This file contains plumbing construction drawings and specifications for the "Improve Patient Privacy 4B" project at Hunter Holmes McGuire VA Medical Center in Richmond, VA. The drawings show detailed plumbing plans for the fourth floor, including demolition and new construction phases for sanitary, vent, domestic water, and medical gas systems.
The plans detail a two-phase construction approach with specific requirements for plumbing fixtures, pipe sizes, and connections. Key components include waste piping systems (2"-5" sizes), vent piping, domestic cold water, hot water and hot water return systems (1/2"-3" sizes), and medical gas systems including oxygen, medical air, and vacuum. The drawings include general plumbing notes requiring conformance to VA standards, manufacturer recommendations, and local codes. The project requires water hammer arrestors, firestopping of penetrations, and coordination with existing conditions. Detailed diagrams show connections for water closets, lavatories, medical gas zone valves, and dialysis boxes. The drawings are dated June 12, 2019 and were prepared by Apogee Consulting Group for the Department of Veterans Affairs.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING GENERAL NOTES
P-101
PL105
PL105
A
KEYED NOTE
FIXTURE OR
FAUCET TAG
DRAWING NUMBER
WHERE SHOWN
SECTION LETTER
DRAWING NUMBER
WHERE DRAWN
DETAIL NUMBER
DRAWING SYMBOLS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
P
M
P-001
MRASPG
PLUMBING GENERAL NOTES,
LEGEND AND ABBREVIATIONS
1 16
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA
STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE
FOR THE PURPOSES INTENDED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO
THE APPROVAL OF THE ARCHITECT/ENGINEER. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR
BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE
ARCHITECT/ENGINEER.
6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR
EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
7. PLUMBING FIXTURES SHALL HAVE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
8. SANITARY SEWER PIPING SHOWN IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED
OTHERWISE. SANITARY VENT PIPING SHOWN IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED
OTHERWISE.
9. SUPPORT PIPING SYSTEM AS REQUIRED BY LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
10. PIPING PENETRATIONS THROUGH NEW OR EXISTING WALLS OR FLOORS SHALL BE SEALED TO EQUAL THE
RATING OF THE NEW OR EXISTING WALL OR FLOOR.
11. PLUMBING SYSTEM SHALL BE TESTED AS REQUIRED PER ALL LOCAL, STATE, AND NATIONAL CODES ALONG WITH
ALL VA STANDARDS.
12. COORDINATE ALL PLUMBING PIPING WITH ALL STRUCTURAL COMPONENTS.
13. DISINFECT THE DOMESTIC WATER SYSTEM IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL CODES
ALONG WITH ALL VA STANDARDS.
14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. CONTRACTOR SHALL
COORDINATE ROUTING OF ALL PIPING WITH EXISTING CONDITIONS AND SHALL PROVIDE ANY NECESSARY
OFFSETS, REROUTING, ETC. REQUIRED FOR A COMPLETE AND COORDINATED INSTALLATION.
16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE WORKING PLUMBING SYSTEM.
DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING
SYSTEMS.
17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE OWNER 1 WEEK IN
ADVANCE.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS
CONTRACT, UNLESS NOTED OTHERWISE.
19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF
PROJECT.
20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
21. PIPES SHALL NOT BE ROUTED ABOVE TELECOM OR ELECTRICAL ROOMS.
PIPING DOWN
PIPING UP
TEE UP
TEE DOWN
EXISTING PIPING TO REMAIN
BALL VALVE
CHECK VALVE
LIMITS OF DEMOLITION
POINT OF CONNECTION TO EXISTING
DCW
DHW
DHWR
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
PIPING TO BE DEMOLISHED
SAN
SANITARY SEWER
V
SANITARY VENT
BALANCING VALVE
WALL CLEAN OUT (WCO)
A/E ARCHITECT / ENGINEER
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
ASME AMERICAN SOCIETY
MECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY
PLUMBING ENGINEERS
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER
RETURN
DN DOWN
DWG DRAWING
EL ELEVATION
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EX EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FU FIXTURE UNITS
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIBB
HD HUB DRAIN
HP HORSEPOWER
HS HAND SINK
HWCP HOT WATER CIRCULATING
PUMP
HWP HOT WATER PUMP
INV INVERT
IPC INTERNATIONAL PLUMBING
CODE
LAV LAVATORY
M METER
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NOM. NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
PDI PLUMBING AND DRAINAGE
INSTITUTE
PSIG POUNDS PER SQUARE INCH
GAUGE
SAN SANITARY SEWER
SQFT SQUARE FEET
SS STAINLESS STEEL
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING
VALVE
TP TRAP PRIMER
TYP. TYPICAL
V VENT
VS VENT STACK
VTR VENT THROUGH ROOF
WC WATER CLOSET
WCO WALL CLEANOUT
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WS WASTE STACK
CA
COMPRESSED AIR
O
OXYGEN
VAC
VACUUM
AutoCAD SHX Text
PLUMBING LEGEND
AutoCAD SHX Text
PLUMBING ABBREVIATIONS
sharmon Model
VHARICStileR Text Box P-103
VHARICStileR Text Box
WATER CLOSET, FLOOR MTD, BACK OUTLET
VHARICStileR Text Box
WATER CLOSET, FLOOR MTD, BACK OUTLET
VHARICStileR Text Box
YES
VHARICStileR Text Box
YES
VHARICStileR Text Box
YES
VHARICStileR Text Box P-410, P-510
5" SAN
4" SAN
1-1/2" SAN
5" SAN
1-1/2" SAN
4" SAN
4" SAN
4" SAN
1-1/2" SAN
1-1/2" SAN
4" SAN
4" SAN
2" SAN
1-1/2" SAN
3" SAN
4" SAN
4" SAN
3" SAN
4" SAN
1-1/2" SAN
4" SAN
1-1/2" SAN
2" SAN
4" SAN
4" SAN
1-1/2" SAN
4" SAN
4" SAN
1-1/2" SAN
4" SAN
4" SAN
3" SAN
1-1/2" SAN
3" SAN
5"
4"
2"
2"
P-401
P-101 P-528
P-528
P-401
P-101
P-528
P-101
P-401
P-528
P-101
P-401
P-101
P-401
P-528 P-528
P-101
P-401
P-528
P-101P-401
P-528
P-101
P-401
P-101
P-401
P-528 P-401
P-101
P-528 P-528
P-101
P-401
P-101
P-401
P-528
P-401 P-401
P-401
P-401
P-401
P-401
P-101
P-101
P-401
P-401
P-502
P-604
P-502
P-505
(TYP.)
(TYP.)
(TYP.)
16151413 21191817 22
22w 22e
12 20
1-1/2" SAN
STORAGE
STORAGE
BREAK RM
PATIENT RM
TOILET
TOILET
UTILITY
PATIENT RM
EQUIP
TOILET
RM
TOILET
SECURITY
1 BED ATIENT
TOILET
1 BED
ANTE RM
TOILET
4 BED RM
TOILET
2 BED RM
1 BED RM
TOILET
CORRIDOR
STEP-DOWN
CLEAN
C4B-7
4B-163
4B-164
4B-161
4B-159
4B-157
4B-158
RM
4B-155
4B-148
4B-147
4B-156
4B-143
4B-144
4B-141
4B-142
4B-139
4B-140
4B-169
4B-168
4A-206
4B-166
4B-104
1 BED
PATIENT RM
4 BED
2 BED
STORAGE/OFFICE
PATIENT RM
4B-154
HSK
SATELLITE MED
4B-162
PREP AREA
PHARMACY
OFFICE
TOILET
PATIENT RM
PATIENT RM
TOILET
TOILET
PATIENT RM
CORRIDOR
OFFICE
TEAM RM-3
MEDICINE
1 BED ROOM
TOILET
TOILET
2 BED RM
RM
TOILET
SHOWER
TOILET
1 BED
TOILET
PATIENT RM
PATIENT RM
TOILET
TOILET
PATIENT RM
TOILET
PATIENT RM
PATIENT RM
TOILET
IV TEAM
STORAGE
CLOSET
CORRIDOR
BRONCHOSCOPY
I.V. TEAM
STAFF RM
OFFICE
CLEAN
UTILITY
DIETICIAN
UTILITY
SOILED
CONGREGATE
BATH/SHOWER
CORRIDOR
NURSE STATION
AND CLERK
MEDICATION
PATIENT
TOILET
REST RM
NOURISHMENT
KITCHEN
CORRIDOR
OFFICE
TOILET
4C-140
C4B-6
4C-141
4B-134
4B-135
4B-136
4B-150
4B-146
4B-130
4B-127
4B-126
4B-123
4B-153
4B-120
4B-151
4B-152
C4B-4
C4B-3
4B-113
4B-111
4B-110
4B-115
4B-114
4B-116
4B-117
4B-118
4B-119
4B-121
4B-122
4B-125
4B-124
4B-129
4B-128
4B-133
4B-131
4B-132
C4B-5
4B-137
4B-138
4B-112
4B-105
C4B-2
4B-101
4B-100
4B-102
4B-103
4B-107
4B-106
DIETICIAN
NURSE
MGR
BRONCHOSCOPY
ELEC
REGISTERED
CLINICAL
OFFICE
PATIENT RM
4 BED PATIENT
OFFICE
MONITORING RM
TELEMETRY
TEAM -2
4B-145
MEDICINE
OFFICE
SHOWER
4B-165
ELEC
SVC
BAY
MECH
SVC BAY-G
EQUIP
CONVEYOR
OFFICE
TRASH
ELEV
LOBBY
STAIR
LINEN
FAMILY
WAITING
VISITORS
TOILET
PULMONARY
FELLOWS
MEDICAL
TEAM ROOM
OFFICE
MALE
TOILET
MALE
LOCKER
FEMALE
LOCKER
FEMALE
TOILET
ON CALL
STRETCH
TOILET
STRETCH
OFFICE
TOILET
H.A.C
SHOWER
STORAGE
CORRIDOR
OFFICE
ELECTROPHYSIOLOGY
OFFICE
TOILET
CRITICAL CARE
STORAGE
EP LAB
UTILITY
RECOVERY
CONTROL
4A-109
4A-108
4A-106
4A-105
4A-104
4A-107
4A-102
4A-101
C4A-5
4A-145
C4A-15
4A-199
4A-196
4A-197
4A-195
4A-198
4A-152
C4A-8
4A-147
4A-148
4A-146
4A-151
4A-144
4A-143
4A-194
4A-193
4A-200
4A-149
4A-150
C4A-1
4A-201
4A-100
4A-204
4A-205 TSC-2
4A-202
4A-203
CARDIOLOGY
SOILED
P-3
P-2
P-1
CM-1
DT-1
P-4
TSC-2
INTERN
INTERN
ELEV
ELEV
ELEV
CONVEYOR
ELEV
PRESSURE
EMERGENCY
ELEV
CARDIAC
PULMONARY
OFFICE
OFFICE
CORRIDOR
C4A-3
CORRIDOR
C4A-2
CORRIDOR
C4A-17
4A-204A
STORAGE
ELECTROPHISIOLOGY
X
W
Y
Z
AA
PLUMBING DEMOLITION INTERSTITIAL PLAN - SANITARY AND VENT - PHASE 1
1/8" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
WALL RATING LEGEND:
30 MINUTE SMOKE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
FOURTH FLOOR KEY PLAN:
AREA OF WORK
1. DEMOLISH FIXTURE AND ALL ASSOCIATED
PIPING TO LOCATION INDICATED.
2. DEMOLISH WASTE PIPING AND SUPPORTS
COMPLETE.
3. DEMOLISH VENT PIPING AND SUPPORTS
COMPLETE.
4. TEMPORARY NOURISHMENT STATION DURING
PHASE 1 CONSTRUCTION.
5. SANITARY PIPE AND VENT PIPE FOR MOP SINK
SHALL BE DEMOLISHED AND REPLACE
IMMEDIATELY TO REMAIN IN SERVICE.
6. CAP PIPE HERE.
P
M
PD101
MRASPG
PLUMBING FOURTH FLOOR
DEMOLITION PLAN - SANITARY AND VENT -
PHASE 1
2 16
0 4 8 16
NORTH
PLAN
A. COORDINATE PHASING LIMITS AS SHOWN
ON GI102.
B. REFER TO HA PLANS FOR INDICATION OF
HAZARDOUS MATERIALS PRIOR TO
STARTING WORK.
C. DEMOLITION WORK SHALL BE DONE SUCH
THAT ALL THE PIPES, HANGERS, SUPPORTS,
AND VALVES ARE REMOVED ALL THE WAY
TO THE MAINS. REMOVE ALL ITEMS TO
ENSURE NOTHING IS LEFT ABANDONED IN
PLACE.
D. SANITARY PIPE BELOW SLAB AND VENT
PIPING IN INTERSTITIAL ABOVE.
AutoCAD SHX Text X sharmon Model
VHARICStileR Line
VHARICStileR Line
VHARICStileR Text Box
NOT IN CONTRACT
4" SAN
1-1/2" SAN
4" SAN
4" SAN
2" SAN
4" SAN
4" SAN
4" SAN 4" SAN
1-1/2" SAN
4" SAN
2" SAN
1-1/2" SAN
4" SAN
1-1/2" SAN
4" SAN
1-1/2" SAN
2"
3"
P-401
P-401
P-401
P-401
P-401
P-401
P-401
P-401
P-528
P-528
P-528
P-528
P-528 P-528
P-528
P-528
P-101
P-101
P-101
P-101
P-101
P-101
P-101
P-101
(TYP.)
(TYP.)
(TYP.)
16151413 21191817 22
22w 22e
12 20
STORAGE
STORAGE
BREAK RM
PATIENT RM
TOILET
TOILET
UTILITY
PATIENT RM
EQUIP
TOILET
RM
TOILET
SECURITY
1 BED ATIENT
TOILET
1 BED
ANTE RM
TOILET
4 BED RM
TOILET
2 BED RM
1 BED RM
TOILET
CORRIDOR
STEP-DOWN
CLEAN
C4B-7
4B-163
4B-164
4B-161
4B-159
4B-157
4B-158
RM
4B-155
4B-148
4B-147
4B-156
4B-143
4B-144
4B-141
4B-142
4B-139
4B-140
4B-169
4B-168
4A-206
4B-166
4B-104
1 BED
PATIENT RM
4 BED
2 BED
STORAGE/OFFICE
PATIENT RM
4B-154
HSK
SATELLITE MED
4B-162
PREP AREA
PHARMACY
OFFICE
SHOWER
4B-165
ELEC
SVC
BAY
MECH
SVC BAY-G
EQUIP
CONVEYOR
OFFICE
TRASH
ELEV
LOBBY
STAIR
LINEN
FAMILY
WAITING
VISITORS
TOILET
PULMONARY
FELLOWS
MEDICAL
TEAM ROOM
OFFICE
MALE
TOILET
MALE
LOCKER
FEMALE
LOCKER
FEMALE
TOILET
ON CALL
STRETCH
TOILET
STRETCH
OFFICE
TOILET
H.A.C
SHOWER
STORAGE
CORRIDOR
OFFICE
ELECTROPHYSIOLOGY
OFFICE
TOILET
CRITICAL CARE
STORAGE
EP LAB
UTILITY
RECOVERY
CONTROL
4A-109
4A-108
4A-106
4A-105
4A-104
4A-107
4A-102
4A-101
C4A-5
4A-145
C4A-15
4A-199
4A-196
4A-197
4A-195
4A-198
4A-152
C4A-8
4A-147
4A-148
4A-146
4A-151
4A-144
4A-143
4A-194
4A-193
4A-200
4A-149
4A-150
C4A-1
4A-201
4A-100
4A-204
4A-205 TSC-2
4A-202
4A-203
CARDIOLOGY
SOILED
P-3
P-2
P-1
CM-1
DT-1
P-4
TSC-2
INTERN
INTERN
ELEV
ELEV
ELEV
CONVEYOR
ELEV
PRESSURE
EMERGENCY
ELEV
CARDIAC
PULMONARY
OFFICE
OFFICE
CORRIDOR
C4A-3
CORRIDOR
C4A-2
CORRIDOR
C4A-17
1 BED
PATIENT RM
4B-110
TOILET
4B-110T
1 BED
PATIENT RM
4B-111
TOILET
4B-111T
1 BED
PATIENT RM
4B-103
TOILET
4B-103T
1 BED
PATIENT RM
4B-104
TOILET
4B-104T
1 BED
PATIENT RM
4B-107
BREAK RM
4B-108
TOILET
4B-107T
TOILET
4B-109T
1 BED
PATIENT RM
4B-106
TOILET
4B-106T
1 BED
PATIENT RM
4B-109
1 BED
PATIENT RM
4B-102
1 BED
BARRIATRIC
PATIENT RM
4B-101
1 BED
PATIENT RM
4B-100
LACTATION
4B-108A
1 BED
PATIENT RM
4B-105
TOILET
4B-105T
TOILET
4B-102T
STAFF TOILET
4B-108B
OIT
4B-123
NURSE
STATION
4B-128
STAFF TOILET
4B-129
KT / OT
OFFICE
4B-130
NURSES
OFFICE
4B-131
PHYSICAL
THERAPY
4B-132A
LOCKERS
4B-124E
NOURISH.
4B-127C
CORRIDOR
4B-127
MEDICATION
4B-128A
TELEMETRY
4B-128B
STERILE
SUPPLY
4B-133
ELECTRICAL
4B-132B
CORRIDOR
4B-132
HUB
4B-132D
ELECTRICAL
4B-132C
TOILET
4B-101T
TOILET
4B-100T
CORRIDOR
4B-150N
4A-204A
STORAGE
ELECTROPHISIOLOGY
X
W
Y
Z
AA
PLUMBING DEMOLITION INTERSTITIAL PLAN - SANITARY AND VENT - PHASE 2
1/8" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
WALL RATING LEGEND:
30 MINUTE SMOKE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
FOURTH FLOOR KEY PLAN:
AREA OF WORK
1. DEMOLISH FIXTURE AND ALL ASSOCIATED
PIPING TO LOCATION INDICATED.
2. DEMOLISH WASTE PIPING AND SUPPORTS
COMPLETE.
3. DEMOLISH VENT PIPING AND SUPPORTS
COMPLETE.
P
M
PD102
MRASPG
PLUMBING FOURTH FLOOR
DEMOLITION PLAN - SANITARY AND VENT -
PHASE 2
3 16
0 4 8 16
NORTH
PLAN
A. COORDINATE PHASING LIMITS AS SHOWN
ON GI102.
B. REFER TO HA PLANS FOR INDICATION OF
HAZARDOUS MATERIALS PRIOR TO
STARTING WORK.
C. DEMOLITION WORK SHALL BE DONE SUCH
THAT ALL THE PIPES, HANGERS, SUPPORTS,
AND VALVES ARE REMOVED ALL THE WAY
TO THE MAINS. REMOVE ALL ITEMS TO
ENSURE NOTHING IS LEFT ABANDONED IN
PLACE.
D. SANITARY PIPE BELOW SLAB AND VENT
PIPING IN INTERSTITIAL ABOVE.
AutoCAD SHX Text X sharmon Model
VHARICStileR Line
VHARICStileR Line
VHARICStileR Text Box
NOT IN CONTRACT
VHARICStileR Rectangle
3"
2"1/2"
3"
1-1/2"1/2"
2"
1/2"1/2"
2"
1"
(TYP.)
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
16151413 21191817 22
22w 22e
17 20 211918 22
22w 22e
ELEC
SVC
BAY
MECH
SVC BAY-G
EQUIP
CONVEYOR
OFFICE
TRASH
ELEV
LOBBY
STAIR
LINEN
FAMILY
WAITING
VISITORS
TOILET
OFFICE
MALE
TOILET
MALE
LOCKER
FEMALE
LOCKER
FEMALE
TOILET
ON CALL
TOILET
OFFICE
H.A.C
SHOWER
STORAGE
CORRIDOR
OFFICE
ELECTROPHYSIOLOGY
OFFICE
TOILET
CRITICAL CARE
STORAGE
EP LAB
UTILITY
RECOVERY
CONTROL
4A-109
4A-108
4A-106
4A-105
4A-104
4A-107
4A-110
4A-102
4A-101
C4A-5
4A-145
4A-142
4A-199
4A-196
4A-198
4A-152
4A-147
4A-148
4A-146
4A-151
4A-144
4A-143
4A-200
4A-149
4A-150
C4A-1
4A-201
4A-100
4A-204
4A-205 TSC-2
4A-202
4A-203
CARDIOLOGY
SOILED
P-3
P-2
P-1
CM-1
DT-1
P-4
TSC-2
INTERN
INTERN
ELEV
ELEV
ELEV
CONVEYOR
ELEV
PRESSURE
EMERGENCY
ELEV
CARDIAC
CORRIDOR
C4A-3
CORRIDOR
C4A-2
CORRIDOR
C4A-17
STORAGE
STORAGE
STORAGE
BREAK RM
PATIENT RM
TOILET
TOILET
UTILITY
PATIENT RM
EQUIP
TOILET
RM
TOILET
SECURITY
1 BED ATIENT
TOILET
1 BED
ANTE RM
TOILET
4 BED RM
TOILET
2 BED RM
1 BED RM
TOILET
CORRIDOR
STEP-DOWN
CLEAN
C4B-7
4B-163
4B-164
4B-161
4B-159
4B-157
4B-158
RM
4B-155
4B-148
4B-147
4B-156
4B-143
4B-144
4B-141
4B-142
4B-139
4B-140
4B-169
4B-168
4A-204A
4A-206
4B-166
4B-104
ELECTROPHISIOLOGY
1 BED
PATIENT RM
4 BED
2 BED
STORAGE/OFFICE
PATIENT RM
4B-154
HSK
SATELLITE MED
4B-162
PREP AREA
PHARMACY
OFFICE
TOILET
PATIENT RM
PATIENT RM
TOILET
TOILET
PATIENT RM
CORRIDOR
OFFICE
TEAM RM-3
MEDICINE
1 BED ROOM
TOILET
TOILET
2 BED RM
RM
TOILET
SHOWER
TOILET
1 BED
TOILET
PATIENT RM
PATIENT RM
TOILET
TOILET
PATIENT RM
TOILET
PATIENT RM
PATIENT RM
TOILET
IV TEAM
STORAGE
CLOSET
CORRIDOR
BRONCHOSCOPY
I.V. TEAM
STAFF RM
OFFICE
CLEAN
UTILITY
DIETICIAN
UTILITY
SOILED
CONGREGATE
BATH/SHOWER
CORRIDOR
NURSE STATION
AND CLERK
MEDICATION
PATIENT
TOILET
REST RM
NOURISHMENT
KITCHEN
CORRIDOR
OFFICE
TOILET
4C-140
C4B-6
4C-141
4B-134
4B-135
4B-136
4B-150
4B-146
4B-130
4B-127
4B-126
4B-123
4B-153
4B-120
4B-151
4B-152
C4B-4
C4B-3
4B-113
4B-111
4B-110
4B-115
4B-114
4B-116
4B-117
4B-118
4B-119
4B-121
4B-122
4B-125
4B-124
4B-129
4B-128
4B-133
4B-131
4B-132
C4B-5
4B-137
4B-138
4B-112
4B-105
C4B-2
4B-101
4B-100
4B-102
4B-103
4B-107
4B-106
DIETICIAN
NURSE
MGR
BRONCHOSCOPY
ELEC
REGISTERED
CLINICAL
OFFICE
PATIENT RM
4 BED PATIENT
OFFICE
MONITORING RM
TELEMETRY
TEAM -2
4B-145
MEDICINE
OFFICE
SHOWER
4B-165
ELEC
SVC
BAY
MECH
SVC BAY-G
EQUIP
CONVEYOR
OFFICE
TRASH
ELEV
LOBBY
STAIR
LINEN
FAMILY
WAITING
VISITORS
TOILET
OFFICE
MALE
TOILET
MALE
LOCKER
FEMALE
LOCKER
FEMALE
TOILET
ON CALL
TOILET
OFFICE
H.A.C
SHOWER
STORAGE
CORRIDOR
OFFICE
ELECTROPHYSIOLOGY
OFFICE
TOILET
CRITICAL CARE
STORAGE
EP LAB
UTILITY
RECOVERY
CONTROL
4A-109
4A-108
4A-106
4A-105
4A-104
4A-107
4A-110
4A-102
4A-101
C4A-5
4A-145
4A-142
4A-199
4A-196
4A-198
4A-152
4A-147
4A-148
4A-146
4A-151
4A-144
4A-143
4A-200
4A-149
4A-150
C4A-1
4A-201
4A-100
4A-204
4A-205 TSC-2
4A-202
4A-203
CARDIOLOGY
SOILED
P-3
P-2
P-1
CM-1
DT-1
P-4
TSC-2
INTERN
INTERN
ELEV
ELEV
ELEV
CONVEYOR
ELEV
PRESSURE
EMERGENCY
ELEV
CARDIAC
CORRIDOR
C4A-3
CORRIDOR
C4A-2
CORRIDOR
C4A-17
X
W
Y
Z
AA
PLUMBING FOURTH FLOOR DEMOLITION PLAN - DOMESTIC WATER - PHASE 1
1/8" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
WALL RATING LEGEND:
30 MINUTE SMOKE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
FOURTH FLOOR KEY PLAN:
AREA OF WORK
1. DEMOLISH DOMESTIC HOT WATER, COLD
WATER, AND RETURN WATER PIPING BACK
TO POINT OF DEMOLITION.
2. DEMOLISH DOMESTIC WATER LINES BACK
TO MAIN.
3. DOMESTIC WATER SHALL BE DEMOLISHED
AND REPLACED IMMEDIATELY TO REMAIN
IN SERVICE.
A. COORDINATE PHASING LIMITS AS SHOWN
ON GI102.
B. REFER TO HA PLANS FOR INDICATION OF
HAZARDOUS MATERIALS PRIOR TO
STARTING WORK.
C. DOMESTIC WATER PIPING IN INTERSTITIAL
SPACE FLOOR PLAN SHOWN FOR CLARITY.
P
M
PD103
MRASPG
PLUMBING FOURTH FLOOR
DEMOLITION PLAN - DOMESTIC WATER -
PHASE 1
4 16
0 4 8 16
NORTH
PLAN
AutoCAD SHX Text X sharmon Model
VHARICStileR Line
VHARICStileR Line
VHARICStileR Text Box
NOT IN CONTRACT
1/2"
2"
3/4"1"
1-1/4"
2-1/2"
1-1/2"
2-1/2"
2"
3"
1/2"
1-1/2"
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
(TYP.)
16151413 21191817 22
22w 22e
17 20 211918 22
22w 22e
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
STORAGE
STORAGE
STORAGE
BREAK RM
PATIENT RM
TOILET
TOILET
UTILITY
PATIENT RM
EQUIP
TOILET
RM
TOILET
SECURITY
1 BED ATIENT
TOILET
1 BED
ANTE RM
TOILET
4 BED RM
TOILET
2 BED RM
1 BED RM
TOILET
CORRIDOR
STEP-DOWN
CLEAN
C4B-7
4B-163
4B-164
4B-161
4B-159
4B-157
4B-158
RM
4B-155
4B-148
4B-147
4B-156
4B-143
4B-144
4B-141
4B-142
4B-139
4B-140
4B-169
4B-168
4A-204A
4A-206
4B-166
4B-104
ELECTROPHISIOLOGY
1 BED
PATIENT RM
4 BED
2 BED
STORAGE/OFFICE
PATIENT RM
4B-154
HSK
SATELLITE MED
4B-162
PREP AREA
PHARMACY
OFFICE
SHOWER
4B-165
ELEC
SVC
BAY
MECH
SVC BAY-G
EQUIP
CONVEYOR
OFFICE
TRASH
ELEV
LOBBY
STAIR
LINEN
FAMILY
WAITING
VISITORS
TOILET
OFFICE
MALE
TOILET
MALE
LOCKER
FEMALE
LOCKER
FEMALE
TOILET
ON CALL
TOILET
OFFICE
H.A.C
SHOWER
STORAGE
CORRIDOR
OFFICE
ELECTROPHYSIOLOGY
OFFICE
TOILET
CRITICAL CARE
STORAGE
EP LAB
UTILITY
RECOVERY
CONTROL
4A-109
4A-108
4A-106
4A-105
4A-104
4A-107
4A-110
4A-102
4A-101
C4A-5
4A-145
4A-142
4A-199
4A-196
4A-198
4A-152
4A-147
4A-148
4A-146
4A-151
4A-144
4A-143
4A-200
4A-149
4A-150
C4A-1
4A-201
4A-100
4A-204
4A-205 TSC-2
4A-202
4A-203
CARDIOLOGY
SOILED
P-3
P-2
P-1
CM-1
DT-1
P-4
TSC-2
INTERN
INTERN
ELEV
ELEV
ELEV
CONVEYOR
ELEV
PRESSURE
EMERGENCY
ELEV
CARDIAC
CORRIDOR
C4A-3
CORRIDOR
C4A-2
CORRIDOR
C4A-17
1 BED
PATIENT RM
4B-110
TOILET
4B-110T
1 BED
PATIENT RM
4B-111
TOILET
4B-111T
1 BED
PATIENT RM
4B-103
TOILET
4B-103T
1 BED
PATIENT RM
4B-104
TOILET
4B-104T
1 BED
PATIENT RM
4B-107
BREAK RM
4B-108
TOILET
4B-107T
TOILET
4B-109T
1 BED
PATIENT RM
4B-106
TOILET
4B-106T
1 BED
PATIENT RM
4B-109
1 BED
PATIENT RM
4B-102
1 BED
BARRIATRIC
PATIENT RM
4B-101
1 BED
PATIENT RM
4B-100
LACTATION
4B-108A
1 BED
PATIENT RM
4B-105
TOILET
4B-105T
TOILET
4B-102T
STAFF TOILET
4B-108B
OIT
4B-123
NURSE
STATION
4B-128
STAFF TOILET
4B-129
KT / OT
OFFICE
4B-130
NURSES
OFFICE
4B-131
PHYSICAL
THERAPY
4B-132A
LOCKERS
4B-124E
NOURISH.
4B-127C
CORRIDOR
4B-127
MEDICATION
4B-128A
TELEMETRY
4B-128B
STERILE
SUPPLY
4B-133
ELECTRICAL
4B-132B
CORRIDOR
4B-132
HUB
4B-132D
ELECTRICAL
4B-132C
TOILET
4B-101T
TOILET
4B-100T
CORRIDOR
4B-150N
X
W
Y
Z
AA
PLUMBING FOURTH FLOOR DEMOLITION PLAN - DOMESTIC WATER - PHASE 2
1/8" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
WALL RATING LEGEND:
30 MINUTE SMOKE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
FOURTH FLOOR KEY PLAN:
AREA OF WORK
1. DEMOLISH DOMESTIC HOT WATER, COLD
WATER, AND RETURN WATER PIPING BACK
TO POINT OF DEMOLITION.
2. DEMOLISH DOMESTIC WATER LINES BACK
TO MAIN.
A. COORDINATE PHASING LIMITS AS SHOWN
ON GI102.
B. REFER TO HA PLANS FOR INDICATION OF
HAZARDOUS MATERIALS PRIOR TO
STARTING WORK.
C. DOMESTIC WATER PIPING IN INTERSTITIAL
SPACE FLOOR PLAN SHOWN FOR CLARITY.
P
M
PD104
MRASPG
PLUMBING FOURTH FLOOR
DEMOLITION PLAN - DOMESTIC WATER -
PHASE 2
5 16
0 4 8 16
NORTH
PLAN
AutoCAD SHX Text X sharmon Model
VHARICStileR Line
VHARICStileR Line
VHARICStileR Text Box
NOT IN CONTRACT
3/4"
3/4"
1-1/2"
1"
1"
1-1/2"
3/4"
1"
1-1/2"
1"
1-1/2"
3/4"
1-1/2"
(TYP.)
MV
MA
O
MV
MA
O
MV
MA
O
MV
MA
O
MV
MA
O
MV
MA
O
MV
MA
O
MV
MA
O
16151413 21191817 22
22w 22e
STORAGE
STORAGE
STORAGE
BREAK RM
PATIENT RM
TOILET
TOILET
UTILITY
PATIENT RM
EQUIP
TOILET
RM
TOILET
SECURITY
1 BED ATIENT
TOILET
1 BED
ANTE RM
TOILET
4 BED RM
TOILET
2 BED RM
1 BED RM
TOILET
CORRIDOR
STEP-DOWN
CLEAN
C4B-7
4B-163
4B-164
4B-161
4B-159
4B-157
4B-158
RM
4B-155
4B-148
4B-147
4B-156
4B-143
4B-144
4B-141
4B-142
4B-139
4B-140
4B-169
4B-168
4A-204A
4A-206
4B-166
4B-104
ELECTROPHISIOLOGY
1 BED
PATIENT RM
4 BED
2 BED
STORAGE/OFFICE
PATIENT RM
4B-154
HSK
SATELLITE MED
4B-162
PREP AREA
PHARMACY
OFFICE
TOILET
PATIENT RM
PATIENT RM
TOILET
TOILET
PATIENT RM
CORRIDOR
OFFICE
TEAM RM-3
MEDICINE
1 BED ROOM
TOILET
TOILET
2 BED RM
RM
TOILET
SHOWER
TOILET
1 BED
TOILET
PATIENT RM
PATIENT RM
TOILET
TOILET
PATIENT RM
TOILET
PATIENT RM
PATIENT RM
TOILET
IV TEAM
STORAGE
CLOSET
CORRIDOR
BRONCHOSCOPY
I.V. TEAM
STAFF RM
OFFICE
CLEAN
UTILITY
DIETICIAN
UTILITY
SOILED
CONGREGATE
BATH/SHOWER
CORRIDOR
NURSE STATION
AND CLERK
MEDICATION
PATIENT
TOILET
REST RM
NOURISHMENT
KITCHEN
CORRIDOR
OFFICE
TOILET
4C-140
C4B-6
4C-141
4B-134
4B-135
4B-136
4B-150
4B-146
4B-130
4B-127
4B-126
4B-123
4B-153
4B-120
4B-151
4B-152
C4B-4
C4B-3
4B-113
4B-111
4B-110
4B-115
4B-114
4B-116
4B-117
4B-118
4B-119
4B-121
4B-122
4B-125
4B-124
4B-129
4B-128
4B-133
4B-131
4B-132
C4B-5
4B-137
4B-138
4B-112
4B-105
C4B-2
4B-101
4B-100
4B-102
4B-103
4B-107
4B-106
DIETICIAN
NURSE
MGR
BRONCHOSCOPY
ELEC
REGISTERED
CLINICAL
OFFICE
PATIENT RM
4 BED PATIENT
OFFICE
MONITORING RM
TELEMETRY
TEAM -2
4B-145
MEDICINE
OFFICE
SHOWER
4B-165
ELEC
SVC
BAY
MECH
SVC BAY-G
EQUIP
CONVEYOR
OFFICE
TRASH
ELEV
LOBBY
STAIR
LINEN
FAMILY
WAITING
VISITORS
TOILET
OFFICE
MALE
TOILET
MALE
LOCKER
FEMALE
LOCKER
FEMALE
TOILET
ON CALL
TOILET
OFFICE
H.A.C
SHOWER
CORRIDOR
OFFICE
ELECTROPHYSIOLOGY
OFFICE
TOILET
CRITICAL CARE
STORAGE
EP LAB
UTILITY
RECOVERY
CONTROL
4A-109
4A-108
4A-106
4A-105
4A-104
4A-107
4A-102
4A-101
C4A-5
4A-145
4A-199
4A-196
4A-198
4A-152
4A-147
4A-148
4A-146
4A-151
4A-144
4A-143
4A-200
4A-149
4A-150
C4A-1
4A-201
4A-100
4A-204
4A-205 TSC-2
4A-202
4A-203
CARDIOLOGY
SOILED
P-3
P-2
P-1
CM-1
DT-1
P-4
TSC-2
INTERN
INTERN
ELEV
ELEV
ELEV
CONVEYOR
ELEV
PRESSURE
EMERGENCY
ELEV
CARDIAC
CORRIDOR
C4A-3
CORRIDOR
C4A-2
CORRIDOR
C4A-17
X
W
Y
Z
AA
PLUMBING FOURTH FLOOR DEMOLITION PLAN - MEDICAL GAS - PHASE 1
1/8" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
WALL RATING LEGEND:
30 MINUTE SMOKE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
FOURTH FLOOR KEY PLAN:
AREA OF WORK
1. MEDICAL GAS ZONE VALVE AND AREA ALARM
PANEL ARE TO BE DEMOLISHED.
2. DEMOLISH MEDICAL AIR, OXYGEN, AND
VACUUM PIPING TO LOCATION INDICATED.
SHUTDOWN MEDICAL GASES IN AREA OF
WORK PER PHASE. COORDINATE SHUTDOWN
OF MEDICAL GAS SYSTEM WITH COR.
3. DEMOLISH MAIN SEGMENT AFTER NEW PIPE
HAS BEEN INSTALLED TO RETAIN SERVICE TO
4B SUITES. COORDINATE OUTAGE WITH COR.
TANKS WILL NEED TO BE PROVIDED FOR
EXTENDED DOWNTIME.
0 4 8 16
NORTH
PLAN
A. COORDINATE PHASING LIMITS AS SHOWN
ON GI102.
B. REFER TO HA PLANS FOR INDICATION OF
HAZARDOUS MATERIALS PRIOR TO
STARTING WORK.
C. DEMOLITION WORK SHALL BE DONE SUCH
THAT ALL THE PIPES, HANGERS, SUPPORTS,
AND VALVES ARE REMOVED ALL THE WAY
TO THE MAINS. REMOVE ALL ITEMS TO
ENSURE NOTHING IS LEFT ABANDONED IN
PLACE.
D. NO DEAD ENDS SHALL REMAIN. THE
MAXIMUM LENGTH OF DEAD ENDS SHALL BE
NO GREATER THAN TWO PIPE DIAMETERS
FROM THE BRANCH, RISER, OR MAIN THAT IT
IS CONNECTED TO.
E. MEDICAL GAS PIPING IN INTERSTITIAL
SPACE FLOOR PLAN SHOWN FOR CLARITY.
F. CONTRACTOR TO CLOSELY COORDINATE
MED GAS REPLACEMENT PROVIDE TANKS
FOR MICU IN 4B IF NECESSARY.
P
M
PD105
MRASPG
PLUMBING FOURTH FLOOR
DEMOLITION PLAN - MEDICAL GAS -
PHASE 1
6 16
AutoCAD SHX Text X sharmon Model
VHARICStileR Line
VHARICStileR Line
VHARICStileR Text Box
NOT IN CONTRACT
(TYP.)
MV
MA
O
MV
MA
O
MV
MA
O
16151413 21191817 22
22w 22e
STORAGE
STORAGE
STORAGE
BREAK RM
PATIENT RM
TOILET
TOILET
UTILITY
PATIENT RM
EQUIP
TOILET
RM
TOILET
SECURITY
1 BED ATIENT
TOILET
1 BED
ANTE RM
TOILET
4 BED RM
TOILET
2 BED RM
1 BED RM
TOILET
CORRIDOR
STEP-DOWN
CLEAN
C4B-7
4B-163
4B-164
4B-161
4B-159
4B-157
4B-158
RM
4B-155
4B-148
4B-147
4B-156
4B-143
4B-144
4B-141
4B-142
4B-139
4B-140
4B-169
4B-168
4A-204A
4A-206
4B-166
4B-104
ELECTROPHISIOLOGY
1 BED
PATIENT RM
4 BED
2 BED
STORAGE/OFFICE
PATIENT RM
4B-154
HSK
SATELLITE MED
4B-162
PREP AREA
PHARMACY
OFFICE
SHOWER
4B-165
ELEC
SVC
BAY
MECH
SVC BAY-G
EQUIP
CONVEYOR
OFFICE
TRASH
ELEV
LOBBY
STAIR
LINEN
FAMILY
WAITING
VISITORS
TOILET
OFFICE
MALE
TOILET
MALE
LOCKER
FEMALE
LOCKER
FEMALE
TOILET
ON CALL
TOILET
OFFICE
H.A.C
SHOWER
CORRIDOR
OFFICE
ELECTROPHYSIOLOGY
OFFICE
TOILET
CRITICAL CARE
STORAGE
EP LAB
UTILITY
RECOVERY
CONTROL
4A-109
4A-108
4A-106
4A-105
4A-104
4A-107
4A-102
4A-101
C4A-5
4A-145
4A-199
4A-196
4A-198
4A-152
4A-147
4A-148
4A-146
4A-151
4A-144
4A-143
4A-200
4A-149
4A-150
C4A-1
4A-201
4A-100
4A-204
4A-205 TSC-2
4A-202
4A-203
CARDIOLOGY
SOILED
P-3
P-2
P-1
CM-1
DT-1
P-4
TSC-2
INTERN
INTERN
ELEV
ELEV
ELEV
CONVEYOR
ELEV
PRESSURE
EMERGENCY
ELEV
CARDIAC
CORRIDOR
C4A-3
CORRIDOR
C4A-2
CORRIDOR
C4A-17
1 BED
PATIENT RM
4B-110
TOILET
4B-110T
1 BED
PATIENT RM
4B-111
TOILET
4B-111T
1 BED
PATIENT RM
4B-103
TOILET
4B-103T
1 BED
PATIENT RM
4B-104
TOILET
4B-104T
1 BED
PATIENT RM
4B-107
BREAK RM
4B-108
TOILET
4B-107T
TOILET
4B-109T
1 BED
PATIENT RM
4B-106
TOILET
4B-106T
1 BED
PATIENT RM
4B-109
1 BED
PATIENT RM
4B-102
1 BED
BARRIATRIC
PATIENT RM
4B-101
1 BED
PATIENT RM
4B-100
LACTATION
4B-108A
1 BED
PATIENT RM
4B-105
TOILET
4B-105T
TOILET
4B-102T
STAFF TOILET
4B-108B
OIT
4B-123
NURSE
STATION
4B-128
STAFF TOILET
4B-129
KT / OT
OFFICE
4B-130
NURSES
OFFICE
4B-131
PHYSICAL
THERAPY
4B-132A
LOCKERS
4B-124E
NOURISH.
4B-127C
CORRIDOR
4B-127
MEDICATION
4B-128A
TELEMETRY
4B-128B
STERILE
SUPPLY
4B-133
ELECTRICAL
4B-132B
CORRIDOR
4B-132
HUB
4B-132D
ELECTRICAL
4B-132C
TOILET
4B-101T
TOILET
4B-100T
CORRIDOR
4B-150N
X
W
Y
Z
AA
PLUMBING FOURTH FLOOR DEMOLITION PLAN - MEDICAL GAS - PHASE 2
1/8" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
WALL RATING LEGEND:
30 MINUTE SMOKE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
FOURTH FLOOR KEY PLAN:
AREA OF WORK
1. MEDICAL GAS ZONE VALVE AND AREA ALARM
PANEL ARE TO BE DEMOLISHED.
2. DEMOLISH MEDICAL AIR, OXYGEN, AND
VACUUM PIPING TO LOCATION INDICATED.
SHUTDOWN MEDICAL GASES IN AREA OF
WORK PER PHASE. COORDINATE SHUTDOWN
OF MEDICAL GAS SYSTEM WITH COR.
0 4 8 16
NORTH
PLAN
A. COORDINATE PHASING LIMITS AS SHOWN
ON GI102.
B. REFER TO HA PLANS FOR INDICATION OF
HAZARDOUS MATERIALS PRIOR TO
STARTING WORK.
C. DEMOLITION WORK SHALL BE DONE SUCH
THAT ALL THE PIPES, HANGERS, SUPPORTS,
AND VALVES ARE REMOVED ALL THE WAY
TO THE MAINS. REMOVE ALL ITEMS TO
ENSURE NOTHING IS LEFT ABANDONED IN
PLACE.
D. NO DEAD ENDS SHALL REMAIN. THE
MAXIMUM LENGTH OF DEAD ENDS SHALL BE
NO GREATER THAN TWO PIPE DIAMETERS
FROM THE BRANCH, RISER, OR MAIN THAT IT
IS CONNECTED TO.
E. MEDICAL GAS PIPING IN INTERSTITIAL
SPACE FLOOR PLAN SHOWN FOR CLARITY.
F. CONTRACTOR TO CLOSELY COORDINATE
MED GAS REPLACEMENT PROVIDE TANKS
FOR MICU IN 4B IF NECESSARY.
P
M
PD106
MRASPG
PLUMBING FOURTH FLOOR
DEMOLITION PLAN - MEDICAL GAS -
PHASE 2
7 16
AutoCAD SHX Text X sharmon Model
VHARICStileR Line
VHARICStileR Line
VHARICStileR Text Box
NOT IN CONTRACT
16151413 21191817 22
22w 22e
5" SAN
4" SAN
4" SAN
4" SAN
4" SAN 4" SAN
4" SAN
(TYP.)
(TYP.)
P-420
P-103
P-410
P-701
P-420
P-114
P-421
P-701
P-420
P-410
P-701
P-420
P-410
P-701
P-420
P-410
P-701
P-420
P-410
P-701
P-420
P-410
P-701
P-420
P-410
P-701
P-410
P-103
P-420
P-528
P-420
P-410
P-701
P-420
P-410
P-701
P-410
P-420
P-701
P-501
P-510
4" SAN
4" SAN
4" SAN4" SAN
4" SAN
4" SAN
P-528
P-420
3 3
2" SAN
2" SAN
2" V 2" V
2" V2" V
2" V
2" V 2" V
2" V
2" V
P-809
P-809
P-809
WCO
WCO WCO WCO
WCO
WCO
WCO WCO
P-708
1 BED
PATIENT RM
4B-110
TOILET
4B-110T
1 BED
PATIENT RM
4B-111
TOILET
4B-111T
1 BED
PATIENT RM
4B-103
TOILET
4B-103T
1 BED
PATIENT RM
4B-104
TOILET
4B-104T
1 BED
PATIENT RM
4B-107
BREAK RM
4B-108
TOILET
4B-107T
TOILET
4B-109T
1 BED
PATIENT RM
4B-106
TOILET
4B-106T
1 BED
PATIENT RM
4B-109
1 BED
PATIENT RM
4B-102
1 BED
BARRIATRIC
PATIENT RM
4B-101
1 BED
PATIENT RM
4B-100
LACTATION
4B-108A
1 BED
PATIENT RM
4B-105
TOILET
4B-105T
TOILET
4B-102T
STAFF TOILET
4B-108B
OIT
4B-123
NURSE
STATION
4B-128
STAFF TOILET
4B-129
KT / OT
OFFICE
4B-130
NURSES
OFFICE
4B-131
PHYSICAL
THERAPY
4B-132A
LOCKERS
4B-124E
NOURISH.
4B-127C
CORRIDOR
4B-127
MEDICATION
4B-128A
TELEMETRY
4B-128B
STERILE
SUPPLY
4B-133
ELECTRICAL
4B-132B
CORRIDOR
4B-132
HUB
4B-132D
ELECTRICAL
4B-132C
TOILET
4B-101T
TOILET
4B-100T
CORRIDOR
4B-150N
2" V
2" V
3" SAN
P-502
P-604
P-103
P-103 P-103 P-103
P-103
P-103
P-103 P-103
P-103
X
W
Y
Z
AA
1. PROVIDE WASTE PIPING AND SUPPORTS
COMPLETE.
2. PROVIDE VENT PIPING AND SUPPORTS
COMPLETE.
3. SANITARY TURNS DOWN BELOW SLAB HERE.
PIPING DOWN STREAM OF THIS POINT IS IN THE
INTERSTITIAL SPACE BELOW.
4. SEE DETAIL M-501/7 FOR DIALYSIS
CONNECTIONS.
5. SANITARY PIPE AND VENT PIPE FOR MOP SINK
SHALL BE DEMOLISHED AND REPLACE
IMMEDIATELY TO REMAIN IN SERVICE.
PLUMBING FOURTH FLOOR PLAN - SANITARY AND VENT - PHASE 1
1/8" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
WALL RATING LEGEND:
30 MINUTE SMOKE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
FOURTH FLOOR KEY PLAN:
AREA OF WORK
P
M
PP101
MASPG
PLUMBING FOURTH FLOOR PLAN
SANITARY AND VENT - PHASE 1
8 16
A. COORDINATE PHASING LIMITS AS SHOWN ON
GI102.
B. REFER TO HA PLANS FOR INDICATION OF
HAZARDOUS MATERIALS PRIOR TO STARTING
WORK.
C. SLEEVE ALL PENETRATIONS, FIRESTOP OR
SEAL AS REQUIRED.
D. UNLESS NOTED OTHERWISE, THE SIZE OF
FIXTURE RUNOUTS IS TO BE WHAT IS LISTED IN
THE PLUMBING FIXTURE SCHEDULE.
E. SANITARY PIPES ARE BELOW SLAB OR IN WALL
AND VENT PIPES ARE ABOVE IN INTERSTITIAL
SPACE UNLESS NOTED OTHERWISE.
F. SEAL NEW AND EXISTING PIPE PENETRATIONS
THROUGH FLOOR WATER TIGHT.
0 4 8 16
NORTH
PLAN
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
BREAK RM
AutoCAD SHX Text
PATIENT RM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
PATIENT RM
AutoCAD SHX Text
EQUIP
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
RM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text
1 BED ATIENT
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
1 BED
AutoCAD SHX Text
ANTE RM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
4 BED RM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
2 BED RM
AutoCAD SHX Text
1 BED RM
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
STEP-DOWN
AutoCAD SHX Text
CLEAN
AutoCAD SHX Text C4B-7
AutoCAD SHX Text 4B-163
AutoCAD SHX Text 4B-164
AutoCAD SHX Text 4B-161
AutoCAD SHX Text 4B-159
AutoCAD SHX Text 4B-157
AutoCAD SHX Text 4B-158
AutoCAD SHX Text
RM
AutoCAD SHX Text 4B-155
AutoCAD SHX Text 4B-148
AutoCAD SHX Text 4B-147
AutoCAD SHX Text 4B-156
AutoCAD SHX Text 4B-143
AutoCAD SHX Text 4B-144
AutoCAD SHX Text 4B-141
AutoCAD SHX Text 4B-142
AutoCAD SHX Text 4B-139
AutoCAD SHX Text 4B-140
AutoCAD SHX Text 4B-169
AutoCAD SHX Text 4B-168
AutoCAD SHX Text 4A-204A
AutoCAD SHX Text 4A-206
AutoCAD SHX Text 4B-166
AutoCAD SHX Text 4B-104
AutoCAD SHX Text
ELECTROPHISIOLOGY
AutoCAD SHX Text
1 BED
AutoCAD SHX Text
PATIENT RM
AutoCAD SHX Text
4 BED
AutoCAD SHX Text
2 BED
AutoCAD SHX Text
STORAGE/OFFICE
AutoCAD SHX Text
PATIENT RM
AutoCAD SHX Text 4B-154
AutoCAD SHX Text
HSK
AutoCAD SHX Text
SATELLITE MED
AutoCAD SHX Text 4B-162
AutoCAD SHX Text
PREP AREA
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
SHOWER
AutoCAD SHX Text 4B-165
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
SVC
AutoCAD SHX Text
BAY
AutoCAD SHX Text
MECH
AutoCAD SHX Text
SVC BAY-G
AutoCAD SHX Text
EQUIP
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
TRASH
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
LINEN
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
FEMALE
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
ELECTROPHYSIOLOGY
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
EP LAB
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
RECOVERY
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text 4A-109
AutoCAD SHX Text 4A-108
AutoCAD SHX Text 4A-106
AutoCAD SHX Text 4A-105
AutoCAD SHX Text 4A-104
AutoCAD SHX Text 4A-107
AutoCAD SHX Text 4A-102
AutoCAD SHX Text 4A-101
AutoCAD SHX Text 4A-145
AutoCAD SHX Text 4A-146
AutoCAD SHX Text 4A-144
AutoCAD SHX Text 4A-200
AutoCAD SHX Text
AutoCAD SHX Text C4A-1
AutoCAD SHX Text 4A-201
AutoCAD SHX Text 4A-100
AutoCAD SHX Text 4A-204
AutoCAD SHX Text
4A-205 TSC-2
AutoCAD SHX Text 4A-202
AutoCAD SHX Text 4A-203
AutoCAD SHX Text
CARDIOLOGY
AutoCAD SHX Text
SOILED
AutoCAD SHX Text P-3
AutoCAD SHX Text P-2
AutoCAD SHX Text P-1
AutoCAD SHX Text
CM-1
AutoCAD SHX Text
DT-1
AutoCAD SHX Text P-4
AutoCAD SHX Text
TSC-2
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
PRESSURE
AutoCAD SHX Text
EMERGENCY
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
CARDIAC
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C4A-3
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C4A-2
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C4A-17
AutoCAD SHX Text F.C.
AutoCAD SHX Text X sharmon Model
VHARICStileR Line
VHARICStileR Line
VHARICStileR Text Box
NOT IN CONTRACT
WARMING
22w 22e
4" SAN
4" SAN
4" SAN 4" SAN 4" SAN 4" SAN 4" SAN
(TYP.)
(TYP.)
P-420
P-103
P-701
P-420 P-420
P-701 P-701
P-410
P-420 P-420
P-410
P-701
P-701
P-410
P-420
P-420
P-420 P-420 P-420
P-701
P-701
P-701 P-701 P-701
P-410
P-410
P-410 P-410
P-410
P-501
P-410
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN 4" SAN
4" SAN
P-101
P-410
4" SAN
2" V
2" V2" V2" V
2" V
3 3 3 3 3
P-809P-809
P-809
4 4
WCO
WCO WCO WCO
WCO
P-708
1 BED
PATIENT RM
4B-110
TOILET
4B-110T
1 BED
PATIENT RM
4B-111
TOILET
4B-111T
1 BED
PATIENT RM
4B-103
TOILET
4B-103T
1 BED
PATIENT RM
4B-104
TOILET
4B-104T
1 BED
PATIENT RM
4B-107
BREAK RM
4B-108
TOILET
4B-107T
TOILET
4B-109T
1 BED
PATIENT RM
4B-106
TOILET
4B-106T
1 BED
PATIENT RM
4B-109
1 BED
PATIENT RM
4B-102
1 BED
BARRIATRIC
PATIENT RM
4B-101
1 BED
PATIENT RM
4B-100
LACTATION
4B-108A
1 BED
PATIENT RM
4B-105
TOILET
4B-105T
TOILET
4B-102T
STAFF TOILET
4B-108B
OIT
4B-123
NURSE
STATION
4B-128
STAFF TOILET
4B-129
KT / OT
OFFICE
4B-130
NURSES
OFFICE
4B-131
PHYSICAL
THERAPY
4B-132A
LOCKERS
4B-124E
NOURISH.
4B-127C
CORRIDOR
4B-127
MEDICATION
4B-128A
TELEMETRY
4B-128B
STERILE
SUPPLY
4B-133
ELECTRICAL
4B-132B
CORRIDOR
4B-132
HUB
4B-132D
ELECTRICAL
4B-132C
TOILET
4B-101T
TOILET
4B-100T
CORRIDOR
4B-150N
1 BED
PATIENT RM
4B-113
TOILET
4B-113T
1 BED
PATIENT RM
4B-112
TOILET
4B-112T
1 BED
PATIENT RM
4B-118
TOILET
4B-118T
1 BED
PATIENT RM
4B-117
TOILET
4B-117T
1 BED
PATIENT RM
4B-120
TOILET
4B-120T
1 BED
PATIENT RM
4B-119
TOILET
4B-119T
TOILET
4B-114T
1 BED
PATIENT RM
4B-114
1 BED
ISOLATION
PATIENT RM
4B-115A
1 BED
PATIENT RM
4B-116
TOILET
4B-115T
TOILET
4B-116T
TOILET
4B-121T
1 BED
PATIENT RM
4B-121
TRAINING/
COUNSELING
4B-122
EQUIPMENT
STORAGE
4B-124A
SOILED
UTILITY
4B-124B
TEAM
ROOM
4B-125
CLEAN LINEN
4B-126
NURSE
MANAGER
OFFICE
4B-127A
CORRIDOR
4B-124
DISPATCH
4B-124C
HAC
4B-124D
COUNSELING
OFFICE
4B-127B
TEAM
ROOM
4B-134
CORRIDOR
4B-150S
ISOLATION RM
VESTIBULE
4B-115
P-103
P-103 P-103 P-103 P-103 P-103
P-103 P-103 P-103
P-505
X
W
Y
Z
AA
PLUMBING FOURTH FLOOR PLAN - SANITARY AND VENT - PHASE 2
1/8" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
WALL RATING LEGEND:
30 MINUTE SMOKE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
FOURTH FLOOR KEY PLAN:
AREA OF WORK
P
M
PP102
MASPG
PLUMBING FOURTH FLOOR PLAN
SANITARY AND VENT - PHASE 2
9 16
0 4 8 16
NORTH
PLAN
1. PROVIDE WASTE PIPING AND SUPPORTS
COMPLETE.
2. PROVIDE VENT PIPING AND SUPPORTS
COMPLETE.
3. SANITARY TURNS DOWN BELOW SLAB HERE.
PIPING DOWN STREAM OF THIS POINT IS IN THE
INTERSTITIAL SPACE BELOW.
4. SEE DETAIL M-501/7 FOR DIALYSIS
CONNECTIONS.
A. COORDINATE PHASING LIMITS AS SHOWN ON
GI102.
B. REFER TO HA PLANS FOR INDICATION OF
HAZARDOUS MATERIALS PRIOR TO STARTING
WORK.
C. SLEEVE ALL PENETRATIONS, FIRESTOP OR
SEAL AS REQUIRED.
D. UNLESS NOTED OTHERWISE, THE SIZE OF
FIXTURE RUNOUTS IS TO BE WHAT IS LISTED IN
THE PLUMBING FIXTURE SCHEDULE.
E. SANITARY PIPES ARE BELOW SLAB OR IN WALL
AND VENT PIPES ARE ABOVE IN INTERSTITIAL
SPACE UNLESS NOTED OTHERWISE.
F. SEAL NEW AND EXISTING PIPE PENETRATIONS
THROUGH FLOOR WATER TIGHT.
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
SVC
AutoCAD SHX Text
BAY
AutoCAD SHX Text
MECH
AutoCAD SHX Text
SVC BAY-G
AutoCAD SHX Text
EQUIP
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
TRASH
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
LINEN
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
FEMALE
AutoCAD SHX Text
LOCKER
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
ELECTROPHYSIOLOGY
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
CRITICAL CARE
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
EP LAB
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text
RECOVERY
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text 4A-109
AutoCAD SHX Text 4A-108
AutoCAD SHX Text 4A-106
AutoCAD SHX Text 4A-105
AutoCAD SHX Text 4A-104
AutoCAD SHX Text 4A-107
AutoCAD SHX Text 4A-102
AutoCAD SHX Text 4A-101
AutoCAD SHX Text 4A-145
AutoCAD SHX Text 4A-146
AutoCAD SHX Text 4A-144
AutoCAD SHX Text 4A-200
AutoCAD SHX Text
AutoCAD SHX Text C4A-1
AutoCAD SHX Text 4A-201
AutoCAD SHX Text 4A-100
AutoCAD SHX Text 4A-204
AutoCAD SHX Text
4A-205 TSC-2
AutoCAD SHX Text 4A-202
AutoCAD SHX Text 4A-203
AutoCAD SHX Text
CARDIOLOGY
AutoCAD SHX Text
SOILED
AutoCAD SHX Text P-3
AutoCAD SHX Text P-2
AutoCAD SHX Text P-1
AutoCAD SHX Text
CM-1
AutoCAD SHX Text
DT-1
AutoCAD SHX Text P-4
AutoCAD SHX Text
TSC-2
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
CONVEYOR
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
PRESSURE
AutoCAD SHX Text
EMERGENCY
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
CARDIAC
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C4A-3
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C4A-2
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C4A-17
AutoCAD SHX Text F.C.
AutoCAD SHX Text X sharmon Model
VHARICStileR Line
VHARICStileR Line
VHARICStileR Text Box
NOT IN CONTRACT
22w 22e
3"
2"
1/2"
3"
1-1/2"
1/2"
2"
1/2" 1/2"
2"
1"
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
(TYP.)
P-420
P-103
P-410
P-701
P-420
P-114
P-421
P-701
P-420
P-410
P-701
P-420
P-410
P-701
P-420
P-410
P-701
P-420
P-410
P-701
P-420
P-410
P-701
P-420
P-410
P-701
P-410
P-420
P-510
P-420
P-410 P-701
P-420
P-410
P-701
P-410
P-420
P-701
P-501
P-510
1-1/4"
3/4"
3/4"
1-1/4"
1-1/4"
3/4"
1-1/4"
3/4" 1-1/4"
3/4"
1-1/4"
3/4"
1-1/4"
3/4"
1-1/4"
3/4"
3/4"
1-1/4"
3/4"
1-1/4"
P-510
P-510
P-809
P-809 P-8093
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
STORAGE
STORAGE
STORAGE
BREAK RM
PATIENT RM
TOILET
TOILET
UTILITY
PATIENT RM
EQUIP
TOILET
RM
TOILET
SECURITY
1 BED ATIENT
TOILET
1 BED
ANTE RM
TOILET
4 BED RM
TOILET
2 BED RM
1 BED RM
TOILET
CORRIDOR
STEP-DOWN
CLEAN
C4B-7
4B-163
4B-164
4B-161
4B-159
4B-157
4B-158
RM
4B-155
4B-148
4B-147
4B-156
4B-143
4B-144
4B-141
4B-142
4B-139
4B-140
4B-169
4B-168
4A-204A
4A-206
4B-166
4B-104
ELECTROPHISIOLOGY
1 BED
PATIENT RM
4 BED
2 BED
STORAGE/OFFICE
PATIENT RM
4B-154
HSK
SATELLITE MED
4B-162
PREP AREA
PHARMACY
OFFICE
SHOWER
4B-165
ELEC
SVC
BAY
MECH
SVC BAY-G
EQUIP
CONVEYOR
OFFICE
TRASH
ELEV
LOBBY
STAIR
OFFICE
FEMALE
LOCKER
CORRIDOR
OFFICE
ELECTROPHYSIOLOGY
OFFICE
TOILET
STORAGE
EP LAB
UTILITY
RECOVERY
CONTROL
4A-109
4A-108
4A-106
4A-105
4A-104
4A-107
4A-102
4A-101
4A-145
4A-146
4A-144
C4A-1
4A-201
4A-100
4A-204
4A-205 TSC-2
4A-202
4A-203
CARDIOLOGY
SOILED
P-3
P-2
P-1
CM-1
DT-1
P-4
TSC-2
ELEV
ELEV
ELEV
CONVEYOR
ELEV
PRESSURE
EMERGENCY
ELEV
CARDIAC
CORRIDOR
C4A-3
CORRIDOR
C4A-2
CORRIDOR
C4A-17
1 BED
PATIENT RM
4B-110
TOILET
4B-110T
1 BED
PATIENT RM
4B-111
TOILET
4B-111T
1 BED
PATIENT RM
4B-103
TOILET
4B-103T
1 BED
PATIENT RM
4B-104
TOILET
4B-104T
1 BED
PATIENT RM
4B-107
BREAK RM
4B-108
TOILET
4B-107T
TOILET
4B-109T
1 BED
PATIENT RM
4B-106
TOILET
4B-106T
1 BED
PATIENT RM
4B-109
1 BED
PATIENT RM
4B-102
1 BED
BARRIATRIC
PATIENT RM
4B-101
1 BED
PATIENT RM
4B-100
LACTATION
4B-108A
1 BED
PATIENT RM
4B-105
TOILET
4B-105T
TOILET
4B-102T
STAFF TOILET
4B-108B
OIT
4B-123
NURSE
STATION
4B-128
STAFF TOILET
4B-129
KT / OT
OFFICE
4B-130
NURSES
OFFICE
4B-131
PHYSICAL
THERAPY
4B-132A
LOCKERS
4B-124E
NOURISH.
4B-127C
CORRIDOR
4B-127
MEDICATION
4B-128A
TELEMETRY
4B-128B
STERILE
SUPPLY
4B-133
ELECTRICAL
4B-132B
CORRIDOR
4B-132
HUB
4B-132D
ELECTRICAL
4B-132C
TOILET
4B-101T
TOILET
4B-100T
CORRIDOR
4B-150N
P-701
1/2"
1/2"
P-502
P-103
P-103
P-103
P-103
P-103
P-103
P-103
P-103
P-103
P-103
X
W
Y
Z
AA
PLUMBING FOURTH FLOOR PLAN - DOMESTIC WATER - PHASE 1
1/8" = 1'-0"
A. COORDINATE PHASING LIMITS AS SHOWN ON
GI102.
B. REFER TO HA PLANS FOR INDICATION OF
HAZARDOUS MATERIALS PRIOR TO STARTING
WORK.
C. SLEEVE ALL PENETRATIONS, FIRESTOP OR
SEAL AS REQUIRED.
D. UNLESS NOTED OTHERWISE, THE SIZE OF
FIXTURE RUNOUTS IS TO BE WHAT IS LISTED IN
THE PLUMBING FIXTURE SCHEDULE.
E. DOMESTIC WATER AND SANITARY PIPES ARE
BELOW SLAB OR IN WALL AND VENT PIPES ARE
ABOVE CEILING UNLESS NOTED OTHERWISE.
F. SEAL NEW AND EXISTING PIPE PENETRATIONS
THROUGH FLOOR WATER TIGHT.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
WALL RATING LEGEND:
30 MINUTE SMOKE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
FOURTH FLOOR KEY PLAN:
AREA OF WORK
1. PROVIDE DOMESTIC COLD WATER, HOT
WATER, AND HOT WATER RETURN PIPING
AND SUPPORTS COMPLETE.
2. CONNECT TO EXISTING MAINS IN CORRIDOR
C4A-17.
3. SEE DETAIL M-501/7 FOR DIALYSIS
CONNECTIONS.
4. PROVIDE DOMESTIC COLD WATER, HOT
WATER, AND HOT WATER RETURN PIPING
COMPLETE FOR TEMPORARY NOURISHMENT
SINK.
5. DOMESTIC WATER SHALL BE DEMOLISHED
AND REPLACED IMMEDIATELY TO REMAIN IN
SERVICE.
P
M
PP103
MASPG
PLUMBING FOURTH FLOOR PLAN
DOMESTIC WATER - PHASE 1
10 16
0 4 8 16
NORTH
PLAN
AutoCAD SHX Text X sharmon Model
VHARICStileR Line
VHARICStileR Line
VHARICStileR Text Box
NOT IN CONTRACT
22w 22e
1/2"
1/2"
2"3/4"1" 1-1/4"
2-1/2"
1-1/2"
2-1/2"
2"
3"
1/2"
1-1/2"
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
DCWS
DHWS
DHWR
(TYP.)
P-420
P-103
P-410
P-701
P-420 P-420
P-410
P-701 P-701
P-410
P-420 P-420
P-410
P-701
P-701
P-410
P-420
P-420
P-420 P-420 P-420
P-701
P-701
P-701
P-701
P-701
P-410
P-410
P-410
P-410
P-410
P-501
P-410
P-420
3/4"
1-1/4"
3/4"
1-1/4"
3/4"
1"
3/4"
1-1/4"
3/4"
1-1/4"
3/4"
1-1/4"
3/4"
1-1/4"
3/4"
1-1/4"
3/4"
1-1/4"
3/4"
1-1/4"
P-701
P-809P-809 P-809
ELEC
SVC
BAY
MECH
SVC BAY-G
EQUIP
CONVEYOR
OFFICE
TRASH
ELEV
LOBBY
STAIR
OFFICE
FEMALE
LOCKER
CORRIDOR
OFFICE
ELECTROPHYSIOLOGY
OFFICE
TOILET
CRITICAL CARE
STORAGE
EP LAB
UTILITY
RECOVERY
CONTROL
4A-109
4A-108
4A-106
4A-105
4A-104
4A-107
4A-102
4A-101
C4A-5
4A-145
4A-146
4A-144
C4A-1
4A-201
4A-100
4A-204
4A-205 TSC-2
4A-202
4A-203
CARDIOLOGY
SOILED
P-3
P-2
P-1
CM-1
DT-1
P-4
TSC-2
ELEV
ELEV
ELEV
CONVEYOR
ELEV
PRESSURE
EMERGENCY
ELEV
CARDIAC
CORRIDOR
C4A-3
CORRIDOR
C4A-2
CORRIDOR
C4A-17
1 BED
PATIENT RM
4B-110
TOILET
4B-110T
1 BED
PATIENT RM
4B-111
TOILET
4B-111T
1 BED
PATIENT RM
4B-103
TOILET
4B-103T
1 BED
PATIENT RM
4B-104
TOILET
4B-104T
1 BED
PATIENT RM
4B-107
BREAK RM
4B-108
TOILET
4B-107T
TOILET
4B-109T
1 BED
PATIENT RM
4B-106
TOILET
4B-106T
1 BED
PATIENT RM
4B-109
1 BED
PATIENT RM
4B-102
1 BED
BARRIATRIC
PATIENT RM
4B-101
1 BED
PATIENT RM
4B-100
LACTATION
4B-108A
1 BED
PATIENT RM
4B-105
TOILET
4B-105T
TOILET
4B-102T
STAFF TOILET
4B-108B
OIT
4B-123
NURSE
STATION
4B-128
STAFF TOILET
4B-129
KT / OT
OFFICE
4B-130
NURSES
OFFICE
4B-131
PHYSICAL
THERAPY
4B-132A
LOCKERS
4B-124E
NOURISH.
4B-127C
CORRIDOR
4B-127
MEDICATION
4B-128A
TELEMETRY
4B-128B
STERILE
SUPPLY
4B-133
ELECTRICAL
4B-132B
CORRIDOR
4B-132
HUB
4B-132D
ELECTRICAL
4B-132C
TOILET
4B-101T
TOILET
4B-100T
CORRIDOR
4B-150N
1 BED
PATIENT RM
4B-113
TOILET
4B-113T
1 BED
PATIENT RM
4B-112
TOILET
4B-112T
1 BED
PATIENT RM
4B-118
TOILET
4B-118T
1 BED
PATIENT RM
4B-117
TOILET
4B-117T
1 BED
PATIENT RM
4B-120
TOILET
4B-120T
1 BED
PATIENT RM
4B-119
TOILET
4B-119T
TOILET
4B-114T
1 BED
PATIENT RM
4B-114
1 BED
ISOLATION
PATIENT RM
4B-115A
1 BED
PATIENT RM
4B-116
TOILET
4B-115T
TOILET
4B-116T
TOILET
4B-121T
1 BED
PATIENT RM
4B-121
TRAINING/
COUNSELING
4B-122
EQUIPMENT
STORAGE
4B-124A
SOILED
UTILITY
4B-124B
TEAM
ROOM
4B-125
CLEAN LINEN
4B-126
NURSE
MANAGER
OFFICE
4B-127A
CORRIDOR
4B-124
DISPATCH
4B-124C
HAC
4B-124D
COUNSELING
OFFICE
4B-127B
TEAM
ROOM
4B-134
CORRIDOR
4B-150S
ISOLATION RM
VESTIBULE
4B-115
P-505
P-103 P-103 P-103 P-103
P-103
P-103
P-103 P-103 P-103
P-103
X
W
Y
Z
AA
PLUMBING FOURTH FLOOR PLAN - DOMESTIC WATER - PHASE 2
1/8" = 1'-0"
A. COORDINATE PHASING LIMITS AS SHOWN ON
GI102.
B. REFER TO HA PLANS FOR INDICATION OF
HAZARDOUS MATERIALS PRIOR TO STARTING
WORK.
C. SLEEVE ALL PENETRATIONS, FIRESTOP OR
SEAL AS REQUIRED.
D. UNLESS NOTED OTHERWISE, THE SIZE OF
FIXTURE RUNOUTS IS TO BE WHAT IS LISTED IN
THE PLUMBING FIXTURE SCHEDULE.
E. DOMESTIC WATER AND SANITARY PIPES ARE
BELOW SLAB OR IN WALL AND VENT PIPES ARE
ABOVE CEILING UNLESS NOTED OTHERWISE.
F. SEAL NEW AND EXISTING PIPE PENETRATIONS
THROUGH FLOOR WATER TIGHT.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# 06/12/2019
IMPROVE PATIENT
PRIVACY 4B
652-14-106
HUNTER HOLMES MCGUIRE VAMC
1201 BROAD ROCK BLVD
RICHMOND, VA 23249
18-083
BID DOCUMENTS
FULLY SPRINKLERED
WALL RATING LEGEND:
30 MINUTE SMOKE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
FOURTH FLOOR KEY PLAN:
AREA OF WORK
1. PROVIDE DOMESTIC COLD WATER, HOT
WATER, AND HOT WATER RETURN PIPING
AND SUPPORTS COMPLETE.
2. CONNECT TO EXISTING MAINS IN CORRIDOR
C4A-2.
3. SEE DETAIL M-501/7 FOR DIALYSIS
CONNECTIONS.
P
M
PP104
MASPG
PLUMBING FOURTH FLOOR PLAN
DOMESTIC WATER - PHASE 2
11 16
0 4 8 16
NORTH
PLAN
AutoCAD SHX Text X sharmon Model
VHARICStileR Line
VHARICStileR Line
VHARICStileR Text Box
NOT IN CONTRACT
(TYP.)
3/4"
1-1/2"
1"
1"
1-1/2"
3/4"
1"
1-1/2"
1"
1-1/2"
3/4"
1-1/2"
MV
MA
O
MV
MA
O
MV
MA
O
STORAGE
STORAGE
STORAGE
BREAK RM
PATIENT RM
TOILET
TOILET
UTILITY
PATIENT RM
EQUIP
TOILET
RM
TOILET
SECURITY
1 BED ATIENT
TOILET
1 BED
ANTE RM
TOILET
4 BED RM
TOILET
2 BED RM
1 BED RM
TOILET
CORRIDOR
STEP-DOWN
CLEAN
C4B-7
4B-163
4B-164
4B-161
4B-159
4B-157
4B-158
RM
4B-155
4B-148
4B-147
4B-156
4B-143
4B-144
4B-141
4B-142
4B-139
4B-140
4B-169
4B-168
4A-204A
4A-206
4B-166
4B-104
ELECTROPHISIOLOGY
1 BED
PATIENT RM
4 BED
2 BED
STORAGE/OFFICE
PATIENT RM
4B-154
HSK
SATELLITE MED
4B-162
PREP AREA
PHARMACY
OFFICE
SHOWER
4B-165
ELEC
SVC
BAY
MECH
SVC BAY-G
EQUIP
CONVEYOR
OFFICE
TRASH
ELEV
LOBBY
STAIR
OFFICE
FEMALE
LOCKER
CORRIDOR
OFFICE
ELECTROPHYSIOLOGY
OFFICE
TOILET
CRITICAL CARE
STORAGE
EP LAB
UTILITY
RECOVERY
CONTROL
4A-109
4A-108
4A-106
4A-105
4A-104
4A-107
4A-102
4A-101
C4A-5
4A-145
4A-146
4A-144
C4A-1
4A-201
4A-100
4A-204
4A-205 TSC-2
4A-202
4A-203
CARDIOLOGY
SOILED
P-3
P-2
P-1
CM-1
DT-1
P-4
TSC-2
ELEV
ELEV
ELEV
CONVEYOR
ELEV
PRESSURE
EMERGENCY
ELEV
CARDIAC
CORRIDOR
C4A-3
CORRIDOR
C4A-2
CORRIDOR
C4A-17
1 BED
PATIENT RM
4B-110
TOILET
4B-110T
1 BED
PATIENT RM
4B-111
TOILET
4B-111T
1 BED
PATIENT RM
4B-103
TOILET
4B-103T
1 BED
PATIENT RM
4B-104
TOILET
4B-104T
1 BED
PATIENT RM
4B-107
BREAK RM
4B-108
TOILET
4B-107T
TOILET
4B-109T
1 BED
PATIENT RM
4B-106
TOILET
4B-106T
1 BED
PATIENT RM
4B-109
1 BED
PATIENT RM
4B-102
1 BED
BARRIATRIC
PATIENT RM
4B-101
1 BED
PATIENT RM
4B-100
LACTATION
4B-108A
1 BED
PATIENT RM
4B-105
TOILET
4B-105T
TOILET
4B-102T
STAFF TOILET
4B-108B
OIT
4B-123
NURSE
STATION
4B-128
STAFF TOILET
4B-129
KT / OT
OFFICE
4B-130
NURSES
OFFICE
4B-131
PHYSICAL
THERAPY
4B-132A
LOCKERS
4B-124E
NOURISH.
4B-127C
CORRIDOR
4B-127
MEDICATION
4B-128A
TELEMETRY
4B-128B
STERILE
SUPPLY
4B-133
ELECTRICAL
4B-132B
CORRIDOR
4B-132
HU…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .