About this file

This file contains plumbing construction drawings and specifications for the "Improve Patient Privacy 4B" project at Hunter Holmes McGuire VA Medical Center in Richmond, VA. The drawings show detailed plumbing plans for the fourth floor, including demolition and new construction phases for sanitary, vent, domestic water, and medical gas systems.

The plans detail a two-phase construction approach with specific requirements for plumbing fixtures, pipe sizes, and connections. Key components include waste piping systems (2"-5" sizes), vent piping, domestic cold water, hot water and hot water return systems (1/2"-3" sizes), and medical gas systems including oxygen, medical air, and vacuum. The drawings include general plumbing notes requiring conformance to VA standards, manufacturer recommendations, and local codes. The project requires water hammer arrestors, firestopping of penetrations, and coordination with existing conditions. Detailed diagrams show connections for water closets, lavatories, medical gas zone valves, and dialysis boxes. The drawings are dated June 12, 2019 and were prepared by Apogee Consulting Group for the Department of Veterans Affairs.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA-- Improve Patient Privacy 4B Project# 652-14-106, newest first.
File Type Posted
36C24625B0006 0007.docx DOCX document
RFI Reponses 3.pdf PDF
VA 10 90 00 Ceiling Mounted Patient Lift System.pdf PDF
36C24625B0006 0006.docx DOCX document
18-083 AI601.pdf PDF
04-Structural.pdf PDF
087100 Door Hardware_Add 1.pdf PDF
03 Architectural 03.20.25.pdf PDF
RFI Reponses 2.pdf PDF
Hardware Materials BOD.pdf PDF
M-601.pdf PDF
36C24625B0006 0005.docx DOCX document
36C24625B0006 0001_UPDATED.pdf PDF
36C24625B0006 0003_UPDATED.pdf PDF
36C24625B0006 0002_UPDATED.pdf PDF
36C24625B0006 0004.docx DOCX document
S04_Site Visit Sign-in Sheet_4B.pdf PDF
4B Signage Package.pdf PDF
RFI Responses_Improve 4B.pdf PDF
36C24625B0006 0003.docx DOCX document
SECTION 10 90 00 Ceiling Mounted Patient Lift System.pdf PDF
36C24625B0006 0002.docx DOCX document
36C24625B0006 0001.docx DOCX document
36C24625B0006_1.docx DOCX document
08-LOW VOLTAGE AND FIRE ALARM_R.pdf PDF
07- ELECTRICAL_r.pdf PDF
02 HA_R.pdf PDF
01-General_100 Bid Docs_r.pdf PDF
Drawings Index and Specifications Table of Contents.pdf PDF
Wage Determination.pdf PDF
03 Architectural_R.pdf PDF
Combined Specs Richmond 4B_R.pdf PDF
06-MECH_R.pdf PDF
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION.docx DOCX document
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING_CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx DOCX document
05-FP_R.pdf PDF
04 Structural_R.pdf PDF
Contractor EMR Certification Form 2023_4B.docx DOCX document
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLUMBING GENERAL NOTES

P-101

PL105

PL105

A

KEYED NOTE

FIXTURE OR

FAUCET TAG

DRAWING NUMBER

WHERE SHOWN

SECTION LETTER

DRAWING NUMBER

WHERE DRAWN

DETAIL NUMBER

DRAWING SYMBOLS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

P

M

P-001

MRASPG

PLUMBING GENERAL NOTES,

LEGEND AND ABBREVIATIONS

1 16

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE

FOR THE PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO

THE APPROVAL OF THE ARCHITECT/ENGINEER. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR

BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE

ARCHITECT/ENGINEER.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR

EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. PLUMBING FIXTURES SHALL HAVE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

8. SANITARY SEWER PIPING SHOWN IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED

OTHERWISE. SANITARY VENT PIPING SHOWN IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED

OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. PIPING PENETRATIONS THROUGH NEW OR EXISTING WALLS OR FLOORS SHALL BE SEALED TO EQUAL THE

RATING OF THE NEW OR EXISTING WALL OR FLOOR.

11. PLUMBING SYSTEM SHALL BE TESTED AS REQUIRED PER ALL LOCAL, STATE, AND NATIONAL CODES ALONG WITH

ALL VA STANDARDS.

12. COORDINATE ALL PLUMBING PIPING WITH ALL STRUCTURAL COMPONENTS.

13. DISINFECT THE DOMESTIC WATER SYSTEM IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL CODES

ALONG WITH ALL VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. CONTRACTOR SHALL

COORDINATE ROUTING OF ALL PIPING WITH EXISTING CONDITIONS AND SHALL PROVIDE ANY NECESSARY

OFFSETS, REROUTING, ETC. REQUIRED FOR A COMPLETE AND COORDINATED INSTALLATION.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE WORKING PLUMBING SYSTEM.

DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING

SYSTEMS.

17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE OWNER 1 WEEK IN

ADVANCE.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS

CONTRACT, UNLESS NOTED OTHERWISE.

19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF

PROJECT.

20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

21. PIPES SHALL NOT BE ROUTED ABOVE TELECOM OR ELECTRICAL ROOMS.

PIPING DOWN

PIPING UP

TEE UP

TEE DOWN

EXISTING PIPING TO REMAIN

BALL VALVE

CHECK VALVE

LIMITS OF DEMOLITION

POINT OF CONNECTION TO EXISTING

DCW

DHW

DHWR

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

PIPING TO BE DEMOLISHED

SAN

SANITARY SEWER

V

SANITARY VENT

BALANCING VALVE

WALL CLEAN OUT (WCO)

A/E ARCHITECT / ENGINEER

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AG AIR GAP

AP ACCESS PANEL

ASME AMERICAN SOCIETY

MECHANICAL ENGINEERS

ASPE AMERICAN SOCIETY

PLUMBING ENGINEERS

CI CAST IRON

CO CLEANOUT

CS CLINICAL SINK

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER

RETURN

DN DOWN

DWG DRAWING

EL ELEVATION

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYE WASH STATION

EX EXISTING

F FAHRENHEIT

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FU FIXTURE UNITS

GAL GALLON

GCO GRADE CLEANOUTS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HB HOSE BIBB

HD HUB DRAIN

HP HORSEPOWER

HS HAND SINK

HWCP HOT WATER CIRCULATING

PUMP

HWP HOT WATER PUMP

INV INVERT

IPC INTERNATIONAL PLUMBING

CODE

LAV LAVATORY

M METER

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NOM. NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

PDI PLUMBING AND DRAINAGE

INSTITUTE

PSIG POUNDS PER SQUARE INCH

GAUGE

SAN SANITARY SEWER

SQFT SQUARE FEET

SS STAINLESS STEEL

TD TEMPERATURE DIFFERENCE

TD TRENCH DRAIN

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING

VALVE

TP TRAP PRIMER

TYP. TYPICAL

V VENT

VS VENT STACK

VTR VENT THROUGH ROOF

WC WATER CLOSET

WCO WALL CLEANOUT

WH WALL HYDRANT

WH WATER HEATER

WHA WATER HAMMER ARRESTER

WS WASTE STACK

CA

COMPRESSED AIR

O

OXYGEN

VAC

VACUUM

AutoCAD SHX Text

PLUMBING LEGEND

AutoCAD SHX Text

PLUMBING ABBREVIATIONS

sharmon Model

VHARICStileR Text Box P-103

VHARICStileR Text Box

WATER CLOSET, FLOOR MTD, BACK OUTLET

VHARICStileR Text Box

WATER CLOSET, FLOOR MTD, BACK OUTLET

VHARICStileR Text Box

YES

VHARICStileR Text Box

YES

VHARICStileR Text Box

YES

VHARICStileR Text Box P-410, P-510

5" SAN

4" SAN

1-1/2" SAN

5" SAN

1-1/2" SAN

4" SAN

4" SAN

4" SAN

1-1/2" SAN

1-1/2" SAN

4" SAN

4" SAN

2" SAN

1-1/2" SAN

3" SAN

4" SAN

4" SAN

3" SAN

4" SAN

1-1/2" SAN

4" SAN

1-1/2" SAN

2" SAN

4" SAN

4" SAN

1-1/2" SAN

4" SAN

4" SAN

1-1/2" SAN

4" SAN

4" SAN

3" SAN

1-1/2" SAN

3" SAN

5"

4"

2"

2"

P-401

P-101 P-528

P-528

P-401

P-101

P-528

P-101

P-401

P-528

P-101

P-401

P-101

P-401

P-528 P-528

P-101

P-401

P-528

P-101P-401

P-528

P-101

P-401

P-101

P-401

P-528 P-401

P-101

P-528 P-528

P-101

P-401

P-101

P-401

P-528

P-401 P-401

P-401

P-401

P-401

P-401

P-101

P-101

P-401

P-401

P-502

P-604

P-502

P-505

(TYP.)

(TYP.)

(TYP.)

16151413 21191817 22

22w 22e

12 20

1-1/2" SAN

STORAGE

STORAGE

BREAK RM

PATIENT RM

TOILET

TOILET

UTILITY

PATIENT RM

EQUIP

TOILET

RM

TOILET

SECURITY

1 BED ATIENT

TOILET

1 BED

ANTE RM

TOILET

4 BED RM

TOILET

2 BED RM

1 BED RM

TOILET

CORRIDOR

STEP-DOWN

CLEAN

C4B-7

4B-163

4B-164

4B-161

4B-159

4B-157

4B-158

RM

4B-155

4B-148

4B-147

4B-156

4B-143

4B-144

4B-141

4B-142

4B-139

4B-140

4B-169

4B-168

4A-206

4B-166

4B-104

1 BED

PATIENT RM

4 BED

2 BED

STORAGE/OFFICE

PATIENT RM

4B-154

HSK

SATELLITE MED

4B-162

PREP AREA

PHARMACY

OFFICE

TOILET

PATIENT RM

PATIENT RM

TOILET

TOILET

PATIENT RM

CORRIDOR

OFFICE

TEAM RM-3

MEDICINE

1 BED ROOM

TOILET

TOILET

2 BED RM

RM

TOILET

SHOWER

TOILET

1 BED

TOILET

PATIENT RM

PATIENT RM

TOILET

TOILET

PATIENT RM

TOILET

PATIENT RM

PATIENT RM

TOILET

IV TEAM

STORAGE

CLOSET

CORRIDOR

BRONCHOSCOPY

I.V. TEAM

STAFF RM

OFFICE

CLEAN

UTILITY

DIETICIAN

UTILITY

SOILED

CONGREGATE

BATH/SHOWER

CORRIDOR

NURSE STATION

AND CLERK

MEDICATION

PATIENT

TOILET

REST RM

NOURISHMENT

KITCHEN

CORRIDOR

OFFICE

TOILET

4C-140

C4B-6

4C-141

4B-134

4B-135

4B-136

4B-150

4B-146

4B-130

4B-127

4B-126

4B-123

4B-153

4B-120

4B-151

4B-152

C4B-4

C4B-3

4B-113

4B-111

4B-110

4B-115

4B-114

4B-116

4B-117

4B-118

4B-119

4B-121

4B-122

4B-125

4B-124

4B-129

4B-128

4B-133

4B-131

4B-132

C4B-5

4B-137

4B-138

4B-112

4B-105

C4B-2

4B-101

4B-100

4B-102

4B-103

4B-107

4B-106

DIETICIAN

NURSE

MGR

BRONCHOSCOPY

ELEC

REGISTERED

CLINICAL

OFFICE

PATIENT RM

4 BED PATIENT

OFFICE

MONITORING RM

TELEMETRY

TEAM -2

4B-145

MEDICINE

OFFICE

SHOWER

4B-165

ELEC

SVC

BAY

MECH

SVC BAY-G

EQUIP

CONVEYOR

OFFICE

TRASH

ELEV

LOBBY

STAIR

LINEN

FAMILY

WAITING

VISITORS

TOILET

PULMONARY

FELLOWS

MEDICAL

TEAM ROOM

OFFICE

MALE

TOILET

MALE

LOCKER

FEMALE

LOCKER

FEMALE

TOILET

ON CALL

STRETCH

TOILET

STRETCH

OFFICE

TOILET

H.A.C

SHOWER

STORAGE

CORRIDOR

OFFICE

ELECTROPHYSIOLOGY

OFFICE

TOILET

CRITICAL CARE

STORAGE

EP LAB

UTILITY

RECOVERY

CONTROL

4A-109

4A-108

4A-106

4A-105

4A-104

4A-107

4A-102

4A-101

C4A-5

4A-145

C4A-15

4A-199

4A-196

4A-197

4A-195

4A-198

4A-152

C4A-8

4A-147

4A-148

4A-146

4A-151

4A-144

4A-143

4A-194

4A-193

4A-200

4A-149

4A-150

C4A-1

4A-201

4A-100

4A-204

4A-205 TSC-2

4A-202

4A-203

CARDIOLOGY

SOILED

P-3

P-2

P-1

CM-1

DT-1

P-4

TSC-2

INTERN

INTERN

ELEV

ELEV

ELEV

CONVEYOR

ELEV

PRESSURE

EMERGENCY

ELEV

CARDIAC

PULMONARY

OFFICE

OFFICE

CORRIDOR

C4A-3

CORRIDOR

C4A-2

CORRIDOR

C4A-17

4A-204A

STORAGE

ELECTROPHISIOLOGY

X

W

Y

Z

AA

PLUMBING DEMOLITION INTERSTITIAL PLAN - SANITARY AND VENT - PHASE 1

1/8" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. DEMOLISH FIXTURE AND ALL ASSOCIATED

PIPING TO LOCATION INDICATED.

2. DEMOLISH WASTE PIPING AND SUPPORTS

COMPLETE.

3. DEMOLISH VENT PIPING AND SUPPORTS

COMPLETE.

4. TEMPORARY NOURISHMENT STATION DURING

PHASE 1 CONSTRUCTION.

5. SANITARY PIPE AND VENT PIPE FOR MOP SINK

SHALL BE DEMOLISHED AND REPLACE

IMMEDIATELY TO REMAIN IN SERVICE.

6. CAP PIPE HERE.

P

M

PD101

MRASPG

PLUMBING FOURTH FLOOR

DEMOLITION PLAN - SANITARY AND VENT -

PHASE 1

2 16

0 4 8 16

NORTH

PLAN

A. COORDINATE PHASING LIMITS AS SHOWN

ON GI102.

B. REFER TO HA PLANS FOR INDICATION OF

HAZARDOUS MATERIALS PRIOR TO

STARTING WORK.

C. DEMOLITION WORK SHALL BE DONE SUCH

THAT ALL THE PIPES, HANGERS, SUPPORTS,

AND VALVES ARE REMOVED ALL THE WAY

TO THE MAINS. REMOVE ALL ITEMS TO

ENSURE NOTHING IS LEFT ABANDONED IN

PLACE.

D. SANITARY PIPE BELOW SLAB AND VENT

PIPING IN INTERSTITIAL ABOVE.

AutoCAD SHX Text X sharmon Model

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

4" SAN

1-1/2" SAN

4" SAN

4" SAN

2" SAN

4" SAN

4" SAN

4" SAN 4" SAN

1-1/2" SAN

4" SAN

2" SAN

1-1/2" SAN

4" SAN

1-1/2" SAN

4" SAN

1-1/2" SAN

2"

3"

P-401

P-401

P-401

P-401

P-401

P-401

P-401

P-401

P-528

P-528

P-528

P-528

P-528 P-528

P-528

P-528

P-101

P-101

P-101

P-101

P-101

P-101

P-101

P-101

(TYP.)

(TYP.)

(TYP.)

16151413 21191817 22

22w 22e

12 20

STORAGE

STORAGE

BREAK RM

PATIENT RM

TOILET

TOILET

UTILITY

PATIENT RM

EQUIP

TOILET

RM

TOILET

SECURITY

1 BED ATIENT

TOILET

1 BED

ANTE RM

TOILET

4 BED RM

TOILET

2 BED RM

1 BED RM

TOILET

CORRIDOR

STEP-DOWN

CLEAN

C4B-7

4B-163

4B-164

4B-161

4B-159

4B-157

4B-158

RM

4B-155

4B-148

4B-147

4B-156

4B-143

4B-144

4B-141

4B-142

4B-139

4B-140

4B-169

4B-168

4A-206

4B-166

4B-104

1 BED

PATIENT RM

4 BED

2 BED

STORAGE/OFFICE

PATIENT RM

4B-154

HSK

SATELLITE MED

4B-162

PREP AREA

PHARMACY

OFFICE

SHOWER

4B-165

ELEC

SVC

BAY

MECH

SVC BAY-G

EQUIP

CONVEYOR

OFFICE

TRASH

ELEV

LOBBY

STAIR

LINEN

FAMILY

WAITING

VISITORS

TOILET

PULMONARY

FELLOWS

MEDICAL

TEAM ROOM

OFFICE

MALE

TOILET

MALE

LOCKER

FEMALE

LOCKER

FEMALE

TOILET

ON CALL

STRETCH

TOILET

STRETCH

OFFICE

TOILET

H.A.C

SHOWER

STORAGE

CORRIDOR

OFFICE

ELECTROPHYSIOLOGY

OFFICE

TOILET

CRITICAL CARE

STORAGE

EP LAB

UTILITY

RECOVERY

CONTROL

4A-109

4A-108

4A-106

4A-105

4A-104

4A-107

4A-102

4A-101

C4A-5

4A-145

C4A-15

4A-199

4A-196

4A-197

4A-195

4A-198

4A-152

C4A-8

4A-147

4A-148

4A-146

4A-151

4A-144

4A-143

4A-194

4A-193

4A-200

4A-149

4A-150

C4A-1

4A-201

4A-100

4A-204

4A-205 TSC-2

4A-202

4A-203

CARDIOLOGY

SOILED

P-3

P-2

P-1

CM-1

DT-1

P-4

TSC-2

INTERN

INTERN

ELEV

ELEV

ELEV

CONVEYOR

ELEV

PRESSURE

EMERGENCY

ELEV

CARDIAC

PULMONARY

OFFICE

OFFICE

CORRIDOR

C4A-3

CORRIDOR

C4A-2

CORRIDOR

C4A-17

1 BED

PATIENT RM

4B-110

TOILET

4B-110T

1 BED

PATIENT RM

4B-111

TOILET

4B-111T

1 BED

PATIENT RM

4B-103

TOILET

4B-103T

1 BED

PATIENT RM

4B-104

TOILET

4B-104T

1 BED

PATIENT RM

4B-107

BREAK RM

4B-108

TOILET

4B-107T

TOILET

4B-109T

1 BED

PATIENT RM

4B-106

TOILET

4B-106T

1 BED

PATIENT RM

4B-109

1 BED

PATIENT RM

4B-102

1 BED

BARRIATRIC

PATIENT RM

4B-101

1 BED

PATIENT RM

4B-100

LACTATION

4B-108A

1 BED

PATIENT RM

4B-105

TOILET

4B-105T

TOILET

4B-102T

STAFF TOILET

4B-108B

OIT

4B-123

NURSE

STATION

4B-128

STAFF TOILET

4B-129

KT / OT

OFFICE

4B-130

NURSES

OFFICE

4B-131

PHYSICAL

THERAPY

4B-132A

LOCKERS

4B-124E

NOURISH.

4B-127C

CORRIDOR

4B-127

MEDICATION

4B-128A

TELEMETRY

4B-128B

STERILE

SUPPLY

4B-133

ELECTRICAL

4B-132B

CORRIDOR

4B-132

HUB

4B-132D

ELECTRICAL

4B-132C

TOILET

4B-101T

TOILET

4B-100T

CORRIDOR

4B-150N

4A-204A

STORAGE

ELECTROPHISIOLOGY

X

W

Y

Z

AA

PLUMBING DEMOLITION INTERSTITIAL PLAN - SANITARY AND VENT - PHASE 2

1/8" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. DEMOLISH FIXTURE AND ALL ASSOCIATED

PIPING TO LOCATION INDICATED.

2. DEMOLISH WASTE PIPING AND SUPPORTS

COMPLETE.

3. DEMOLISH VENT PIPING AND SUPPORTS

COMPLETE.

P

M

PD102

MRASPG

PLUMBING FOURTH FLOOR

DEMOLITION PLAN - SANITARY AND VENT -

PHASE 2

3 16

0 4 8 16

NORTH

PLAN

A. COORDINATE PHASING LIMITS AS SHOWN

ON GI102.

B. REFER TO HA PLANS FOR INDICATION OF

HAZARDOUS MATERIALS PRIOR TO

STARTING WORK.

C. DEMOLITION WORK SHALL BE DONE SUCH

THAT ALL THE PIPES, HANGERS, SUPPORTS,

AND VALVES ARE REMOVED ALL THE WAY

TO THE MAINS. REMOVE ALL ITEMS TO

ENSURE NOTHING IS LEFT ABANDONED IN

PLACE.

D. SANITARY PIPE BELOW SLAB AND VENT

PIPING IN INTERSTITIAL ABOVE.

AutoCAD SHX Text X sharmon Model

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

VHARICStileR Rectangle

3"

2"1/2"

3"

1-1/2"1/2"

2"

1/2"1/2"

2"

1"

(TYP.)

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

16151413 21191817 22

22w 22e

17 20 211918 22

22w 22e

ELEC

SVC

BAY

MECH

SVC BAY-G

EQUIP

CONVEYOR

OFFICE

TRASH

ELEV

LOBBY

STAIR

LINEN

FAMILY

WAITING

VISITORS

TOILET

OFFICE

MALE

TOILET

MALE

LOCKER

FEMALE

LOCKER

FEMALE

TOILET

ON CALL

TOILET

OFFICE

H.A.C

SHOWER

STORAGE

CORRIDOR

OFFICE

ELECTROPHYSIOLOGY

OFFICE

TOILET

CRITICAL CARE

STORAGE

EP LAB

UTILITY

RECOVERY

CONTROL

4A-109

4A-108

4A-106

4A-105

4A-104

4A-107

4A-110

4A-102

4A-101

C4A-5

4A-145

4A-142

4A-199

4A-196

4A-198

4A-152

4A-147

4A-148

4A-146

4A-151

4A-144

4A-143

4A-200

4A-149

4A-150

C4A-1

4A-201

4A-100

4A-204

4A-205 TSC-2

4A-202

4A-203

CARDIOLOGY

SOILED

P-3

P-2

P-1

CM-1

DT-1

P-4

TSC-2

INTERN

INTERN

ELEV

ELEV

ELEV

CONVEYOR

ELEV

PRESSURE

EMERGENCY

ELEV

CARDIAC

CORRIDOR

C4A-3

CORRIDOR

C4A-2

CORRIDOR

C4A-17

STORAGE

STORAGE

STORAGE

BREAK RM

PATIENT RM

TOILET

TOILET

UTILITY

PATIENT RM

EQUIP

TOILET

RM

TOILET

SECURITY

1 BED ATIENT

TOILET

1 BED

ANTE RM

TOILET

4 BED RM

TOILET

2 BED RM

1 BED RM

TOILET

CORRIDOR

STEP-DOWN

CLEAN

C4B-7

4B-163

4B-164

4B-161

4B-159

4B-157

4B-158

RM

4B-155

4B-148

4B-147

4B-156

4B-143

4B-144

4B-141

4B-142

4B-139

4B-140

4B-169

4B-168

4A-204A

4A-206

4B-166

4B-104

ELECTROPHISIOLOGY

1 BED

PATIENT RM

4 BED

2 BED

STORAGE/OFFICE

PATIENT RM

4B-154

HSK

SATELLITE MED

4B-162

PREP AREA

PHARMACY

OFFICE

TOILET

PATIENT RM

PATIENT RM

TOILET

TOILET

PATIENT RM

CORRIDOR

OFFICE

TEAM RM-3

MEDICINE

1 BED ROOM

TOILET

TOILET

2 BED RM

RM

TOILET

SHOWER

TOILET

1 BED

TOILET

PATIENT RM

PATIENT RM

TOILET

TOILET

PATIENT RM

TOILET

PATIENT RM

PATIENT RM

TOILET

IV TEAM

STORAGE

CLOSET

CORRIDOR

BRONCHOSCOPY

I.V. TEAM

STAFF RM

OFFICE

CLEAN

UTILITY

DIETICIAN

UTILITY

SOILED

CONGREGATE

BATH/SHOWER

CORRIDOR

NURSE STATION

AND CLERK

MEDICATION

PATIENT

TOILET

REST RM

NOURISHMENT

KITCHEN

CORRIDOR

OFFICE

TOILET

4C-140

C4B-6

4C-141

4B-134

4B-135

4B-136

4B-150

4B-146

4B-130

4B-127

4B-126

4B-123

4B-153

4B-120

4B-151

4B-152

C4B-4

C4B-3

4B-113

4B-111

4B-110

4B-115

4B-114

4B-116

4B-117

4B-118

4B-119

4B-121

4B-122

4B-125

4B-124

4B-129

4B-128

4B-133

4B-131

4B-132

C4B-5

4B-137

4B-138

4B-112

4B-105

C4B-2

4B-101

4B-100

4B-102

4B-103

4B-107

4B-106

DIETICIAN

NURSE

MGR

BRONCHOSCOPY

ELEC

REGISTERED

CLINICAL

OFFICE

PATIENT RM

4 BED PATIENT

OFFICE

MONITORING RM

TELEMETRY

TEAM -2

4B-145

MEDICINE

OFFICE

SHOWER

4B-165

ELEC

SVC

BAY

MECH

SVC BAY-G

EQUIP

CONVEYOR

OFFICE

TRASH

ELEV

LOBBY

STAIR

LINEN

FAMILY

WAITING

VISITORS

TOILET

OFFICE

MALE

TOILET

MALE

LOCKER

FEMALE

LOCKER

FEMALE

TOILET

ON CALL

TOILET

OFFICE

H.A.C

SHOWER

STORAGE

CORRIDOR

OFFICE

ELECTROPHYSIOLOGY

OFFICE

TOILET

CRITICAL CARE

STORAGE

EP LAB

UTILITY

RECOVERY

CONTROL

4A-109

4A-108

4A-106

4A-105

4A-104

4A-107

4A-110

4A-102

4A-101

C4A-5

4A-145

4A-142

4A-199

4A-196

4A-198

4A-152

4A-147

4A-148

4A-146

4A-151

4A-144

4A-143

4A-200

4A-149

4A-150

C4A-1

4A-201

4A-100

4A-204

4A-205 TSC-2

4A-202

4A-203

CARDIOLOGY

SOILED

P-3

P-2

P-1

CM-1

DT-1

P-4

TSC-2

INTERN

INTERN

ELEV

ELEV

ELEV

CONVEYOR

ELEV

PRESSURE

EMERGENCY

ELEV

CARDIAC

CORRIDOR

C4A-3

CORRIDOR

C4A-2

CORRIDOR

C4A-17

X

W

Y

Z

AA

PLUMBING FOURTH FLOOR DEMOLITION PLAN - DOMESTIC WATER - PHASE 1

1/8" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. DEMOLISH DOMESTIC HOT WATER, COLD

WATER, AND RETURN WATER PIPING BACK

TO POINT OF DEMOLITION.

2. DEMOLISH DOMESTIC WATER LINES BACK

TO MAIN.

3. DOMESTIC WATER SHALL BE DEMOLISHED

AND REPLACED IMMEDIATELY TO REMAIN

IN SERVICE.

A. COORDINATE PHASING LIMITS AS SHOWN

ON GI102.

B. REFER TO HA PLANS FOR INDICATION OF

HAZARDOUS MATERIALS PRIOR TO

STARTING WORK.

C. DOMESTIC WATER PIPING IN INTERSTITIAL

SPACE FLOOR PLAN SHOWN FOR CLARITY.

P

M

PD103

MRASPG

PLUMBING FOURTH FLOOR

DEMOLITION PLAN - DOMESTIC WATER -

PHASE 1

4 16

0 4 8 16

NORTH

PLAN

AutoCAD SHX Text X sharmon Model

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

1/2"

2"

3/4"1"

1-1/4"

2-1/2"

1-1/2"

2-1/2"

2"

3"

1/2"

1-1/2"

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

(TYP.)

16151413 21191817 22

22w 22e

17 20 211918 22

22w 22e

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

STORAGE

STORAGE

STORAGE

BREAK RM

PATIENT RM

TOILET

TOILET

UTILITY

PATIENT RM

EQUIP

TOILET

RM

TOILET

SECURITY

1 BED ATIENT

TOILET

1 BED

ANTE RM

TOILET

4 BED RM

TOILET

2 BED RM

1 BED RM

TOILET

CORRIDOR

STEP-DOWN

CLEAN

C4B-7

4B-163

4B-164

4B-161

4B-159

4B-157

4B-158

RM

4B-155

4B-148

4B-147

4B-156

4B-143

4B-144

4B-141

4B-142

4B-139

4B-140

4B-169

4B-168

4A-204A

4A-206

4B-166

4B-104

ELECTROPHISIOLOGY

1 BED

PATIENT RM

4 BED

2 BED

STORAGE/OFFICE

PATIENT RM

4B-154

HSK

SATELLITE MED

4B-162

PREP AREA

PHARMACY

OFFICE

SHOWER

4B-165

ELEC

SVC

BAY

MECH

SVC BAY-G

EQUIP

CONVEYOR

OFFICE

TRASH

ELEV

LOBBY

STAIR

LINEN

FAMILY

WAITING

VISITORS

TOILET

OFFICE

MALE

TOILET

MALE

LOCKER

FEMALE

LOCKER

FEMALE

TOILET

ON CALL

TOILET

OFFICE

H.A.C

SHOWER

STORAGE

CORRIDOR

OFFICE

ELECTROPHYSIOLOGY

OFFICE

TOILET

CRITICAL CARE

STORAGE

EP LAB

UTILITY

RECOVERY

CONTROL

4A-109

4A-108

4A-106

4A-105

4A-104

4A-107

4A-110

4A-102

4A-101

C4A-5

4A-145

4A-142

4A-199

4A-196

4A-198

4A-152

4A-147

4A-148

4A-146

4A-151

4A-144

4A-143

4A-200

4A-149

4A-150

C4A-1

4A-201

4A-100

4A-204

4A-205 TSC-2

4A-202

4A-203

CARDIOLOGY

SOILED

P-3

P-2

P-1

CM-1

DT-1

P-4

TSC-2

INTERN

INTERN

ELEV

ELEV

ELEV

CONVEYOR

ELEV

PRESSURE

EMERGENCY

ELEV

CARDIAC

CORRIDOR

C4A-3

CORRIDOR

C4A-2

CORRIDOR

C4A-17

1 BED

PATIENT RM

4B-110

TOILET

4B-110T

1 BED

PATIENT RM

4B-111

TOILET

4B-111T

1 BED

PATIENT RM

4B-103

TOILET

4B-103T

1 BED

PATIENT RM

4B-104

TOILET

4B-104T

1 BED

PATIENT RM

4B-107

BREAK RM

4B-108

TOILET

4B-107T

TOILET

4B-109T

1 BED

PATIENT RM

4B-106

TOILET

4B-106T

1 BED

PATIENT RM

4B-109

1 BED

PATIENT RM

4B-102

1 BED

BARRIATRIC

PATIENT RM

4B-101

1 BED

PATIENT RM

4B-100

LACTATION

4B-108A

1 BED

PATIENT RM

4B-105

TOILET

4B-105T

TOILET

4B-102T

STAFF TOILET

4B-108B

OIT

4B-123

NURSE

STATION

4B-128

STAFF TOILET

4B-129

KT / OT

OFFICE

4B-130

NURSES

OFFICE

4B-131

PHYSICAL

THERAPY

4B-132A

LOCKERS

4B-124E

NOURISH.

4B-127C

CORRIDOR

4B-127

MEDICATION

4B-128A

TELEMETRY

4B-128B

STERILE

SUPPLY

4B-133

ELECTRICAL

4B-132B

CORRIDOR

4B-132

HUB

4B-132D

ELECTRICAL

4B-132C

TOILET

4B-101T

TOILET

4B-100T

CORRIDOR

4B-150N

X

W

Y

Z

AA

PLUMBING FOURTH FLOOR DEMOLITION PLAN - DOMESTIC WATER - PHASE 2

1/8" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. DEMOLISH DOMESTIC HOT WATER, COLD

WATER, AND RETURN WATER PIPING BACK

TO POINT OF DEMOLITION.

2. DEMOLISH DOMESTIC WATER LINES BACK

TO MAIN.

A. COORDINATE PHASING LIMITS AS SHOWN

ON GI102.

B. REFER TO HA PLANS FOR INDICATION OF

HAZARDOUS MATERIALS PRIOR TO

STARTING WORK.

C. DOMESTIC WATER PIPING IN INTERSTITIAL

SPACE FLOOR PLAN SHOWN FOR CLARITY.

P

M

PD104

MRASPG

PLUMBING FOURTH FLOOR

DEMOLITION PLAN - DOMESTIC WATER -

PHASE 2

5 16

0 4 8 16

NORTH

PLAN

AutoCAD SHX Text X sharmon Model

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

3/4"

3/4"

1-1/2"

1"

1"

1-1/2"

3/4"

1"

1-1/2"

1"

1-1/2"

3/4"

1-1/2"

(TYP.)

MV

MA

O

MV

MA

O

MV

MA

O

MV

MA

O

MV

MA

O

MV

MA

O

MV

MA

O

MV

MA

O

16151413 21191817 22

22w 22e

STORAGE

STORAGE

STORAGE

BREAK RM

PATIENT RM

TOILET

TOILET

UTILITY

PATIENT RM

EQUIP

TOILET

RM

TOILET

SECURITY

1 BED ATIENT

TOILET

1 BED

ANTE RM

TOILET

4 BED RM

TOILET

2 BED RM

1 BED RM

TOILET

CORRIDOR

STEP-DOWN

CLEAN

C4B-7

4B-163

4B-164

4B-161

4B-159

4B-157

4B-158

RM

4B-155

4B-148

4B-147

4B-156

4B-143

4B-144

4B-141

4B-142

4B-139

4B-140

4B-169

4B-168

4A-204A

4A-206

4B-166

4B-104

ELECTROPHISIOLOGY

1 BED

PATIENT RM

4 BED

2 BED

STORAGE/OFFICE

PATIENT RM

4B-154

HSK

SATELLITE MED

4B-162

PREP AREA

PHARMACY

OFFICE

TOILET

PATIENT RM

PATIENT RM

TOILET

TOILET

PATIENT RM

CORRIDOR

OFFICE

TEAM RM-3

MEDICINE

1 BED ROOM

TOILET

TOILET

2 BED RM

RM

TOILET

SHOWER

TOILET

1 BED

TOILET

PATIENT RM

PATIENT RM

TOILET

TOILET

PATIENT RM

TOILET

PATIENT RM

PATIENT RM

TOILET

IV TEAM

STORAGE

CLOSET

CORRIDOR

BRONCHOSCOPY

I.V. TEAM

STAFF RM

OFFICE

CLEAN

UTILITY

DIETICIAN

UTILITY

SOILED

CONGREGATE

BATH/SHOWER

CORRIDOR

NURSE STATION

AND CLERK

MEDICATION

PATIENT

TOILET

REST RM

NOURISHMENT

KITCHEN

CORRIDOR

OFFICE

TOILET

4C-140

C4B-6

4C-141

4B-134

4B-135

4B-136

4B-150

4B-146

4B-130

4B-127

4B-126

4B-123

4B-153

4B-120

4B-151

4B-152

C4B-4

C4B-3

4B-113

4B-111

4B-110

4B-115

4B-114

4B-116

4B-117

4B-118

4B-119

4B-121

4B-122

4B-125

4B-124

4B-129

4B-128

4B-133

4B-131

4B-132

C4B-5

4B-137

4B-138

4B-112

4B-105

C4B-2

4B-101

4B-100

4B-102

4B-103

4B-107

4B-106

DIETICIAN

NURSE

MGR

BRONCHOSCOPY

ELEC

REGISTERED

CLINICAL

OFFICE

PATIENT RM

4 BED PATIENT

OFFICE

MONITORING RM

TELEMETRY

TEAM -2

4B-145

MEDICINE

OFFICE

SHOWER

4B-165

ELEC

SVC

BAY

MECH

SVC BAY-G

EQUIP

CONVEYOR

OFFICE

TRASH

ELEV

LOBBY

STAIR

LINEN

FAMILY

WAITING

VISITORS

TOILET

OFFICE

MALE

TOILET

MALE

LOCKER

FEMALE

LOCKER

FEMALE

TOILET

ON CALL

TOILET

OFFICE

H.A.C

SHOWER

CORRIDOR

OFFICE

ELECTROPHYSIOLOGY

OFFICE

TOILET

CRITICAL CARE

STORAGE

EP LAB

UTILITY

RECOVERY

CONTROL

4A-109

4A-108

4A-106

4A-105

4A-104

4A-107

4A-102

4A-101

C4A-5

4A-145

4A-199

4A-196

4A-198

4A-152

4A-147

4A-148

4A-146

4A-151

4A-144

4A-143

4A-200

4A-149

4A-150

C4A-1

4A-201

4A-100

4A-204

4A-205 TSC-2

4A-202

4A-203

CARDIOLOGY

SOILED

P-3

P-2

P-1

CM-1

DT-1

P-4

TSC-2

INTERN

INTERN

ELEV

ELEV

ELEV

CONVEYOR

ELEV

PRESSURE

EMERGENCY

ELEV

CARDIAC

CORRIDOR

C4A-3

CORRIDOR

C4A-2

CORRIDOR

C4A-17

X

W

Y

Z

AA

PLUMBING FOURTH FLOOR DEMOLITION PLAN - MEDICAL GAS - PHASE 1

1/8" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. MEDICAL GAS ZONE VALVE AND AREA ALARM

PANEL ARE TO BE DEMOLISHED.

2. DEMOLISH MEDICAL AIR, OXYGEN, AND

VACUUM PIPING TO LOCATION INDICATED.

SHUTDOWN MEDICAL GASES IN AREA OF

WORK PER PHASE. COORDINATE SHUTDOWN

OF MEDICAL GAS SYSTEM WITH COR.

3. DEMOLISH MAIN SEGMENT AFTER NEW PIPE

HAS BEEN INSTALLED TO RETAIN SERVICE TO

4B SUITES. COORDINATE OUTAGE WITH COR.

TANKS WILL NEED TO BE PROVIDED FOR

EXTENDED DOWNTIME.

0 4 8 16

NORTH

PLAN

A. COORDINATE PHASING LIMITS AS SHOWN

ON GI102.

B. REFER TO HA PLANS FOR INDICATION OF

HAZARDOUS MATERIALS PRIOR TO

STARTING WORK.

C. DEMOLITION WORK SHALL BE DONE SUCH

THAT ALL THE PIPES, HANGERS, SUPPORTS,

AND VALVES ARE REMOVED ALL THE WAY

TO THE MAINS. REMOVE ALL ITEMS TO

ENSURE NOTHING IS LEFT ABANDONED IN

PLACE.

D. NO DEAD ENDS SHALL REMAIN. THE

MAXIMUM LENGTH OF DEAD ENDS SHALL BE

NO GREATER THAN TWO PIPE DIAMETERS

FROM THE BRANCH, RISER, OR MAIN THAT IT

IS CONNECTED TO.

E. MEDICAL GAS PIPING IN INTERSTITIAL

SPACE FLOOR PLAN SHOWN FOR CLARITY.

F. CONTRACTOR TO CLOSELY COORDINATE

MED GAS REPLACEMENT PROVIDE TANKS

FOR MICU IN 4B IF NECESSARY.

P

M

PD105

MRASPG

PLUMBING FOURTH FLOOR

DEMOLITION PLAN - MEDICAL GAS -

PHASE 1

6 16

AutoCAD SHX Text X sharmon Model

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

(TYP.)

MV

MA

O

MV

MA

O

MV

MA

O

16151413 21191817 22

22w 22e

STORAGE

STORAGE

STORAGE

BREAK RM

PATIENT RM

TOILET

TOILET

UTILITY

PATIENT RM

EQUIP

TOILET

RM

TOILET

SECURITY

1 BED ATIENT

TOILET

1 BED

ANTE RM

TOILET

4 BED RM

TOILET

2 BED RM

1 BED RM

TOILET

CORRIDOR

STEP-DOWN

CLEAN

C4B-7

4B-163

4B-164

4B-161

4B-159

4B-157

4B-158

RM

4B-155

4B-148

4B-147

4B-156

4B-143

4B-144

4B-141

4B-142

4B-139

4B-140

4B-169

4B-168

4A-204A

4A-206

4B-166

4B-104

ELECTROPHISIOLOGY

1 BED

PATIENT RM

4 BED

2 BED

STORAGE/OFFICE

PATIENT RM

4B-154

HSK

SATELLITE MED

4B-162

PREP AREA

PHARMACY

OFFICE

SHOWER

4B-165

ELEC

SVC

BAY

MECH

SVC BAY-G

EQUIP

CONVEYOR

OFFICE

TRASH

ELEV

LOBBY

STAIR

LINEN

FAMILY

WAITING

VISITORS

TOILET

OFFICE

MALE

TOILET

MALE

LOCKER

FEMALE

LOCKER

FEMALE

TOILET

ON CALL

TOILET

OFFICE

H.A.C

SHOWER

CORRIDOR

OFFICE

ELECTROPHYSIOLOGY

OFFICE

TOILET

CRITICAL CARE

STORAGE

EP LAB

UTILITY

RECOVERY

CONTROL

4A-109

4A-108

4A-106

4A-105

4A-104

4A-107

4A-102

4A-101

C4A-5

4A-145

4A-199

4A-196

4A-198

4A-152

4A-147

4A-148

4A-146

4A-151

4A-144

4A-143

4A-200

4A-149

4A-150

C4A-1

4A-201

4A-100

4A-204

4A-205 TSC-2

4A-202

4A-203

CARDIOLOGY

SOILED

P-3

P-2

P-1

CM-1

DT-1

P-4

TSC-2

INTERN

INTERN

ELEV

ELEV

ELEV

CONVEYOR

ELEV

PRESSURE

EMERGENCY

ELEV

CARDIAC

CORRIDOR

C4A-3

CORRIDOR

C4A-2

CORRIDOR

C4A-17

1 BED

PATIENT RM

4B-110

TOILET

4B-110T

1 BED

PATIENT RM

4B-111

TOILET

4B-111T

1 BED

PATIENT RM

4B-103

TOILET

4B-103T

1 BED

PATIENT RM

4B-104

TOILET

4B-104T

1 BED

PATIENT RM

4B-107

BREAK RM

4B-108

TOILET

4B-107T

TOILET

4B-109T

1 BED

PATIENT RM

4B-106

TOILET

4B-106T

1 BED

PATIENT RM

4B-109

1 BED

PATIENT RM

4B-102

1 BED

BARRIATRIC

PATIENT RM

4B-101

1 BED

PATIENT RM

4B-100

LACTATION

4B-108A

1 BED

PATIENT RM

4B-105

TOILET

4B-105T

TOILET

4B-102T

STAFF TOILET

4B-108B

OIT

4B-123

NURSE

STATION

4B-128

STAFF TOILET

4B-129

KT / OT

OFFICE

4B-130

NURSES

OFFICE

4B-131

PHYSICAL

THERAPY

4B-132A

LOCKERS

4B-124E

NOURISH.

4B-127C

CORRIDOR

4B-127

MEDICATION

4B-128A

TELEMETRY

4B-128B

STERILE

SUPPLY

4B-133

ELECTRICAL

4B-132B

CORRIDOR

4B-132

HUB

4B-132D

ELECTRICAL

4B-132C

TOILET

4B-101T

TOILET

4B-100T

CORRIDOR

4B-150N

X

W

Y

Z

AA

PLUMBING FOURTH FLOOR DEMOLITION PLAN - MEDICAL GAS - PHASE 2

1/8" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. MEDICAL GAS ZONE VALVE AND AREA ALARM

PANEL ARE TO BE DEMOLISHED.

2. DEMOLISH MEDICAL AIR, OXYGEN, AND

VACUUM PIPING TO LOCATION INDICATED.

SHUTDOWN MEDICAL GASES IN AREA OF

WORK PER PHASE. COORDINATE SHUTDOWN

OF MEDICAL GAS SYSTEM WITH COR.

0 4 8 16

NORTH

PLAN

A. COORDINATE PHASING LIMITS AS SHOWN

ON GI102.

B. REFER TO HA PLANS FOR INDICATION OF

HAZARDOUS MATERIALS PRIOR TO

STARTING WORK.

C. DEMOLITION WORK SHALL BE DONE SUCH

THAT ALL THE PIPES, HANGERS, SUPPORTS,

AND VALVES ARE REMOVED ALL THE WAY

TO THE MAINS. REMOVE ALL ITEMS TO

ENSURE NOTHING IS LEFT ABANDONED IN

PLACE.

D. NO DEAD ENDS SHALL REMAIN. THE

MAXIMUM LENGTH OF DEAD ENDS SHALL BE

NO GREATER THAN TWO PIPE DIAMETERS

FROM THE BRANCH, RISER, OR MAIN THAT IT

IS CONNECTED TO.

E. MEDICAL GAS PIPING IN INTERSTITIAL

SPACE FLOOR PLAN SHOWN FOR CLARITY.

F. CONTRACTOR TO CLOSELY COORDINATE

MED GAS REPLACEMENT PROVIDE TANKS

FOR MICU IN 4B IF NECESSARY.

P

M

PD106

MRASPG

PLUMBING FOURTH FLOOR

DEMOLITION PLAN - MEDICAL GAS -

PHASE 2

7 16

AutoCAD SHX Text X sharmon Model

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

16151413 21191817 22

22w 22e

5" SAN

4" SAN

4" SAN

4" SAN

4" SAN 4" SAN

4" SAN

(TYP.)

(TYP.)

P-420

P-103

P-410

P-701

P-420

P-114

P-421

P-701

P-420

P-410

P-701

P-420

P-410

P-701

P-420

P-410

P-701

P-420

P-410

P-701

P-420

P-410

P-701

P-420

P-410

P-701

P-410

P-103

P-420

P-528

P-420

P-410

P-701

P-420

P-410

P-701

P-410

P-420

P-701

P-501

P-510

4" SAN

4" SAN

4" SAN4" SAN

4" SAN

4" SAN

P-528

P-420

3 3

2" SAN

2" SAN

2" V 2" V

2" V2" V

2" V

2" V 2" V

2" V

2" V

P-809

P-809

P-809

WCO

WCO WCO WCO

WCO

WCO

WCO WCO

P-708

1 BED

PATIENT RM

4B-110

TOILET

4B-110T

1 BED

PATIENT RM

4B-111

TOILET

4B-111T

1 BED

PATIENT RM

4B-103

TOILET

4B-103T

1 BED

PATIENT RM

4B-104

TOILET

4B-104T

1 BED

PATIENT RM

4B-107

BREAK RM

4B-108

TOILET

4B-107T

TOILET

4B-109T

1 BED

PATIENT RM

4B-106

TOILET

4B-106T

1 BED

PATIENT RM

4B-109

1 BED

PATIENT RM

4B-102

1 BED

BARRIATRIC

PATIENT RM

4B-101

1 BED

PATIENT RM

4B-100

LACTATION

4B-108A

1 BED

PATIENT RM

4B-105

TOILET

4B-105T

TOILET

4B-102T

STAFF TOILET

4B-108B

OIT

4B-123

NURSE

STATION

4B-128

STAFF TOILET

4B-129

KT / OT

OFFICE

4B-130

NURSES

OFFICE

4B-131

PHYSICAL

THERAPY

4B-132A

LOCKERS

4B-124E

NOURISH.

4B-127C

CORRIDOR

4B-127

MEDICATION

4B-128A

TELEMETRY

4B-128B

STERILE

SUPPLY

4B-133

ELECTRICAL

4B-132B

CORRIDOR

4B-132

HUB

4B-132D

ELECTRICAL

4B-132C

TOILET

4B-101T

TOILET

4B-100T

CORRIDOR

4B-150N

2" V

2" V

3" SAN

P-502

P-604

P-103

P-103 P-103 P-103

P-103

P-103

P-103 P-103

P-103

X

W

Y

Z

AA

1. PROVIDE WASTE PIPING AND SUPPORTS

COMPLETE.

2. PROVIDE VENT PIPING AND SUPPORTS

COMPLETE.

3. SANITARY TURNS DOWN BELOW SLAB HERE.

PIPING DOWN STREAM OF THIS POINT IS IN THE

INTERSTITIAL SPACE BELOW.

4. SEE DETAIL M-501/7 FOR DIALYSIS

CONNECTIONS.

5. SANITARY PIPE AND VENT PIPE FOR MOP SINK

SHALL BE DEMOLISHED AND REPLACE

IMMEDIATELY TO REMAIN IN SERVICE.

PLUMBING FOURTH FLOOR PLAN - SANITARY AND VENT - PHASE 1

1/8" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

P

M

PP101

MASPG

PLUMBING FOURTH FLOOR PLAN

SANITARY AND VENT - PHASE 1

8 16

A. COORDINATE PHASING LIMITS AS SHOWN ON

GI102.

B. REFER TO HA PLANS FOR INDICATION OF

HAZARDOUS MATERIALS PRIOR TO STARTING

WORK.

C. SLEEVE ALL PENETRATIONS, FIRESTOP OR

SEAL AS REQUIRED.

D. UNLESS NOTED OTHERWISE, THE SIZE OF

FIXTURE RUNOUTS IS TO BE WHAT IS LISTED IN

THE PLUMBING FIXTURE SCHEDULE.

E. SANITARY PIPES ARE BELOW SLAB OR IN WALL

AND VENT PIPES ARE ABOVE IN INTERSTITIAL

SPACE UNLESS NOTED OTHERWISE.

F. SEAL NEW AND EXISTING PIPE PENETRATIONS

THROUGH FLOOR WATER TIGHT.

0 4 8 16

NORTH

PLAN

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BREAK RM

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

EQUIP

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text

1 BED ATIENT

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

1 BED

AutoCAD SHX Text

ANTE RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

4 BED RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

2 BED RM

AutoCAD SHX Text

1 BED RM

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

STEP-DOWN

AutoCAD SHX Text

CLEAN

AutoCAD SHX Text C4B-7

AutoCAD SHX Text 4B-163

AutoCAD SHX Text 4B-164

AutoCAD SHX Text 4B-161

AutoCAD SHX Text 4B-159

AutoCAD SHX Text 4B-157

AutoCAD SHX Text 4B-158

AutoCAD SHX Text

RM

AutoCAD SHX Text 4B-155

AutoCAD SHX Text 4B-148

AutoCAD SHX Text 4B-147

AutoCAD SHX Text 4B-156

AutoCAD SHX Text 4B-143

AutoCAD SHX Text 4B-144

AutoCAD SHX Text 4B-141

AutoCAD SHX Text 4B-142

AutoCAD SHX Text 4B-139

AutoCAD SHX Text 4B-140

AutoCAD SHX Text 4B-169

AutoCAD SHX Text 4B-168

AutoCAD SHX Text 4A-204A

AutoCAD SHX Text 4A-206

AutoCAD SHX Text 4B-166

AutoCAD SHX Text 4B-104

AutoCAD SHX Text

ELECTROPHISIOLOGY

AutoCAD SHX Text

1 BED

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text

4 BED

AutoCAD SHX Text

2 BED

AutoCAD SHX Text

STORAGE/OFFICE

AutoCAD SHX Text

PATIENT RM

AutoCAD SHX Text 4B-154

AutoCAD SHX Text

HSK

AutoCAD SHX Text

SATELLITE MED

AutoCAD SHX Text 4B-162

AutoCAD SHX Text

PREP AREA

AutoCAD SHX Text

PHARMACY

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text 4B-165

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

SVC

AutoCAD SHX Text

BAY

AutoCAD SHX Text

MECH

AutoCAD SHX Text

SVC BAY-G

AutoCAD SHX Text

EQUIP

AutoCAD SHX Text

CONVEYOR

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

TRASH

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

LINEN

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

FEMALE

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

ELECTROPHYSIOLOGY

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

EP LAB

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

RECOVERY

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text 4A-109

AutoCAD SHX Text 4A-108

AutoCAD SHX Text 4A-106

AutoCAD SHX Text 4A-105

AutoCAD SHX Text 4A-104

AutoCAD SHX Text 4A-107

AutoCAD SHX Text 4A-102

AutoCAD SHX Text 4A-101

AutoCAD SHX Text 4A-145

AutoCAD SHX Text 4A-146

AutoCAD SHX Text 4A-144

AutoCAD SHX Text 4A-200

AutoCAD SHX Text

AutoCAD SHX Text C4A-1

AutoCAD SHX Text 4A-201

AutoCAD SHX Text 4A-100

AutoCAD SHX Text 4A-204

AutoCAD SHX Text

4A-205 TSC-2

AutoCAD SHX Text 4A-202

AutoCAD SHX Text 4A-203

AutoCAD SHX Text

CARDIOLOGY

AutoCAD SHX Text

SOILED

AutoCAD SHX Text P-3

AutoCAD SHX Text P-2

AutoCAD SHX Text P-1

AutoCAD SHX Text

CM-1

AutoCAD SHX Text

DT-1

AutoCAD SHX Text P-4

AutoCAD SHX Text

TSC-2

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

CONVEYOR

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

PRESSURE

AutoCAD SHX Text

EMERGENCY

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

CARDIAC

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C4A-3

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C4A-2

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C4A-17

AutoCAD SHX Text F.C.

AutoCAD SHX Text X sharmon Model

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

WARMING

22w 22e

4" SAN

4" SAN

4" SAN 4" SAN 4" SAN 4" SAN 4" SAN

(TYP.)

(TYP.)

P-420

P-103

P-701

P-420 P-420

P-701 P-701

P-410

P-420 P-420

P-410

P-701

P-701

P-410

P-420

P-420

P-420 P-420 P-420

P-701

P-701

P-701 P-701 P-701

P-410

P-410

P-410 P-410

P-410

P-501

P-410

4" SAN

4" SAN

4" SAN

4" SAN

4" SAN 4" SAN

4" SAN

P-101

P-410

4" SAN

2" V

2" V2" V2" V

2" V

3 3 3 3 3

P-809P-809

P-809

4 4

WCO

WCO WCO WCO

WCO

P-708

1 BED

PATIENT RM

4B-110

TOILET

4B-110T

1 BED

PATIENT RM

4B-111

TOILET

4B-111T

1 BED

PATIENT RM

4B-103

TOILET

4B-103T

1 BED

PATIENT RM

4B-104

TOILET

4B-104T

1 BED

PATIENT RM

4B-107

BREAK RM

4B-108

TOILET

4B-107T

TOILET

4B-109T

1 BED

PATIENT RM

4B-106

TOILET

4B-106T

1 BED

PATIENT RM

4B-109

1 BED

PATIENT RM

4B-102

1 BED

BARRIATRIC

PATIENT RM

4B-101

1 BED

PATIENT RM

4B-100

LACTATION

4B-108A

1 BED

PATIENT RM

4B-105

TOILET

4B-105T

TOILET

4B-102T

STAFF TOILET

4B-108B

OIT

4B-123

NURSE

STATION

4B-128

STAFF TOILET

4B-129

KT / OT

OFFICE

4B-130

NURSES

OFFICE

4B-131

PHYSICAL

THERAPY

4B-132A

LOCKERS

4B-124E

NOURISH.

4B-127C

CORRIDOR

4B-127

MEDICATION

4B-128A

TELEMETRY

4B-128B

STERILE

SUPPLY

4B-133

ELECTRICAL

4B-132B

CORRIDOR

4B-132

HUB

4B-132D

ELECTRICAL

4B-132C

TOILET

4B-101T

TOILET

4B-100T

CORRIDOR

4B-150N

1 BED

PATIENT RM

4B-113

TOILET

4B-113T

1 BED

PATIENT RM

4B-112

TOILET

4B-112T

1 BED

PATIENT RM

4B-118

TOILET

4B-118T

1 BED

PATIENT RM

4B-117

TOILET

4B-117T

1 BED

PATIENT RM

4B-120

TOILET

4B-120T

1 BED

PATIENT RM

4B-119

TOILET

4B-119T

TOILET

4B-114T

1 BED

PATIENT RM

4B-114

1 BED

ISOLATION

PATIENT RM

4B-115A

1 BED

PATIENT RM

4B-116

TOILET

4B-115T

TOILET

4B-116T

TOILET

4B-121T

1 BED

PATIENT RM

4B-121

TRAINING/

COUNSELING

4B-122

EQUIPMENT

STORAGE

4B-124A

SOILED

UTILITY

4B-124B

TEAM

ROOM

4B-125

CLEAN LINEN

4B-126

NURSE

MANAGER

OFFICE

4B-127A

CORRIDOR

4B-124

DISPATCH

4B-124C

HAC

4B-124D

COUNSELING

OFFICE

4B-127B

TEAM

ROOM

4B-134

CORRIDOR

4B-150S

ISOLATION RM

VESTIBULE

4B-115

P-103

P-103 P-103 P-103 P-103 P-103

P-103 P-103 P-103

P-505

X

W

Y

Z

AA

PLUMBING FOURTH FLOOR PLAN - SANITARY AND VENT - PHASE 2

1/8" = 1'-0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

P

M

PP102

MASPG

PLUMBING FOURTH FLOOR PLAN

SANITARY AND VENT - PHASE 2

9 16

0 4 8 16

NORTH

PLAN

1. PROVIDE WASTE PIPING AND SUPPORTS

COMPLETE.

2. PROVIDE VENT PIPING AND SUPPORTS

COMPLETE.

3. SANITARY TURNS DOWN BELOW SLAB HERE.

PIPING DOWN STREAM OF THIS POINT IS IN THE

INTERSTITIAL SPACE BELOW.

4. SEE DETAIL M-501/7 FOR DIALYSIS

CONNECTIONS.

A. COORDINATE PHASING LIMITS AS SHOWN ON

GI102.

B. REFER TO HA PLANS FOR INDICATION OF

HAZARDOUS MATERIALS PRIOR TO STARTING

WORK.

C. SLEEVE ALL PENETRATIONS, FIRESTOP OR

SEAL AS REQUIRED.

D. UNLESS NOTED OTHERWISE, THE SIZE OF

FIXTURE RUNOUTS IS TO BE WHAT IS LISTED IN

THE PLUMBING FIXTURE SCHEDULE.

E. SANITARY PIPES ARE BELOW SLAB OR IN WALL

AND VENT PIPES ARE ABOVE IN INTERSTITIAL

SPACE UNLESS NOTED OTHERWISE.

F. SEAL NEW AND EXISTING PIPE PENETRATIONS

THROUGH FLOOR WATER TIGHT.

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

SVC

AutoCAD SHX Text

BAY

AutoCAD SHX Text

MECH

AutoCAD SHX Text

SVC BAY-G

AutoCAD SHX Text

EQUIP

AutoCAD SHX Text

CONVEYOR

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

TRASH

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

LINEN

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

FEMALE

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

ELECTROPHYSIOLOGY

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

CRITICAL CARE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

EP LAB

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text

RECOVERY

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text 4A-109

AutoCAD SHX Text 4A-108

AutoCAD SHX Text 4A-106

AutoCAD SHX Text 4A-105

AutoCAD SHX Text 4A-104

AutoCAD SHX Text 4A-107

AutoCAD SHX Text 4A-102

AutoCAD SHX Text 4A-101

AutoCAD SHX Text 4A-145

AutoCAD SHX Text 4A-146

AutoCAD SHX Text 4A-144

AutoCAD SHX Text 4A-200

AutoCAD SHX Text

AutoCAD SHX Text C4A-1

AutoCAD SHX Text 4A-201

AutoCAD SHX Text 4A-100

AutoCAD SHX Text 4A-204

AutoCAD SHX Text

4A-205 TSC-2

AutoCAD SHX Text 4A-202

AutoCAD SHX Text 4A-203

AutoCAD SHX Text

CARDIOLOGY

AutoCAD SHX Text

SOILED

AutoCAD SHX Text P-3

AutoCAD SHX Text P-2

AutoCAD SHX Text P-1

AutoCAD SHX Text

CM-1

AutoCAD SHX Text

DT-1

AutoCAD SHX Text P-4

AutoCAD SHX Text

TSC-2

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

CONVEYOR

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

PRESSURE

AutoCAD SHX Text

EMERGENCY

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

CARDIAC

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C4A-3

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C4A-2

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C4A-17

AutoCAD SHX Text F.C.

AutoCAD SHX Text X sharmon Model

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

22w 22e

3"

2"

1/2"

3"

1-1/2"

1/2"

2"

1/2" 1/2"

2"

1"

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

(TYP.)

P-420

P-103

P-410

P-701

P-420

P-114

P-421

P-701

P-420

P-410

P-701

P-420

P-410

P-701

P-420

P-410

P-701

P-420

P-410

P-701

P-420

P-410

P-701

P-420

P-410

P-701

P-410

P-420

P-510

P-420

P-410 P-701

P-420

P-410

P-701

P-410

P-420

P-701

P-501

P-510

1-1/4"

3/4"

3/4"

1-1/4"

1-1/4"

3/4"

1-1/4"

3/4" 1-1/4"

3/4"

1-1/4"

3/4"

1-1/4"

3/4"

1-1/4"

3/4"

3/4"

1-1/4"

3/4"

1-1/4"

P-510

P-510

P-809

P-809 P-8093

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

STORAGE

STORAGE

STORAGE

BREAK RM

PATIENT RM

TOILET

TOILET

UTILITY

PATIENT RM

EQUIP

TOILET

RM

TOILET

SECURITY

1 BED ATIENT

TOILET

1 BED

ANTE RM

TOILET

4 BED RM

TOILET

2 BED RM

1 BED RM

TOILET

CORRIDOR

STEP-DOWN

CLEAN

C4B-7

4B-163

4B-164

4B-161

4B-159

4B-157

4B-158

RM

4B-155

4B-148

4B-147

4B-156

4B-143

4B-144

4B-141

4B-142

4B-139

4B-140

4B-169

4B-168

4A-204A

4A-206

4B-166

4B-104

ELECTROPHISIOLOGY

1 BED

PATIENT RM

4 BED

2 BED

STORAGE/OFFICE

PATIENT RM

4B-154

HSK

SATELLITE MED

4B-162

PREP AREA

PHARMACY

OFFICE

SHOWER

4B-165

ELEC

SVC

BAY

MECH

SVC BAY-G

EQUIP

CONVEYOR

OFFICE

TRASH

ELEV

LOBBY

STAIR

OFFICE

FEMALE

LOCKER

CORRIDOR

OFFICE

ELECTROPHYSIOLOGY

OFFICE

TOILET

STORAGE

EP LAB

UTILITY

RECOVERY

CONTROL

4A-109

4A-108

4A-106

4A-105

4A-104

4A-107

4A-102

4A-101

4A-145

4A-146

4A-144

C4A-1

4A-201

4A-100

4A-204

4A-205 TSC-2

4A-202

4A-203

CARDIOLOGY

SOILED

P-3

P-2

P-1

CM-1

DT-1

P-4

TSC-2

ELEV

ELEV

ELEV

CONVEYOR

ELEV

PRESSURE

EMERGENCY

ELEV

CARDIAC

CORRIDOR

C4A-3

CORRIDOR

C4A-2

CORRIDOR

C4A-17

1 BED

PATIENT RM

4B-110

TOILET

4B-110T

1 BED

PATIENT RM

4B-111

TOILET

4B-111T

1 BED

PATIENT RM

4B-103

TOILET

4B-103T

1 BED

PATIENT RM

4B-104

TOILET

4B-104T

1 BED

PATIENT RM

4B-107

BREAK RM

4B-108

TOILET

4B-107T

TOILET

4B-109T

1 BED

PATIENT RM

4B-106

TOILET

4B-106T

1 BED

PATIENT RM

4B-109

1 BED

PATIENT RM

4B-102

1 BED

BARRIATRIC

PATIENT RM

4B-101

1 BED

PATIENT RM

4B-100

LACTATION

4B-108A

1 BED

PATIENT RM

4B-105

TOILET

4B-105T

TOILET

4B-102T

STAFF TOILET

4B-108B

OIT

4B-123

NURSE

STATION

4B-128

STAFF TOILET

4B-129

KT / OT

OFFICE

4B-130

NURSES

OFFICE

4B-131

PHYSICAL

THERAPY

4B-132A

LOCKERS

4B-124E

NOURISH.

4B-127C

CORRIDOR

4B-127

MEDICATION

4B-128A

TELEMETRY

4B-128B

STERILE

SUPPLY

4B-133

ELECTRICAL

4B-132B

CORRIDOR

4B-132

HUB

4B-132D

ELECTRICAL

4B-132C

TOILET

4B-101T

TOILET

4B-100T

CORRIDOR

4B-150N

P-701

1/2"

1/2"

P-502

P-103

P-103

P-103

P-103

P-103

P-103

P-103

P-103

P-103

P-103

X

W

Y

Z

AA

PLUMBING FOURTH FLOOR PLAN - DOMESTIC WATER - PHASE 1

1/8" = 1'-0"

A. COORDINATE PHASING LIMITS AS SHOWN ON

GI102.

B. REFER TO HA PLANS FOR INDICATION OF

HAZARDOUS MATERIALS PRIOR TO STARTING

WORK.

C. SLEEVE ALL PENETRATIONS, FIRESTOP OR

SEAL AS REQUIRED.

D. UNLESS NOTED OTHERWISE, THE SIZE OF

FIXTURE RUNOUTS IS TO BE WHAT IS LISTED IN

THE PLUMBING FIXTURE SCHEDULE.

E. DOMESTIC WATER AND SANITARY PIPES ARE

BELOW SLAB OR IN WALL AND VENT PIPES ARE

ABOVE CEILING UNLESS NOTED OTHERWISE.

F. SEAL NEW AND EXISTING PIPE PENETRATIONS

THROUGH FLOOR WATER TIGHT.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. PROVIDE DOMESTIC COLD WATER, HOT

WATER, AND HOT WATER RETURN PIPING

AND SUPPORTS COMPLETE.

2. CONNECT TO EXISTING MAINS IN CORRIDOR

C4A-17.

3. SEE DETAIL M-501/7 FOR DIALYSIS

CONNECTIONS.

4. PROVIDE DOMESTIC COLD WATER, HOT

WATER, AND HOT WATER RETURN PIPING

COMPLETE FOR TEMPORARY NOURISHMENT

SINK.

5. DOMESTIC WATER SHALL BE DEMOLISHED

AND REPLACED IMMEDIATELY TO REMAIN IN

SERVICE.

P

M

PP103

MASPG

PLUMBING FOURTH FLOOR PLAN

DOMESTIC WATER - PHASE 1

10 16

0 4 8 16

NORTH

PLAN

AutoCAD SHX Text X sharmon Model

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

22w 22e

1/2"

1/2"

2"3/4"1" 1-1/4"

2-1/2"

1-1/2"

2-1/2"

2"

3"

1/2"

1-1/2"

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

DCWS

DHWS

DHWR

(TYP.)

P-420

P-103

P-410

P-701

P-420 P-420

P-410

P-701 P-701

P-410

P-420 P-420

P-410

P-701

P-701

P-410

P-420

P-420

P-420 P-420 P-420

P-701

P-701

P-701

P-701

P-701

P-410

P-410

P-410

P-410

P-410

P-501

P-410

P-420

3/4"

1-1/4"

3/4"

1-1/4"

3/4"

1"

3/4"

1-1/4"

3/4"

1-1/4"

3/4"

1-1/4"

3/4"

1-1/4"

3/4"

1-1/4"

3/4"

1-1/4"

3/4"

1-1/4"

P-701

P-809P-809 P-809

ELEC

SVC

BAY

MECH

SVC BAY-G

EQUIP

CONVEYOR

OFFICE

TRASH

ELEV

LOBBY

STAIR

OFFICE

FEMALE

LOCKER

CORRIDOR

OFFICE

ELECTROPHYSIOLOGY

OFFICE

TOILET

CRITICAL CARE

STORAGE

EP LAB

UTILITY

RECOVERY

CONTROL

4A-109

4A-108

4A-106

4A-105

4A-104

4A-107

4A-102

4A-101

C4A-5

4A-145

4A-146

4A-144

C4A-1

4A-201

4A-100

4A-204

4A-205 TSC-2

4A-202

4A-203

CARDIOLOGY

SOILED

P-3

P-2

P-1

CM-1

DT-1

P-4

TSC-2

ELEV

ELEV

ELEV

CONVEYOR

ELEV

PRESSURE

EMERGENCY

ELEV

CARDIAC

CORRIDOR

C4A-3

CORRIDOR

C4A-2

CORRIDOR

C4A-17

1 BED

PATIENT RM

4B-110

TOILET

4B-110T

1 BED

PATIENT RM

4B-111

TOILET

4B-111T

1 BED

PATIENT RM

4B-103

TOILET

4B-103T

1 BED

PATIENT RM

4B-104

TOILET

4B-104T

1 BED

PATIENT RM

4B-107

BREAK RM

4B-108

TOILET

4B-107T

TOILET

4B-109T

1 BED

PATIENT RM

4B-106

TOILET

4B-106T

1 BED

PATIENT RM

4B-109

1 BED

PATIENT RM

4B-102

1 BED

BARRIATRIC

PATIENT RM

4B-101

1 BED

PATIENT RM

4B-100

LACTATION

4B-108A

1 BED

PATIENT RM

4B-105

TOILET

4B-105T

TOILET

4B-102T

STAFF TOILET

4B-108B

OIT

4B-123

NURSE

STATION

4B-128

STAFF TOILET

4B-129

KT / OT

OFFICE

4B-130

NURSES

OFFICE

4B-131

PHYSICAL

THERAPY

4B-132A

LOCKERS

4B-124E

NOURISH.

4B-127C

CORRIDOR

4B-127

MEDICATION

4B-128A

TELEMETRY

4B-128B

STERILE

SUPPLY

4B-133

ELECTRICAL

4B-132B

CORRIDOR

4B-132

HUB

4B-132D

ELECTRICAL

4B-132C

TOILET

4B-101T

TOILET

4B-100T

CORRIDOR

4B-150N

1 BED

PATIENT RM

4B-113

TOILET

4B-113T

1 BED

PATIENT RM

4B-112

TOILET

4B-112T

1 BED

PATIENT RM

4B-118

TOILET

4B-118T

1 BED

PATIENT RM

4B-117

TOILET

4B-117T

1 BED

PATIENT RM

4B-120

TOILET

4B-120T

1 BED

PATIENT RM

4B-119

TOILET

4B-119T

TOILET

4B-114T

1 BED

PATIENT RM

4B-114

1 BED

ISOLATION

PATIENT RM

4B-115A

1 BED

PATIENT RM

4B-116

TOILET

4B-115T

TOILET

4B-116T

TOILET

4B-121T

1 BED

PATIENT RM

4B-121

TRAINING/

COUNSELING

4B-122

EQUIPMENT

STORAGE

4B-124A

SOILED

UTILITY

4B-124B

TEAM

ROOM

4B-125

CLEAN LINEN

4B-126

NURSE

MANAGER

OFFICE

4B-127A

CORRIDOR

4B-124

DISPATCH

4B-124C

HAC

4B-124D

COUNSELING

OFFICE

4B-127B

TEAM

ROOM

4B-134

CORRIDOR

4B-150S

ISOLATION RM

VESTIBULE

4B-115

P-505

P-103 P-103 P-103 P-103

P-103

P-103

P-103 P-103 P-103

P-103

X

W

Y

Z

AA

PLUMBING FOURTH FLOOR PLAN - DOMESTIC WATER - PHASE 2

1/8" = 1'-0"

A. COORDINATE PHASING LIMITS AS SHOWN ON

GI102.

B. REFER TO HA PLANS FOR INDICATION OF

HAZARDOUS MATERIALS PRIOR TO STARTING

WORK.

C. SLEEVE ALL PENETRATIONS, FIRESTOP OR

SEAL AS REQUIRED.

D. UNLESS NOTED OTHERWISE, THE SIZE OF

FIXTURE RUNOUTS IS TO BE WHAT IS LISTED IN

THE PLUMBING FIXTURE SCHEDULE.

E. DOMESTIC WATER AND SANITARY PIPES ARE

BELOW SLAB OR IN WALL AND VENT PIPES ARE

ABOVE CEILING UNLESS NOTED OTHERWISE.

F. SEAL NEW AND EXISTING PIPE PENETRATIONS

THROUGH FLOOR WATER TIGHT.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848

U.S. Department of Veterans Affairs

© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019

IMPROVE PATIENT

PRIVACY 4B

652-14-106

HUNTER HOLMES MCGUIRE VAMC

1201 BROAD ROCK BLVD

RICHMOND, VA 23249

18-083

BID DOCUMENTS

FULLY SPRINKLERED

WALL RATING LEGEND:

30 MINUTE SMOKE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

FOURTH FLOOR KEY PLAN:

AREA OF WORK

1. PROVIDE DOMESTIC COLD WATER, HOT

WATER, AND HOT WATER RETURN PIPING

AND SUPPORTS COMPLETE.

2. CONNECT TO EXISTING MAINS IN CORRIDOR

C4A-2.

3. SEE DETAIL M-501/7 FOR DIALYSIS

CONNECTIONS.

P

M

PP104

MASPG

PLUMBING FOURTH FLOOR PLAN

DOMESTIC WATER - PHASE 2

11 16

0 4 8 16

NORTH

PLAN

AutoCAD SHX Text X sharmon Model

VHARICStileR Line

VHARICStileR Line

VHARICStileR Text Box

NOT IN CONTRACT

(TYP.)

3/4"

1-1/2"

1"

1"

1-1/2"

3/4"

1"

1-1/2"

1"

1-1/2"

3/4"

1-1/2"

MV

MA

O

MV

MA

O

MV

MA

O

STORAGE

STORAGE

STORAGE

BREAK RM

PATIENT RM

TOILET

TOILET

UTILITY

PATIENT RM

EQUIP

TOILET

RM

TOILET

SECURITY

1 BED ATIENT

TOILET

1 BED

ANTE RM

TOILET

4 BED RM

TOILET

2 BED RM

1 BED RM

TOILET

CORRIDOR

STEP-DOWN

CLEAN

C4B-7

4B-163

4B-164

4B-161

4B-159

4B-157

4B-158

RM

4B-155

4B-148

4B-147

4B-156

4B-143

4B-144

4B-141

4B-142

4B-139

4B-140

4B-169

4B-168

4A-204A

4A-206

4B-166

4B-104

ELECTROPHISIOLOGY

1 BED

PATIENT RM

4 BED

2 BED

STORAGE/OFFICE

PATIENT RM

4B-154

HSK

SATELLITE MED

4B-162

PREP AREA

PHARMACY

OFFICE

SHOWER

4B-165

ELEC

SVC

BAY

MECH

SVC BAY-G

EQUIP

CONVEYOR

OFFICE

TRASH

ELEV

LOBBY

STAIR

OFFICE

FEMALE

LOCKER

CORRIDOR

OFFICE

ELECTROPHYSIOLOGY

OFFICE

TOILET

CRITICAL CARE

STORAGE

EP LAB

UTILITY

RECOVERY

CONTROL

4A-109

4A-108

4A-106

4A-105

4A-104

4A-107

4A-102

4A-101

C4A-5

4A-145

4A-146

4A-144

C4A-1

4A-201

4A-100

4A-204

4A-205 TSC-2

4A-202

4A-203

CARDIOLOGY

SOILED

P-3

P-2

P-1

CM-1

DT-1

P-4

TSC-2

ELEV

ELEV

ELEV

CONVEYOR

ELEV

PRESSURE

EMERGENCY

ELEV

CARDIAC

CORRIDOR

C4A-3

CORRIDOR

C4A-2

CORRIDOR

C4A-17

1 BED

PATIENT RM

4B-110

TOILET

4B-110T

1 BED

PATIENT RM

4B-111

TOILET

4B-111T

1 BED

PATIENT RM

4B-103

TOILET

4B-103T

1 BED

PATIENT RM

4B-104

TOILET

4B-104T

1 BED

PATIENT RM

4B-107

BREAK RM

4B-108

TOILET

4B-107T

TOILET

4B-109T

1 BED

PATIENT RM

4B-106

TOILET

4B-106T

1 BED

PATIENT RM

4B-109

1 BED

PATIENT RM

4B-102

1 BED

BARRIATRIC

PATIENT RM

4B-101

1 BED

PATIENT RM

4B-100

LACTATION

4B-108A

1 BED

PATIENT RM

4B-105

TOILET

4B-105T

TOILET

4B-102T

STAFF TOILET

4B-108B

OIT

4B-123

NURSE

STATION

4B-128

STAFF TOILET

4B-129

KT / OT

OFFICE

4B-130

NURSES

OFFICE

4B-131

PHYSICAL

THERAPY

4B-132A

LOCKERS

4B-124E

NOURISH.

4B-127C

CORRIDOR

4B-127

MEDICATION

4B-128A

TELEMETRY

4B-128B

STERILE

SUPPLY

4B-133

ELECTRICAL

4B-132B

CORRIDOR

4B-132

HU…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .