90084-E-600-Lightning Protection-20260421.pdf
PDF 10 MB Posted
- Solicitation number
- 36C24526R0030
About this file
This document is a set of architectural design drawings for a new lightning protection system installation at multiple Department of Veterans Affairs (VA) facilities.
The project encompasses the design and installation of lightning protection systems for Buildings 1, 1S, 1W, 2, 3, 4, 5, 6, 7, 8, 9, 11 (Water Tower), 12, 15, 19, 20, 21 (Fisher), 23, 23R, 25, 26, 28, 34, 51, 52, and Trailers 1–5. The work scope includes installation of copper air terminals spaced at maximum 20-foot intervals, copper lightning protection cables fastened to roofs every 36 inches maximum, thru-roof copper down conductors, and ground rods installed at exterior corners and every 150 feet along building perimeters. All materials and equipment must be UL-listed and meet VA facility standards, NFPA 780, and UL 96A specifications. Ground resistance must not exceed 10 ohms, or meet stricter VA standards. The contractor must conduct pre-construction surveys to verify existing conditions, repair or replace roof systems as needed to ensure compatibility, perform continuity and resistance testing, provide as-built drawings and manufacturer certifications, and coordinate with other trades to avoid conflicts with HVAC, plumbing, and electrical systems. The designs vary by building configuration, with different scales and orientations applied to each structure's unique roof layout.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.4 ON DRAWING
EP-624.
1 FOOT FROM EDGE
20' - 20' FT APART
(TYP.)
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE EVERY
MAXIMUM 100 FT.
GROUND ROD (TYP.)REFER TO DETAIL
NO.4 ON DRAWING EP-624.
COPPER AIR TERMINALS (TYP.) REFER TO
DETAIL NO.1 ON DRAWING EP-624
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE
COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF
STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO
MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING
PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST
RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.
HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
BUILDING 1, 1S, 1W, 2, 12, 23, 23R NEW LIGHTNING PROTECTION SYSTEM
SCALE: NOT TO SCALE
Scale: NTS
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE
COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING
PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
Department of Veteran Affairs
PROJECT
NORTH
(DASHED)
TRUE NORTH
AutoCAD SHX Text 1, 1S, 1W, 2, 12, 23, 23R
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 1, 1S, 1W, 2, 12, 23, 23R NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
EP-601
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
AutoCAD SHX Text 04/21/2026
COPPER AIR TERMINALS (TYP.)
REFER TO DETAIL NO.1 ON DRAWING
EP-624
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD
(TYP.), REFER TO DETAIL NO.4
ON DRAWING EP-624
1 FOOT FROM EDGE
20' - 20' FT APART
(TYP.)
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE
EVERY 150 FT.
GROUND ROD (TYP.)REFER TO
DETAIL NO.4 ON DRAWING EP-624.
BUILDING 26 NEW LIGHTNING PROTECTION SYSTEM
SCALE: 3/8" = 1'-0"
Scale: 3/8" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE
COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF
STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO
MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING
PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST
RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.
HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE
COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING
PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
PROJECT
NORTH
(DASHED)
TRUE NORTH
Department of Veteran Affairs
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 26 NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
EP-602
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
COPPER AIR TERMINALS (TYP.) REFER TO DETAIL
NO.1 ON DRAWING EP-624
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.5 ON DRAWING EP-624
1 FOOT FROM EDGE
ADD GROUNDING ROD TO EACH EXTERIOR
CORNER AND ONE EVERY 150 FT.
GROUND ROD (TYP.)REFER TO DETAIL
NO.4 ON DRAWING EP-624.
BUILDING 34 NEW LIGHTNING PROTECTION SYSTEM
SCALE: 3/8" = 1'-0"
Scale: 3/8" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE
COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF
STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO
MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING
PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST
RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.
HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE
COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING
PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
PROJECT
NORTH
(DASHED)
TRUE NORTH
Department of Veteran Affairs
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 34 NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
EP-603
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
COPPER AIR TERMINALS (TYP.) REFER TO DETAIL
NO.1 ON DRAWING EP-624
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.4 ON DRAWING
EP-624.
1 FOOT FROM EDGE
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE
EVERY 150 FT.
GROUND ROD (TYP.)REFER TO
DETAIL NO.4 ON DRAWING EP-624.
Scale: 1/4" = 1'-0"
BUILDING 3 NEW LIGHTNING PROTECTION SYSTEM
SCALE: 1/4" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE
COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF
STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO
MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING
PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST
RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.
HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE
COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING
PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
PROJECT
NORTH
(DASHED)
TRUE NORTH
Department of Veteran Affairs
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 3 NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
EP-604
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
COPPER AIR TERMINALS (TYP.) REFER TO
DETAIL NO.1 ON DRAWING EP-624
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.4 ON DRAWING EP-624
1 FOOT FROM EDGE
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE
EVERY 150 FT.
GROUND ROD (TYP.)REFER TO
DETAIL NO.4 ON DRAWING EP-624.
BUILDING 5 NEW LIGHTNING PROTECTION SYSTEM
SCALE: 1/4" = 1'-0"
Scale: 1/4" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE
COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF
STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO
MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING
PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST
RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.
HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE
COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING
PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
PROJECT
NORTH
TRUE NORTH
(DASHED)
Department of Veteran Affairs
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 5 NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
EP-605
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
1 FOOT FROM EDGE
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.4 ON DRAWING EP-624
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE
EVERY 150 FT. GROUND ROD
(TYP.)REFER TO DETAIL NO.4 ON
DRAWING EP-624.
BUILDING 6 NEW LIGHTNING PROTECTION SYSTEM
SCALE: 3/8" = 1'-0"
Scale: 3/8" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE
COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF
STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO
MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING
PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST
RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.
HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE
COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING
PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
PROJECT
NORTH
TRUE NORTH
(DASHED)
Department of Veteran Affairs
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 6 NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
EP-606
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.4 ON DRAWING EP-624
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE
EVERY 150 FT. GROUND ROD
(TYP.)REFER TO DETAIL NO.4 ON
DRAWING EP-624.
1 FOOT FROM EDGE
BUILDING 7 NEW LIGHTNING PROTECTION SYSTEM
SCALE: 3/8" = 1'-0"
Scale: 3/8" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE
COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF
STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO
MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING
PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST
RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.
HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE
COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING
PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
PROJECT
NORTH
TRUE NORTH
(DASHED)
Department of Veteran Affairs
1 1
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 7 NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
EP-607
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
1 FOOT FROM EDGE
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.4 ON DRAWING EP-624
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE
EVERY 150 FT. GROUND ROD
(TYP.)REFER TO DETAIL NO.4 ON
DRAWING EP-624.
2 2
BUILDING 8 NEW LIGHTNING PROTECTION SYSTEM
SCALE: 3/8" = 1'-0"
Scale: 3/8" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE
COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF
STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO
MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING
PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST
RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.
HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE
COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING
PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
PROJECT
NORTH
TRUE NORTH
(DASHED)
Department of Veteran Affairs
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 8 NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
EP-608
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
1 FOOT FROM EDGE
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.4 ON DRAWING EP-624
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE
EVERY 150 FT. GROUND ROD
(TYP.)REFER TO DETAIL NO.4 ON
DRAWING EP-624.
BUILDING 4 NEW LIGHTNING PROTECTION SYSTEM
SCALE: 3/16" = 1'-0"
Scale: 3/16" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE
COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF
STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO
MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING
PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST
RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.
HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE
COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING
PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
PROJECT
NORTH
TRUE NORTH
(DASHED)
Department of Veteran Affairs
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 4 NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text
EP-609
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
1 FOOT FROM EDGE
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.4 ON DRAWING EP-624
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE
EVERY 150 FT. GROUND ROD
(TYP.)REFER TO DETAIL NO.4 ON
DRAWING EP-624.
N
BUILDING 20 NEW LIGHTNING PROTECTION SYSTEM
SCALE: 3/16" = 1'-0"
Scale: 3/16" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN
GUIDELINES FOR LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO
VERIFY EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE
COMPATIBILITY WITH THE LIGHTNING PROTECTION SYSTEM. COORDINATE
WITH ROOFING CONTRACTORS FOR ANY ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION
SYSTEM ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO
ENSURE COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780
SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA
STANDARDS IF STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM
TO MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED
LIGHTNING PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND
GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM.
SUBMIT TEST RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED
COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING
SYSTEMS (E.G. HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET
CODE COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING
LIGHTNING PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
PROJECT
NORTH
TRUE NORTH
(DASHED)
Department of Veteran Affairs
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 20 NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
EP-610
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
1 FOOT FROM EDGE
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.4 ON DRAWING EP-624
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE
EVERY 150 FT. GROUND ROD
(TYP.)REFER TO DETAIL NO.4 ON
DRAWING EP-624
N
BUILDING 19 NEW LIGHTNING PROTECTION SYSTEM
SCALE: 1/4" = 1'-0"
Scale: 1/4" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5. PROVIDE TESTING AND CERTIFICATION OF THE COMPLETED SYSTEM TO ENSURE
COMPLIANCE WITH NFPA AND UL REQUIREMENTS.
6. INSTALL GROUND RODS AT ALL REQUIRED LOCATIONS PER NFPA 780 SPECIFICATIONS.
7. ENSURE GROUND RESISTANCE DOES NO EXCEED 10 OHMS, OR MEET VA STANDARDS IF
STRICTER.
8. BOND ALL GROUND RODS TO THE BUILDING'S EXISTING GROUNDING SYSTEM TO
MAINTAIN A UNIFIED GROUNDING NETWORK.
9. DOCUMENT AND TESTING
9.A. PROVIDE AS-BUILT DRAWINGS SHOWING THE LAYOUT OF THE INSTALLED LIGHTNING
PROTECTION SYSTEM, INCLUDING ALL COMPONENTS AND GROUNDING LOCATIONS.
9.B. CONDUCT CONTINUITY AND RESISTANCE TESTING OF THE SYSTEM. SUBMIT TEST
RESULTS FOR APPROVAL.
9.C. PROVIDE MANUFACTURER'S CERTIFICATIONS FOR ALL INSTALLED COMPONENTS.
10. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS WITH BUILDING SYSTEMS (E.G.
HVAC, PLUMBING, AND ELECTRICAL SYSTEMS).
KEY NOTES
INSTALL NEW DOWN CONDUCTORS AND GROUND RODS AS NEEDED TO MEET CODE
COMPLIANCE.
SURVEY AND REPAIR THE ROOF-MOUNTED COMPONENTS OF THE EXISTING LIGHTNING
PROTECTION SYSTEM TO ENSURE INTEGRITY AND FUNCTION.
PROJECT
NORTH
TRUE NORTH
(DASHED)
Department of Veteran Affairs
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
BUILDING 19 NEW LIGHTNING PROTECTION SYSTEM
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Upgrade Electrical Infrastructure
AutoCAD SHX Text 581-22-102
AutoCAD SHX Text
ALS
AutoCAD SHX Text
HF
AutoCAD SHX Text Floor No.
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text DAVENERGY SOLUTIONS 2207 GARNET AVE, SUITE I SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive, Huntington, WV 25704-9300
AutoCAD SHX Text
BID SET RESUBMISSION
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
EP-611
AutoCAD SHX Text 08/29/2025
AutoCAD SHX Text
1 PRE BID RFI RESPONSE UPDATES
20' - 20' FT APART
(TYP.)
COPPER AIR TERMINALS (TYP.) REFER TO
DETAIL NO.1 ON DRAWING EP-624
COPPER LIGHTNING PROTECTION
CABLE FASTENED TO ROOF EVERY
36" MAX. (TYP.)
ADD GROUNDING ROD TO EACH
EXTERIOR CORNER AND ONE
EVERY 150 FT. GROUND ROD
(TYP.)REFER TO DETAIL NO.4 ON
DRAWING EP-624
THRU-ROOF AND COPPER DOWN
CONNECTOR TO GROUND ROD (TYP.),
REFER TO DETAIL NO.4 ON DRAWING
EP-624.
1 FOOT FROM EDGE2
BUILDING 21 FISHER NEW LIGHTNING PROTECTION SYSTEM
SCALE: 3/16" = 1'-0"
Scale: 3/16" = 1'-0"
GENERAL NOTES
1. ALL WORK SHALL COMPLY WITH NFPA 780, UL 96A, AND VA DESIGN GUIDELINES FOR
LIGHTNING PROTECTION SYSTEMS.
2. CONDUCT A PRE-CONSTRUCTION SURVEY OF ALL DESIGNATED BUILDINGS TO VERIFY
EXISTING CONDITIONS AND FINALIZE THE SCOPE OF WORK.
3. REPAIR OR REPLACE ROOF SYSTEMS AS REQUIRED TO ENSURE COMPATIBILITY WITH THE
LIGHTNING PROTECTION SYSTEM. COORDINATE WITH ROOFING CONTRACTORS FOR ANY
ROOF REPAIRS.
4. ENSURE ALL MATERIALS AND EQUIPMENT USED IN THE LIGHTNIN PROTECTION SYSTEM
ARE UL-LISTED AND SUITABLE FOR VA FACILITY STANDARDS.
5.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .