Z2DA--Upgrade Electrical Infrastructure 581-22-102 Huntington VAMC
Solicitation number
36C24526R0030
Issued by

About this file

This is a Basis of Design document prepared for a federal contract to upgrade electrical infrastructure at Hershel "Woody" Williams VA Medical Center in Huntington, West Virginia. The project (581-22-102) is under Contract Number 36C24522C0141 and was prepared by Davenergy Solutions on March 31, 2025.

The design addresses electrical infrastructure deficiencies through replacement of obsolete NEHB panelboards, relocation of underrated panels, transformer upgrades, fire alarm system modernization, and related mechanical and plumbing improvements. Key electrical scope includes replacing approximately 60 obsolete Square D NEHB panels (277/480V, 100A) across multiple buildings with modern equivalents; relocating panels in Buildings 5 and 12 to achieve code-compliant accessibility and work clearances; replacing three distribution transformers with oil containment berms and FR3 biobased fluid; upgrading lightning protection systems; and installing power metering for energy efficiency monitoring. Mechanical work focuses on Building 23R Room G03, requiring dedicated direct expansion cooling with dual parallel compressors, thermostatically controlled heating, temperature monitoring with local and remote alarms, and coordination with Johnson Controls' Metasys system. Architectural improvements include minor remodeling to support mechanical and electrical installations, such as creating new electrical rooms, fire-rated partitions, bollards, and wire mesh doors. The design complies with 2021 International Building Code, VA Technical Integration Library standards, NFPA codes (70, 72, 101), NEC requirements, and ASHRAE 90.1 for energy efficiency. Fire alarm upgrades involve converting existing Edwards EST-3 panels to EST-4 panels across 19 locations with software modernization and component repurposing where feasible. Protective device coordination adjustments, transformer oil testing, grounding/lightning protection testing, and load monitoring have been completed to support proper equipment sizing and system reliability.

View the file

Other files

File Type Posted
26 41 00 - FACILITY LIGHTNING PROTECTION 20260421.pdf PDF
36C24526R0030 0004.pdf PDF
FAR 52-222.90.pdf PDF
90084-E-600-Lightning Protection-20260421.pdf PDF
90084-Huntington LP Above Grade Floors List.pdf PDF
36C24526R0030 0003 Amendment.pdf PDF
RFIs Electrical Infrastructure Project Huntington VAMC-Davenergy Final Copy .pdf PDF
36C24526R0030 0002.pdf PDF
36C24526R0030 0001.docx DOCX document
S04 Site Visit.pdf PDF
VHA ICRA Bldg 12 rm ga108a electrical upgrade - Copy.pdf PDF
90084 - 581-22-102 - Huntington Upgrade Elect Infrastructure-FINAL BID SET Drawings - 20250128 - Copy.pdf PDF
Brand Name Justification FA Signed - Copy.pdf PDF
VHA ICRA Bldg Rm GD111 laundry area - Copy.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION DEVIATION.docx DOCX document
VHA ICRA Bldg 5 Room 5114 - Copy.pdf PDF
VHA ICRA Bldg 5 Room 5234 - Copy.pdf PDF
VHA ICRA-Bldg 6 Room 6105 - Copy.pdf PDF
90084 - 581-22-102 - Huntington VAMC Electrical Infrastructure BID Set-BOD-20250428 - Copy.pdf PDF
Brand Name Justification SEL Signed - Copy.pdf PDF
Contractor Certification Attachment.docx DOCX document
36C24526R0030.docx DOCX document
Past Performance Questioniare .docx DOCX document
90084 - 581-22-102 - Huntington Elect Infrastructure-Specs-Final Submission-20250829 - Copy.pdf PDF
SAM Wage Determine 2026.pdf PDF
VHA ICRA-Bldg 23R Rm G03 - Copy.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RobertoPerez Cloud

RobertoPerez Cloud

File details come from the government source that posted it. Updated .