BLDG 500 Renovate 3A-3B - Drawings 3B Issue for Bid_Part3.pdf
PDF 10 MB Posted
- Solicitation number
- 36C24521B0008
About this file
This document outlines a federal construction contract opportunity for renovations to buildings 3A and 3B at the VA Medical Center in Martinsburg, West Virginia. The Department of Veterans Affairs seeks a prime contractor to provide all labor, materials, tools and equipment for project number 613-19-100, with an estimated construction cost between $10-20 million. This is a 100% Service-Disabled Veteran Owned Small Business set-aside requiring the firm to have a General Construction size standard of $39.5 million. Interested parties must register on various websites and attend a pre-bid site visit on June 9, 2021 to be eligible. Questions are due by June 17, 2021 and solicitation documents will be available on June 3, 2021. The bid opening will occur on July 14, 2021 at the VA Medical Center. The contract is contingent upon funding availability.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OS
OS
OS
OS
OS OS OS OS OS OS
OS
J J J J J J J J J J J J J JJ JJ JJ JJ JJ JJ J
J JJ JJ JJ J
J J J J J J J J J J J J J J J J J J J J J J
J J
ES501.
ES501.
.LV
.LV
.LV
.LV
.LV
.LV
.LV
.LV
.LV
.OS
.OS
B1 B1B1
B1
B1
B1 B1 B1 B1 B1
B1
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
B1
B1
B1
B1
B1
B1
B1B1
A2A2
A2A2
A2A2
A2
A2
A2 A2
A2
A2 A2
A2
A2
B1 B1
B1
B1
B1
B1 B1
B1 B1
B1
B1B1 B1
B1
F1
F1
F1
F1
F1
F1
X1
X1
X1
X1
X1
X1
X1
B1
B1
X1
X1
X1
X1
X1
B1
D4-15
P2 D4-15
D4-15
D4-15P2
B1
D4-15
D4-15
D4-15
D4-15
P2 D4-15
D4-15 P2
D4-15 P2
B1 B1 B1B1
P2 D4-15
P2 D4-15
D4-15 P2
D4-15 P2
B1
P2 P2 P2 P2P2 P2 P2 P2
D4-15 D4-15 D4-15
B1
B1 B1 B1
B1 B1 B1
B1
B1
B1
B1
B1
A2
B1
B1 B1
B1
B1B1B1B1 B1B1
B1B1
B1 B1
D4-15
P2
P2 D4-15
D4-15 P2
P2 D4-15
D4-15
D4-15
P2 P2 D4-15
D4-15P2D4-15
D4-15
P2
B1
P2P2P2P2
D4-15P2
P2D4-15
P2 D4-15
P2P2P2P2
A2
A2
D6-20
D4-15
D4-15P2
P2
P2
P2D4-15
D4-15
D4-15
B1
D4-15D4-15 D4-15
D4-15 D4-15
D6-20
D6-20
D4-15 D4-15 D4-15 D4-15
P1
D4-15
D4-15 D4-15
D4-15 D4-15
D4-15
D4-15
P2P2P2P2
D4-15
D4-15
D4-15
D4-15
D4-15
D4-15 D4-15 D4-15 D4-15
D4-15 D4-15 D4-15 D4-15
D4-15
EQUIPMENT STORAGE
3B-321
SOILED UTILITY
3B-319 W ORK ROOM
3B-329
NURSE STATION
3B-314
CLEAN SUPPLIES
3B-310
STAFF LOCKER ROOM
3A-343A
STAFF LOUNGE
3A-343
W AITING
3A-301
RECEPTION
3A-344
FAMILY TOILET
3B-305
PUBLIC TOILET
3B-306
PATIENT ROOM
3B-307
OFFICE
3B-304
NURSE SUPERVISOR OFFICE
3B-303
NURSE MANAGER OFFICE
3B-301
MECHANICAL ROOM
3B-300
PATIENT ROOM
3B-311
TOILET
3B-311A
PATIENT ROOM
3B-313
TOILET
3B-313A
PATIENT ROOM
3B-316
TOILET
3B-316A
PATIENT ROOM
3B-318
TOILET
3B-318A
PATIENT ROOM
3B-322
TOILET
3B-322A
PATIENT ISO ROOM
3B-326A
TOILET
3B-326B
PATIENT ISO ROOM
3B-327A
PATIENT ISO ROOM
3B-328A
TOILET
3B-330A
PATIENT ROOM
3B-331
PATIENT ROOM
3B-332
PATIENT ROOM
3B-333
TOILET
3B-335A
PATIENT ROOM
3B-336
PATIENT ROOM
3B-338
BARIATRIC PATIENT ROOM
3A-341
BARIATRIC TOILET
3A-341A
PATIENT ROOM
3A-337
TOILET
3A-337A
PATIENT ROOM
3A-335
TOILET
3A-335A
PATIENT ROOM
3A-334
TOILET
3A-334A
TELE. RM.
3A-300
ELEC. RM.
3A-345
TOILET
3B-309A
TOILET
3B-307A
TOILET
3B-327B
TOILET
3B-333A
TOILET
3B-336A
PATIENT ROOM
3B-324
TOILET
3B-324A
PATIENT ROOM
3B-320
TOILET
3B-320A
PATIENT ROOM
3B-317
TOILET
3B-317A
PATIENT ROOM
3B-315
TOILET
3B-315A
BARIATRIC PATIENT ROOM
3A-342
BARIATRIC TOILET
3A-342A
PATIENT ROOM
3A-339
TOILET
3A-339A
PATIENT ROOM
3A-336
TOILET
3A-336A
NURSE SUPERVISOR OFFICE
3B-302
NOURISHMENT
3B-334
MEDICATION ROOM
3B-312
ANTE ROOM
3B-325
ANTE ROOM
3B-326
ANTE ROOM
3B-327
ANTE ROOM
3B-328
CORRIDOR
C7
CORRIDOR
C9
CORRIDOR
C11
CORRIDOR
C6
CORRIDOR
C8
CORRIDOR
C10
ELEVATOR LOBBY
C1
CORRIDOR
C2
CORRIDOR
C5
H.A.C.
3B-308
STAFF TOILET
3B-337
PATIENT ROOM
3B-330
TOILET
3B-331A
TOILET
3B-332A
PATIENT ROOM
3B-335
TOILET
3B-338A
SAT. NURSE STATION
3B-323
PATIENT ROOM
3B-309
PATIENT ISO ROOM
3B-325A
TOILET
3B-325B
TOILET
3B-328B
SAT. NURSE STATION
3A-338
ES501.
N2 E2 N2 E2
N2 E2 N2
E2
N2 E2 N2
E2 N2 E2
N2 E2N2 E2
N2 E2N2 E2N2 E2N2 E2
N2 E2
N2 E2
N2 E2 N2 E2
N2 E2 N2 E2 N2 E2 N2 E2 N2 E2 N2 E2 N2 E2
N2 E2 N2 E2
N2 E2
N2
E2
N2
E2
(TYP)
L1
(TYP)
L1
D4-15D4-15D4-15
X1
A2 A2
A2
A2
.OS
X1
X2
X2
X1
F1F1
.OS
D6-20
D6-20
D4-15
D4-15 D4-15
D4-15
D4-15
.LV
.LV
.LV
-1LP-3B
-3LP-3B
-4LP-3B
-5LP-3B
-6LP-3B
-7LP-3B
-1ELP-3B
-2ELP-3B
-3ELP-3B
-4ELP-3B
-9LP-3B
B1
B1
SL1
SL1
L4
E2LS-3
B
-8LP-3B
B1B1
V1
.LV
.LV
.LV
.LV
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
(TYP)
L1
.LV
.LV
.LV
.LV
.LV
.LV
.LV
.LV
.LV
.LV
.LV
.LV
.LV
.LV
-2LP-3B
-103RP-3B
.LV3D
.LV3D
.LV
.LVD
.LV
ES501.
7 9
10 11
6.9
A
B
C D
E
F
7.7 8.3
B.6
1 2 4 5
.LV.LV .LVD
L16
L16
L16
L16
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\b k a rc h e r\
D o c u m e n ts
\V M
W V
-0 -E
-R b k a rc h e rR U
V A
B .r v t
/5
/2
:4
:2
P
M
ES201.
THIRD FLOOR PLAN - 3B, LIGHTING
510 BUTLER AVENUE MARTINSBURG, WV 25405
04/07/2021 PDY BBK
BID DOCUMENTS
FULLY
SPRINKLERED
GENERAL NOTES (LIGHTING):
A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,
AND CASEW ORK DETAILS FOR EXACT LOCATIONS OF ALL W ALL AND
CEILING MOUNTED ELECTRICAL DEVICES.
B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS
INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)
BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE
PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED
NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT
CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME
CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL
CURRENT CARRYING CONDUCTORS PER N.E.C. #310.15(B)(3), AND
UPSIZE CONDUIT AS REQUIRED PER N.E.C. #300.17 AND ANNEX
C. MULTIW IRE BRANCH CIRCUITS AS DEFINED IN N.E.C #100 / 210.4
(CIRCUITS SHARING A COMMON NEUTRAL CONDUCTOR) SHALL NOT BE
PERMITTED.
C. ALL DEVICE COVERPLATES SHALL BE #302 STAINLESS STEEL. IDENTIFY
THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES, SW ITCHES,
ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELS
W ITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE
EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. ALSO,
MARK INSIDES OF ALL DEVICE BOXES W ITH PANEL AND CIRCUIT
NUMBER.
D. LOCATE CHAIN-HUNG INDUSTRIAL FIXTURES IN MECHANICAL ROOMS TO
AVOID DUCTW ORK AND PIPING, TO MAXIMIZE AVAILABLE LIGHT. SPACE
AROUND EQUIPMENT, AIR HANDLERS, ETC. TO PROVIDE ADEQUATE
LIGHTING TO ALL AREAS OF ROOM. PROVIDE ADDITIONAL FIXTURES OF
SAME TYPE AS NEEDED TO FULFILL THIS REQUIREMENT.
E. LOCATE EXIT SIGNS FOR MAXIMUM VIEW ING AREA TO IDENTIFY EGRESS
PATHS AS INDICATED ON PLANS. COORDINATE LOCATIONS SUCH THAT
ARCHITECTURAL FEATURES OR EQUIPMENT FROM OTHER TRADES DO
NOT OBSTRUCT VIEW .
F. W HERE EXIT SIGNS OR EMERGENCY BATTERY PACKS ARE PROVIDED,
THEY SHALL BE CONNECTED TO AN UNSW ITCHED LINE.
G. LUMINAIRES INDICATED W ITH MULTI-LEVEL SW ITCHING SHALL HAVE
SIMILAR LAMPS CONTROLLED TOGETHER, I.E. INBOARD AND OUTBOARD
LAMPS OR RIGHT AND LEFT HAND LAMPS.
H. ALL LIGHTING FIXTURE LENSES, PARABOLIC LOUVERS, DOW NLIGHTING
ALZAK CONES AND "PARACUBE" LOUVERS SHALL BE HANDLED W ITH
COTTON GLOVES DURING INSTALLATION AND LAMPING TO AVOID
FINGERPRINTS OR DIRT DEPOSITS. IT IS PREFERRED THAT FIXTURES
BE SHIPPED AND INSTALLED W ITH CLEAR PLASTIC BAGS TO PROTECT
LOUVERS. AT CLOSE OF PROJECT, AND AFTER CONSTRUCTION AIR
FILTERS ARE CHANGED, REMOVE BAGS. ANY LOUVER OR CONE
SHOW ING DIRT OR FINGER PRINTS SHALL BE CLEANED W ITH SOLVENT
RECOMMENDED BY THE MANUFACTURER, OR REPLACED AS
NECESSARY IN ORDER TO TURN OVER TO THE OW NER NEW FIXTURES
AT OCCUPANCY.
I. RECESSED LUMINAIRES SHALL BE SECURED SUCH THAT THE FORCE
REQUIRED INSERTING LAMPS, TRIMS, LENSES, LOUVERS, OR DOOR
FRAMES DOES NOT SHIFT HOUSING. ALL TRIMS SHALL BE COMPLETELY
FLUSH W ITH FINISHED CEILINGS AT COMPLETION OF CONSTRUCTION.
J. CONTRACTOR SHALL PROVIDE UNSW ITCHED CONDUCTOR TO ALL EXIT
SIGNS, EMERGENCY INVERTER BATTERY PACKS, AND NIGHT LIGHTS AS
REQUIRED.
NORTH
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
TAGGED NOTES
L1 REFER TO TYPICAL ENLARGED PATIENT ROOM PLANS ON
DRAWING ES501 FOR WORK REQUIRED IN SHADED AREA
INDICATED. ROOMS MAY BE REVERSED AND/ OR MIRROR
IMAGE BUT ORIENTATION TO HEADWALL, FOOTWALL, ETC.
SHALL BE THE SAME REGARDLESS. NOTE: CERTAIN DEVICE
LOCATIONS ARE AS SPECIFICALLY NOTED ON THESE FLOOR
PLANS WHERE DIFFERENCES WERE NOTED FROM THE
TYPICAL DESIGN. ANY FURTHER DEVIATIONS DISCOVERED
SHOULD BE COORDINATED WITH THE ARCHITECT PRIOR TO
OUTLET ROUGH-IN.
L4 ROUTE NUMBER OF #12 CONDUCTORS AS INDICATED IN 3/4''
CONDUIT TO NEW / SPARE 20A/1P BREAKER(S) IN EXISTING
PANEL INDICATED. WHERE EXISTING PANEL IS
FLUSH-MOUNTED IN AN EXISTING WALL, CONTRACTOR SHALL
CUT, PATCH AND REPAIR WALL AS REQUIRED FOR
CONCEALED CONDUIT ENTRY.
L16 EXCLUDE ALL WORK IN THIS AREA, FROM CEILING PLANE TO
FLOOR.
1/8" = 1'-0"ES201.
2 THIRD FLOOR PLAN - 3B, LIGHTING
TYPICAL ROOM JUNCTION BOX CONNECTION LEGEND
N1 - 120V NORMAL POW ER CIRCUIT (SEE CONTINUATION ON POW ER
DRAW ING ES301).
N2 - 277V NORMAL POW ER LIGHTING CIRCUIT (SEE CONTINUATION ON
LIGHTING DRAW ING ES201).
E1 - 120V EMERGENCY CRITICAL POW ER CIRCUIT (SEE CONTINUATION ON
POW ER DRAW ING ES301).
E2 - 277V EMERGENCY CRITICAL LIGHTING CIRCUIT (SEE CONTINUATION ON
LIGHTING DRAW ING ES201).
E3 - 120V EMERGENCY CRITICAL ''BOOM'' POW ER CIRCUIT (SEE
CONTINUATION ON POW ER DRAW ING ES301).
G1 - 120V NORMAL POW ER GFI CIRCUIT (SEE CONTINUATION ON POW ER
DRAW ING ES301).
REVISIONS: DATE:
ISSUE FOR BID 04/07/2021
T
T
JJ JJJJ JJJ
JJ JJJJ
JJ JJJJJJ JJJJJJ JJJJJJ JJJJ
JJJJJ JJJJJJ JJJJ
JJJJJJ JJ JJJ J
JJ JJJJ JJ JJJJ JJ JJJJJJ J
JJ
ES501.
ES501.
ES502.
ES502.
GFI
GFI
E
E
E .
E
E E
E
E/GFI
E
E
GFI
GFI
GFI
E
E
E
E
E
E
E
S
S
S
GFI
USB
E
E
GFI
GFI
E
GFI
GFI
E
E
E
E E
(TYP)
P1
GFI
GFI
E/GFI
E/GFI
EQUIPMENT STORAGE
3B-321
SOILED UTILITY
3B-319
W ORK ROOM
3B-329
NURSE STATION
3B-314 CLEAN SUPPLIES
3B-310
STAFF LOCKER ROOM
3A-343A
STAFF LOUNGE
3A-343
W AITING
3A-301
RECEPTION
3A-344
FAMILY TOILET
3B-305
PUBLIC TOILET
3B-306
PATIENT ROOM
3B-307
OFFICE
3B-304
NURSE SUPERVISOR OFFICE
3B-303
NURSE MANAGER OFFICE
3B-301
MECHANICAL ROOM
3B-300
PATIENT ROOM
3B-311
TOILET
3B-311A
PATIENT ROOM
3B-313
TOILET
3B-313A
PATIENT ROOM
3B-316
PATIENT ROOM
3B-318
PATIENT ROOM
3B-322
PATIENT ISO ROOM
3B-326A
TOILET
3B-326B
PATIENT ISO ROOM
3B-327A
PATIENT ISO ROOM
3B-328A
TOILET
3B-330A
PATIENT ROOM
3B-331
PATIENT ROOM
3B-332
PATIENT ROOM
3B-333
TOILET
3B-335A
PATIENT ROOM
3B-336
PATIENT ROOM
3B-338
BARIATRIC PATIENT ROOM
3A-341
BARIATRIC TOILET
3A-341A
PATIENT ROOM
3A-337
TOILET
3A-337A
PATIENT ROOM
3A-335
TOILET
3A-335A
PATIENT ROOM
3A-334
TOILET
3A-334A
TELE. RM.
3A-300
ELEC. RM.
3A-345
TOILET
3B-309A
TOILET
3B-307A
TOILET
3B-327B
TOILET
3B-333A
TOILET
3B-336A
PATIENT ROOM
3B-324
TOILET
3B-324A
PATIENT ROOM
3B-320
PATIENT ROOM
3B-317
PATIENT ROOM
3B-315
BARIATRIC PATIENT ROOM
3A-342
BARIATRIC TOILET
3A-342A
PATIENT ROOM
3A-339
TOILET
3A-339A
PATIENT ROOM
3A-336
TOILET
3A-336A
NURSE SUPERVISOR OFFICE
3B-302
NOURISHMENT
3B-334
MEDICATION ROOM
3B-312
ANTE ROOM
3B-325
ANTE ROOM
3B-326
ANTE ROOM
3B-327
ANTE ROOM
3B-328
CORRIDOR
C7
CORRIDOR
C9
CORRIDOR
C11
CORRIDOR
C6
CORRIDOR
C8
CORRIDOR
C10
ELEVATOR LOBBY
C1
CORRIDOR
C2
CORRIDOR
C5
H.A.C.
3B-308
STAFF TOILET
3B-337
EW C
PATIENT ROOM
3B-330
TOILET
3B-331A
TOILET
3B-332A
PATIENT ROOM
3B-335
TOILET
3B-338A
SAT. NURSE STATION
3B-323
PATIENT ROOM
3B-309
PATIENT ISO ROOM
3B-325A
TOILET
3B-325B
TOILET
3B-328B
SAT. NURSE STATION
3A-338
E
E
ES501.
N1
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P13
(TYP)
P12
(TYP)
P12
E E
E
E
E
(TYP)
P10
(TYP)
P10
P14
ES502.
P2
P19
-1RP-3B
-12RP-3B
-91RP-3B
-15RP-3B -13RP-3B
-16RP-3B
-11RP-3B
-10RP-3B
-19RP-3B
-20RP-3B
G1
N1G1
N1G1
N1 G1
N1G1
-20EP-3B
-19EP-3B
-26RP-3B
-25RP-3B
-18EP-3B
-17EP-3B
-24RP-3B
-23RP-3B
TOILET
3B-315A
N1 G1
N1G1
-23EP-3B
-24EP-3B
-30RP-3B
-29RP-3B
-22EP-3B
-21EP-3B
-27RP-3B
-28RP-3B
TOILET
3B-317A
N1 G1
N1G1
-27EP-3B
-28EP-3B
-34RP-3B
-33RP-3B
-26EP-3B
-25EP-3B
-31RP-3B
-32RP-3B
TOILET
3B-320A
N1 G1
N1G1
-31EP-3B
-32EP-3B
-38RP-3B
-37RP-3B
-30EP-3B
-29EP-3B
-36RP-3B
-35RP-3B
N1 G1
N1G1
-35EP-3B
-36EP-3B
-42RP-3B
-41RP-3B
-34EP-3B
-33EP-3B
-40RP-3B
-39RP-3B
-43RP-3B -44RP-3B
-45RP-3B
-47RP-3B
-46RP-3B
-53EP-3B
-54EP-3B
-56EP-3B
-55EP-3B
-49RP-3B
-48RP-3B
TOILET
3B-322A
TOILET
3B-318A
TOILET
3B-316A
N1G1
-55RP-3B
-54RP-3B
-58EP-3B
-57EP-3B
N1 G1
N1G1
-59RP-3B
-58RP-3B
-50EP-3B
-49EP-3B
-52EP-3B
-51EP-3B
-57RP-3B
-56RP-3B
N1 G1
N1G1
-63RP-3B
-62RP-3B
-46EP-3B
-45EP-3B
-48EP-3B
-47EP-3B
-61RP-3B
-60RP-3B
N1G1
-65RP-3B
-64RP-3B
-44EP-3B
-43EP-3B
N1G1
-69RP-3B
-68RP-3B
-40EP-3B
-39EP-3B
N1 G1
-42EP-3B
-41EP-3B
-67RP-3B
-66RP-3B
N1 G1
-38EP-3B
-37EP-3B
-71RP-3B
-70RP-3B
-4RP-3B
-74RP-3B
-73RP-3B
-9RP-3B
-72RP-3B
-75RP-3B
-17RP-3B
-5RP-3B
-6RP-3B
-7RP-3B
-8RP-3B
N1 G1
N1G1
N1 G1
N1G1
N1 G1
N1G1
N1 G1
-18RP-3B
-2EP-3B
-3EP-3B
-1EP-3B
-4EP-3B
-76RP-3B
-6EP-3B
-7EP-3B
-10EP-3B
-9EP-3B
-12EP-3B
-14EP-3B
-13EP-3B
-59EP-3B
-60EP-3B
-61EP-3B
-62EP-3B
-63EP-3B
-66EP-3B
-67EP-3B
-65EP-3B
-68EP-3B
-90RP-3B
NSF DIRTY TRAYS
3A-333
-50RP-3B
-51RP-3B
-52RP-3B
-77RP-3B
-53RP-3B
-78RP-3B
-79RP-3B
-80RP-3B
-64EP-3B
-81RP-3B
-82RP-3B
-83RP-3B
-84RP-3B
-85RP-3B
-86RP-3B
-87RP-3B
-88RP-3B
-82EP-3B
-81EP-3B
-80EP-3B
-79EP-3B
-77EP-3B
-78EP-3B
-75EP-3B
-76EP-3B
-73EP-3B
-74EP-3B
-72EP-3B
-71EP-3B
-69EP-3B
-70EP-3B
FRIDGE
MICRO
COFFEE
FRIDGE
PRINTER
E
MED
STORAGE
U.C.
FRIDGE
E/GFI
-84EP-3B
-83EP-3B
FRIDGE
MICRO
COFFEE
ICE
P19
AC-21-S
AC-21-R
-1,3,5MP-3C
-2,4,6MP-3C
-96RP-3B
HWP-1A
-8,10,12MP-3C
CWP-1A
CWP-1B
HWP-1B
-7,9,11MP-3C
-13,15,17MP-3C
-14,16,18MP-3C
C/S
-94RP-3B
-95RP-3B
-92RP-3B
-93RP-3B
EW C -100RP-3B
-14RP-3B
-101RP-3B
6' - 0"
6' - 0"
E
E3
-101EP-3B
-99EP-3B
-103EP-3B
-100EP-3B
E3
-105EP-3B
-107EP-3B
-109EP-3B
-111EP-3B
-15EP-3B
-16EP-3B
-21RP-3B
-22RP-3B
FCU
-113EP-3B
E
E
-115EP-3B
E.
E
E
E E
E
E
-97EP-3B
E
-117EP-3B
-102RP-3B
P20
-8EP-3B
7' - 0" 7' - 0"
E1 E1 E1 E1 E1 E1 E1 E1 E1
E1
E1 E1 E1 E1
E1 E1 E1E1 E1E1 E1 E1 E1 E1 E1 E1 E1 E1
E-11EP-3B
P11
4' - 0"
4' - 0"
4' - 0"
-90EP-3B
P20
S
USB
USB
USB
USB
GFI
ES501.
7 9
10 11
6.9
A
B
C D
E
F
7.7 8.3
B.6
1 2 4 5
-3RP-3B
P29
-123EP-3B
-121EP-3B
-119EP-3B
-125EP-3B
P33
P33
P33
P33
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\b k a rc h e r\
D o c u m e n ts
\V M
W V
-0 -E
-R b k a rc h e rR U
V A
B .r v t
/5
/2
:4
:4
P
M
ES301.
THIRD FLOOR PLAN - 3B, POWER
510 BUTLER AVENUE MARTINSBURG, WV 25405
04/07/2021 PDY BBK
BID DOCUMENTS
FULLY
SPRINKLERED
1/8" = 1'-0"ES301.
1 THIRD FLOOR PLAN - 3B, POWER
NORTH
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
GENERAL NOTES (POWER):
A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,
AND CASEW ORK DETAILS FOR EXACT LOCATIONS OF ALL W ALL AND
CEILING MOUNTED ELECTRICAL DEVICES.
B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS
INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)
BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE
PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED
NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT
CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME
CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL
CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE
CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIW IRE
BRANCH CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A
COMMON NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.
C. ALL DEVICE COVERPLATES SHALL BE #302 STAINLESS STEEL. IDENTIFY
THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES, SW ITCHES,
ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELS
W ITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE
EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. MARK
INSIDES OF ALL DEVICE BOXES W ITH PANEL AND CIRCUIT NUMBER.
D. RECEPTACLES THAT ARE CONTROLLED BY AN AUTOMATIC MEANS
SUCH AS OCCUPANCY SENSOR OR ENERGY MANAGEMENT SYSTEM
SHALL BE MARKED IN ACCORDANCE W ITH NEC 406.3(E).
E. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS
SHALL BE COORDINATED W ITH MECHANICAL AND PLUMBING
CONTRACTORS TO ENSURE ACCESS AND W ORKING CLEARANCE IS
MAINTAINED PER NEC. NOTIFY OTHER TRADES OF REQUIRED
CLEARANCE AREAS TO AVOID ROUTING OF OTHER SYSTEMS IN THESE
AREAS. DO NOT INSTALL ELECTRICAL EQUIPMENT OVER EQUIPMENT
NAMEPLATES OR ACCESS PANELS OR THROUGH
ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT BY OTHER
TRADES.
TAGGED NOTES
P1 PROVIDE DISCONNECT SWITCH FUSED AT EQUIPMENT NAMEPLATE RATING
FOR EQUIPMENT INDICATED. COORDINATE EXACT MOUNTING LOCATION AND
CONNECTION REQUIREMENTS WITH MECHANICAL EQUIPMENT, PIPING
CLEARANCES PRIOR TO ROUGH-IN. REFER TO "EQUIPMENT CONNECTION
SCHEDULE ON DRAWING ES701" FOR ADDITIONAL REQUIREMENTS.
P2 PROVIDE UNISTRUT AS REQUIRED FOR MOUNTING SERVICE RECEPTACLES
ON ROOF. COORDINATE EXACT MOUNTING LOCATION WITH ALL TRADES
PRIOR TO ROUGH-IN.
P10 REFER TO ENLARGED PLAN OF ELECTRICAL ROOM ON DRAWING ES502.
P11 PROVIDE CIRCUITRY AND CONNECTIONS FOR P-TUBE STATION. PNEUMATIC
TUBE TRANSFER STATION FINAL LOCATION(S) TO BE DETERMINED BY
OWNER'S VENDOR.
P12 PROVIDE PLUGMOLD STRIP LENGTH AS INDICATED. PLUGMOLD SHALL BE
BRUSHED ALUMINUM WITH 20A OUTLETS SPACES AT 18” ON CENTERS.
EMERGENCY RECEPTACLES SHALL BE RED IN COLOR AND SHALL HAVE
CIRCUIT IDENTIFICATION (SEE GENERAL NOTE - THIS SHEET) MOUNT AT 48"
AFF.
P13 REFER TO TYPICAL ENLARGED PATIENT ROOM PLANS ON DRAWING ES501
FOR WORK REQUIRED IN SHADED AREA INDICATED. ROOMS MAY BE
REVERSED AND/ OR MIRROR IMAGE BUT ORIENTATION TO HEADWALL,
FOOTWALL, ETC. SHALL BE THE SAME REGARDLESS. NOTE: CERTAIN DEVICE
LOCATIONS ARE AS SPECIFICALLY NOTED ON THESE FLOOR PLANS WHERE
DIFFERENCES WERE NOTED FROM THE TYPICAL DESIGN. ANY FURTHER
DEVIATIONS DISCOVERED SHOULD BE COORDINATED WITH THE ARCHITECT
PRIOR TO OUTLET ROUGH-IN.
P14 REFER TO ENLARGED PLAN OF DATA ROOM ON DRAWING ES502.
P19 VARIABLE FREQUENCY DRIVE (VFD) WITH INTEGRAL DISCONNECT SWITCH -
REFER TO MECHANICAL EQUIPMENT SCHEDULES FOR FURTHER
REQUIREMENTS. (TYPICAL)
P20 PROVIDE AN EXTENSION OF THE EXISTING LIGHTNING PROTECTION SYSTEM
TO THE NEW HVAC ROOFTOP EQUIPMENT AND AHU SCREEN-WALL
ENCLOSURE BOND IN ACCORDANCE TO VA SPECIFICATIONS AND
GUIDELINES. REFER ALSO TO THE LIGHTNING PROTECTION SYSTEM NOTE ON
THIS DRAWING ES302.
P29 TEMPERATURE CONTROL PANEL FURNISHED AND INSTALLED BY
MECHANICAL CONTRACTOR. PROVIDE 120V POWER AND DATA CONNECTION.
P33 EXCLUDE ALL WORK IN THIS AREA, FROM CEILING PLANE TO FLOOR.
TYPICAL ROOM JUNCTION BOX CONNECTION LEGEND
N1 - 120V NORMAL POW ER CIRCUIT (SEE CONTINUATION ON POW ER
DRAW ING ES301).
N2 - 277V NORMAL POW ER LIGHTING CIRCUIT (SEE CONTINUATION ON
LIGHTING DRAW ING ES201).
E1 - 120V EMERGENCY CRITICAL POW ER CIRCUIT (SEE CONTINUATION ON
POW ER DRAW ING ES301).
E2 - 277V EMERGENCY CRITICAL LIGHTING CIRCUIT (SEE CONTINUATION ON
LIGHTING DRAW ING ES201).
E3 - 120V EMERGENCY CRITICAL ''BOOM'' POW ER CIRCUIT (SEE
CONTINUATION ON POW ER DRAW ING ES301).
G1 - 120V NORMAL POW ER GFI CIRCUIT (SEE CONTINUATION ON POW ER
DRAW ING ES301).
W P/GFI
P1
P2
NEW
277/480V
NORMAL POW ER
PANEL "MP-PH"
P18EXISTING
277/480V
NORMAL POW ER
MOTOR CONTROL
CENTER "MCC-1A"
TO REMAIN
-2,4,6MP-PH
-1,3,5MP-PH
P1
EF-61B
EF-61A
EXISTING
277/480V
NORMAL POW ER
PANEL "P-P"
TO REMAIN
EXISTING
277/480V
EM-CRITICAL
PANEL "EMDP"
TO REMAIN
EXISTING
277/480V
EM-ELEVATOR
PANEL "EDP"
TO REMAIN
EXISTING
600A
EM-ELEVATOR
"ATS-EDP"
TO REMAIN
EXISTING
120/208V
NORMAL POW ER
PANEL "PA-RP"
TO REMAIN
EXISTING
277/480V
EM-LIFE SAFETY
PANEL "DP-LS"
TO REMAIN
PA-RP
P17
7 9
B
C D
E
F
7.7 8.3
B.6
1 2 4 5
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\b k a rc h e r\
D o c u m e n ts
\V M
W V
-0 -E
-R b k a rc h e rR U
V A
B .r v t
/5
/2
:4
:4
P
M
ES302.
ROOF PLAN - 3B, ELECTRICAL
510 BUTLER AVENUE MARTINSBURG, WV 25405
04/07/2021 PDY BBK
BID DOCUMENTS
FULLY
SPRINKLERED
1/8" = 1'-0"ES302.
1 ROOF PLAN - 3B, ELECTRICAL
GENERAL NOTES (ROOF):
A. REFER TO POW ER, SYSTEMS, AND LIGHTING PLANS FOR GENERAL
NOTES APPLICABLE TO INTERIOR SPACES SHOW N ON THIS PLAN.
B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS
INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)
BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE
PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED
NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT
CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME
CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL
CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE
CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIW IRE
BRANCH CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A
COMMON NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.
C. IDENTIFY THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES,
SW ITCHES, ETC. IN AREA OF CONSTRUCTION. PROVIDE ENGRAVED
LAMACOID LABLES FOR ALL EXTERIOR DEVICES. MARK INSIDES OF ALL
DEVICE BOXES W ITH PANEL AND CIRCUIT NUMBER.
D. PROVIDE UNI-STRUT AS REQUIRED FOR MOUNTING OF ALL DEVICES ON
ROOF. COORDINATE W ITH ROOFING CONTRACTOR PRIOR TO
CONSTRUCTION FOR ALL PENETRATIONS. SEAL PENETRATIONS AS
REQUIRED PER ROOFING CONTRACTOR AND ROOFING
MANUFACTURER'S RECOMMENDATIONS AS REQUIRED TO MAINTAIN
ROOF W ARRANTY. PROVIDE CURBS AND/OR FLASHED BOOTS AT ALL
DEVICES AND PENETRATIONS.
E. CONDUITS SHALL PENETRATE ROOF FROM BELOW AS CLOSE TO FINAL
ROOF EQUIPMENT TERMINATION POINT AS POSSIBLE. SUPPORT ALL
ROOF MOUNTED CONDUITS AT INTERVALS NOT EXCEEDING 10 FEET
W ITH STRUT-BASED SUPPORT SYSTEM. SUPPORT SYSTEM TO BE
CADDY PYRAMID ST SERIES OR APPROVED EQUAL.
F. ALL CONDUIT EXPOSED TO DIRECT SUNLIGHT SHALL BE AT LEAST 12''
ABOVE THE ROOF-TOP. NO CONDUIT SHALL BE EXPOSED TO DIRECT
SUNLIGHT BELOW THIS HEIGHT.
G. W HERE RACEW AY OR CONDUCTORS ARE INSTALLED EXPOSED ON
ROOF, DERATE AMPACITY OF CONDUCTORS IN ACCORDANCE W ITH
NEC.
H. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS
SHALL BE COORDINATED W ITH MECHANICAL AND PLUMBING
CONTRACTORS TO ENSURE ACCESS AND W ORKING CLEARANCE IS
MAINTAINED PER NEC. NOTIFY OTHER TRADES OF REQUIRED
CLEARANCE AREAS TO AVOID ROUTING OF OTHER SYSTEMS IN THESE
AREAS. DO NOT INSTALL ELECTRICAL EQUIPMENT OVER EQUIPMENT
NAMEPLATES OR ACCESS PANELS OR THROUGH
ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT BY OTHER
TRADES.
I. PROVIDE MAINTENANCE RECEPTACLE W ITHIN 25 FT OF EACH
MECHANICAL UNIT AS REQUIRED BY NEC. COORDINATE INSTALLATION
LOCATIONS W ITH FINAL EQUIPMENT LAYOUT PROVIDE BY MECHANICAL
CONTRACTOR.
J. CONDUIT FOR ROOF MOUNTED EQUIPMENT SHALL BE ROUTED IN
CEILING SPACE BELOW ROOF DECK UNO.
TAGGED NOTES
P1 PROVIDE DISCONNECT SWITCH FUSED AT EQUIPMENT NAMEPLATE
RATING FOR EQUIPMENT INDICATED. COORDINATE EXACT MOUNTING
LOCATION AND CONNECTION REQUIREMENTS WITH MECHANICAL
EQUIPMENT, PIPING CLEARANCES PRIOR TO ROUGH-IN. REFER TO
"EQUIPMENT CONNECTION SCHEDULE ON DRAWING ES701" FOR
ADDITIONAL REQUIREMENTS.
P2 PROVIDE UNISTRUT AS REQUIRED FOR MOUNTING SERVICE
RECEPTACLES ON ROOF. COORDINATE EXACT MOUNTING LOCATION
WITH ALL TRADES PRIOR TO ROUGH-IN.
P17 ROUTE NUMBER OF #12 CONDUCTORS AS INDICATED IN 3/4'' CONDUIT
TO NEW / SPARE 20A/1P BREAKER(S) IN EXISTING PANEL INDICATED.
WHERE EXISTING PANEL IS FLUSH-MOUNTED IN AN EXISTING WALL,
CONTRACTOR SHALL CUT, PATCH AND REPAIR WALL AS REQUIRED
FOR CONCEALED CONDUIT ENTRY.
P18 FIELD VERIFY BEST LOCATION FOR NEW PANELBOARD AND PROVIDE
ANGLE-IRON SUPPORTS AS REQUIRED FOR MOUNTING IN AN OPEN
SPACE. INSURE ALL REQUIRED EQUIPMENT CLEARANCES ARE
MAINTAINED.
NORTH
GENERAL NOTES (LIGHTNING PROTECTION SYSTEM ):
A. LIGHTNING PROTECTION LAYOUT SHOW N IS INTENDED TO CONVEY
SCOPE OF PROJECT. CONTRACTOR SHALL PROVIDE FINAL DESIGN
AND INSTALLATION FOR A COMPLETE LIGHTNING PROTECTION
SYSTEM FOR THIS FACILITY. SYSTEM SHALL COMPLY W ITH UL #96A
"MASTER LABELED LIGHTNING PROTECTION SYSTEMS'' AND NFPA 780.
REFER TO THE ELECTRICAL SPECIFICATION SECTION 264113
"LIGHTNING PROTECTION FOR STRUCTURES" FOR ADDITIONAL
REQUIREMENTS.
B. CONTRACTOR SHALL PROVIDE BONDING PROTECTION TO ALL
CAMERAS.
C. PENETRATIONS THROUGH SHEET METAL INCLUDING BUT NOT LIMITED
TO COPINGS, AND COUNTER FLASHINGS SHALL NOT BE ALLOW ED.
CONNECTIONS TO PARAPETS SHALL BE BY CLAMPS MADE TO FASTEN
TO THE DRIP EDGE OF COPINGS W ITHOUT PENETRATION TO AND OF
THE COPINGS. REFER TO ARCHITECTURAL ROOF PLAN FOR DETAILS
OF PENETRATIONS THROUGH HORIZONTAL ROOF AREAS.
PENETRATIONS THROUGH HORIZONTAL ROOF AREAS SHALL BE NO
CLOSER THAN 16'' TO ANY VERTICAL BUILDING SURFACE.
D. ALL ROOF PENETRATIONS AND ASSOCIATED LABOR COSTS SHALL BE
AT THE EXPENSE OF THIS CONTRACTOR, BUT SHALL BE INSTALLED BY
THE ROOFING CONTRACTOR IN ORDER TO MAINTAIN ANY APPLICABLE
ROOF W ARRANTIES. ANY DEVIATIONS NECESSARY BY THIS
CONTRACTOR SHALL FIRST BE SUBMITTED TO THE ARCHITECT's
OFFICE FOR REVIEW . ANY COSTS ASSOCIATED W ITH CHANGES TO
THIS SYSTEM THAT ARE A RESULT OF PROPOSED DETAILS NOT BEING
ACCEPTABLE TO THE OW NER, ARCHITECT OR ENGINEER SHALL BE AT
THE EXPENSE OF THIS CONTRACTOR. ALL REQUIRED CONNECTION
DEVICES SHALL BE REVIEW ED BY THE ARCHITECT AND ENGINEER.
PENETRATION DEVICES THROUGH STANDING SEAM METAL ROOF
AREAS SHALL BE PROVIDED BY THE SHEET METAL ROOFING
CONTRACTOR.
E. ALL CABLING/W IRING SHALL BE CONCEALED W ITHIN THE BUILDING.
ROUTE ALL CONCEALED CABLING IN SCHEDULE 80 PVC CONDUIT.
F. PROVIDE LIGHTNING PROTECTION SYSTEM EXTENSION FOR ADDED
ROOFTOP HVAC EQUIPMENT AT THIS FACILITY. SYSTEM SHALL COMPLY
W ITH UL 96A “MASTER LABELED LIGHTNING PROTECTION SYSTEMS”,
NFPA 780 AND THE PROJECT SPECIFICATIONS.
G. W HERE ELEMENTS OF THE SYSTEM ARE IN DIRECT CONTACT W ITH THE
ALUMINUM BUILDING MATERIALS, UTILIZE ALUMINUM EQUIPMENT.
W HERE IN CONTACT W ITH ANY OTHER BUILDING MATERIALS, UTILIZE
COPPER EQUIPMENT.
H. AIR TERMINALS SHALL BE INSTALLED W ITH-IN 2'-0" OF OUTSIDE
BUILDING EDGE, OUTSIDE CORNERS AND RIDGE ENDS - SPACING
BETW EEN AIR TERMINALS NOT TO EXTEND 20 FT.
I. NO BEND OF A CONDUIT SHALL FORM AN ANGLE MORE THAN 90
DEGREES NOR SHALL HAVE A RADIUS OF BEND THAN 8".
J. CONDUCTORS W ITHIN BUILDING SHALL BE IN 1" CONDUIT.
K. THE STEEL COLUMNS OF THE BUILDING SHALL BE USED AS THE DOW N
CONDUCTORS.
L. BOND ALL ROOF DRAINS, AHU HOUSING, ANTENNAS AND OTHER ROOF
MOUNTED METALLIC OBJECTS TO THE SYSTEM IN AN APPROVED
MANNER.
M. ALL UNDERGROUND METALLIC OBJECTS LOCATED W ITHIN 6 FEET OF
THE SYSTEM SHALL BE BONDED TO THE SYSTEM IN AN APPROVED
MANNER.
N. PROPER FLASHING AND PITCH POCKETS SHALL BE PROVIDED FOR ALL
ROOF PENETRATIONS.
O. ALL ROOF PENETRATIONS AND ALL ITEMS FASTENED TO
ARCHITECTURAL ELEMENTS OF THE BUILDING SHALL MEET W ITH THE
ARCHITECT'S APPROVAL.
P. BOND ENTIRE SYSTEM TOGETHER TO THE COLD W ATER MAINS
ENTERING THE BUILDING IN AN APPROVED MANNER.
Q. INTERCONNECT LIGHTNING PROTECTION GROUND TO ELECTRIC,
TELEPHONE AND OTHER BUILDING GROUND SYSTEMS AS SHOW N OR
AS REQUIRED BY CODE.
R. THE SYSTEM SHALL BE THE PRODUCT OF ONE MANUFACTURER
REGULARLY ENGAGED IN THE PRODUCTION OF LIGHTNING
PROTECTION SYSTEMS AND SHALL BE REGISTERED AND APPROVED BY
THE LIGHTNING PROTECTION INSTITUTE.
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
F
F
F
F
F
F
F
F
S
S
S
S
S
S
S
S
S
S
S
F
F
F
F
F
FF
MS
M S
W AP
W AP
W AP
W AP
F
F
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
W AP
W AP
W AP
W AP
W AP
W AP
W AP
W AP
W AP
W AP
W AP
CC
CC
C C
CC
PB PB
PB
PB
PB
PB
PB
CR
T
T
CR
CR
CR
CR
CRCR
CR
CR
CR
CR
CR
IM
IM
IR
IR
IM
SS SS
SS
SS SS
IR
IRCR
DS
DS
KP
IM
F
DS
DS
DS
DS
DS
DS
DSDS
DS DS
DP
DS
DS
C C
CR
CR
DS
LPA
SD
SD
SD SD
SD
SD
SD
SD
SD
DS
IRCR
DD
SM
DD
SM
DD
DD DD
DD
DD
DD
SM
DD
SM
DD
SM
DD
SM
DP
W AP
W APW APW AP
W AP
W AP
W AP
W AP
W AP
W APW AP
W AP
ES501.
ES501.
EQUIPMENT STORAGE
3B-321
SOILED UTILITY
3B-319
W ORK ROOM
3B-329
NURSE STATION
3B-314 CLEAN SUPPLIES
3B-310
STAFF LOCKER ROOM
3A-343A
STAFF LOUNGE
3A-343
W AITING
3A-301
RECEPTION
3A-344
FAMILY TOILET
3B-305
PUBLIC TOILET
3B-306
PATIENT ROOM
3B-307
OFFICE
3B-304
NURSE SUPERVISOR OFFICE
3B-303
NURSE MANAGER OFFICE
3B-301
MECHANICAL ROOM
3B-300
PATIENT ROOM
3B-311
TOILET
3B-311A
PATIENT ROOM
3B-313
TOILET
3B-313A
PATIENT ROOM
3B-316
TOILET
3B-316A
PATIENT ROOM
3B-318
TOILET
3B-318A
PATIENT ROOM
3B-322
TOILET
3B-322A
PATIENT ISO ROOM
3B-326A
TOILET
3B-326B
PATIENT ISO ROOM
3B-327A
PATIENT ISO ROOM
3B-328A
TOILET
3B-330A
PATIENT ROOM
3B-331
PATIENT ROOM
3B-332
PATIENT ROOM
3B-333
TOILET
3B-335A
PATIENT ROOM
3B-336
PATIENT ROOM
3B-338 BARIATRIC PATIENT ROOM
3A-341
BARIATRIC TOILET
3A-341A
PATIENT ROOM
3A-337
TOILET
3A-337A
PATIENT ROOM
3A-335
TOILET
3A-335A
PATIENT ROOM
3A-334
TOILET
3A-334A
TELE. RM.
3A-300
ELEC. RM.
3A-345
TOILET
3B-309A
TOILET
3B-307A
TOILET
3B-327B
TOILET
3B-333A
TOILET
3B-336A
PATIENT ROOM
3B-324
TOILET
3B-324A
PATIENT ROOM
3B-320
TOILET
3B-320A
PATIENT ROOM
3B-317
TOILET
3B-317A
PATIENT ROOM
3B-315
TOILET
3B-315A
BARIATRIC PATIENT ROOM
3A-342
BARIATRIC TOILET
3A-342A
PATIENT ROOM
3A-339
TOILET
3A-339A
PATIENT ROOM
3A-336
TOILET
3A-336A
NURSE SUPERVISOR OFFICE
3B-302
NOURISHMENT
3B-334
MEDICATION ROOM
3B-312
ANTE ROOM
3B-325
ANTE ROOM
3B-326
ANTE ROOM
3B-327
ANTE ROOM
3B-328
CORRIDOR
C7
CORRIDOR
C9
CORRIDOR
C11
CORRIDOR
C6
CORRIDOR
C8
CORRIDOR
C10
ELEVATOR LOBBY
C1
CORRIDOR
C2
CORRIDOR
C5
H.A.C.
3B-308
STAFF TOILET
3B-337
ES501.
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S5
(TYP)
S1
(TYP)
S1
(TYP)
S2
(TYP)
S2
(TYP)
S2(TYP)
S1
(TYP)
S2
S3
ES502.
3D/1V
3D/1V
SAT. NURSE STATION
3B-323
S19
S2
CORRIDOR
C8
6' - 0"
6' - 0"
3D/1V
3D/1V
PATIENT ROOM
3B-309
PATIENT ISO ROOM
3B-325A
C
S15
S14
S14
S14
S14
P17
ELLS-3B
S12
S12 S12
P-TUBE
STATION
S16
W
ES501.
7 9
10 11
6.9
A
B
C D
E
F
7.7 8.3
B.6
1 2 4 5
2D
S17
ELLS-3C
P17
ELLS-3B
P17
ELLS-3B
P17
S15
S15
S15
S15
ELLS-3B
P17
P17
ELLS-3B
S21
S21
S21
S21
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\b k a rc h e r\
D o c u m e n ts
\V M
W V
-0 -E
-R b k a rc h e rR U
V A
B .r v t
/5
/2
:4
:5
P
M
ES401.
THIRD FLOOR PLAN - 3B,
SYSTEMS
510 BUTLER AVENUE MARTINSBURG, WV 25405
04/07/2021 PDY BBK
BID DOCUMENTS
FULLY
SPRINKLERED
GENERAL NOTES (SYSTEMS):
A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,
AND CASEW ORK DETAILS FOR EXACT LOCATIONS OF ALL W ALL AND
CEILING MOUNTED ELECTRICAL DEVICES.
B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS
INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)
BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE
PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED
NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT
CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME
CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL
CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE
CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIW IRE
BRANCH CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A
COMMON NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.
C. ALL DEVICE COVERPLATES SHALL BE #302 STAINLESS STEEL. IDENTIFY
THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES, SW ITCHES,
ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELS
W ITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE
EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. MARK
INSIDES OF ALL DEVICE BOXES W ITH PANEL AND CIRCUIT NUMBER.
D. REFER TO "SYSTEM INSTALLATION MATRIX" (ON SYSTEMS LEGEND
SHEET) AND SPECIFICATIONS FOR CONTRACTOR REQUIREMENTS OF
EACH SYSTEM.
E. THE CONTRACTOR SHALL ROUTE ALL ''SYSTEM CONDUIT STUB-UPS'' TO
THE NEAREST CORRIDOR CABLING PATH (SEE ''STUB-UP'' DETAILS).
REFER TO CABLING PATH INSTALLATION DETAIL FOR ADDITIONAL
REQUIREMENTS.
F. CONTRACTOR SHALL PAINT ALL SYSTEMS CONDUIT STUB-UPS LIGHT
BLUE FOR SYSTEMS CABLING INTO THE CORRIDOR CABLING PATH.
PROVIDE PULL STRINGS IN ALL NEW CONDUIT RUNS FOR SYSTEM
CABLING INSTALLATION.
1/8" = 1'-0"ES401.
1 THIRD FLOOR PLAN - 3B, SYSTEMS
TAGGED NOTES
P17 ROUTE NUMBER OF #12 CONDUCTORS AS INDICATED IN 3/4''
CONDUIT TO NEW / SPARE 20A/1P BREAKER(S) IN EXISTING
PANEL INDICATED. WHERE EXISTING PANEL IS
FLUSH-MOUNTED IN AN EXISTING WALL, CONTRACTOR SHALL
CUT, PATCH AND REPAIR WALL AS REQUIRED FOR
CONCEALED CONDUIT ENTRY.
S1 PROPOSED J-HOOK CABLING PATH - COORDINATE ALL PATHS
WITH VENDOR's AND HOSPITAL STAFF (NOTE : STUB-UP
CONDUITS WILL NEED TO BE RAN TO THESE CABLING PATHS).
PROVIDE J-HOOKS ALONG ALL REQUIRED CABLING PATHS -
REFER TO INSTALLATION DETAIL ON DRAWING ES802 FOR
FURTHER REQUIREMENTS (TYPICAL). PROVIDE CONDUITS AND
SLEEVES WHERE REQUIRED DUE TO HARD/INACCESSIBLE
CEILING LOCATIONS. REFER TO REFLECTED CEILING PLAN
AND FIELD VERIFY EXACT REQUIREMENTS.
S2 CABLING CONTRACTOR SHALL INSTALL SLEEVES OF
SUFFICIENT SIZE AND QUANTITY FOR PATHWAY THROUGH
WALL. REFER TO SYSTEMS CABLING SLEEVE DETAIL ON
ES802. CABLING CONTRACTOR SHALL INSTALL ALL SLEEVES
PER MANUFACTURER INSTRUCTIONS.
S3 REFER TO ENLARGED PLAN OF DATA ROOM ON DRAWING
ES502.
S5 REFER TO TYPICAL ENLARGED PATIENT ROOM PLANS ON
DRAWING ES501 FOR WORK REQUIRED IN SHADED AREA
INDICATED. ROOMS MAY BE REVERSED AND/ OR MIRROR
IMAGE BUT ORIENTATION TO HEADWALL, FOOTWALL, ETC.
SHALL BE THE SAME REGARDLESS. NOTE: CERTAIN DEVICE
LOCATIONS ARE AS SPECIFICALLY NOTED ON THESE FLOOR
PLANS WHERE DIFFERENCES WERE NOTED FROM THE
TYPICAL DESIGN. ANY FURTHER DEVIATIONS DISCOVERED
SHOULD BE COORDINATED WITH THE ARCHITECT PRIOR TO
OUTLET ROUGH-IN.
S12 CONTRACTOR TO VERIFY THE EXACT LOCATION OF DEVICE
INDICATED WITH OWNER / ARCHITECT PRIOR TO ROUGH-IN.
S14 PROVIDE OUTLET BOX ROUGH-IN FOR DEVICES INDICATED.
DEVICES TO BE PROVIDED UNDER SEPERATE CONTRACT ('3A'
RENOVATION).
S15 PROVIDE CONNECTION TO DOOR CONTROLS WITH F.A.
CONTROL MODULE TO DISCONNECT POWER TO DOORS /
CLOSE DOORS UPON FIRE ALARM.
S16 COMBINATION KEYPAD / CARD READER UNIT
S17 TEMPERATURE CONTROL PANEL FURNISHED AND INSTALLED
BY MECHANICAL CONTRACTOR. PROVIDE 120V POWER AND
DATA CONNECTION.
S19 EXISTING CAMERA TO BE RELOCATED. COORDINATE WITH
ELECTRICAL DEMOLITION PLAN ON DRAWING ED101. RE-WORK
CONNECTIONS AS REQUIRED.
S21 EXCLUDE ALL WORK IN THIS AREA, FROM CEILING PLANE TO
FLOOR.
NORTH
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
J
J
S P
C
C B
S C
S
P C
DL
J J J
P
CRF
C C
J
J
S P
C
C B
S C
S
P C
DLJ JJ
P C
RF
CC
J
J
S P
C
C B
S C
S
P C
DL
JJ P
CJ
RF
C C
JJ
J J
JJ
J J
J
J
S P
C
C B
S C
S
P C
DLJ JJ
P C
RF
CC
J
E
GFI
USB
5' - 0"
T
TOILET
3B-309A
TOILET
3B-307A
PATIENT ROOM
3B-309
N1 G1
E1
C
PATIENT
LIFT
8' - 0"
1' - 4"2' - 0"
E
2' - 0"
2' - 0" 3D/1V
2' - 0"
4' - 0"
4' - 0" E
E
6' - 6"
E
6' - 6"
3D
P24
L11
C
D
B.6
GFI
USB
E
5' - 0" T
PATIENT ISO ROOM
3B-328A
TOILET
3B-330AANTE ROOM
3B-328
CORRIDOR
C8
TOILET
3B-328B
N1 E1
C
G1
PATIENT
LIFT
8' - 0"
1' - 4" 2' - 0"
E
6' - 6"
2' - 0"
3D
2' - 0" .
3D/1V
2' - 0"
4' - 0"
4' - 0" E
6' - 6"
E
E
P24
L11
P25
P25 P25
A
E
USB
GFI
E 1' - 4"2' - 0"
E 2' - 0"
5' - 0"
T
BARIATRIC PATIENT ROOM
3A-342
BARIATRIC TOILET
3A-342A
E1 N1
C
G1
PATIENT
LIFT
8' - 0"
2' - 0"
3D/1V
2' - 0"
4' - 0"
4' - 0".
E
E 6' - 6"
6' - 6"
3D
(TYP)
P24
L11
A
8.3
.D
.N
V1
DS-10
D4-15
D4-15
MFST
TOILET
3B-309A
TOILET
3B-307A
PATIENT ROOM
3B-309
D4-15
D4-15
D4-15
E2N2
L2
L3
P24
C
D
B.6
.N
MF
D4-15G
D4-15G
DS-10
ST
V1
A1
PATIENT ISO ROOM
3B-328A
TOILET
3B-330A
TOILET
3B-327B
ANTE ROOM
3B-328
CORRIDOR
C8
TOILET
3B-328B
D4-15G
D4-15G
D4-15G
D4-15G
E2 N2
.D
L2
L3
P25
P25
P25
L14
P24
A
.N
.D
MF
ST
D4-15 D4-15
DS-10
V1
BARIATRIC TOILET
3A-341A
BARIATRIC PATIENT ROOM
3A-342
BARIATRIC TOILET
3A-342A
D4-15
D4-15
D4-15
E2N2
D4-15
D4-15
L2
L3
A
8.3
.N
B1
D4-15G
D4-15G
DS-10
ST
V1
A1
PATIENT ISO ROOM
3B-326A
ANTE ROOM
3B-326
TOILET
3B-326B
D4-15G
D4-15G
D4-15G
D4-15G
E2 N2
.D
P24
HG
HG
L7
L11
A
GFI
USB
E
5' - 0"
T
PATIENT ISO ROOM
3B-326A
ANTE ROOM
3B-326
TOILET
3B-326B
N1 E1
C
G1
PATIENT
LIFT
8' - 0"
1' - 4" 2' - 0"
E
6' - 6"
2' - 0"
3D
2' - 0" .
3D/1V
2' - 0"
4' - 0"
4' - 0"
E
6' - 6"
E
E
P24
L11
CEILING
BOOM
B3
A
2D
S20
P31
P32
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\b k a rc h e r\
D o c u m e n ts
\V M
W V
-0 -E
-R b k a rc h e rR U
V A
B .r v t
/5
/2
:4
:0
P
M
ES501.
ENLARGED PLANS
510 BUTLER AVENUE MARTINSBURG, WV 25405
04/07/2021 PDY BBK
BID DOCUMENTS
FULLY
SPRINKLERED
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
THIRD FLOOR - POW ER/SYSTEMS - TYPICAL
PATIENT ROOM
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
THIRD FLOOR - POW ER/SYSTEMS -TYPICAL
PATIENT ISO ROOM
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
THIRD FLOOR - POW ER/SYSTEMS - TYPICAL
BARIATRIC ROOM
GENERAL NOTES (POWER):
A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,
AND CASEW ORK DETAILS FOR EXACT LOCATIONS OF ALL W ALL AND
CEILING MOUNTED ELECTRICAL DEVICES.
B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS
INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)
BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE
PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED
NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT
CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME
CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL
CURRENT CARRYING CONDUCTORS PER NEC 310.15(B)(3), AND UPSIZE
CONDUIT AS REQUIRED PER NEC 300.17 AND ANNEX C. MULTIW IRE
BRANCH CIRCUITS AS DEFINED IN NEC 100 / 210.4 (CIRCUITS SHARING A
COMMON NEUTRAL CONDUCTOR) SHALL NOT BE PERMITTED.
C. ALL DEVICE COVERPLATES SHALL BE #302 STAINLESS STEEL. IDENTIFY
THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES, SW ITCHES,
ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELS
W ITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE
EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. MARK
INSIDES OF ALL DEVICE BOXES W ITH PANEL AND CIRCUIT NUMBER.
D. RECEPTACLES THAT ARE CONTROLLED BY AN AUTOMATIC MEANS
SUCH AS OCCUPANCY SENSOR OR ENERGY MANAGEMENT SYSTEM
SHALL BE MARKED IN ACCORDANCE W ITH NEC 406.3(E).
E. LOCATIONS OF ELECTRICAL CONNECTIONS AND LOCAL DISCONNECTS
SHALL BE COORDINATED W ITH MECHANICAL AND PLUMBING
CONTRACTORS TO ENSURE ACCESS AND W ORKING CLEARANCE IS
MAINTAINED PER NEC. NOTIFY OTHER TRADES OF REQUIRED
CLEARANCE AREAS TO AVOID ROUTING OF OTHER SYSTEMS IN THESE
AREAS. DO NOT INSTALL ELECTRICAL EQUIPMENT OVER EQUIPMENT
NAMEPLATES OR ACCESS PANELS OR THROUGH
ACCESS/MAINTENANCE CLEARANCES OF EQUIPMENT BY OTHER
TRADES.
GENERAL NOTES (ENLARGED AND TYPICAL):
A. ALL ROOM LAYOUTS ARE TYPICAL AND MAY VARY OR MIRROR OTHER
ASSOCIATED ROOMS. CONTRACTOR SHALL REFER TO ARCHITECTURAL
ELEVATIONS AND COORDINATE EACH ROOM PRIOR TO ROUGH-IN.
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
THIRD FLOOR - LIGHTING - TYPICAL PATIENT
ROOM
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
THIRD FLOOR - LIGHTING - TYPICAL PATIENT
ISO ROOM
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
THIRD FLOOR - LIGHTING - TYPICAL
BARIATRIC PATIENT ROOM
TAGGED NOTES
L2 COORDINATE INSTALLATION OF LIGHT SWITCH FOR CONTROL
OF EXAM FUNCTIONS AT OVERHEAD 2x4 LIGHT BESIDE NEW
MODULAR HEADWALL UNIT.
L3 CONTRACTOR SHALL ROUTE CONTROL WIRING IN CONDUIT AS
REQUIRED FROM OVER-HEAD 2x4 LIGHT FIXTURE ''MF'' TO
CONTROL AMBIENT LIGHT AND READING LIGHT SECTIONS VIA
NURSE CALL PATIENT STATION FOR PILLOW SPEAKER
CONTROL (LVC RELAY FOR EACH ''MF'' FIXTURE IN NEMA-1
ENCLOSURE ABOVE ACCESSIBLE CEILING AS REQUIRED - SEE
DETAIL ON THIS SHEET). COORDINATE EXACT LOW VOLTAGE
CONTROL WIRING WITH NURSE CALL AND RELAY
MANUFACTURER PRIOR TO ROUGH-IN. ALSO REFER TO
STUB-OUT DETAIL FOR ADDITIONAL CONDUIT STUB-OUT(S)
REQUIRED FROM NURSE CALL DEVICES TO ROOM AND
CORRIDOR CABLING PATH.
L7 CURBELL #LVC-2000-004 DIMMING RELAY PROVIDED AND
INSTALLED BY THIS CONTRACTOR. MOUNT IN 5-GANG
MASONRY BOX AT THE HEADWALL (ABOVE SUSPENDED
CEILING) AS REQUIRED TO CONTROL HEADWALL DOWNLIGHT
UNITS. REFER ALSO TO "PATIENT READING LIGHT CONTROL
SCHEMATIC" ON DRAWING ES701.
L11 CONTRACTOR TO ROUTE CONTROL WIRING IN CONDUIT FROM
LIGHTING CONTROL RELAY INDICATED TO CONTROL READING
LIGHTS (FIXTURE TYPE "H" OR "HG") VIA NURSE CALL PATIENT
STATION FOR PATIENT PILLOW SPEAKER CONTROL.
COORDINATE EXACT WIRING REQUIREMENTS WITH NURSE
CALL SYSTEM MANUFACTURER AND RELAY MANUFACTURER
PRIOR TO ROUGH-IN.
L14 PROVIDE NEOPRENE GASKET MATERIAL AROUND DOOR
FRAME FOR ROOM PRESSURE SEAL.
P24 ROOM POWER JUNCTION BOXES ABOVE ACCESSIBLE CEILING.
REFER TO LIGHTING / POWER FLOOR PLANS FOR
CONTINUATION. SUBSCRIPT LETTER BESIDE JUNCTION BOX
CORRESPONDS WITH LETTER ON FLOOR PLAN DRAWINGS.
(TYPICAL).
P25 PROVIDE NEOPRENE GASKET AROUND ALL OUTLET BOXES
(ON CEILINGS AND WALLS) WITHIN THE ISOLATION PATIENT
ROOMS (INCLUDING THE ANTE AND TOILET ROOMS). TYPICAL.
P31 CONTRACTOR TO WIRE THREE (3) OUTLETS IN SKYTRON
BOOM TO EACH CIRCUIT AND LABEL EACH OF THESE
SKYTRON BOOM OUTLETS FOR CIRCUIT IDENTIFICATION.
REFER TO SKYTRON BOOM VENDOR DRAWINGS FOR
ADDITIONAL REQUIREMENTS.
P32 PROVIDE AN ADDITIONAL EMERGENCY POWER DUPLEX
OUTLET WITHIN A STEEL ENCLOSURE (LOCATE ABOVE THE
CEILING AND PROVIDE PER VENDOR DRAWINGS) FOR THE
OWNERS DISPLAY INTERFACE. CONNECT TO ONE OF THE
EMERGENCY POWER CIRCUITS INDICATED FOR THE CEILING
BOOM.
S20 PROVIDE DATA OUTLET WITHIN BOOM EQUIPMENT AS
REQUIRED. COORDINATE CONNECTION REQUIREMENTS WITH
BOOM INSTALLATION.TYPICAL ROOM JUNCTION BOX CONNECTION LEGEND
N1 - 120V NORMAL POW ER CIRCUIT (SEE CONTINUATION ON POW ER
DRAW ING ES301).
N2 - 277V NORMAL POW ER LIGHTING CIRCUIT (SEE CONTINUATION ON
LIGHTING DRAW ING ES201).
E1 - 120V EMERGENCY CRITICAL POW ER CIRCUIT (SEE CONTINUATION ON
POW ER DRAW ING ES301).
E2 - 277V EMERGENCY CRITICAL LIGHTING CIRCUIT (SEE CONTINUATION ON
LIGHTING DRAW ING ES201).
E3 - 120V EMERGENCY CRITICAL ''BOOM'' POW ER CIRCUIT (SEE
CONTINUATION ON POW ER DRAW ING ES301).
G1 - 120V NORMAL POW ER GFI CIRCUIT (SEE CONTINUATION ON POW ER
DRAW ING ES301).
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
THIRD FLOOR - LIGHTING - TYPICAL PATIENT
ISO ROOM (BOOM)
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
THIRD FLOOR - POW ER/SYSTEMS -TYPICAL
PATIENT ISO ROOM (BOOM)
SD
SD
MS
MD
RP-3C
LOCATION FOR FUTURE
PANEL TUB
BD-1 BD-2 BD-3 BD-4
SEC
EXISTING BUS-DUCT
RISERS TO REMAIN
(SEE POW ER RISER
FOR ADDITIONAL
REQUIREMENTS)
TV-A
EXISTING RADIO
EQUIP. TO REMAIN
NEW
277/480V
NORMAL POW ER
PANEL "MP-3C"
EXISTING 9-KVA FLOOR-MTD.
TRANSFORMER FOR
"ELLS-3C" TO REMAIN
NEW REPLACEMENT
277/480V
NORMAL POWER
PANEL "LP-3C"
NEW REPLACEMENT
277/480V
EM-CRITICAL POW ER
PANEL "ELP-3C"
EXISTING
PACS
TO REMAIN
EXISTING
TO REMAIN
EXISTING 120/208V
EM-LIFE SAFETY
PANEL "ELLS-3C"
TO REMAIN
EXISTING 277/480V
EM-LIFE SAFETY
PANEL "ELS-3C"
TO REMAIN
P16
NEW REPLACEMENT
TRANSFORMERS SUSPENDED
FROM CEILING STRUCTURE (SEE
DETAIL)
LOCATION FOR FUTURE
PANEL TUB
NEW REPLACEMENT
120/208V
NORMAL POW ER
DOUBLE TUB
PANEL "RP-3C"
T-RP-3CT-EP-3C
NEW REPLACEMENT
120/208V
EM-CRITICAL BRANCH
DOUBLE TUB
PANEL "EP-3C"
B
P16
NEW REPLACEMENT
TRANSFORMERS SUSPENDED FROM
CEILING STRUCTURE (SEE DETAIL)
NEW REPLACEMENT
120/208V
NORMAL POWER
TRIPLE TUB
PANEL "RP-3B"
NEW REPLACEMENT
277/480V
NORMAL POWER
PANEL "LP-3B"
NEW REPLACEMENT
120/208V
EM-CRITICAL
BRANCH
TRIPLE TUB
PANEL "EP-3B"
NEW REPLACEMENT
277/480V
EM-CRITICAL POWER
PANEL "ELP-3B"
EXISTING 9-KVA FLOOR-MTD.
TRANSFORMER FOR
"ELLS-3B" TO REMAIN
EXISTING 277/480V
EM-LIFE SAFETY
PANEL "ELS-3B"
TO REMAIN
EXISTING 120/208V
EM-LIFE SAFETY
PANEL "ELLS-3B"
TO REMAIN
T-EP-3B
T-RP-3B
B
NC-A
P15
SEC
BD-1 BD-2 BD-3 BD-4
EXISTING BUS-DUCT
RISERS TO REMAIN
(SEE POW ER RISER
FOR ADDITIONAL
REQUIREMENTS)
TV-A
EXISTING RADIO
EQUIP. TO REMAIN
REMOVE EXISTING
120/208V
NORMAL POWER
DOUBLE-TUB
PANEL "RP-3C"
REMOVE EXISTING
120/208V
EM-CRITICAL BRANCH
PANEL "EP-3C"
REMOVE EXISTING
STACKING TRANSFORMERS
TOP-"T2" FOR "EP-3C" (30-KVA)
TOP-"T4" FOR "RP-3C" (30-KVA)
EXISTING 9-KVA FLOOR-MTD.
TRANSFORMER FOR
"ELLS-3C" TO REMAIN
REMOVE EXISTING
277/480V
NORMAL POWER
PANEL "LP-3C"
REMOVE
ABANDONED
REMOVE EXISTING
277/480V
EM-CRITICAL POW ER
PANEL "ELP-3C"
EXISTING
PACS
TO REMAIN
EXISTING
TO REMAIN
EXISTING 120/208V
EM-LIFE SAFETY
PANEL "ELLS-3C"
TO REMAIN
EXISTING 277/480V
EM-LIFE SAFETY
PANEL "ELS-3C"
TO REMAIN
P26
P26
P26
P26B
REMOVE ABANDONED
CABINET
REMOVE EXISTING
120/208V
EM-CRITICAL BRANCH
PANEL "EP-3B"
EXISTING 277/480V
EM-LIFE SAFETY
PANEL "ELS-3B"
TO REMAIN
EXISTING 120/208V
EM-LIFE SAFETY
PANEL "ELLS-3B"
TO REMAIN
REMOVE EXISTING
277/480V
EM-CRITICAL POWER
PANEL "ELP-3B"
REMOVE EXISTING
120/208V
NORMAL POWER
TRIPLE TUB
PANEL "RP-3B"
REMOVE EXISTING
STACKING TRANSFORMERS
TOP-"T5" FOR "RP-3B" (30-KVA)
REMOVE EXISTING
277/480V
NORMAL POWER
PANEL "LP-3B"
EXISTING 9-KVA FLOOR-MTD.
TRANSFORMER FOR
"ELLS-3B" TO REMAIN
P26
P26
P26
P26
B
ELEC. RM.
3A-340
EXISTING
STACKING TRANSFORMERS
TOP-"T3" FOR "EP-3A" (30-KVA)
TOP-"T6" FOR "RP-3A" (30-KVA)
TO REMAIN
EXISTING
120/208V
NORMAL POWER
DOUBLE-TUB
PANEL "RP-3A"
TO REMAIN
EXISTING
277/480V
NORMAL POWER
PANEL "LP-3A"
TO REMAIN
EXISTING
120/208V
EM-CRITICAL BRANCH
PANEL "EP-3A"
TO REMAIN
EXISTING 277/480V
EM-LIFE SAFETY
PANEL "ELS-3A"
TO REMAIN
EXISTING 120/208V
EM-LIFE SAFETY
PANEL "ELLS-3A"
TO REMAIN
EXISTING 9-KVA FLOOR-MTD.
TRANSFORMER FOR
"ELLS-3A" TO REMAIN
EXISTING
277/480V
EM-CRITICAL POW ER
PANEL "ELP-3A"
TO REMAIN
B
7.77.6
C
D
C
D
7.7
NAC
SEC
NC-A
AMP
TV-A.
C/S
C/S
E .
E
E
E
E
E
E
E
E
E
E
P6
P7
IT
3A-303
BIOMED
3A-302
E
E
PHILLIPS
TELEM. RACK
T-MON
-87EP-3B
-86EP-3B
-85EP-3B
-89,91EP-3B
-88EP-3B
-97RP-3B
-98RP-3B
-92EP-3B
-98EP-3B
-95EP-3B
-96EP-3B
-2ELLS-3B
-94EP-3B
-93EP-3B
-99RP-3B
FIRE ALARM
3B
(2) STACKING PACS
3B
NURSE CALL
3B
PAGING
3B
CATV
3B
C
D
7.7
P4
P4
P3
IDF
DATA
RACKS
P5
NACFIRE ALARM
3B
PACS
3B
SEC
NC-A
NURSE CALL
3B
AMP
PAGING
3B TV-A
CATV
3B
TEL
NEW BACKBOARD AT
ROOM PERIMETER
TEL
NEW BACKBOARD AT
ROOM PERIMETERIT
3A-303
BIOMED
3A-302
W
C
D
7.7
P28
3' - 0"
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\b k a rc h e r\
D o c u m e n ts
\V M
W V
-0 -E
-R b k a rc h e rR U
V A
B .r v t
/5
/2
:4
:0
P
M
ES502.
ENLARGED PLANS
510 BUTLER AVENUE MARTINSBURG, WV 25405
04/07/2021 PDY BBK
BID DOCUMENTS
FULLY
SPRINKLERED
GENERAL NOTES (LIGHTING):
A. REFER TO THE ARCHITECT'S REFLECTED CEILING PLANS, ELEVATIONS,
AND CASEW ORK DETAILS FOR EXACT LOCATIONS OF ALL W ALL AND
CEILING MOUNTED ELECTRICAL DEVICES.
B. CONTRACTOR SHALL FOLLOW BRANCH CIRCUITING LAY-OUT, AS
INDICATED ON THE FLOOR PLANS, W ITH A MAXIMUM OF THREE (3)
BRANCH CIRCUITS PER HOMERUN. EACH BRANCH CIRCUIT SHALL BE
PROVIDED W ITH A DEDICATED NEUTRAL CONDUCTOR. DEDICATED
NEUTRAL CONDUCTORS SHALL BE CONSIDERED CURRENT
CARRYING. IF ADDITIONAL CONDUCTORS ARE RAN IN THE SAME
CONDUIT W ITH THOSE INDICATED, CONTRACTOR SHALL DERATE ALL
CURRENT CARRYING CONDUCTORS PER N.E.C. #310.15(B)(3), AND
UPSIZE CONDUIT AS REQUIRED PER N.E.C. #300.17 AND ANNEX
C. MULTIW IRE BRANCH CIRCUITS AS DEFINED IN N.E.C #100 / 210.4
(CIRCUITS SHARING A COMMON NEUTRAL CONDUCTOR) SHALL NOT BE
PERMITTED.
C. ALL DEVICE COVERPLATES SHALL BE #302 STAINLESS STEEL. IDENTIFY
THE PANEL AND CIRCUIT NUMBER FOR ALL RECEPTACLES, SW ITCHES,
ETC. IN AREA OF CONSTRUCTION. PROVIDE CLEAR ADHESIVE LABELS
W ITH BLACK LETTERING. IN HEALTHCARE FACILITIES, ENGRAVE
EMERGENCY DEVICE COVERPLATES IN PATIENT CARE AREAS. ALSO,
MARK INSIDES OF ALL DEVICE BOXES W ITH PANEL AND CIRCUIT
NUMBER.
D. LOCATE CHAIN-HUNG INDUSTRIAL FIXTURES IN MECHANICAL ROOMS TO
AVOID DUCTW ORK AND PIPING, TO MAXIMIZE AVAILABLE LIGHT. SPACE
AROUND EQUIPMENT, AIR HANDLERS, ETC. TO PROVIDE ADEQUATE
LIGHTING TO ALL AREAS OF ROOM. PROVIDE ADDITIONAL FIXTURES OF
SAME TYPE AS NEEDED TO FULFILL THIS REQUIREMENT.
E. LOCATE EXIT SIGNS FOR MAXIMUM VIEW ING AREA TO IDENTIFY EGRESS
PATHS AS INDICATED ON PLANS. COORDINATE LOCATIONS SUCH THAT
ARCHITECTURAL FEATURES OR EQUIPMENT FROM OTHER TRADES DO
NOT OBSTRUCT VIEW .
F. W HERE EXIT SIGNS OR EMERGENCY BATTERY PACKS ARE PROVIDED,
THEY SHALL BE CONNECTED TO AN UNSW ITCHED LINE.
G. LUMINAIRES INDICATED W ITH MULTI-LEVEL SW ITCHING SHALL HAVE
SIMILAR LAMPS CONTROLLED TOGETHER, I.E. INBOARD AND OUTBOARD
LAMPS OR RIGHT AND LEFT HAND LAMPS.
H. ALL LIGHTING FIXTURE LENSES, PARABOLIC LOUVERS, DOW NLIGHTING
ALZAK CONES AND "PARACUBE" LOUVERS SHALL BE HANDLED W ITH
COTTON GLOVES DURING INSTALLATION AND LAMPING TO AVOID
FINGERPRINTS OR DIRT DEPOSITS. IT IS PREFERRED THAT FIXTURES
BE SHIPPED AND INSTALLED W ITH CLEAR PLASTIC BAGS TO PROTECT
LOUVERS. AT CLOSE OF PROJECT, AND AFTER CONSTRUCTION AIR
FILTERS ARE CHANGED, REMOVE BAGS. ANY LOUVER OR CONE
SHOW ING DIRT OR FINGER PRINTS SHALL BE CLEANED W ITH SOLVENT
RECOMMENDED BY THE MANUFACTURER, OR REPLACED AS
NECESSARY IN ORDER TO TURN OVER TO THE OW NER NEW FIXTURES
AT OCCUPANCY.
I. RECESSED LUMINAIRES SHALL BE SECURED SUCH THAT THE FORCE
REQUIRED INSERTING LAMPS, TRIMS, LENSES, LOUVERS, OR DOOR
FRAMES DOES NOT SHIFT HOUSING. ALL TRIMS SHALL BE COMPLETELY
FLUSH W ITH FINISHED CEILINGS AT COMPLETION OF CONSTRUCTION.
J. CONTRACTOR SHALL PROVIDE UNSW ITCHED CONDUCTOR TO ALL EXIT
SIGNS, EMERGENCY INVERTER BATTERY PACKS, AND NIGHT LIGHTS AS
REQUIRED.
TAGGED NOTES
P3 ROUTE ALL NEW DATA/VOICE CABLING ON PROJECT TO NEW
"IDF" CLOSET UNLESS OTHERWISE NOTED
P4 PROVIDE TWO ROWS OF FOUR 4" CONDUIT SLEEVES
THROUGH WALL TO CABLING PATH - SEE DETAILS (TYPICAL)
P5 LADDER TYPE CABLE TRAY OVER EQUIPMENT RACKS - SEE
DETAIL
P6 PROVIDE NEMA #L14-30R RECEPTACLE FOR DATA RACK 6-KVA
UPS UNIT.
P7 MOUNT RECEPTACLES INDICATED ON TO CABLE TRAY AS
REQUIRED - SEE SYSTEMS PLAN
P15 REMOVE ALL EXISTING CABLING, CONDUIT, SYSTEM
COMPONENTS, RACKS, CABLING PATHS, ETC. AT EXISTING
TELEPHONE CLOSET ASSOCIATED WITH DEMOLITION WORK
ON THIS PROJECT. THE ONLY CABLING OR COMPONENTS TO
REMAIN SHALL BE ITEMS THAT PROVIDE SERVICE TO AREAS
OUTSIDE THE PROJECT LIMITS.
P16 ROUTE 1 #10 GROUND CONDUCTOR IN 1/2'' CONDUIT
CONTINUOUSLY AROUND ROOM (FULL CIRCLE) CONNECTING
TO ALL PANELBOARD GROUND BARS IN ROOM AS REQUIRED
BY N.E.C. #517.14. CONTRACTOR SHALL ALSO SUBMIT
DETAILED ''DIMENSIONED'' SHOP DRAWINGS OF ELECTRIC
ROOMS INDICATING PANELBOARD LOCATIONS,
TRANSFORMER LOCATIONS, DISCONNECT SWITCHES, ETC.
P26 REMOVE EXISTING POWER PANEL INDICATED AND PANEL
FEED COMPLETELY BACK TO SOURCE. FIELD VERIFY IF PANEL
HAS ANY DEVICES, LIGHTS, ETC. ON CIRCUITS THAT ARE TO
REMAIN. RE-ROUTE THESE CIRCUITS TO EXISTING/NEW
PANELS THAT ARE IN THE SAME AREA AS REQUIRED (UTILIZE
SPACES/SPARES IN THESE PANELS AS NECESSARY).
CONTRACTOR SHALL CAREFULLY DETERMINE EXTENT OF
WORK PRIOR TO DEMOLITION OF THE PANEL/PANEL FEEDER.
REFER TO PANEL DEMOLITION DETAIL ON ES802 AND POWER
RISER ON ES601.
P28 PROVIDE SIX (6) 4'' VERTICAL CONDUIT SLEEVES AT FLOOR
(INTO INTERSTITIAL SPACE BELOW). REFER TO SLEEVE DETAIL
ON DRAWING ES802. ONLY TWO WILL BE ACTIVE (FIBER +
ANALOG TO GD100A).
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
ENLARGED THIRD FLOOR "3C" ELECTRICAL
ROOM 300 - ELECTRICAL NEW W ORK
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
ENLARGED THIRD FLOOR "3B" ELECTRICAL
ROOM 346 - ELECTRICAL NEW W ORK
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
ENLARGED THIRD FLOOR "3C" ELECTRICAL
ROOM 300 - ELECTRICAL DEMOLITION
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
ENLARGED THIRD FLOOR "3B" ELECTRICAL
ROOM 346 - ELECTRICAL DEMOLITION
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
ENLARGED THIRD FLOOR "3A" ELECTRICAL
ROOM 348 - EXISTING
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
ENLARGED THIRD FLOOR "3B" IT AND
BIO-MED ROOMS - POW ER
2' 4' 16'8'0
1/4" = 1'-0"
12'1'
SCALE: 1/4" = 1'-0"
ENLARGED THIRD FLOOR "3B" IT AND
BIO-MED ROOMS - SYSTEMS
NOTE: SHOWN FOR REFERENCE ONLY. TO BE
REM…