This document outlines a federal construction contract opportunity for renovations to buildings 3A and 3B at the VA Medical Center in Martinsburg, West Virginia. The Department of Veterans Affairs seeks a prime contractor to provide all labor, materials, tools and equipment for project number 613-19-100, with an estimated construction cost between $10-20 million. This is a 100% Service-Disabled Veteran Owned Small Business set-aside requiring the firm to have a General Construction size standard of $39.5 million. Interested parties must register on various websites and attend a pre-bid site visit on June 9, 2021 to be eligible. Questions are due by June 17, 2021 and solicitation documents will be available on June 3, 2021. The bid opening will occur on July 14, 2021 at the VA Medical Center. The contract is contingent upon funding availability.

View the file

Other files

File Type Posted
092216 Non-Structural Metal Framing.pdf PDF
Martinsburg 3B Negative Air Bid Document Missing Spec SUBMITTAL TRANSMITTAL.pdf PDF
099100 Painting.pdf PDF
123600 Countertops.pdf PDF
36C24521B0008 0002.pdf PDF
090600 Schedule for finishes 3B-SV.pdf PDF
123200 Manufactured Wood Casework.pdf PDF
BLDG 500 Renovate 3A 3B - Specs VOL 1 Issue for Bid - REV 07132021.pdf PDF
101400 Signage.pdf PDF
092900 Gypsum Board.pdf PDF
123100 Manufactured Metal Casework.pdf PDF
096513 Resilient Base and Accessories.pdf PDF
117310 Ceiling Mounted ICU Boom 3B - Rev11092020.pdf PDF
613-19-101_Renovate 3A-3B_RFI-Log_21-0812.pdf PDF
BLDG 500 Renovate 3A 3B - Specs VOL 3 Issue for Bid - REV 07132021.pdf PDF
117310 Ceiling Mounted ICU Boom 3A - Rev 02162021.pdf PDF
096516 Resilient Sheet Flooring.pdf PDF
122400 Window Shades.pdf PDF
096519 Resilient Tile Flooring.pdf PDF
093013 Ceramic Porcelain Tiling.pdf PDF
095100 Acoustical Ceilings.pdf PDF
Martinsburg 3A Negative Air Bid Document Missing Spec SUBMITTAL TRANSMITTAL.pdf PDF
36C24521B0008 0001 signed.pdf PDF
BLDG 500 Renovate 3A-3B - Drawings 3A Issue for Bid_Part2.pdf PDF
BLDG 500 Renovate 3A-3B - Drawings 3B Issue for Bid_Part2.pdf PDF
Brand Name Justification 3B.pdf PDF
Security_CompletePacket.pdf PDF
613-19-100 Renovate 3A 3B_ILSM - Copy.pdf PDF
BLDG 500 Renovate 3A-3B - Specs VOL 1 Issue for Bid_.pdf PDF
BLDG 500 Renovate 3A-3B - Drawings 3A Issue for Bid_Part1.pdf PDF
613-19-101_Renovate 3B_Patient Lift Installation_Relocation - Copy.pdf PDF
BLDG 500 Renovate 3A-3B - Specs VOL 4 Issue for Bid_.pdf PDF
BLDG 500 Renovate 3A-3B - Drawings 3B Issue for Bid_Part1.pdf PDF
BLDG 500 Renovate 3A-3B - Specs VOL 2 Issue for Bid_.pdf PDF
BLDG 500 Renovate 3A-3B - Drawings 3A Issue for Bid_Part3.pdf PDF
BLDG 500 Renovate 3A-3B - Specs VOL 3 Issue for Bid_.pdf PDF
36C24521B0008_1.docx DOCX document
36C24521B0008.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OS

OS

OS

OS

OS OS OS OS OS OS

OS

J J J J J J J J J J J J J JJ JJ JJ JJ JJ JJ J

J JJ JJ JJ J

J J J J J J J J J J J J J J J J J J J J J J

J J

ES501.

ES501.

.LV

.LV

.LV

.LV

.LV

.LV

.LV

.LV

.LV

.OS

.OS

B1 B1B1

B1

B1

B1 B1 B1 B1 B1

B1

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2

B1

B1

B1

B1

B1

B1

B1B1

A2A2

A2A2

A2A2

A2

A2

A2 A2

A2

A2 A2

A2

A2

B1 B1

B1

B1

B1

B1 B1

B1 B1

B1

B1B1 B1

B1

F1

F1

F1

F1

F1

F1

X1

X1

X1

X1

X1

X1

X1

B1

B1

X1

X1

X1

X1

X1

B1

D4-15

P2 D4-15

D4-15

D4-15P2

B1

D4-15

D4-15

D4-15

D4-15

P2 D4-15

D4-15 P2

D4-15 P2

B1 B1 B1B1

P2 D4-15

P2 D4-15

D4-15 P2

D4-15 P2

B1

P2 P2 P2 P2P2 P2 P2 P2

D4-15 D4-15 D4-15

B1

B1 B1 B1

B1 B1 B1

B1

B1

B1

B1

B1

A2

B1

B1 B1

B1

B1B1B1B1 B1B1

B1B1

B1 B1

D4-15

P2

P2 D4-15

D4-15 P2

P2 D4-15

D4-15

D4-15

P2 P2 D4-15

D4-15P2D4-15

D4-15

P2

B1

P2P2P2P2

D4-15P2

P2D4-15

P2 D4-15

P2P2P2P2

A2

A2

D6-20

D4-15

D4-15P2

P2

P2

P2D4-15

D4-15

D4-15

B1

D4-15D4-15 D4-15

D4-15 D4-15

D6-20

D6-20

D4-15 D4-15 D4-15 D4-15

P1

D4-15

D4-15 D4-15

D4-15 D4-15

D4-15

D4-15

P2P2P2P2

D4-15

D4-15

D4-15

D4-15

D4-15

D4-15 D4-15 D4-15 D4-15

D4-15 D4-15 D4-15 D4-15

D4-15

EQUIPMENT STORAGE

3B-321

SOILED UTILITY

3B-319 W ORK ROOM

3B-329

NURSE STATION

3B-314

CLEAN SUPPLIES

3B-310

STAFF LOCKER ROOM

3A-343A

STAFF LOUNGE

3A-343

W AITING

3A-301

RECEPTION

3A-344

FAMILY TOILET

3B-305

PUBLIC TOILET

3B-306

PATIENT ROOM

3B-307

OFFICE

3B-304

NURSE SUPERVISOR OFFICE

3B-303

NURSE MANAGER OFFICE

3B-301

MECHANICAL ROOM

3B-300

PATIENT ROOM

3B-311

TOILET

3B-311A

PATIENT ROOM

3B-313

TOILET

3B-313A

PATIENT ROOM

3B-316

TOILET

3B-316A

PATIENT ROOM

3B-318

TOILET

3B-318A

PATIENT ROOM

3B-322

TOILET

3B-322A

PATIENT ISO ROOM

3B-326A

TOILET

3B-326B

PATIENT ISO ROOM

3B-327A

PATIENT ISO ROOM

3B-328A

TOILET

3B-330A

PATIENT ROOM

3B-331

PATIENT ROOM

3B-332

PATIENT ROOM

3B-333

TOILET

3B-335A

PATIENT ROOM

3B-336

PATIENT ROOM

3B-338

BARIATRIC PATIENT ROOM

3A-341

BARIATRIC TOILET

3A-341A

PATIENT ROOM

3A-337

TOILET

3A-337A

PATIENT ROOM

3A-335

TOILET

3A-335A

PATIENT ROOM

3A-334

TOILET

3A-334A

TELE. RM.

3A-300

ELEC. RM.

3A-345

TOILET

3B-309A

TOILET

3B-307A

TOILET

3B-327B

TOILET

3B-333A

TOILET

3B-336A

PATIENT ROOM

3B-324

TOILET

3B-324A

PATIENT ROOM

3B-320

TOILET

3B-320A

PATIENT ROOM

3B-317

TOILET

3B-317A

PATIENT ROOM

3B-315

TOILET

3B-315A

BARIATRIC PATIENT ROOM

3A-342

BARIATRIC TOILET

3A-342A

PATIENT ROOM

3A-339

TOILET

3A-339A

PATIENT ROOM

3A-336

TOILET

3A-336A

NURSE SUPERVISOR OFFICE

3B-302

NOURISHMENT

3B-334

MEDICATION ROOM

3B-312

ANTE ROOM

3B-325

ANTE ROOM

3B-326

ANTE ROOM

3B-327

ANTE ROOM

3B-328

CORRIDOR

C7

CORRIDOR

C9

CORRIDOR

C11

CORRIDOR

C6

CORRIDOR

C8

CORRIDOR

C10

ELEVATOR LOBBY

C1

CORRIDOR

C2

CORRIDOR

C5

H.A.C.

3B-308

STAFF TOILET

3B-337

PATIENT ROOM

3B-330

TOILET

3B-331A

TOILET

3B-332A

PATIENT ROOM

3B-335

TOILET

3B-338A

SAT. NURSE STATION

3B-323

PATIENT ROOM

3B-309

PATIENT ISO ROOM

3B-325A

TOILET

3B-325B

TOILET

3B-328B

SAT. NURSE STATION

3A-338

ES501.

N2 E2 N2 E2

N2 E2 N2

E2

N2 E2 N2

E2 N2 E2

N2 E2N2 E2

N2 E2N2 E2N2 E2N2 E2

N2 E2

N2 E2

N2 E2 N2 E2

N2 E2 N2 E2 N2 E2 N2 E2 N2 E2 N2 E2 N2 E2

N2 E2 N2 E2

N2 E2

N2

E2

N2

E2

(TYP)

L1

(TYP)

L1

D4-15D4-15D4-15

X1

A2 A2

A2

A2

.OS

X1

X2

X2

X1

F1F1

.OS

D6-20

D6-20

D4-15

D4-15 D4-15

D4-15

D4-15

.LV

.LV

.LV

-1LP-3B

-3LP-3B

-4LP-3B

-5LP-3B

-6LP-3B

-7LP-3B

-1ELP-3B

-2ELP-3B

-3ELP-3B

-4ELP-3B

-9LP-3B

B1

B1

SL1

SL1

L4

E2LS-3

B

-8LP-3B

B1B1

V1

.LV

.LV

.LV

.LV

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

(TYP)

L1

.LV

.LV

.LV

.LV

.LV

.LV

.LV

.LV

.LV

.LV

.LV

.LV

.LV

.LV

-2LP-3B

-103RP-3B

.LV3D

.LV3D

.LV

.LVD

.LV

ES501.

7 9

10 11

6.9

A

B

C D

E

F

7.7 8.3

B.6

1 2 4 5

.LV.LV .LVD

L16

L16

L16

L16

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

BLDG 500 RENOVATE 3B 613-19-101

19026

CMTA CONSULTING ENGINEERS, INC.

10411 MEETING STREET,

PROSPECT, KY 40059

(502)326-3085

VOLUME BC

U s e rs

\b k a rc h e r\

D o c u m e n ts

\V M

W V

-0 -E

-R b k a rc h e rR U

V A

B .r v t

/5

/2

:4

:2

P

M

ES201.

THIRD FLOOR PLAN - 3B, LIGHTING

510 BUTLER AVENUE MARTINSBURG, WV 25405

04/07/2021 PDY BBK

BID DOCUMENTS

FULLY

SPRINKLERED

GENERAL NOTES (LIGHTING):

A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,

AND CASEW ORK DETAILS FOR EXACT LOCATIONS OF ALL W ALL AND

CEILING MOUNTED ELECTRICAL DEVICES.

B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS

INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)

BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE

PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED

NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT

CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME

CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL

CURRENT CARRYING CONDUCTORS PER N.E.C. #310.15(B)(3), AND

UPSIZE CONDUIT AS REQUIRED PER N.E.C. #300.17 AND ANNEX

C. MULTIW IRE BRANCH CIRCUITS AS DEFINED IN N.E.C #100 / 210.4

(CIRCUITS SHARING A COMMON NEUTRAL CONDUCTOR) SHALL NOT BE

PERMITTED.

C. ALL DEVICE COVERPLATES SHALL BE #302 STAINLESS STEEL. IDENTIFY

THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES, SW ITCHES,

ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELS

W ITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE

EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. ALSO,

MARK INSIDES OF ALL DEVICE BOXES W ITH PANEL AND CIRCUIT

NUMBER.

D. LOCATE CHAIN-HUNG INDUSTRIAL FIXTURES IN MECHANICAL ROOMS TO

AVOID DUCTW ORK AND PIPING, TO MAXIMIZE AVAILABLE LIGHT. SPACE

AROUND EQUIPMENT, AIR HANDLERS, ETC. TO PROVIDE ADEQUATE

LIGHTING TO ALL AREAS OF ROOM. PROVIDE ADDITIONAL FIXTURES OF

SAME TYPE AS NEEDED TO FULFILL THIS REQUIREMENT.

E. LOCATE EXIT SIGNS FOR MAXIMUM VIEW ING AREA TO IDENTIFY EGRESS

PATHS AS INDICATED ON PLANS. COORDINATE LOCATIONS SUCH THAT

ARCHITECTURAL FEATURES OR EQUIPMENT FROM OTHER TRADES DO

NOT OBSTRUCT VIEW .

F. W HERE EXIT SIGNS OR EMERGENCY BATTERY PACKS ARE PROVIDED,

THEY SHALL BE CONNECTED TO AN UNSW ITCHED LINE.

G. LUMINAIRES INDICATED W ITH MULTI-LEVEL SW ITCHING SHALL HAVE

SIMILAR LAMPS CONTROLLED TOGETHER, I.E. INBOARD AND OUTBOARD

LAMPS OR RIGHT AND LEFT HAND LAMPS.

H. ALL LIGHTING FIXTURE LENSES, PARABOLIC LOUVERS, DOW NLIGHTING

ALZAK CONES AND "PARACUBE" LOUVERS SHALL BE HANDLED W ITH

COTTON GLOVES DURING INSTALLATION AND LAMPING TO AVOID

FINGERPRINTS OR DIRT DEPOSITS. IT IS PREFERRED THAT FIXTURES

BE SHIPPED AND INSTALLED W ITH CLEAR PLASTIC BAGS TO PROTECT

LOUVERS. AT CLOSE OF PROJECT, AND AFTER CONSTRUCTION AIR

FILTERS ARE CHANGED, REMOVE BAGS. ANY LOUVER OR CONE

SHOW ING DIRT OR FINGER PRINTS SHALL BE CLEANED W ITH SOLVENT

RECOMMENDED BY THE MANUFACTURER, OR REPLACED AS

NECESSARY IN ORDER TO TURN OVER TO THE OW NER NEW FIXTURES

AT OCCUPANCY.

I. RECESSED LUMINAIRES SHALL BE SECURED SUCH THAT THE FORCE

REQUIRED INSERTING LAMPS, TRIMS, LENSES, LOUVERS, OR DOOR

FRAMES DOES NOT SHIFT HOUSING. ALL TRIMS SHALL BE COMPLETELY

FLUSH W ITH FINISHED CEILINGS AT COMPLETION OF CONSTRUCTION.

J. CONTRACTOR SHALL PROVIDE UNSW ITCHED CONDUCTOR TO ALL EXIT

SIGNS, EMERGENCY INVERTER BATTERY PACKS, AND NIGHT LIGHTS AS

REQUIRED.

NORTH

0' 4' 8' 16'

SCALE 1/8" = 1'-0"

TAGGED NOTES

L1 REFER TO TYPICAL ENLARGED PATIENT ROOM PLANS ON

DRAWING ES501 FOR WORK REQUIRED IN SHADED AREA

INDICATED. ROOMS MAY BE REVERSED AND/ OR MIRROR

IMAGE BUT ORIENTATION TO HEADWALL, FOOTWALL, ETC.

SHALL BE THE SAME REGARDLESS. NOTE: CERTAIN DEVICE

LOCATIONS ARE AS SPECIFICALLY NOTED ON THESE FLOOR

PLANS WHERE DIFFERENCES WERE NOTED FROM THE

TYPICAL DESIGN. ANY FURTHER DEVIATIONS DISCOVERED

SHOULD BE COORDINATED WITH THE ARCHITECT PRIOR TO

OUTLET ROUGH-IN.

L4 ROUTE NUMBER OF #12 CONDUCTORS AS INDICATED IN 3/4''

CONDUIT TO NEW / SPARE 20A/1P BREAKER(S) IN EXISTING

PANEL INDICATED. WHERE EXISTING PANEL IS

FLUSH-MOUNTED IN AN EXISTING WALL, CONTRACTOR SHALL

CUT, PATCH AND REPAIR WALL AS REQUIRED FOR

CONCEALED CONDUIT ENTRY.

L16 EXCLUDE ALL WORK IN THIS AREA, FROM CEILING PLANE TO

FLOOR.

1/8" = 1'-0"ES201.

2 THIRD FLOOR PLAN - 3B, LIGHTING

TYPICAL ROOM JUNCTION BOX CONNECTION LEGEND

N1 - 120V NORMAL POW ER CIRCUIT (SEE CONTINUATION ON POW ER

DRAW ING ES301).

N2 - 277V NORMAL POW ER LIGHTING CIRCUIT (SEE CONTINUATION ON

LIGHTING DRAW ING ES201).

E1 - 120V EMERGENCY CRITICAL POW ER CIRCUIT (SEE CONTINUATION ON

POW ER DRAW ING ES301).

E2 - 277V EMERGENCY CRITICAL LIGHTING CIRCUIT (SEE CONTINUATION ON

LIGHTING DRAW ING ES201).

E3 - 120V EMERGENCY CRITICAL ''BOOM'' POW ER CIRCUIT (SEE

CONTINUATION ON POW ER DRAW ING ES301).

G1 - 120V NORMAL POW ER GFI CIRCUIT (SEE CONTINUATION ON POW ER

DRAW ING ES301).

REVISIONS: DATE:

ISSUE FOR BID 04/07/2021

T

T

JJ JJJJ JJJ

JJ JJJJ

JJ JJJJJJ JJJJJJ JJJJJJ JJJJ

JJJJJ JJJJJJ JJJJ

JJJJJJ JJ JJJ J

JJ JJJJ JJ JJJJ JJ JJJJJJ J

JJ

ES501.

ES501.

ES502.

ES502.

GFI

GFI

E

E

E .

E

E E

E

E/GFI

E

E

GFI

GFI

GFI

E

E

E

E

E

E

E

S

S

S

GFI

USB

E

E

GFI

GFI

E

GFI

GFI

E

E

E

E E

(TYP)

P1

GFI

GFI

E/GFI

E/GFI

EQUIPMENT STORAGE

3B-321

SOILED UTILITY

3B-319

W ORK ROOM

3B-329

NURSE STATION

3B-314 CLEAN SUPPLIES

3B-310

STAFF LOCKER ROOM

3A-343A

STAFF LOUNGE

3A-343

W AITING

3A-301

RECEPTION

3A-344

FAMILY TOILET

3B-305

PUBLIC TOILET

3B-306

PATIENT ROOM

3B-307

OFFICE

3B-304

NURSE SUPERVISOR OFFICE

3B-303

NURSE MANAGER OFFICE

3B-301

MECHANICAL ROOM

3B-300

PATIENT ROOM

3B-311

TOILET

3B-311A

PATIENT ROOM

3B-313

TOILET

3B-313A

PATIENT ROOM

3B-316

PATIENT ROOM

3B-318

PATIENT ROOM

3B-322

PATIENT ISO ROOM

3B-326A

TOILET

3B-326B

PATIENT ISO ROOM

3B-327A

PATIENT ISO ROOM

3B-328A

TOILET

3B-330A

PATIENT ROOM

3B-331

PATIENT ROOM

3B-332

PATIENT ROOM

3B-333

TOILET

3B-335A

PATIENT ROOM

3B-336

PATIENT ROOM

3B-338

BARIATRIC PATIENT ROOM

3A-341

BARIATRIC TOILET

3A-341A

PATIENT ROOM

3A-337

TOILET

3A-337A

PATIENT ROOM

3A-335

TOILET

3A-335A

PATIENT ROOM

3A-334

TOILET

3A-334A

TELE. RM.

3A-300

ELEC. RM.

3A-345

TOILET

3B-309A

TOILET

3B-307A

TOILET

3B-327B

TOILET

3B-333A

TOILET

3B-336A

PATIENT ROOM

3B-324

TOILET

3B-324A

PATIENT ROOM

3B-320

PATIENT ROOM

3B-317

PATIENT ROOM

3B-315

BARIATRIC PATIENT ROOM

3A-342

BARIATRIC TOILET

3A-342A

PATIENT ROOM

3A-339

TOILET

3A-339A

PATIENT ROOM

3A-336

TOILET

3A-336A

NURSE SUPERVISOR OFFICE

3B-302

NOURISHMENT

3B-334

MEDICATION ROOM

3B-312

ANTE ROOM

3B-325

ANTE ROOM

3B-326

ANTE ROOM

3B-327

ANTE ROOM

3B-328

CORRIDOR

C7

CORRIDOR

C9

CORRIDOR

C11

CORRIDOR

C6

CORRIDOR

C8

CORRIDOR

C10

ELEVATOR LOBBY

C1

CORRIDOR

C2

CORRIDOR

C5

H.A.C.

3B-308

STAFF TOILET

3B-337

EW C

PATIENT ROOM

3B-330

TOILET

3B-331A

TOILET

3B-332A

PATIENT ROOM

3B-335

TOILET

3B-338A

SAT. NURSE STATION

3B-323

PATIENT ROOM

3B-309

PATIENT ISO ROOM

3B-325A

TOILET

3B-325B

TOILET

3B-328B

SAT. NURSE STATION

3A-338

E

E

ES501.

N1

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P13

(TYP)

P12

(TYP)

P12

E E

E

E

E

(TYP)

P10

(TYP)

P10

P14

ES502.

P2

P19

-1RP-3B

-12RP-3B

-91RP-3B

-15RP-3B -13RP-3B

-16RP-3B

-11RP-3B

-10RP-3B

-19RP-3B

-20RP-3B

G1

N1G1

N1G1

N1 G1

N1G1

-20EP-3B

-19EP-3B

-26RP-3B

-25RP-3B

-18EP-3B

-17EP-3B

-24RP-3B

-23RP-3B

TOILET

3B-315A

N1 G1

N1G1

-23EP-3B

-24EP-3B

-30RP-3B

-29RP-3B

-22EP-3B

-21EP-3B

-27RP-3B

-28RP-3B

TOILET

3B-317A

N1 G1

N1G1

-27EP-3B

-28EP-3B

-34RP-3B

-33RP-3B

-26EP-3B

-25EP-3B

-31RP-3B

-32RP-3B

TOILET

3B-320A

N1 G1

N1G1

-31EP-3B

-32EP-3B

-38RP-3B

-37RP-3B

-30EP-3B

-29EP-3B

-36RP-3B

-35RP-3B

N1 G1

N1G1

-35EP-3B

-36EP-3B

-42RP-3B

-41RP-3B

-34EP-3B

-33EP-3B

-40RP-3B

-39RP-3B

-43RP-3B -44RP-3B

-45RP-3B

-47RP-3B

-46RP-3B

-53EP-3B

-54EP-3B

-56EP-3B

-55EP-3B

-49RP-3B

-48RP-3B

TOILET

3B-322A

TOILET

3B-318A

TOILET

3B-316A

N1G1

-55RP-3B

-54RP-3B

-58EP-3B

-57EP-3B

N1 G1

N1G1

-59RP-3B

-58RP-3B

-50EP-3B

-49EP-3B

-52EP-3B

-51EP-3B

-57RP-3B

-56RP-3B

N1 G1

N1G1

-63RP-3B

-62RP-3B

-46EP-3B

-45EP-3B

-48EP-3B

-47EP-3B

-61RP-3B

-60RP-3B

N1G1

-65RP-3B

-64RP-3B

-44EP-3B

-43EP-3B

N1G1

-69RP-3B

-68RP-3B

-40EP-3B

-39EP-3B

N1 G1

-42EP-3B

-41EP-3B

-67RP-3B

-66RP-3B

N1 G1

-38EP-3B

-37EP-3B

-71RP-3B

-70RP-3B

-4RP-3B

-74RP-3B

-73RP-3B

-9RP-3B

-72RP-3B

-75RP-3B

-17RP-3B

-5RP-3B

-6RP-3B

-7RP-3B

-8RP-3B

N1 G1

N1G1

N1 G1

N1G1

N1 G1

N1G1

N1 G1

-18RP-3B

-2EP-3B

-3EP-3B

-1EP-3B

-4EP-3B

-76RP-3B

-6EP-3B

-7EP-3B

-10EP-3B

-9EP-3B

-12EP-3B

-14EP-3B

-13EP-3B

-59EP-3B

-60EP-3B

-61EP-3B

-62EP-3B

-63EP-3B

-66EP-3B

-67EP-3B

-65EP-3B

-68EP-3B

-90RP-3B

NSF DIRTY TRAYS

3A-333

-50RP-3B

-51RP-3B

-52RP-3B

-77RP-3B

-53RP-3B

-78RP-3B

-79RP-3B

-80RP-3B

-64EP-3B

-81RP-3B

-82RP-3B

-83RP-3B

-84RP-3B

-85RP-3B

-86RP-3B

-87RP-3B

-88RP-3B

-82EP-3B

-81EP-3B

-80EP-3B

-79EP-3B

-77EP-3B

-78EP-3B

-75EP-3B

-76EP-3B

-73EP-3B

-74EP-3B

-72EP-3B

-71EP-3B

-69EP-3B

-70EP-3B

FRIDGE

MICRO

COFFEE

FRIDGE

PRINTER

E

MED

STORAGE

U.C.

FRIDGE

E/GFI

-84EP-3B

-83EP-3B

FRIDGE

MICRO

COFFEE

ICE

P19

AC-21-S

AC-21-R

-1,3,5MP-3C

-2,4,6MP-3C

-96RP-3B

HWP-1A

-8,10,12MP-3C

CWP-1A

CWP-1B

HWP-1B

-7,9,11MP-3C

-13,15,17MP-3C

-14,16,18MP-3C

C/S

-94RP-3B

-95RP-3B

-92RP-3B

-93RP-3B

EW C -100RP-3B

-14RP-3B

-101RP-3B

6' - 0"

6' - 0"

E

E3

-101EP-3B

-99EP-3B

-103EP-3B

-100EP-3B

E3

-105EP-3B

-107EP-3B

-109EP-3B

-111EP-3B

-15EP-3B

-16EP-3B

-21RP-3B

-22RP-3B

FCU

-113EP-3B

E

E

-115EP-3B

E.

E

E

E E

E

E

-97EP-3B

E

-117EP-3B

-102RP-3B

P20

-8EP-3B

7' - 0" 7' - 0"

E1 E1 E1 E1 E1 E1 E1 E1 E1

E1

E1 E1 E1 E1

E1 E1 E1E1 E1E1 E1 E1 E1 E1 E1 E1 E1 E1

E-11EP-3B

P11

4' - 0"

4' - 0"

4' - 0"

-90EP-3B

P20

S

USB

USB

USB

USB

GFI

ES501.

7 9

10 11

6.9

A

B

C D

E

F

7.7 8.3

B.6

1 2 4 5

-3RP-3B

P29

-123EP-3B

-121EP-3B

-119EP-3B

-125EP-3B

P33

P33

P33

P33

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

BLDG 500 RENOVATE 3B 613-19-101

19026

CMTA CONSULTING ENGINEERS, INC.

10411 MEETING STREET,

PROSPECT, KY 40059

(502)326-3085

VOLUME BC

U s e rs

\b k a rc h e r\

D o c u m e n ts

\V M

W V

-0 -E

-R b k a rc h e rR U

V A

B .r v t

/5

/2

:4

:4

P

M

ES301.

THIRD FLOOR PLAN - 3B, POWER

510 BUTLER AVENUE MARTINSBURG, WV 25405

04/07/2021 PDY BBK

BID DOCUMENTS

FULLY

SPRINKLERED

1/8" = 1'-0"ES301.

1 THIRD FLOOR PLAN - 3B, POWER

NORTH

0' 4' 8' 16'

SCALE 1/8" = 1'-0"

GENERAL NOTES (POWER):

A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,

AND CASEW ORK DETAILS FOR EXACT LOCATIONS OF ALL W ALL AND

CEILING MOUNTED ELECTRICAL DEVICES.

B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS

INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)

BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE

PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED

NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT

CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME

CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL

CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE

CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIW IRE

BRANCH CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A

COMMON NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.

C. ALL DEVICE COVERPLATES SHALL BE #302 STAINLESS STEEL. IDENTIFY

THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES, SW ITCHES,

ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELS

W ITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE

EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. MARK

INSIDES OF ALL DEVICE BOXES W ITH PANEL AND CIRCUIT NUMBER.

D. RECEPTACLES THAT ARE CONTROLLED BY AN AUTOMATIC MEANS

SUCH AS OCCUPANCY SENSOR OR ENERGY MANAGEMENT SYSTEM

SHALL BE MARKED IN ACCORDANCE W ITH NEC 406.3(E).

E. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS

SHALL BE COORDINATED W ITH MECHANICAL AND PLUMBING

CONTRACTORS TO ENSURE ACCESS AND W ORKING CLEARANCE IS

MAINTAINED PER NEC. NOTIFY OTHER TRADES OF REQUIRED

CLEARANCE AREAS TO AVOID ROUTING OF OTHER SYSTEMS IN THESE

AREAS. DO NOT INSTALL ELECTRICAL EQUIPMENT OVER EQUIPMENT

NAMEPLATES OR ACCESS PANELS OR THROUGH

ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT BY OTHER

TRADES.

TAGGED NOTES

P1 PROVIDE DISCONNECT SWITCH FUSED AT EQUIPMENT NAMEPLATE RATING

FOR EQUIPMENT INDICATED. COORDINATE EXACT MOUNTING LOCATION AND

CONNECTION REQUIREMENTS WITH MECHANICAL EQUIPMENT, PIPING

CLEARANCES PRIOR TO ROUGH-IN. REFER TO "EQUIPMENT CONNECTION

SCHEDULE ON DRAWING ES701" FOR ADDITIONAL REQUIREMENTS.

P2 PROVIDE UNISTRUT AS REQUIRED FOR MOUNTING SERVICE RECEPTACLES

ON ROOF. COORDINATE EXACT MOUNTING LOCATION WITH ALL TRADES

PRIOR TO ROUGH-IN.

P10 REFER TO ENLARGED PLAN OF ELECTRICAL ROOM ON DRAWING ES502.

P11 PROVIDE CIRCUITRY AND CONNECTIONS FOR P-TUBE STATION. PNEUMATIC

TUBE TRANSFER STATION FINAL LOCATION(S) TO BE DETERMINED BY

OWNER'S VENDOR.

P12 PROVIDE PLUGMOLD STRIP LENGTH AS INDICATED. PLUGMOLD SHALL BE

BRUSHED ALUMINUM WITH 20A OUTLETS SPACES AT 18” ON CENTERS.

EMERGENCY RECEPTACLES SHALL BE RED IN COLOR AND SHALL HAVE

CIRCUIT IDENTIFICATION (SEE GENERAL NOTE - THIS SHEET) MOUNT AT 48"

AFF.

P13 REFER TO TYPICAL ENLARGED PATIENT ROOM PLANS ON DRAWING ES501

FOR WORK REQUIRED IN SHADED AREA INDICATED. ROOMS MAY BE

REVERSED AND/ OR MIRROR IMAGE BUT ORIENTATION TO HEADWALL,

FOOTWALL, ETC. SHALL BE THE SAME REGARDLESS. NOTE: CERTAIN DEVICE

LOCATIONS ARE AS SPECIFICALLY NOTED ON THESE FLOOR PLANS WHERE

DIFFERENCES WERE NOTED FROM THE TYPICAL DESIGN. ANY FURTHER

DEVIATIONS DISCOVERED SHOULD BE COORDINATED WITH THE ARCHITECT

PRIOR TO OUTLET ROUGH-IN.

P14 REFER TO ENLARGED PLAN OF DATA ROOM ON DRAWING ES502.

P19 VARIABLE FREQUENCY DRIVE (VFD) WITH INTEGRAL DISCONNECT SWITCH -

REFER TO MECHANICAL EQUIPMENT SCHEDULES FOR FURTHER

REQUIREMENTS. (TYPICAL)

P20 PROVIDE AN EXTENSION OF THE EXISTING LIGHTNING PROTECTION SYSTEM

TO THE NEW HVAC ROOFTOP EQUIPMENT AND AHU SCREEN-WALL

ENCLOSURE BOND IN ACCORDANCE TO VA SPECIFICATIONS AND

GUIDELINES. REFER ALSO TO THE LIGHTNING PROTECTION SYSTEM NOTE ON

THIS DRAWING ES302.

P29 TEMPERATURE CONTROL PANEL FURNISHED AND INSTALLED BY

MECHANICAL CONTRACTOR. PROVIDE 120V POWER AND DATA CONNECTION.

P33 EXCLUDE ALL WORK IN THIS AREA, FROM CEILING PLANE TO FLOOR.

TYPICAL ROOM JUNCTION BOX CONNECTION LEGEND

N1 - 120V NORMAL POW ER CIRCUIT (SEE CONTINUATION ON POW ER

DRAW ING ES301).

N2 - 277V NORMAL POW ER LIGHTING CIRCUIT (SEE CONTINUATION ON

LIGHTING DRAW ING ES201).

E1 - 120V EMERGENCY CRITICAL POW ER CIRCUIT (SEE CONTINUATION ON

POW ER DRAW ING ES301).

E2 - 277V EMERGENCY CRITICAL LIGHTING CIRCUIT (SEE CONTINUATION ON

LIGHTING DRAW ING ES201).

E3 - 120V EMERGENCY CRITICAL ''BOOM'' POW ER CIRCUIT (SEE

CONTINUATION ON POW ER DRAW ING ES301).

G1 - 120V NORMAL POW ER GFI CIRCUIT (SEE CONTINUATION ON POW ER

DRAW ING ES301).

W P/GFI

P1

P2

NEW

277/480V

NORMAL POW ER

PANEL "MP-PH"

P18EXISTING

277/480V

NORMAL POW ER

MOTOR CONTROL

CENTER "MCC-1A"

TO REMAIN

-2,4,6MP-PH

-1,3,5MP-PH

P1

EF-61B

EF-61A

EXISTING

277/480V

NORMAL POW ER

PANEL "P-P"

TO REMAIN

EXISTING

277/480V

EM-CRITICAL

PANEL "EMDP"

TO REMAIN

EXISTING

277/480V

EM-ELEVATOR

PANEL "EDP"

TO REMAIN

EXISTING

600A

EM-ELEVATOR

"ATS-EDP"

TO REMAIN

EXISTING

120/208V

NORMAL POW ER

PANEL "PA-RP"

TO REMAIN

EXISTING

277/480V

EM-LIFE SAFETY

PANEL "DP-LS"

TO REMAIN

PA-RP

P17

7 9

B

C D

E

F

7.7 8.3

B.6

1 2 4 5

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

BLDG 500 RENOVATE 3B 613-19-101

19026

CMTA CONSULTING ENGINEERS, INC.

10411 MEETING STREET,

PROSPECT, KY 40059

(502)326-3085

VOLUME BC

U s e rs

\b k a rc h e r\

D o c u m e n ts

\V M

W V

-0 -E

-R b k a rc h e rR U

V A

B .r v t

/5

/2

:4

:4

P

M

ES302.

ROOF PLAN - 3B, ELECTRICAL

510 BUTLER AVENUE MARTINSBURG, WV 25405

04/07/2021 PDY BBK

BID DOCUMENTS

FULLY

SPRINKLERED

1/8" = 1'-0"ES302.

1 ROOF PLAN - 3B, ELECTRICAL

GENERAL NOTES (ROOF):

A. REFER TO POW ER, SYSTEMS, AND LIGHTING PLANS FOR GENERAL

NOTES APPLICABLE TO INTERIOR SPACES SHOW N ON THIS PLAN.

B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS

INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)

BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE

PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED

NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT

CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME

CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL

CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE

CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIW IRE

BRANCH CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A

COMMON NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.

C. IDENTIFY THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES,

SW ITCHES, ETC. IN AREA OF CONSTRUCTION. PROVIDE ENGRAVED

LAMACOID LABLES FOR ALL EXTERIOR DEVICES. MARK INSIDES OF ALL

DEVICE BOXES W ITH PANEL AND CIRCUIT NUMBER.

D. PROVIDE UNI-STRUT AS REQUIRED FOR MOUNTING OF ALL DEVICES ON

ROOF. COORDINATE W ITH ROOFING CONTRACTOR PRIOR TO

CONSTRUCTION FOR ALL PENETRATIONS. SEAL PENETRATIONS AS

REQUIRED PER ROOFING CONTRACTOR AND ROOFING

MANUFACTURER'S RECOMMENDATIONS AS REQUIRED TO MAINTAIN

ROOF W ARRANTY. PROVIDE CURBS AND/OR FLASHED BOOTS AT ALL

DEVICES AND PENETRATIONS.

E. CONDUITS SHALL PENETRATE ROOF FROM BELOW AS CLOSE TO FINAL

ROOF EQUIPMENT TERMINATION POINT AS POSSIBLE. SUPPORT ALL

ROOF MOUNTED CONDUITS AT INTERVALS NOT EXCEEDING 10 FEET

W ITH STRUT-BASED SUPPORT SYSTEM. SUPPORT SYSTEM TO BE

CADDY PYRAMID ST SERIES OR APPROVED EQUAL.

F. ALL CONDUIT EXPOSED TO DIRECT SUNLIGHT SHALL BE AT LEAST 12''

ABOVE THE ROOF-TOP. NO CONDUIT SHALL BE EXPOSED TO DIRECT

SUNLIGHT BELOW THIS HEIGHT.

G. W HERE RACEW AY OR CONDUCTORS ARE INSTALLED EXPOSED ON

ROOF, DERATE AMPACITY OF CONDUCTORS IN ACCORDANCE W ITH

NEC.

H. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS

SHALL BE COORDINATED W ITH MECHANICAL AND PLUMBING

CONTRACTORS TO ENSURE ACCESS AND W ORKING CLEARANCE IS

MAINTAINED PER NEC. NOTIFY OTHER TRADES OF REQUIRED

CLEARANCE AREAS TO AVOID ROUTING OF OTHER SYSTEMS IN THESE

AREAS. DO NOT INSTALL ELECTRICAL EQUIPMENT OVER EQUIPMENT

NAMEPLATES OR ACCESS PANELS OR THROUGH

ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT BY OTHER

TRADES.

I. PROVIDE MAINTENANCE RECEPTACLE W ITHIN 25 FT OF EACH

MECHANICAL UNIT AS REQUIRED BY NEC. COORDINATE INSTALLATION

LOCATIONS W ITH FINAL EQUIPMENT LAYOUT PROVIDE BY MECHANICAL

CONTRACTOR.

J. CONDUIT FOR ROOF MOUNTED EQUIPMENT SHALL BE ROUTED IN

CEILING SPACE BELOW ROOF DECK UNO.

TAGGED NOTES

P1 PROVIDE DISCONNECT SWITCH FUSED AT EQUIPMENT NAMEPLATE

RATING FOR EQUIPMENT INDICATED. COORDINATE EXACT MOUNTING

LOCATION AND CONNECTION REQUIREMENTS WITH MECHANICAL

EQUIPMENT, PIPING CLEARANCES PRIOR TO ROUGH-IN. REFER TO

"EQUIPMENT CONNECTION SCHEDULE ON DRAWING ES701" FOR

ADDITIONAL REQUIREMENTS.

P2 PROVIDE UNISTRUT AS REQUIRED FOR MOUNTING SERVICE

RECEPTACLES ON ROOF. COORDINATE EXACT MOUNTING LOCATION

WITH ALL TRADES PRIOR TO ROUGH-IN.

P17 ROUTE NUMBER OF #12 CONDUCTORS AS INDICATED IN 3/4'' CONDUIT

TO NEW / SPARE 20A/1P BREAKER(S) IN EXISTING PANEL INDICATED.

WHERE EXISTING PANEL IS FLUSH-MOUNTED IN AN EXISTING WALL,

CONTRACTOR SHALL CUT, PATCH AND REPAIR WALL AS REQUIRED

FOR CONCEALED CONDUIT ENTRY.

P18 FIELD VERIFY BEST LOCATION FOR NEW PANELBOARD AND PROVIDE

ANGLE-IRON SUPPORTS AS REQUIRED FOR MOUNTING IN AN OPEN

SPACE. INSURE ALL REQUIRED EQUIPMENT CLEARANCES ARE

MAINTAINED.

NORTH

GENERAL NOTES (LIGHTNING PROTECTION SYSTEM ):

A. LIGHTNING PROTECTION LAYOUT SHOW N IS INTENDED TO CONVEY

SCOPE OF PROJECT. CONTRACTOR SHALL PROVIDE FINAL DESIGN

AND INSTALLATION FOR A COMPLETE LIGHTNING PROTECTION

SYSTEM FOR THIS FACILITY. SYSTEM SHALL COMPLY W ITH UL #96A

"MASTER LABELED LIGHTNING PROTECTION SYSTEMS'' AND NFPA 780.

REFER TO THE ELECTRICAL SPECIFICATION SECTION 264113

"LIGHTNING PROTECTION FOR STRUCTURES" FOR ADDITIONAL

REQUIREMENTS.

B. CONTRACTOR SHALL PROVIDE BONDING PROTECTION TO ALL

CAMERAS.

C. PENETRATIONS THROUGH SHEET METAL INCLUDING BUT NOT LIMITED

TO COPINGS, AND COUNTER FLASHINGS SHALL NOT BE ALLOW ED.

CONNECTIONS TO PARAPETS SHALL BE BY CLAMPS MADE TO FASTEN

TO THE DRIP EDGE OF COPINGS W ITHOUT PENETRATION TO AND OF

THE COPINGS. REFER TO ARCHITECTURAL ROOF PLAN FOR DETAILS

OF PENETRATIONS THROUGH HORIZONTAL ROOF AREAS.

PENETRATIONS THROUGH HORIZONTAL ROOF AREAS SHALL BE NO

CLOSER THAN 16'' TO ANY VERTICAL BUILDING SURFACE.

D. ALL ROOF PENETRATIONS AND ASSOCIATED LABOR COSTS SHALL BE

AT THE EXPENSE OF THIS CONTRACTOR, BUT SHALL BE INSTALLED BY

THE ROOFING CONTRACTOR IN ORDER TO MAINTAIN ANY APPLICABLE

ROOF W ARRANTIES. ANY DEVIATIONS NECESSARY BY THIS

CONTRACTOR SHALL FIRST BE SUBMITTED TO THE ARCHITECT's

OFFICE FOR REVIEW . ANY COSTS ASSOCIATED W ITH CHANGES TO

THIS SYSTEM THAT ARE A RESULT OF PROPOSED DETAILS NOT BEING

ACCEPTABLE TO THE OW NER, ARCHITECT OR ENGINEER SHALL BE AT

THE EXPENSE OF THIS CONTRACTOR. ALL REQUIRED CONNECTION

DEVICES SHALL BE REVIEW ED BY THE ARCHITECT AND ENGINEER.

PENETRATION DEVICES THROUGH STANDING SEAM METAL ROOF

AREAS SHALL BE PROVIDED BY THE SHEET METAL ROOFING

CONTRACTOR.

E. ALL CABLING/W IRING SHALL BE CONCEALED W ITHIN THE BUILDING.

ROUTE ALL CONCEALED CABLING IN SCHEDULE 80 PVC CONDUIT.

F. PROVIDE LIGHTNING PROTECTION SYSTEM EXTENSION FOR ADDED

ROOFTOP HVAC EQUIPMENT AT THIS FACILITY. SYSTEM SHALL COMPLY

W ITH UL 96A “MASTER LABELED LIGHTNING PROTECTION SYSTEMS”,

NFPA 780 AND THE PROJECT SPECIFICATIONS.

G. W HERE ELEMENTS OF THE SYSTEM ARE IN DIRECT CONTACT W ITH THE

ALUMINUM BUILDING MATERIALS, UTILIZE ALUMINUM EQUIPMENT.

W HERE IN CONTACT W ITH ANY OTHER BUILDING MATERIALS, UTILIZE

COPPER EQUIPMENT.

H. AIR TERMINALS SHALL BE INSTALLED W ITH-IN 2'-0" OF OUTSIDE

BUILDING EDGE, OUTSIDE CORNERS AND RIDGE ENDS - SPACING

BETW EEN AIR TERMINALS NOT TO EXTEND 20 FT.

I. NO BEND OF A CONDUIT SHALL FORM AN ANGLE MORE THAN 90

DEGREES NOR SHALL HAVE A RADIUS OF BEND THAN 8".

J. CONDUCTORS W ITHIN BUILDING SHALL BE IN 1" CONDUIT.

K. THE STEEL COLUMNS OF THE BUILDING SHALL BE USED AS THE DOW N

CONDUCTORS.

L. BOND ALL ROOF DRAINS, AHU HOUSING, ANTENNAS AND OTHER ROOF

MOUNTED METALLIC OBJECTS TO THE SYSTEM IN AN APPROVED

MANNER.

M. ALL UNDERGROUND METALLIC OBJECTS LOCATED W ITHIN 6 FEET OF

THE SYSTEM SHALL BE BONDED TO THE SYSTEM IN AN APPROVED

MANNER.

N. PROPER FLASHING AND PITCH POCKETS SHALL BE PROVIDED FOR ALL

ROOF PENETRATIONS.

O. ALL ROOF PENETRATIONS AND ALL ITEMS FASTENED TO

ARCHITECTURAL ELEMENTS OF THE BUILDING SHALL MEET W ITH THE

ARCHITECT'S APPROVAL.

P. BOND ENTIRE SYSTEM TOGETHER TO THE COLD W ATER MAINS

ENTERING THE BUILDING IN AN APPROVED MANNER.

Q. INTERCONNECT LIGHTNING PROTECTION GROUND TO ELECTRIC,

TELEPHONE AND OTHER BUILDING GROUND SYSTEMS AS SHOW N OR

AS REQUIRED BY CODE.

R. THE SYSTEM SHALL BE THE PRODUCT OF ONE MANUFACTURER

REGULARLY ENGAGED IN THE PRODUCTION OF LIGHTNING

PROTECTION SYSTEMS AND SHALL BE REGISTERED AND APPROVED BY

THE LIGHTNING PROTECTION INSTITUTE.

0' 4' 8' 16'

SCALE 1/8" = 1'-0"

F

F

F

F

F

F

F

F

S

S

S

S

S

S

S

S

S

S

S

F

F

F

F

F

FF

MS

M S

W AP

W AP

W AP

W AP

F

F

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

W AP

W AP

W AP

W AP

W AP

W AP

W AP

W AP

W AP

W AP

W AP

CC

CC

C C

CC

PB PB

PB

PB

PB

PB

PB

CR

T

T

CR

CR

CR

CR

CRCR

CR

CR

CR

CR

CR

IM

IM

IR

IR

IM

SS SS

SS

SS SS

IR

IRCR

DS

DS

KP

IM

F

DS

DS

DS

DS

DS

DS

DSDS

DS DS

DP

DS

DS

C C

CR

CR

DS

LPA

SD

SD

SD SD

SD

SD

SD

SD

SD

DS

IRCR

DD

SM

DD

SM

DD

DD DD

DD

DD

DD

SM

DD

SM

DD

SM

DD

SM

DP

W AP

W APW APW AP

W AP

W AP

W AP

W AP

W AP

W APW AP

W AP

ES501.

ES501.

EQUIPMENT STORAGE

3B-321

SOILED UTILITY

3B-319

W ORK ROOM

3B-329

NURSE STATION

3B-314 CLEAN SUPPLIES

3B-310

STAFF LOCKER ROOM

3A-343A

STAFF LOUNGE

3A-343

W AITING

3A-301

RECEPTION

3A-344

FAMILY TOILET

3B-305

PUBLIC TOILET

3B-306

PATIENT ROOM

3B-307

OFFICE

3B-304

NURSE SUPERVISOR OFFICE

3B-303

NURSE MANAGER OFFICE

3B-301

MECHANICAL ROOM

3B-300

PATIENT ROOM

3B-311

TOILET

3B-311A

PATIENT ROOM

3B-313

TOILET

3B-313A

PATIENT ROOM

3B-316

TOILET

3B-316A

PATIENT ROOM

3B-318

TOILET

3B-318A

PATIENT ROOM

3B-322

TOILET

3B-322A

PATIENT ISO ROOM

3B-326A

TOILET

3B-326B

PATIENT ISO ROOM

3B-327A

PATIENT ISO ROOM

3B-328A

TOILET

3B-330A

PATIENT ROOM

3B-331

PATIENT ROOM

3B-332

PATIENT ROOM

3B-333

TOILET

3B-335A

PATIENT ROOM

3B-336

PATIENT ROOM

3B-338 BARIATRIC PATIENT ROOM

3A-341

BARIATRIC TOILET

3A-341A

PATIENT ROOM

3A-337

TOILET

3A-337A

PATIENT ROOM

3A-335

TOILET

3A-335A

PATIENT ROOM

3A-334

TOILET

3A-334A

TELE. RM.

3A-300

ELEC. RM.

3A-345

TOILET

3B-309A

TOILET

3B-307A

TOILET

3B-327B

TOILET

3B-333A

TOILET

3B-336A

PATIENT ROOM

3B-324

TOILET

3B-324A

PATIENT ROOM

3B-320

TOILET

3B-320A

PATIENT ROOM

3B-317

TOILET

3B-317A

PATIENT ROOM

3B-315

TOILET

3B-315A

BARIATRIC PATIENT ROOM

3A-342

BARIATRIC TOILET

3A-342A

PATIENT ROOM

3A-339

TOILET

3A-339A

PATIENT ROOM

3A-336

TOILET

3A-336A

NURSE SUPERVISOR OFFICE

3B-302

NOURISHMENT

3B-334

MEDICATION ROOM

3B-312

ANTE ROOM

3B-325

ANTE ROOM

3B-326

ANTE ROOM

3B-327

ANTE ROOM

3B-328

CORRIDOR

C7

CORRIDOR

C9

CORRIDOR

C11

CORRIDOR

C6

CORRIDOR

C8

CORRIDOR

C10

ELEVATOR LOBBY

C1

CORRIDOR

C2

CORRIDOR

C5

H.A.C.

3B-308

STAFF TOILET

3B-337

ES501.

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S5

(TYP)

S1

(TYP)

S1

(TYP)

S2

(TYP)

S2

(TYP)

S2(TYP)

S1

(TYP)

S2

S3

ES502.

3D/1V

3D/1V

SAT. NURSE STATION

3B-323

S19

S2

CORRIDOR

C8

6' - 0"

6' - 0"

3D/1V

3D/1V

PATIENT ROOM

3B-309

PATIENT ISO ROOM

3B-325A

C

S15

S14

S14

S14

S14

P17

ELLS-3B

S12

S12 S12

P-TUBE

STATION

S16

W

ES501.

7 9

10 11

6.9

A

B

C D

E

F

7.7 8.3

B.6

1 2 4 5

2D

S17

ELLS-3C

P17

ELLS-3B

P17

ELLS-3B

P17

S15

S15

S15

S15

ELLS-3B

P17

P17

ELLS-3B

S21

S21

S21

S21

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

BLDG 500 RENOVATE 3B 613-19-101

19026

CMTA CONSULTING ENGINEERS, INC.

10411 MEETING STREET,

PROSPECT, KY 40059

(502)326-3085

VOLUME BC

U s e rs

\b k a rc h e r\

D o c u m e n ts

\V M

W V

-0 -E

-R b k a rc h e rR U

V A

B .r v t

/5

/2

:4

:5

P

M

ES401.

THIRD FLOOR PLAN - 3B,

SYSTEMS

510 BUTLER AVENUE MARTINSBURG, WV 25405

04/07/2021 PDY BBK

BID DOCUMENTS

FULLY

SPRINKLERED

GENERAL NOTES (SYSTEMS):

A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,

AND CASEW ORK DETAILS FOR EXACT LOCATIONS OF ALL W ALL AND

CEILING MOUNTED ELECTRICAL DEVICES.

B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS

INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)

BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE

PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED

NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT

CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME

CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL

CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE

CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIW IRE

BRANCH CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A

COMMON NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.

C. ALL DEVICE COVERPLATES SHALL BE #302 STAINLESS STEEL. IDENTIFY

THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES, SW ITCHES,

ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELS

W ITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE

EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. MARK

INSIDES OF ALL DEVICE BOXES W ITH PANEL AND CIRCUIT NUMBER.

D. REFER TO "SYSTEM INSTALLATION MATRIX" (ON SYSTEMS LEGEND

SHEET) AND SPECIFICATIONS FOR CONTRACTOR REQUIREMENTS OF

EACH SYSTEM.

E. THE CONTRACTOR SHALL ROUTE ALL ''SYSTEM CONDUIT STUB-UPS'' TO

THE NEAREST CORRIDOR CABLING PATH (SEE ''STUB-UP'' DETAILS).

REFER TO CABLING PATH INSTALLATION DETAIL FOR ADDITIONAL

REQUIREMENTS.

F. CONTRACTOR SHALL PAINT ALL SYSTEMS CONDUIT STUB-UPS LIGHT

BLUE FOR SYSTEMS CABLING INTO THE CORRIDOR CABLING PATH.

PROVIDE PULL STRINGS IN ALL NEW CONDUIT RUNS FOR SYSTEM

CABLING INSTALLATION.

1/8" = 1'-0"ES401.

1 THIRD FLOOR PLAN - 3B, SYSTEMS

TAGGED NOTES

P17 ROUTE NUMBER OF #12 CONDUCTORS AS INDICATED IN 3/4''

CONDUIT TO NEW / SPARE 20A/1P BREAKER(S) IN EXISTING

PANEL INDICATED. WHERE EXISTING PANEL IS

FLUSH-MOUNTED IN AN EXISTING WALL, CONTRACTOR SHALL

CUT, PATCH AND REPAIR WALL AS REQUIRED FOR

CONCEALED CONDUIT ENTRY.

S1 PROPOSED J-HOOK CABLING PATH - COORDINATE ALL PATHS

WITH VENDOR's AND HOSPITAL STAFF (NOTE : STUB-UP

CONDUITS WILL NEED TO BE RAN TO THESE CABLING PATHS).

PROVIDE J-HOOKS ALONG ALL REQUIRED CABLING PATHS -

REFER TO INSTALLATION DETAIL ON DRAWING ES802 FOR

FURTHER REQUIREMENTS (TYPICAL). PROVIDE CONDUITS AND

SLEEVES WHERE REQUIRED DUE TO HARD/INACCESSIBLE

CEILING LOCATIONS. REFER TO REFLECTED CEILING PLAN

AND FIELD VERIFY EXACT REQUIREMENTS.

S2 CABLING CONTRACTOR SHALL INSTALL SLEEVES OF

SUFFICIENT SIZE AND QUANTITY FOR PATHWAY THROUGH

WALL. REFER TO SYSTEMS CABLING SLEEVE DETAIL ON

ES802. CABLING CONTRACTOR SHALL INSTALL ALL SLEEVES

PER MANUFACTURER INSTRUCTIONS.

S3 REFER TO ENLARGED PLAN OF DATA ROOM ON DRAWING

ES502.

S5 REFER TO TYPICAL ENLARGED PATIENT ROOM PLANS ON

DRAWING ES501 FOR WORK REQUIRED IN SHADED AREA

INDICATED. ROOMS MAY BE REVERSED AND/ OR MIRROR

IMAGE BUT ORIENTATION TO HEADWALL, FOOTWALL, ETC.

SHALL BE THE SAME REGARDLESS. NOTE: CERTAIN DEVICE

LOCATIONS ARE AS SPECIFICALLY NOTED ON THESE FLOOR

PLANS WHERE DIFFERENCES WERE NOTED FROM THE

TYPICAL DESIGN. ANY FURTHER DEVIATIONS DISCOVERED

SHOULD BE COORDINATED WITH THE ARCHITECT PRIOR TO

OUTLET ROUGH-IN.

S12 CONTRACTOR TO VERIFY THE EXACT LOCATION OF DEVICE

INDICATED WITH OWNER / ARCHITECT PRIOR TO ROUGH-IN.

S14 PROVIDE OUTLET BOX ROUGH-IN FOR DEVICES INDICATED.

DEVICES TO BE PROVIDED UNDER SEPERATE CONTRACT ('3A'

RENOVATION).

S15 PROVIDE CONNECTION TO DOOR CONTROLS WITH F.A.

CONTROL MODULE TO DISCONNECT POWER TO DOORS /

CLOSE DOORS UPON FIRE ALARM.

S16 COMBINATION KEYPAD / CARD READER UNIT

S17 TEMPERATURE CONTROL PANEL FURNISHED AND INSTALLED

BY MECHANICAL CONTRACTOR. PROVIDE 120V POWER AND

DATA CONNECTION.

S19 EXISTING CAMERA TO BE RELOCATED. COORDINATE WITH

ELECTRICAL DEMOLITION PLAN ON DRAWING ED101. RE-WORK

CONNECTIONS AS REQUIRED.

S21 EXCLUDE ALL WORK IN THIS AREA, FROM CEILING PLANE TO

FLOOR.

NORTH

0' 4' 8' 16'

SCALE 1/8" = 1'-0"

J

J

S P

C

C B

S C

S

P C

DL

J J J

P

CRF

C C

J

J

S P

C

C B

S C

S

P C

DLJ JJ

P C

RF

CC

J

J

S P

C

C B

S C

S

P C

DL

JJ P

CJ

RF

C C

JJ

J J

JJ

J J

J

J

S P

C

C B

S C

S

P C

DLJ JJ

P C

RF

CC

J

E

GFI

USB

5' - 0"

T

TOILET

3B-309A

TOILET

3B-307A

PATIENT ROOM

3B-309

N1 G1

E1

C

PATIENT

LIFT

8' - 0"

1' - 4"2' - 0"

E

2' - 0"

2' - 0" 3D/1V

2' - 0"

4' - 0"

4' - 0" E

E

6' - 6"

E

6' - 6"

3D

P24

L11

C

D

B.6

GFI

USB

E

5' - 0" T

PATIENT ISO ROOM

3B-328A

TOILET

3B-330AANTE ROOM

3B-328

CORRIDOR

C8

TOILET

3B-328B

N1 E1

C

G1

PATIENT

LIFT

8' - 0"

1' - 4" 2' - 0"

E

6' - 6"

2' - 0"

3D

2' - 0" .

3D/1V

2' - 0"

4' - 0"

4' - 0" E

6' - 6"

E

E

P24

L11

P25

P25 P25

A

E

USB

GFI

E 1' - 4"2' - 0"

E 2' - 0"

5' - 0"

T

BARIATRIC PATIENT ROOM

3A-342

BARIATRIC TOILET

3A-342A

E1 N1

C

G1

PATIENT

LIFT

8' - 0"

2' - 0"

3D/1V

2' - 0"

4' - 0"

4' - 0".

E

E 6' - 6"

6' - 6"

3D

(TYP)

P24

L11

A

8.3

.D

.N

V1

DS-10

D4-15

D4-15

MFST

TOILET

3B-309A

TOILET

3B-307A

PATIENT ROOM

3B-309

D4-15

D4-15

D4-15

E2N2

L2

L3

P24

C

D

B.6

.N

MF

D4-15G

D4-15G

DS-10

ST

V1

A1

PATIENT ISO ROOM

3B-328A

TOILET

3B-330A

TOILET

3B-327B

ANTE ROOM

3B-328

CORRIDOR

C8

TOILET

3B-328B

D4-15G

D4-15G

D4-15G

D4-15G

E2 N2

.D

L2

L3

P25

P25

P25

L14

P24

A

.N

.D

MF

ST

D4-15 D4-15

DS-10

V1

BARIATRIC TOILET

3A-341A

BARIATRIC PATIENT ROOM

3A-342

BARIATRIC TOILET

3A-342A

D4-15

D4-15

D4-15

E2N2

D4-15

D4-15

L2

L3

A

8.3

.N

B1

D4-15G

D4-15G

DS-10

ST

V1

A1

PATIENT ISO ROOM

3B-326A

ANTE ROOM

3B-326

TOILET

3B-326B

D4-15G

D4-15G

D4-15G

D4-15G

E2 N2

.D

P24

HG

HG

L7

L11

A

GFI

USB

E

5' - 0"

T

PATIENT ISO ROOM

3B-326A

ANTE ROOM

3B-326

TOILET

3B-326B

N1 E1

C

G1

PATIENT

LIFT

8' - 0"

1' - 4" 2' - 0"

E

6' - 6"

2' - 0"

3D

2' - 0" .

3D/1V

2' - 0"

4' - 0"

4' - 0"

E

6' - 6"

E

E

P24

L11

CEILING

BOOM

B3

A

2D

S20

P31

P32

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

BLDG 500 RENOVATE 3B 613-19-101

19026

CMTA CONSULTING ENGINEERS, INC.

10411 MEETING STREET,

PROSPECT, KY 40059

(502)326-3085

VOLUME BC

U s e rs

\b k a rc h e r\

D o c u m e n ts

\V M

W V

-0 -E

-R b k a rc h e rR U

V A

B .r v t

/5

/2

:4

:0

P

M

ES501.

ENLARGED PLANS

510 BUTLER AVENUE MARTINSBURG, WV 25405

04/07/2021 PDY BBK

BID DOCUMENTS

FULLY

SPRINKLERED

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

THIRD FLOOR - POW ER/SYSTEMS - TYPICAL

PATIENT ROOM

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

THIRD FLOOR - POW ER/SYSTEMS -TYPICAL

PATIENT ISO ROOM

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

THIRD FLOOR - POW ER/SYSTEMS - TYPICAL

BARIATRIC ROOM

GENERAL NOTES (POWER):

A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,

AND CASEW ORK DETAILS FOR EXACT LOCATIONS OF ALL W ALL AND

CEILING MOUNTED ELECTRICAL DEVICES.

B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS

INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)

BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE

PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED

NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT

CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME

CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL

CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE

CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIW IRE

BRANCH CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A

COMMON NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.

C. ALL DEVICE COVERPLATES SHALL BE #302 STAINLESS STEEL. IDENTIFY

THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES, SW ITCHES,

ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELS

W ITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE

EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. MARK

INSIDES OF ALL DEVICE BOXES W ITH PANEL AND CIRCUIT NUMBER.

D. RECEPTACLES THAT ARE CONTROLLED BY AN AUTOMATIC MEANS

SUCH AS OCCUPANCY SENSOR OR ENERGY MANAGEMENT SYSTEM

SHALL BE MARKED IN ACCORDANCE W ITH NEC 406.3(E).

E. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS

SHALL BE COORDINATED W ITH MECHANICAL AND PLUMBING

CONTRACTORS TO ENSURE ACCESS AND W ORKING CLEARANCE IS

MAINTAINED PER NEC. NOTIFY OTHER TRADES OF REQUIRED

CLEARANCE AREAS TO AVOID ROUTING OF OTHER SYSTEMS IN THESE

AREAS. DO NOT INSTALL ELECTRICAL EQUIPMENT OVER EQUIPMENT

NAMEPLATES OR ACCESS PANELS OR THROUGH

ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT BY OTHER

TRADES.

GENERAL NOTES (ENLARGED AND TYPICAL):

A. ALL ROOM LAYOUTS ARE TYPICAL AND MAY VARY OR MIRROR OTHER

ASSOCIATED ROOMS. CONTRACTOR SHALL REFER TO ARCHITECTURAL

ELEVATIONS AND COORDINATE EACH ROOM PRIOR TO ROUGH-IN.

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

THIRD FLOOR - LIGHTING - TYPICAL PATIENT

ROOM

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

THIRD FLOOR - LIGHTING - TYPICAL PATIENT

ISO ROOM

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

THIRD FLOOR - LIGHTING - TYPICAL

BARIATRIC PATIENT ROOM

TAGGED NOTES

L2 COORDINATE INSTALLATION OF LIGHT SWITCH FOR CONTROL

OF EXAM FUNCTIONS AT OVERHEAD 2x4 LIGHT BESIDE NEW

MODULAR HEADWALL UNIT.

L3 CONTRACTOR SHALL ROUTE CONTROL WIRING IN CONDUIT AS

REQUIRED FROM OVER-HEAD 2x4 LIGHT FIXTURE ''MF'' TO

CONTROL AMBIENT LIGHT AND READING LIGHT SECTIONS VIA

NURSE CALL PATIENT STATION FOR PILLOW SPEAKER

CONTROL (LVC RELAY FOR EACH ''MF'' FIXTURE IN NEMA-1

ENCLOSURE ABOVE ACCESSIBLE CEILING AS REQUIRED - SEE

DETAIL ON THIS SHEET). COORDINATE EXACT LOW VOLTAGE

CONTROL WIRING WITH NURSE CALL AND RELAY

MANUFACTURER PRIOR TO ROUGH-IN. ALSO REFER TO

STUB-OUT DETAIL FOR ADDITIONAL CONDUIT STUB-OUT(S)

REQUIRED FROM NURSE CALL DEVICES TO ROOM AND

CORRIDOR CABLING PATH.

L7 CURBELL #LVC-2000-004 DIMMING RELAY PROVIDED AND

INSTALLED BY THIS CONTRACTOR. MOUNT IN 5-GANG

MASONRY BOX AT THE HEADWALL (ABOVE SUSPENDED

CEILING) AS REQUIRED TO CONTROL HEADWALL DOWNLIGHT

UNITS. REFER ALSO TO "PATIENT READING LIGHT CONTROL

SCHEMATIC" ON DRAWING ES701.

L11 CONTRACTOR TO ROUTE CONTROL WIRING IN CONDUIT FROM

LIGHTING CONTROL RELAY INDICATED TO CONTROL READING

LIGHTS (FIXTURE TYPE "H" OR "HG") VIA NURSE CALL PATIENT

STATION FOR PATIENT PILLOW SPEAKER CONTROL.

COORDINATE EXACT WIRING REQUIREMENTS WITH NURSE

CALL SYSTEM MANUFACTURER AND RELAY MANUFACTURER

PRIOR TO ROUGH-IN.

L14 PROVIDE NEOPRENE GASKET MATERIAL AROUND DOOR

FRAME FOR ROOM PRESSURE SEAL.

P24 ROOM POWER JUNCTION BOXES ABOVE ACCESSIBLE CEILING.

REFER TO LIGHTING / POWER FLOOR PLANS FOR

CONTINUATION. SUBSCRIPT LETTER BESIDE JUNCTION BOX

CORRESPONDS WITH LETTER ON FLOOR PLAN DRAWINGS.

(TYPICAL).

P25 PROVIDE NEOPRENE GASKET AROUND ALL OUTLET BOXES

(ON CEILINGS AND WALLS) WITHIN THE ISOLATION PATIENT

ROOMS (INCLUDING THE ANTE AND TOILET ROOMS). TYPICAL.

P31 CONTRACTOR TO WIRE THREE (3) OUTLETS IN SKYTRON

BOOM TO EACH CIRCUIT AND LABEL EACH OF THESE

SKYTRON BOOM OUTLETS FOR CIRCUIT IDENTIFICATION.

REFER TO SKYTRON BOOM VENDOR DRAWINGS FOR

ADDITIONAL REQUIREMENTS.

P32 PROVIDE AN ADDITIONAL EMERGENCY POWER DUPLEX

OUTLET WITHIN A STEEL ENCLOSURE (LOCATE ABOVE THE

CEILING AND PROVIDE PER VENDOR DRAWINGS) FOR THE

OWNERS DISPLAY INTERFACE. CONNECT TO ONE OF THE

EMERGENCY POWER CIRCUITS INDICATED FOR THE CEILING

BOOM.

S20 PROVIDE DATA OUTLET WITHIN BOOM EQUIPMENT AS

REQUIRED. COORDINATE CONNECTION REQUIREMENTS WITH

BOOM INSTALLATION.TYPICAL ROOM JUNCTION BOX CONNECTION LEGEND

N1 - 120V NORMAL POW ER CIRCUIT (SEE CONTINUATION ON POW ER

DRAW ING ES301).

N2 - 277V NORMAL POW ER LIGHTING CIRCUIT (SEE CONTINUATION ON

LIGHTING DRAW ING ES201).

E1 - 120V EMERGENCY CRITICAL POW ER CIRCUIT (SEE CONTINUATION ON

POW ER DRAW ING ES301).

E2 - 277V EMERGENCY CRITICAL LIGHTING CIRCUIT (SEE CONTINUATION ON

LIGHTING DRAW ING ES201).

E3 - 120V EMERGENCY CRITICAL ''BOOM'' POW ER CIRCUIT (SEE

CONTINUATION ON POW ER DRAW ING ES301).

G1 - 120V NORMAL POW ER GFI CIRCUIT (SEE CONTINUATION ON POW ER

DRAW ING ES301).

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

THIRD FLOOR - LIGHTING - TYPICAL PATIENT

ISO ROOM (BOOM)

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

THIRD FLOOR - POW ER/SYSTEMS -TYPICAL

PATIENT ISO ROOM (BOOM)

SD

SD

MS

MD

RP-3C

LOCATION FOR FUTURE

PANEL TUB

BD-1 BD-2 BD-3 BD-4

SEC

EXISTING BUS-DUCT

RISERS TO REMAIN

(SEE POW ER RISER

FOR ADDITIONAL

REQUIREMENTS)

TV-A

EXISTING RADIO

EQUIP. TO REMAIN

NEW

277/480V

NORMAL POW ER

PANEL "MP-3C"

EXISTING 9-KVA FLOOR-MTD.

TRANSFORMER FOR

"ELLS-3C" TO REMAIN

NEW REPLACEMENT

277/480V

NORMAL POWER

PANEL "LP-3C"

NEW REPLACEMENT

277/480V

EM-CRITICAL POW ER

PANEL "ELP-3C"

EXISTING

PACS

TO REMAIN

EXISTING

TO REMAIN

EXISTING 120/208V

EM-LIFE SAFETY

PANEL "ELLS-3C"

TO REMAIN

EXISTING 277/480V

EM-LIFE SAFETY

PANEL "ELS-3C"

TO REMAIN

P16

NEW REPLACEMENT

TRANSFORMERS SUSPENDED

FROM CEILING STRUCTURE (SEE

DETAIL)

LOCATION FOR FUTURE

PANEL TUB

NEW REPLACEMENT

120/208V

NORMAL POW ER

DOUBLE TUB

PANEL "RP-3C"

T-RP-3CT-EP-3C

NEW REPLACEMENT

120/208V

EM-CRITICAL BRANCH

DOUBLE TUB

PANEL "EP-3C"

B

P16

NEW REPLACEMENT

TRANSFORMERS SUSPENDED FROM

CEILING STRUCTURE (SEE DETAIL)

NEW REPLACEMENT

120/208V

NORMAL POWER

TRIPLE TUB

PANEL "RP-3B"

NEW REPLACEMENT

277/480V

NORMAL POWER

PANEL "LP-3B"

NEW REPLACEMENT

120/208V

EM-CRITICAL

BRANCH

TRIPLE TUB

PANEL "EP-3B"

NEW REPLACEMENT

277/480V

EM-CRITICAL POWER

PANEL "ELP-3B"

EXISTING 9-KVA FLOOR-MTD.

TRANSFORMER FOR

"ELLS-3B" TO REMAIN

EXISTING 277/480V

EM-LIFE SAFETY

PANEL "ELS-3B"

TO REMAIN

EXISTING 120/208V

EM-LIFE SAFETY

PANEL "ELLS-3B"

TO REMAIN

T-EP-3B

T-RP-3B

B

NC-A

P15

SEC

BD-1 BD-2 BD-3 BD-4

EXISTING BUS-DUCT

RISERS TO REMAIN

(SEE POW ER RISER

FOR ADDITIONAL

REQUIREMENTS)

TV-A

EXISTING RADIO

EQUIP. TO REMAIN

REMOVE EXISTING

120/208V

NORMAL POWER

DOUBLE-TUB

PANEL "RP-3C"

REMOVE EXISTING

120/208V

EM-CRITICAL BRANCH

PANEL "EP-3C"

REMOVE EXISTING

STACKING TRANSFORMERS

TOP-"T2" FOR "EP-3C" (30-KVA)

TOP-"T4" FOR "RP-3C" (30-KVA)

EXISTING 9-KVA FLOOR-MTD.

TRANSFORMER FOR

"ELLS-3C" TO REMAIN

REMOVE EXISTING

277/480V

NORMAL POWER

PANEL "LP-3C"

REMOVE

ABANDONED

REMOVE EXISTING

277/480V

EM-CRITICAL POW ER

PANEL "ELP-3C"

EXISTING

PACS

TO REMAIN

EXISTING

TO REMAIN

EXISTING 120/208V

EM-LIFE SAFETY

PANEL "ELLS-3C"

TO REMAIN

EXISTING 277/480V

EM-LIFE SAFETY

PANEL "ELS-3C"

TO REMAIN

P26

P26

P26

P26B

REMOVE ABANDONED

CABINET

REMOVE EXISTING

120/208V

EM-CRITICAL BRANCH

PANEL "EP-3B"

EXISTING 277/480V

EM-LIFE SAFETY

PANEL "ELS-3B"

TO REMAIN

EXISTING 120/208V

EM-LIFE SAFETY

PANEL "ELLS-3B"

TO REMAIN

REMOVE EXISTING

277/480V

EM-CRITICAL POWER

PANEL "ELP-3B"

REMOVE EXISTING

120/208V

NORMAL POWER

TRIPLE TUB

PANEL "RP-3B"

REMOVE EXISTING

STACKING TRANSFORMERS

TOP-"T5" FOR "RP-3B" (30-KVA)

REMOVE EXISTING

277/480V

NORMAL POWER

PANEL "LP-3B"

EXISTING 9-KVA FLOOR-MTD.

TRANSFORMER FOR

"ELLS-3B" TO REMAIN

P26

P26

P26

P26

B

ELEC. RM.

3A-340

EXISTING

STACKING TRANSFORMERS

TOP-"T3" FOR "EP-3A" (30-KVA)

TOP-"T6" FOR "RP-3A" (30-KVA)

TO REMAIN

EXISTING

120/208V

NORMAL POWER

DOUBLE-TUB

PANEL "RP-3A"

TO REMAIN

EXISTING

277/480V

NORMAL POWER

PANEL "LP-3A"

TO REMAIN

EXISTING

120/208V

EM-CRITICAL BRANCH

PANEL "EP-3A"

TO REMAIN

EXISTING 277/480V

EM-LIFE SAFETY

PANEL "ELS-3A"

TO REMAIN

EXISTING 120/208V

EM-LIFE SAFETY

PANEL "ELLS-3A"

TO REMAIN

EXISTING 9-KVA FLOOR-MTD.

TRANSFORMER FOR

"ELLS-3A" TO REMAIN

EXISTING

277/480V

EM-CRITICAL POW ER

PANEL "ELP-3A"

TO REMAIN

B

7.77.6

C

D

C

D

7.7

NAC

SEC

NC-A

AMP

TV-A.

C/S

C/S

E .

E

E

E

E

E

E

E

E

E

E

P6

P7

IT

3A-303

BIOMED

3A-302

E

E

PHILLIPS

TELEM. RACK

T-MON

-87EP-3B

-86EP-3B

-85EP-3B

-89,91EP-3B

-88EP-3B

-97RP-3B

-98RP-3B

-92EP-3B

-98EP-3B

-95EP-3B

-96EP-3B

-2ELLS-3B

-94EP-3B

-93EP-3B

-99RP-3B

FIRE ALARM

3B

(2) STACKING PACS

3B

NURSE CALL

3B

PAGING

3B

CATV

3B

C

D

7.7

P4

P4

P3

IDF

DATA

RACKS

P5

NACFIRE ALARM

3B

PACS

3B

SEC

NC-A

NURSE CALL

3B

AMP

PAGING

3B TV-A

CATV

3B

TEL

NEW BACKBOARD AT

ROOM PERIMETER

TEL

NEW BACKBOARD AT

ROOM PERIMETERIT

3A-303

BIOMED

3A-302

W

C

D

7.7

P28

3' - 0"

13100 watertown plank road suite 200 elm grove, wi 53122

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Nagel Architects + Engineers project number:

BLDG 500 RENOVATE 3B 613-19-101

19026

CMTA CONSULTING ENGINEERS, INC.

10411 MEETING STREET,

PROSPECT, KY 40059

(502)326-3085

VOLUME BC

U s e rs

\b k a rc h e r\

D o c u m e n ts

\V M

W V

-0 -E

-R b k a rc h e rR U

V A

B .r v t

/5

/2

:4

:0

P

M

ES502.

ENLARGED PLANS

510 BUTLER AVENUE MARTINSBURG, WV 25405

04/07/2021 PDY BBK

BID DOCUMENTS

FULLY

SPRINKLERED

GENERAL NOTES (LIGHTING):

A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,

AND CASEW ORK DETAILS FOR EXACT LOCATIONS OF ALL W ALL AND

CEILING MOUNTED ELECTRICAL DEVICES.

B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS

INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)

BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE

PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED

NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT

CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME

CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL

CURRENT CARRYING CONDUCTORS PER N.E.C. #310.15(B)(3), AND

UPSIZE CONDUIT AS REQUIRED PER N.E.C. #300.17 AND ANNEX

C. MULTIW IRE BRANCH CIRCUITS AS DEFINED IN N.E.C #100 / 210.4

(CIRCUITS SHARING A COMMON NEUTRAL CONDUCTOR) SHALL NOT BE

PERMITTED.

C. ALL DEVICE COVERPLATES SHALL BE #302 STAINLESS STEEL. IDENTIFY

THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES, SW ITCHES,

ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELS

W ITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE

EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. ALSO,

MARK INSIDES OF ALL DEVICE BOXES W ITH PANEL AND CIRCUIT

NUMBER.

D. LOCATE CHAIN-HUNG INDUSTRIAL FIXTURES IN MECHANICAL ROOMS TO

AVOID DUCTW ORK AND PIPING, TO MAXIMIZE AVAILABLE LIGHT. SPACE

AROUND EQUIPMENT, AIR HANDLERS, ETC. TO PROVIDE ADEQUATE

LIGHTING TO ALL AREAS OF ROOM. PROVIDE ADDITIONAL FIXTURES OF

SAME TYPE AS NEEDED TO FULFILL THIS REQUIREMENT.

E. LOCATE EXIT SIGNS FOR MAXIMUM VIEW ING AREA TO IDENTIFY EGRESS

PATHS AS INDICATED ON PLANS. COORDINATE LOCATIONS SUCH THAT

ARCHITECTURAL FEATURES OR EQUIPMENT FROM OTHER TRADES DO

NOT OBSTRUCT VIEW .

F. W HERE EXIT SIGNS OR EMERGENCY BATTERY PACKS ARE PROVIDED,

THEY SHALL BE CONNECTED TO AN UNSW ITCHED LINE.

G. LUMINAIRES INDICATED W ITH MULTI-LEVEL SW ITCHING SHALL HAVE

SIMILAR LAMPS CONTROLLED TOGETHER, I.E. INBOARD AND OUTBOARD

LAMPS OR RIGHT AND LEFT HAND LAMPS.

H. ALL LIGHTING FIXTURE LENSES, PARABOLIC LOUVERS, DOW NLIGHTING

ALZAK CONES AND "PARACUBE" LOUVERS SHALL BE HANDLED W ITH

COTTON GLOVES DURING INSTALLATION AND LAMPING TO AVOID

FINGERPRINTS OR DIRT DEPOSITS. IT IS PREFERRED THAT FIXTURES

BE SHIPPED AND INSTALLED W ITH CLEAR PLASTIC BAGS TO PROTECT

LOUVERS. AT CLOSE OF PROJECT, AND AFTER CONSTRUCTION AIR

FILTERS ARE CHANGED, REMOVE BAGS. ANY LOUVER OR CONE

SHOW ING DIRT OR FINGER PRINTS SHALL BE CLEANED W ITH SOLVENT

RECOMMENDED BY THE MANUFACTURER, OR REPLACED AS

NECESSARY IN ORDER TO TURN OVER TO THE OW NER NEW FIXTURES

AT OCCUPANCY.

I. RECESSED LUMINAIRES SHALL BE SECURED SUCH THAT THE FORCE

REQUIRED INSERTING LAMPS, TRIMS, LENSES, LOUVERS, OR DOOR

FRAMES DOES NOT SHIFT HOUSING. ALL TRIMS SHALL BE COMPLETELY

FLUSH W ITH FINISHED CEILINGS AT COMPLETION OF CONSTRUCTION.

J. CONTRACTOR SHALL PROVIDE UNSW ITCHED CONDUCTOR TO ALL EXIT

SIGNS, EMERGENCY INVERTER BATTERY PACKS, AND NIGHT LIGHTS AS

REQUIRED.

TAGGED NOTES

P3 ROUTE ALL NEW DATA/VOICE CABLING ON PROJECT TO NEW

"IDF" CLOSET UNLESS OTHERWISE NOTED

P4 PROVIDE TWO ROWS OF FOUR 4" CONDUIT SLEEVES

THROUGH WALL TO CABLING PATH - SEE DETAILS (TYPICAL)

P5 LADDER TYPE CABLE TRAY OVER EQUIPMENT RACKS - SEE

DETAIL

P6 PROVIDE NEMA #L14-30R RECEPTACLE FOR DATA RACK 6-KVA

UPS UNIT.

P7 MOUNT RECEPTACLES INDICATED ON TO CABLE TRAY AS

REQUIRED - SEE SYSTEMS PLAN

P15 REMOVE ALL EXISTING CABLING, CONDUIT, SYSTEM

COMPONENTS, RACKS, CABLING PATHS, ETC. AT EXISTING

TELEPHONE CLOSET ASSOCIATED WITH DEMOLITION WORK

ON THIS PROJECT. THE ONLY CABLING OR COMPONENTS TO

REMAIN SHALL BE ITEMS THAT PROVIDE SERVICE TO AREAS

OUTSIDE THE PROJECT LIMITS.

P16 ROUTE 1 #10 GROUND CONDUCTOR IN 1/2'' CONDUIT

CONTINUOUSLY AROUND ROOM (FULL CIRCLE) CONNECTING

TO ALL PANELBOARD GROUND BARS IN ROOM AS REQUIRED

BY N.E.C. #517.14. CONTRACTOR SHALL ALSO SUBMIT

DETAILED ''DIMENSIONED'' SHOP DRAWINGS OF ELECTRIC

ROOMS INDICATING PANELBOARD LOCATIONS,

TRANSFORMER LOCATIONS, DISCONNECT SWITCHES, ETC.

P26 REMOVE EXISTING POWER PANEL INDICATED AND PANEL

FEED COMPLETELY BACK TO SOURCE. FIELD VERIFY IF PANEL

HAS ANY DEVICES, LIGHTS, ETC. ON CIRCUITS THAT ARE TO

REMAIN. RE-ROUTE THESE CIRCUITS TO EXISTING/NEW

PANELS THAT ARE IN THE SAME AREA AS REQUIRED (UTILIZE

SPACES/SPARES IN THESE PANELS AS NECESSARY).

CONTRACTOR SHALL CAREFULLY DETERMINE EXTENT OF

WORK PRIOR TO DEMOLITION OF THE PANEL/PANEL FEEDER.

REFER TO PANEL DEMOLITION DETAIL ON ES802 AND POWER

RISER ON ES601.

P28 PROVIDE SIX (6) 4'' VERTICAL CONDUIT SLEEVES AT FLOOR

(INTO INTERSTITIAL SPACE BELOW). REFER TO SLEEVE DETAIL

ON DRAWING ES802. ONLY TWO WILL BE ACTIVE (FIBER +

ANALOG TO GD100A).

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

ENLARGED THIRD FLOOR "3C" ELECTRICAL

ROOM 300 - ELECTRICAL NEW W ORK

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

ENLARGED THIRD FLOOR "3B" ELECTRICAL

ROOM 346 - ELECTRICAL NEW W ORK

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

ENLARGED THIRD FLOOR "3C" ELECTRICAL

ROOM 300 - ELECTRICAL DEMOLITION

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

ENLARGED THIRD FLOOR "3B" ELECTRICAL

ROOM 346 - ELECTRICAL DEMOLITION

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

ENLARGED THIRD FLOOR "3A" ELECTRICAL

ROOM 348 - EXISTING

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

ENLARGED THIRD FLOOR "3B" IT AND

BIO-MED ROOMS - POW ER

2' 4' 16'8'0

1/4" = 1'-0"

12'1'

SCALE: 1/4" = 1'-0"

ENLARGED THIRD FLOOR "3B" IT AND

BIO-MED ROOMS - SYSTEMS

NOTE: SHOWN FOR REFERENCE ONLY. TO BE

REM…