" M

AX

" M

AX

"-1

9"

FR

OM

FIN

. F

LR

TO

T.

O.

S

EA

T

54" MIN.

3'-0"

36" MAX. 15"

18"

TOILET PAPER

3'-0"

MI

N.

12" MIN.

TYPICAL TOILET MOUNTING HEIGHTS FOR TOILET ACCESSORIES

6" 2'-6"1'- 6"

3'- 6"

1'-8"

3'- 0"

PULL DOWN

GRAB BAR,

TYPICAL

ADA

GRAB

BARSMIRROR

PATIENT

LIFT

TRACK

SYSTEM

PTD

SD

3'-

4'- 6"

PATIENT TOILET DOOR WITH

SPLIT HEADER FRAME TO

ALLOW PATIENT LIFT PASSAGE

PATIENT

LIFT

TRACK

SYSTEM

isolation 2'-

0" 4'-

0"

PATIENT TOILET DOOR WITH

SPLIT HEADER FRAME TO

ALLOW PATIENT LIFT PASSAGE

MIRROR

ADA

GRAB

BARS

PATIENT

LIFT

TRACK

SYSTEM

4'- 6"

PTD

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project NumberCONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 4/24/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

100% Construction Documents

FULLY SPRINKLERED

WEST ELEVATION

EAST ELEVATION

WEST ELEVATION

WEST ELEVATION

EAST ELEVATION

WEST ELEVATION WEST ELEVATION

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

EAST ELEVATION

STAFF TOILET 4B-108B

STAFF TOILET 4B-129

TYPICAL PATIENT TOILET

TYPICAL PATIENT TOILETISOLATION TOILET

ISOLATION TOILET

BARIATRIC TOILET

BARIATRIC TOILET

/2

8/

1:

:2

PM

AI203

GTSDMM

INTERIOR TOILET ELEVATIONS

FULLY SPRINKLERED

RETRACTABLE

GRAB BARS

RETRACTABLE

GRAB BARS

ADA GRAB BAR

RETRACTABLE GRAB BAR

PT-4

PT-3

PT-2

PT-4

PT-3

PT-2

SOLID SURF. SS-2

SOLID SURF. SS-2

SOLID SURF. SS-2

SOLID SURF. SS-2

SOLID SURF. SS-2

PT-2

PT-4

PT-2

PT-4

PT-4

PT-3

PT-2

P-5

P-5

PT-3 PT-3

SS-2

PT-3

PT-4

PT-3

PT-2

6'-6 15/16" 8'-6" 6'-7"

5'-0 7/8" 5'-1 1/8" 5'-5 1/8" 3'-8 5/16" 3 11/16" 4'-11 1/16" 3'-0 5/8"

5'-0 1/4" 8'-6" 5'-0 1/4"

DRAWER BODY

DRAWER BODY

DRAWER BODY

SS-1 COUNTERTOP,

BACKSPLASH & APRON.

CABINET PULLS

FINISH FACE OF WALL

SEALANT, COLOR TO

MATCH ADJACENT WALL

4" TOE KICK/BASE

AS SCHEDULED

1/4" PLYWOOD BACK W/

PLAM-1

2'-1"

PLAM-1 FINISH, TYPICAL

6"

8"

SS-1 COUNTERTOP WITH

INTEGRAL SINK

REMOVABLE ANGLED FRONT

PANEL/SKIRT

NOTE: ALL EXPOSED TO VIEW

SURFACES TO HAVE PLASTIC

LAMINATE FINISH, U.O.N.

PAPER TOWEL DISPENSER (VA

FURNISHED, CONTRACTOR

INSTALLED)

MIRROR

PARTITION AS SCHEDULED

BASE AS SCEDULED

SS-1 COUNTERTOP,

BACKSPLASH AND APRON.

1/4" PLYWOOD BACK

W/ PLAM-1

4" TOE KICK/BASE

AS SCHEDULED

ADJUSTABLE SHELF (3/4"

PLYWOOD W/ PLAM-1

FINISH).

CABINET PULLS

DRAWER BODY

2'-1"

FINISH FACE OF WALL

SEALANT, COLOR TO

MATCH ADJACENT WALL

PLAM-1 FINISH, TYPICAL

SS-1 COUNTERTOP,

BACKSPLASH AND

APRON ON BLOCK

FRAMING.

1/4" PLYWOOD BACK W/

PLAM-1

4" TOE KICK/BASE

AS SCHEDULED

ADJUSTABLE SHELF (3/4"

PLYWOOD W/ PLAM-1 FINISH).

CABINET PULLS

INTEGRAL SOLID

SURFACE SINK AS

SCHEDULED

FINISH FACE OF WALL

SEALANT, COLOR TO

MATCH ADJACENT WALL

2'-1"

PLAM-1 FINISH, TYPICAL

1'-1"

ADJUSTABLE OPEN

SHELVING (3/4" PLYWOOD

W/ PLAM-1 FINISH).

1/4" PLYWOOD BACK W/

PLAM-1

PLAM-1 SLOPED TOP,

TYPICAL, U.O.N.

1'-1"

ADJUSTABLE SHELF (3/4" PLYWOOD

W/ PLAS. LAMINATE FINISH).

1/4" PLYWOOD BACK W/ PLASTIC

LAMINATE

CABINET PULLS

CONCEALED HINGES, TYP.

PLASTIC LAMINATE SLOPED

TOP, TYPICAL, U.N.O.

1'-1"

ADJUSTABLE SHELVES (3/4" PLYWOOD

W/ PLASTIC LAMINATE FINISH).

1/4" PLYWOOD BACK W/ PLASTIC LAMINATE

CABINET PULLS

PLASTIC LAMINATE SLOPED

TOP, TYPICAL, U.O.N.

CONCEALED HINGES, TYP.

1'-8"

1/4" PLYWOOD BACK W/ PLAM-1

CABINET PULLS

PLAM-1 SLOPED TOP, TYPICAL.

CONCEALED HINGES, TYP.

MICROWAVE SHELF,

(WHERE OCCURS)

1'-1"

MICROWAVE (V.V.)

RAISED COUNTER

SEE PLAN

RESIN PANEL

(MATCH AREA 4D

NURSES'

STATION)

RESIN PANEL

(MATCH AREA 4D

NURSES'

STATION)

NOTE: SS-1 COUNTERTOPS

PLAM-1 FINISHED CASEWORK

FRONT RESIN PANELS TO MATCH 4D

COORDINATE WITH COR

6" TOE KICK/BASE

HC-ACCESSIBLE

COUNTER AND WORK

SURFACE

RAISED COUNTERTOP

DRAWER BODY

DRAWER BODY

PARTIAL HEIGHT

SUPPORT WALL

BELOW (KNEE WALL)

CABINET PULLS

DRAWER BODY

1/4" PLYWOOD BACK

WITH PLASTIC

LAMINATE

RESIN FRONT PANELS

RB-2, TYPICAL

SS-1 TRANSACTION COUNTER

(3'-6" A.F.F., TYP. U.N.O.)

SS-1 ADA ACCESSIBLE

COUNTERTOP (2'-8" A.F.F.)

WALL MOUNTED PNEUMATIC TUBE

STATION W/ 6" CARRIER (SWISSLOG

TRANSLOGIC)

AI202

AI201

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

Scale: 1/2" = 1'-0"

SINK CABINET W/ REMOVABLE

ANGLED FRONT PANEL / SKIRT

Scale: 1/2" = 1'-0"

BASE CABINET DETAIL

Scale: 1/2" = 1'-0"

BASE CABINET SINK UNIT DETAIL

Scale: 1/2" = 1'-0"

BASE CABINET WITH DRAWERS

DETAIL

Scale: 1/2" = 1'-0"

UPPER CABINET DETAIL WITH

OPEN SHELF

Scale: 1/2" = 1'-0"

UPPER CABINET DETAIL WITH

OPEN ADJUSTABLE SHELVES

Scale: 1/2" = 1'-0"

UPPER CABINET DETAIL WITH

ADJUSTABLE SHELF

Scale: 1/2" = 1'-0"

UPPER CABINET DETAIL WITH

ADJUSTABLE SHELVES

AI301

GTSDMM

CASEWORK SECTIONS AND DETAILS

FULLY SPRINKLERED

AI301

AI301

AI301

AI301

Scale: 1/2" = 1'-0"

NURSE'S STATION RECEPTION

DESK

Scale: 1/2" = 1'-0"

WEST ELEVATION - NURSE'S

STATION RECEPTION DESK

Scale: 1/2" = 1'-0"

EAST ELEVATION - NURSE'S

STATION RECEPTION DESK

Scale: 1/2" = 1'-0"

NORTH ELEVATION - NURSE'S

STATION RECEPTION DESK

Scale: 1/2" = 1'-0"

SOUTH ELEVATION - NURSE'S

STATION RECEPTION DESK

RESIN PANEL

(MATCH AREA 4D

NURSE'S STATION)

SS-1 COUNTERTOPS,

TYPICAL

STAINLESS STEEL

SATIN REVEALS,

TYPICAL

RB-2 BASE, TYPICAL

PLAM-1

PLAM-1

PLAM-1

PLAM-1 PLAM-1

RB-2 BASE, TYPICAL

P

P

P

P

P-7

P

P

P-7

PREFABRICATED PLAM-1

CASEWORK, TYPICAL

1. SEE SPECIFICATIONS SECTION 09 06 00 FOR SCHEDULE

FOR FINISHES.

RB-2, TYPICAL

RB-2, TYPICAL

AutoCAD SHX Text

:PLAN VIEW (NURSES' STATION-FRONT RECEPTION DESK)

AutoCAD SHX Text

:PLAN VIEW (NURSES' STATION-BEHIND RECEPTION DESK)

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text H, AutoCAD SHX Text N

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text M

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text Y

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text H

SOILED

UTILITY

4B-124B

CORRIDOR

4B-124

HAC

4B-124D

LOCKERS

4B-124E

7 1/2"

1'-6"

1'-2 1/2"

VIF

FOW

E Q

E Q

VIF

2'-3"

1'-9"

2'-5 1/2"

2'-11 1/2"

VIF

FOW

W S

F

W S

F

W S

F

S E

A L E

D

C O

N C

W S

F

W S

F

LACTATION

4B-108A

STAFF TOILET

4B-108B

F O

W

F O

W

F O

W

WSF-1

WSF-2

P T

W S

F

TOILET

4B-105T

5'-3"

EQ

5'-0"

EQ

F O

W

F O

W

WSF-2

WSF-1

W S

F

P T

WSF-1

WSF-2

EQUIPMENT

WARMING

EQUIPMENT

CLEAN LINEN

4B-126

NURSE

MANAGER

OFFICE

4B-127A

NURSE

STATION

4B-128

STAFF TOILET

4B-129

COUNSELING

OFFICE

4B-127B

NOURISH.

4B-127C

CORRIDOR

4B-127

MEDICATION

4B-128A

TELEMETRY

4B-128B

STERILE SUPPLY

4B-133

2'-1"

12'-0 1/2"

9'-2"

9'-9 1/2"

14'-5"

1'-7"

SEE PLAN ON AI301 FOR

NURSE'S STATION

CASEWORK

DIMENSIONING

1'-6" 4'-3"

6"

2'-6"

6"

FOW

FOW

F O

W

F O

W

WSF-1

WSF-2

WSF-2

WSF-1

C

P

T

W

S

F

W

S

F

W

S

F

C P

T

W S

F

WSF-2

WSF-1

WSF-1

WSF-2

PT-1

WSF-2

TOILET

4B-114T

TOILET

4B-115T

NURSE COMPUTER

ISOLATION RM

VESTIBULE

4B-115

EWF

3'-3" 3'-6 1/2" 11"

5'-0" 2'-0"

4'-0" 4'-9"

F O

W

FOW

FOW

F O

W

F O

W

NURSE COMPUTER

P

T

W

S

F

WSF-1

WSF-2

WSF-2

WSF-1

TOILET

4B-101T

NURSE COMPUTER

EWF

DIALYSIS BOX,

6" STUD

6'-1"1'-0"

2'-4" 1'-2"1'-0"

F O

W F

O W

FOW

F O

W

F O

W

3'-0"

6" 5'-0" 6"

WSF-2

WSF-1

WSF-1

WSF-2

P T

W S

F

CORRIDOR

4B-124

HAC

4B-124D

LOCKERS

4B-124E

W S

F

W S

F

W S

F

S E

A L E

D

C O

N C

X

W

X

W

Y

Z

AA

Y

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING AND FIRE

PROTECTION DRAWINGS FOR ADDITIONAL WORK AND NOTES.

2. PROVIDE/INSTALL NEW METAL STUD WALLS/PARTITION AND/OR

FURRING AS DESIGNATED. REFER TO PARTITION TYPES AND

DETAILS.

3. FOR WALLS AND OTHER ITEMS THAT ARE TO REMAIN (WITHIN

LIMITS OF 4B) REPAINT OR PROVIDE FINISHES TO MATCH

ADJACENT FINISHES. REPAINT WINDOW AND DOOR

TRIMS/FRAMES. REPLACE BASE AS REQUIRED -- SEE FINISH

SCHEDULE REPAINT/PATCH HOLES.

4. REFER TO SHEET AI403 FOR ENLARGED TOILET PLANS AND

CORRESPONDING PARTITION TYPES. REFER TO SHEET A150#

FOR PLAN DETAILS AND CORRESPONDING PARTITION TYPES.

5. ALL WALL PARTITIONS ARE A1 UNLESS NOTED OTHERWISE.

6. WHERE MECHANICAL DUCTS/PENETRATIONS AND/OR

EQUIPMENT, ETC. ARE BEING REMOVED, REPLACED,

RELOCATED AND/OR RESIZED, PROVIDE NEW SEALS AND

FLASHING AS NECESSARY. PATCH HOLES RESULTING FROM

THESE EQUIPMENT REMOVAL. COORDINATE COATING WITH

MECHANICAL DRAWINGS.

7. PATCH CONCRETE FLOOR AFFECTED BY THE REMOVAL OF

EXISTING WALLS AND OTHER ITEMS. CLEAN AND PREPARE TO

RECEIVE NEW FLOOR FINISH -- SEE FINISH SCHEDULE.

8. PROVIDE NECESSARY BLOCKING AND REINFORCEMENTS FOR

CABI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .