This document is a set of architectural design drawings for a new lightning protection system installation at multiple Department of Veterans Affairs (VA) facilities.

The project encompasses the design and installation of lightning protection systems for Buildings 1, 1S, 1W, 2, 3, 4, 5, 6, 7, 8, 9, 11 (Water Tower), 12, 15, 19, 20, 21 (Fisher), 23, 23R, 25, 26, 28, 34, 51, 52, and Trailers 1–5. The work scope includes installation of copper air terminals spaced at maximum 20-foot intervals, copper lightning protection cables fastened to roofs every 36 inches maximum, thru-roof copper down conductors, and ground rods installed at exterior corners and every 150 feet along building perimeters. All materials and equipment must be UL-listed and meet VA facility standards, NFPA 780, and UL 96A specifications. Ground resistance must not exceed 10 ohms, or meet stricter VA standards. The contractor must conduct pre-construction surveys to verify existing conditions, repair or replace roof systems as needed to ensure compatibility, perform continuity and resistance testing, provide as-built drawings and manufacturer certifications, and coordinate with other trades to avoid conflicts with HVAC, plumbing, and electrical systems. The designs vary by building configuration, with different scales and orientations applied to each structure's unique roof layout.

View the file

Other files

File Type Posted
90084-Huntington LP Above Grade Floors List.pdf PDF
FAR 52-222.90.pdf PDF
26 41 00 - FACILITY LIGHTNING PROTECTION 20260421.pdf PDF
36C24526R0030 0004.pdf PDF
90084 - 581-22-102 - Huntington VAMC El...nfrastructure - Bid Set BOD Resub.pdf PDF
36C24526R0030 0003 Amendment.pdf PDF
RFIs Electrical Infrastructure Project Huntington VAMC-Davenergy Final Copy .pdf PDF
36C24526R0030 0002.pdf PDF
36C24526R0030 0001.docx DOCX document
S04 Site Visit.pdf PDF
SAM Wage Determine 2026.pdf PDF
Past Performance Questioniare .docx DOCX document
VHA ICRA-Bldg 23R Rm G03 - Copy.pdf PDF
90084 - 581-22-102 - Huntington Elect Infrastructure-Specs-Final Submission-20250829 - Copy.pdf PDF
36C24526R0030.docx DOCX document
VHA ICRA-Bldg 6 Room 6105 - Copy.pdf PDF
VHA ICRA Bldg 5 Room 5234 - Copy.pdf PDF
Brand Name Justification FA Signed - Copy.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION.docx DOCX document
Contractor Certification Attachment.docx DOCX document
VHA ICRA Bldg 5 Room 5114 - Copy.pdf PDF
VHA ICRA Bldg 12 rm ga108a electrical upgrade - Copy.pdf PDF
Brand Name Justification SEL Signed - Copy.pdf PDF
90084 - 581-22-102 - Huntington VAMC Electrical Infrastructure BID Set-BOD-20250428 - Copy.pdf PDF
90084 - 581-22-102 - Huntington Upgrade Elect Infrastructure-FINAL BID SET Drawings - 20250128 - Copy.pdf PDF
VHA ICRA Bldg Rm GD111 laundry area - Copy.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.4 ON DRAWING

EP-624.

1 FOOT FROM EDGE

20' - 20' FT APART

(TYP.)

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE EVERY

MAXIMUM 100 FT.

GROUND ROD (TYP.)REFER TO DETAIL

NO.4 ON DRAWING EP-624.

COPPER AIR TERMINALS (TYP.) REFER TO

DETAIL NO.1 ON DRAWING EP-624

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE

COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF

STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO

MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING

PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST

RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.

HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

BUILDING 1, 1S, 1W, 2, 12, 23, 23R NEW LIGHTNING PROTECTION SYSTEM

SCALE: NOT TO SCALE

Scale: NTS

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE

COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING

PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

Department of Veteran Affairs

PROJECT

NORTH

(DASHED)

TRUE NORTH

AutoCAD SHX Text 1, 1S, 1W, 2, 12, 23, 23R

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 1, 1S, 1W, 2, 12, 23, 23R NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

EP-601

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

AutoCAD SHX Text 04/21/2026

COPPER AIR TERMINALS (TYP.)

REFER TO DETAIL NO.1 ON DRAWING

EP-624

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD

(TYP.), REFER TO DETAIL NO.4

ON DRAWING EP-624

1 FOOT FROM EDGE

20' - 20' FT APART

(TYP.)

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE

EVERY 150 FT.

GROUND ROD (TYP.)REFER TO

DETAIL NO.4 ON DRAWING EP-624.

BUILDING 26 NEW LIGHTNING PROTECTION SYSTEM

SCALE: 3/8" = 1'-0"

Scale: 3/8" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE

COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF

STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO

MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING

PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST

RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.

HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE

COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING

PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

PROJECT

NORTH

(DASHED)

TRUE NORTH

Department of Veteran Affairs

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 26 NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

EP-602

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

COPPER AIR TERMINALS (TYP.) REFER TO DETAIL

NO.1 ON DRAWING EP-624

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.5 ON DRAWING EP-624

1 FOOT FROM EDGE

ADD GROUNDING ROD TO EACH EXTERIOR

CORNER AND ONE EVERY 150 FT.

GROUND ROD (TYP.)REFER TO DETAIL

NO.4 ON DRAWING EP-624.

BUILDING 34 NEW LIGHTNING PROTECTION SYSTEM

SCALE: 3/8" = 1'-0"

Scale: 3/8" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE

COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF

STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO

MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING

PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST

RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.

HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE

COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING

PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

PROJECT

NORTH

(DASHED)

TRUE NORTH

Department of Veteran Affairs

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 34 NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

EP-603

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

COPPER AIR TERMINALS (TYP.) REFER TO DETAIL

NO.1 ON DRAWING EP-624

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.4 ON DRAWING

EP-624.

1 FOOT FROM EDGE

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE

EVERY 150 FT.

GROUND ROD (TYP.)REFER TO

DETAIL NO.4 ON DRAWING EP-624.

Scale: 1/4" = 1'-0"

BUILDING 3 NEW LIGHTNING PROTECTION SYSTEM

SCALE: 1/4" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE

COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF

STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO

MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING

PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST

RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.

HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE

COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING

PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

PROJECT

NORTH

(DASHED)

TRUE NORTH

Department of Veteran Affairs

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 3 NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

EP-604

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

COPPER AIR TERMINALS (TYP.) REFER TO

DETAIL NO.1 ON DRAWING EP-624

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.4 ON DRAWING EP-624

1 FOOT FROM EDGE

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE

EVERY 150 FT.

GROUND ROD (TYP.)REFER TO

DETAIL NO.4 ON DRAWING EP-624.

BUILDING 5 NEW LIGHTNING PROTECTION SYSTEM

SCALE: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE

COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF

STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO

MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING

PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST

RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.

HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE

COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING

PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

PROJECT

NORTH

TRUE NORTH

(DASHED)

Department of Veteran Affairs

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 5 NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

EP-605

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

1 FOOT FROM EDGE

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.4 ON DRAWING EP-624

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE

EVERY 150 FT. GROUND ROD

(TYP.)REFER TO DETAIL NO.4 ON

DRAWING EP-624.

BUILDING 6 NEW LIGHTNING PROTECTION SYSTEM

SCALE: 3/8" = 1'-0"

Scale: 3/8" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE

COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF

STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO

MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING

PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST

RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.

HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE

COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING

PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

PROJECT

NORTH

TRUE NORTH

(DASHED)

Department of Veteran Affairs

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 6 NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

EP-606

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.4 ON DRAWING EP-624

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE

EVERY 150 FT. GROUND ROD

(TYP.)REFER TO DETAIL NO.4 ON

DRAWING EP-624.

1 FOOT FROM EDGE

BUILDING 7 NEW LIGHTNING PROTECTION SYSTEM

SCALE: 3/8" = 1'-0"

Scale: 3/8" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE

COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF

STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO

MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING

PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST

RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.

HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE

COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING

PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

PROJECT

NORTH

TRUE NORTH

(DASHED)

Department of Veteran Affairs

1 1

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 7 NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

EP-607

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

1 FOOT FROM EDGE

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.4 ON DRAWING EP-624

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE

EVERY 150 FT. GROUND ROD

(TYP.)REFER TO DETAIL NO.4 ON

DRAWING EP-624.

2 2

BUILDING 8 NEW LIGHTNING PROTECTION SYSTEM

SCALE: 3/8" = 1'-0"

Scale: 3/8" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE

COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF

STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO

MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING

PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST

RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.

HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE

COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING

PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

PROJECT

NORTH

TRUE NORTH

(DASHED)

Department of Veteran Affairs

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 8 NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

EP-608

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

1 FOOT FROM EDGE

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.4 ON DRAWING EP-624

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE

EVERY 150 FT. GROUND ROD

(TYP.)REFER TO DETAIL NO.4 ON

DRAWING EP-624.

BUILDING 4 NEW LIGHTNING PROTECTION SYSTEM

SCALE: 3/16" = 1'-0"

Scale: 3/16" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE

COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF

STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO

MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING

PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST

RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.

HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE

COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING

PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

PROJECT

NORTH

TRUE NORTH

(DASHED)

Department of Veteran Affairs

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 4 NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text

EP-609

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

1 FOOT FROM EDGE

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.4 ON DRAWING EP-624

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE

EVERY 150 FT. GROUND ROD

(TYP.)REFER TO DETAIL NO.4 ON

DRAWING EP-624.

N

BUILDING 20 NEW LIGHTNING PROTECTION SYSTEM

SCALE: 3/16" = 1'-0"

Scale: 3/16" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN

GUIDELINES FOR LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO

VERIFY EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE

COMPATIBILITY WITH THE LIGHTNING PROTECTION SYSTEM. COORDINATE

WITH ROOFING CONTRACTORS FOR ANY ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION

SYSTEM ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO

ENSURE COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780

SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA

STANDARDS IF STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM

TO MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED

LIGHTNING PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND

GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM.

SUBMIT TEST RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED

COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING

SYSTEMS (E.G. HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET

CODE COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING

LIGHTNING PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

PROJECT

NORTH

TRUE NORTH

(DASHED)

Department of Veteran Affairs

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 20 NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

EP-610

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

1 FOOT FROM EDGE

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.4 ON DRAWING EP-624

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE

EVERY 150 FT. GROUND ROD

(TYP.)REFER TO DETAIL NO.4 ON

DRAWING EP-624

N

BUILDING 19 NEW LIGHTNING PROTECTION SYSTEM

SCALE: 1/4" = 1'-0"

Scale: 1/4" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE

COMPLIANCE WITH NFPA AND UL REQUIREMENTS.

6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.

7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF

STRICTER.

8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO

MAINTAIN A UNIFIED GROUNDING NETWORK.

9. DOCUMENT AND TESTING

9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING

PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.

9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST

RESULTS FOR APPROVAL.

9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.

10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.

HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).

KEY NOTES

INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE

COMPLIANCE.

SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING

PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.

PROJECT

NORTH

TRUE NORTH

(DASHED)

Department of Veteran Affairs

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

BUILDING 19 NEW LIGHTNING PROTECTION SYSTEM

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Upgrade Electrical Infrastructure

AutoCAD SHX Text 581-22-102

AutoCAD SHX Text

ALS

AutoCAD SHX Text

HF

AutoCAD SHX Text Floor No.

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300

AutoCAD SHX Text

BID SET RESUBMISSION

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

EP-611

AutoCAD SHX Text 08/29/2025

AutoCAD SHX Text

1 PRE BID RFI RESPONSE UPDATES

20' - 20' FT APART

(TYP.)

COPPER AIR TERMINALS (TYP.) REFER TO

DETAIL NO.1 ON DRAWING EP-624

COPPER LIGHTNING PROTECTION

CABLE FASTENED TO ROOF EVERY

36" MAX. (TYP.)

ADD GROUNDING ROD TO EACH

EXTERIOR CORNER AND ONE

EVERY 150 FT. GROUND ROD

(TYP.)REFER TO DETAIL NO.4 ON

DRAWING EP-624

THRU-ROOF AND COPPER DOWN

CONNECTOR TO GROUND ROD (TYP.),

REFER TO DETAIL NO.4 ON DRAWING

EP-624.

1 FOOT FROM EDGE2

BUILDING 21 FISHER NEW LIGHTNING PROTECTION SYSTEM

SCALE: 3/16" = 1'-0"

Scale: 3/16" = 1'-0"

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR

LIGHTNING PROTECTION SYSTEMS.

2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY

EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.

3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE

LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY

ROOF REPAIRS.

4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM

ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.

5.