This document outlines a federal contract opportunity for construction services. The Department of Veterans Affairs is seeking a prime contractor to renovate buildings 3A and 3B at the VA Medical Center in Martinsburg, West Virginia for a project estimated to cost between $10-20 million. Work includes general construction, alterations, removal of existing structures, millwork, permanently mounted equipment and interior finishes. The solicitation number is 36C24521B0008 and interested parties must register on SAM.gov, VetBiz.gov and DOL.gov/vets/vets4212.htm to be eligible for award. A pre-bid site visit will be held on June 9th and questions are due by June 17th. Bid opening will take place on July 14th. This is a 100% SDVOSB set-aside and only verified SDVOSB firms can submit bids.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 4 5 6
7 9
10 11
6.9
A
B
C D
E
F
7.7 8.3
B.6
EQUIPMENT STORAGE
3B-321
SOILED UTILITY
3B-319
WORK ROOM
3B-329
NURSE STATION
3B-314
CLEAN SUPPLIES
3B-310
STAFF LOCKER ROOM
3A-343A
STAFF LOUNGE
3A-343
WAITING
3A-301
RECEPTION
3A-344
FAMILY TOILET
3B-305
PUBLIC TOILET
3B-306
PATIENT ROOM
3B-307
OFFICE
3B-304
NURSE SUPERVISOR OFFICE
3B-303
NURSE MANAGER OFFICE
3B-301
PATIENT ROOM
3B-311
TOILET
3B-311A
PATIENT ROOM
3B-313
TOILET
3B-313A
PATIENT ROOM
3B-316
TOILET
3B-316A
PATIENT ROOM
3B-318
TOILET
3B-318A
PATIENT ROOM
3B-322
TOILET
3B-322A
PATIENT ISO ROOM
3B-326A
TOILET
3B-326B
PATIENT ISO ROOM
3B-327A
PATIENT ISO ROOM
3B-328A
TOILET
3B-330A
PATIENT ROOM
3B-331
PATIENT ROOM
3B-332
PATIENT ROOM
3B-333
TOILET
3B-335A
PATIENT ROOM
3B-336
PATIENT ROOM
3B-338
BARIATRIC PATIENT ROOM
3A-341
BARIATRIC TOILET
3A-341A
PATIENT ROOM
3A-337
TOILET
3A-337A
PATIENT ROOM
3A-335
TOILET
3A-335A
PATIENT ROOM
3A-334
TOILET
3A-334A
TELE. RM.
3A-300
ELEC. RM.
3A-345
TOILET
3B-309A
TOILET
3B-307A
TOILET
3B-327B
TOILET
3B-333A
TOILET
3B-336A
PATIENT ROOM
3B-324
TOILET
3B-324A
PATIENT ROOM
3B-320
TOILET
3B-320A
PATIENT ROOM
3B-317
TOILET
3B-317A
PATIENT ROOM
3B-315
TOILET
3B-315A
BARIATRIC PATIENT ROOM
3A-342
BARIATRIC TOILET
3A-342A
PATIENT ROOM
3A-339
TOILET
3A-339A
PATIENT ROOM
3A-336
TOILET
3A-336A
NURSE SUPERVISOR OFFICE
3B-302
NOURISHMENT
3B-334
MEDICATION ROOM
3B-312
ANTE ROOM
3B-325
ANTE ROOM
3B-326
ANTE ROOM
3B-327
ANTE ROOM
3B-328
CORRIDOR
C7
CORRIDOR
C9
CORRIDOR
C11
CORRIDOR
C6
CORRIDOR
C8
CORRIDOR
C10
CORRIDOR
C2
CORRIDOR
C5
H.A.C.
3B-308
STAFF TOILET
3B-337
PATIENT ROOM
3B-330
TOILET
3B-331A
TOILET
3B-332A
PATIENT ROOM
3B-335
TOILET
3B-338A
SAT. NURSE STATION
3B-323
PATIENT ROOM
3B-309
PATIENT ISO ROOM
3B-325A
TOILET
3B-325B
TOILET
3B-328B
SAT. NURSE STATION
3A-338
3" ø
E (F
P
1 1/4"ø E(FP) 1 1/4"ø E(FP)
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1 1/4"ø E(FP)
3" ø
E (F
P
3" ø
E (F
P
3" ø
E (F
P
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1/
4" ø
E (F
P
1 1/4"ø E(FP) 1 1/4"ø E(FP)
1 1/4"ø E(FP)
3" ø
E (F
P
1 1/4"ø E(FP)
2 1/2"ø E(FP)
3" ø
E (F
P
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1/
4" ø
E (F
P
1/
4" ø
E (F
P
3"ø E(FP) 3"ø E(FP)
1/
4" ø
E (F
P
1/
4" ø
E (F
P
RISER
RISER
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1 1/4"ø E(FP)
1"ø E(FP)
1 1/4"ø E(FP)
1 1/4"ø E(FP)
LEGEND: ALTERNATE DEDUCTS
EXCLUDE ALL WORK, FROM CEILING PLANE TO FLOOR
J E
S S
EDWA R DS
FA
R B
E R21735
P
RO
F E S S I O NA L E NG I N E
E
R
R E G I S T E R E
D
W E S T V I R G I N
I A
STATE OF
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\m h e a le y \D o c u m e n ts
\V M
W V
-0
-M
-R m h e a le y c m ta e g rs
.c o m
.r v t
/5
/2
:4
:0
P
M
FP101
THIRD FLOOR PLAN - 3B, FIRE
PROTECTION
510 BUTLER AVE.
04/07/2021 AJM ISR
BID DOCUMENTS
FULLY
SPRINKLERED
1/8" = 1'-0" FP101
1 THIRD FLOOR PLAN - 3B, FIRE PROTECTION
REFER TO ARCHITECTURAL DRAWINGS AND
OTHER DISCIPLINES FOR CEILING COORDINATION.
NORTH
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
REVISIONS: DATE:
ISSUE FOR BID 04/07/2021
G
CA
FP
ORL
RL
GW
FM
SAN
SS
VT
E(NAME)
ABAN(NAME)
O
A
V
FD-#
RD-#
P-#
TS
FS
PS
BALANCING VALVE (CIRCUIT SOLVER)
BALL VALVE
CHECK VALVE
FLOW SWITCH
PRESSURE SWTICH
TAMPER SWITCH
THERMOMETER
DOUBLE CHECK VALVE ASSEMBLY
PIPING UNION
COMPRESSED AIR
FIRE PROTECTION LINE
SANITARY WASTE PIPING TO GREASE TRAP
OVERFLOW ROOF LEADER PIPING
ROOF LEADER PIPING
FORCED MAIN
GAS LINE
PETE'S PLUG
POINT OF CONNECTION
LIMIT OF DEMOLITION
OS&Y (GATE) VALVE
PIPE ELBOW TURNING UP/TURNING DOWN
PIPE TEE TURNING UP/TURNING DOWN
MEDICAL AIR
ABOVE FINISHED FLOOR
ABOVE FINISHED ROOFAFR
AFF
A, AIR
CARBON DIOXIDECO2
DOMESTIC COLD WATERCW
EVACUATION (WASTE ANESTHETIC GAS DISPOSAL)EV
FIRE HOSE VALVE WITH CABINETFHV
FREEZE PROOF WALL HYDRANTFPWH
HOSE BIBBHB
DOMESTIC HOT WATERHW
INSIDE DIMENSIONID
IN ACCORDANCE WITHIAW
INVERT ELEVATIONIE
LINE PRESSURE ALARM (MEDICAL GAS AREA ALARM)LPA
MANHOLEMH
MULTI-SINGLE ALARM (MEDICAL GAS MASTER ALARM)MSA
NOT TO SCALENTS
NOT IN CONTRACTNIC
NORMALLY OPENNO
NORMALLY CLOSEDNC
OXYGENO, OX
OUTSIDE DIMENSIONOD
OPEN RECEPTACLEOR
TOP ELEVATIONTE
TYPICALTYP
UNLESS OTHERWISE NOTEDUON
SANITARY WASTE PIPING
STORM SEWER PIPING
VENT PIPING
EXISTING PIPING (THIN LINE)
ABANDONED EXISTING PIPING (THIN LINE)
DOMESTIC COLD WATER PIPING
DOMESTIC HOT WATER SUPPLY
DOMESTIC RECIRCULATING HOT WATER
CLEANOUT IN CEILING SPACE
FLOOR CLEANOUT
EXTERIOR CLEANOUT
SYMBOLS & ABBREVIATIONS
CAST IRONC.I.
DOWNDN
OVERFLOW ROOF LEADERORL
PRESSURE REDUCING VALVE (STEAM, WATER, OR GAS)PRV
POUNDS PER SQUARE INCHPSI
DOMESTIC RECIRCULATING HOT WATERRHW
ROOF LEADERRL
SOFT DOMESTIC COLD WATERSCW
SANITARY RISERSR
THRUST BLOCKTB
TRAP PRIMERTP
VACUUMV, VAC
VENT THRU ROOFVTR
OWNER FURNISHED, CONTRACTOR INSTALLEDOFCI
OWNER FURNISHED, OWNER INSTALLEDOFOI
CONTRACTOR FURNISHED, CONTRACTOR INSTALLEDCFCI
CO
CO
ECO
OXYGEN PIPING
MEDICAL AIR
VACUUM PIPING
FLOOR DRAIN DESIGNATOR
ROOF DRAIN DESIGNATOR
PLUMBING FIXTURE DESIGNATOR
XXX
X
EQUIPMENT TAG DESIGNATOR
PRESSURE REDUCING VALVE (STEAM, GAS, WATER, ETC.)
STRAINER
X TAGGED NOTE DESIGNATOR
X REVISION DESIGNATOR
SAFETY RELIEF VALVE
SAFETY RELIEF VALVE
LIMITED AREA SPRINKLER HEAD
VACUUM BREAKERV
X S
TEMPERATURE SENSOR
HOSE BIB
J E
S S
EDWA R DS
FA
R B
E R21735
P
RO
F E S S I O NA L E NG I N E
E
R
R E G I S T E R E
D
W E S T V I R G I N
I A
STATE OF
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\m h e a le y \D o c u m e n ts
\V M
W V
-0
-M
-R m h e a le y c m ta e g rs
.c o m
.r v t
/5
/2
:4
:5
P
M
P101
PLUMBING LEGEND - 3B
510 BUTLER AVE.
04/07/2021 AJM ISR
BID DOCUMENTS
FULLY
SPRINKLERED
PHASING NOTE:
A. THIS PROJECT INTERFACES EXTENSIVELY WITH EXISTING
BUILDING SERVICES. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO COORDINATE AND PHASE ALL TIE-INS AND
INTERRUPTIONS OF EXISTING SERVICES TO MINIMIZE OR
ELIMINATE DOWNTIME. AS AN EXAMPLE, MAIN GAS SERVICE,
WATER SERVICE, ELECTRICAL SERVICE, HVAC SERVICES, STEAM
GENERATION, ETC., WILL BE AFFECTED AND REPLACED OR
MOVED DURING THIS PROJECT. THE CONTRACTOR SHALL
INSTALL ALL NEW SERVICES AND EQUIPMENT AND HAVE THEM
TESTED AND FULLY AND RELIABLY FUNCTIONAL PRIOR TO
INTERRUPTING, RELOCATING OR REMOVING ANY EXISTING
SERVICES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
BARE ANY AND ALL COSTS ASSOCIATED WITH THIS PHASING,
INCLUDING TEMPORARY SERVICES, TEMPORARY RELOCATION,
PREMIUM TIME WORK, ETC. CONTRACTOR SHALL COORDINATE
ALL SAID WORK WITH THE CONTRACTING OFFICER AND
APPLICABLE UTILITIES PER THE CONTRACT DOCUMENTS.
PLUMBING GENERAL NOTES:
A. COORDINATE THE LOCATION OF DRAINS, THERMOSTATS, GAS
OUTLETS, ETC., WITH ALL CASEWORK EQUIPMENT,
MECHANICAL ROOM EQUIPMENT, ETC., PRIOR TO COMMENCING
INSTALLATION. WORK NOT SO COORDINATED SHALL BE
REMOVED AND PROPERLY INSTALLED AT THE EXPENSE OF THE
CONTRACTOR.
B. THE CONTRACTOR SHALL EXERCISE EXTREME CARE IN THE
COURSE OF THEIR WORK SO AS TO ENSURE THAT THEY DO
NOT INTERRUPT ANY EXISTING SERVICE. FOR SAFETY
PURPOSES, PAY PARTICULAR ATTENTION TO THIS PRECAUTION
RELATIVE TO NATURAL GAS AND ELECTRICAL LINES. VERIFY
THE LOCATION, SIZE, TYPE, ETC., OF EACH UNDERGROUND OR
OVERHEAD UTILITY. ALL WORK SHALL BE PERFORMED IN
ACCORD WITH ALL FEDERAL, STATE AND/OR LOCAL RULES,
REGULATIONS, STANDARD AND SAFETY REQUIREMENTS.
UTILITIES SHALL BE INSTALLED IN ACCORD WITH THE
APPLICABLE MUNICIPALITY OR UTILITY COMPANY STANDARDS.
IN ALL CASES, THE MOST STRINGENT REQUIREMENT SHALL
APPLY.
C. WHERE WORK IS REQUIRED ABOVE EXISTING LAY-IN, PLASTER
OR GYPSUM BOARD CEILINGS, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR REMOVAL AND REINSTALLATION (OR
REPLACEMENT, IF DAMAGED) OF ALL CEILING OR TILE AND
GRID MEMBERS NECESSARY TO PERFORM HIS WORK. NEW
TILE AND GRID SHALL MATCH THE SURROUNDING AREAS. ALL
PATCHING WORK SHALL MATCH ADJACENT SURFACES.
D. ALL NEW WORK SHALL BE HUNG FROM STRUCTURE, NOT FROM
THE WORK OF OTHER TRADES, WHETHER EXISTING OR NEW.
E. COORDINATE ALL WORK WITH PROJECT PHASING
REQUIREMENTS.
F. PATCH, REPAIR AND PAINT OR PROVIDE WALL COVERING FOR
(TO OWNER'S STANDARDS) EXISTING WALLS, CEILINGS, ETC.,
THAT ARE TO REMAIN IF DAMAGED DURING CONSTRUCTION.
REPAIRS SHALL MATCH ADJACENT SURFACES TO THE
SATISFACTION OF THE ARCHITECT AND OWNER.
G. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS
THAT MAY APPLY TO THE WORK UNDER THIS CONTRACT.
(CITY, COUNTY, LOCAL, FEDERAL, MUNICIPALITY, UTILITY
COMPANY, ETC.)
H. CONTRACTOR SHALL BE AWARE OF UNSEEN PLUMBING WORK
DURING DEMOLITION. IF ITEMS ARE UNCOVERED DURING
DEMOLITION THEN FIELD VERIFY THE USE OF THE ITEMS AND
PLAN AN ALTERNATE ROUTE TO RUN THESE ITEMS. THEN
CONTACT THE ENGINEERS TO REVIEW THE ROUTING.
I. WHERE FIRE PROOFING IS SPRAYED ON EXISTING STRUCTURE
ALL EXISTING CONDUITS, WATER, HYDRONIC, STEAM, CHILLED
WATER, FIRE PROTECTION LINES, MED GAS, ETC. SHALL BE
LOWERED TO BE BELOW FULL THICKNESS OF FIRE PROOFING
WITH NO INTERFERENCE.
J. ALL PENETRATIONS OF FIRE AND SMOKE RATED ASSEMBLIES
SHALL BE APPROPRIATELY FIRE STOPPED PER AN APPROVED
U.L. LISTED STANDARD. CONTRACTOR SHALL PAY PARTICULAR
ATTENTION TO INSULATED PIPING PENETRATIONS.
K. ALL WORK REQUIRING DOWNTIME OF ANY AREA IN THE
BUILDING SHALL BE SCHEDULED 2 WEEKS IN ADVANCE, AND
SHALL COMPLY WITH INTERIM LIFE SAFETY MEASURES.
L. ALL PIPING IN ROOMS WITH CEILINGS SHALL BE ABOVE CEILING
EXCEPT AS NOTED.
M. LOCATIONS OF PIPING AND EQUIPMENT ARE APPROXIMATE AND
SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. DO NOT
SCALE THE DRAWINGS.
N. ALL OFFSETS IN PIPING ARE NOT NECESSARILY SHOWN.
PROVIDE ADDITIONAL OFFSETS WHERE NECESSARY.
O. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY COMPANY
FEES OR OTHER COSTS THAT ANY UTILITY COMPANY MAY
REQUIRE TO COMPLETE THEIR WORK. (GAS, SEWER, WATER,
ETC.).
P. WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN
CONFLICT WITH ANY OTHER BUILDING SYSTEM, CONTACT THE
ENGINEERS BEFORE INSTALLATION. REFER ALSO TO
ARCHITECTURAL WALL INTERIOR AND EXTERIOR WALL
ELEVATIONS, CEILING HEIGHTS AND OTHER DETAIL OF THESE
DOCUMENTS.
Q. ANY VIBRATING, OSCILLATING OR OTHER NOISE OR MOTION
PRODUCING EQUIPMENT SHALL BE ISOLATED FROM
SURROUNDING SYSTEMS IN AN APPROVED MANNER. NOISY OR
STRUCTURALLY DAMAGING INSTALLATIONS SHALL BE
SATISFACTORILY REPLACED OR REPAIRED AT THE INSTALLING
CONTRACTOR'S EXPENSE. THE FINAL DECISION ON THE
SUITABILITY OF A PARTICULAR INSTALLATION'S ACCEPTABILITY
SHALL BE THAT OF THE ENGINEER.
R. DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR
EQUIPMENT FROM THAT USED AS BASIS OF DESIGN SHALL BE
THE RESPONSIBILITY OF THE PURCHASER OF THAT
EQUIPMENT. ANY PROVISIONS REQUIRED TO ACCOMMODATE A
DEVIATION, WHETHER APPROVED BY THE ENGINEERS OR NOT,
SHALL BE THE RESPONSIBILITY OF THE PURCHASER.
S. VALVES, BALANCING DAMPERS OR ANY
MECHANICAL/ELECTRICAL ITEM REQUIRING ACCESS SHALL NOT
BE LOCATED ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE,
THEN AN APPROPRIATELY SIZED ACCESS DOOR SHALL BE
PLACED UNDER THE ITEM TO ALLOW EASY MAINTENANCE AND
ADJUSTMENT. ADDITIONALLY ALL SUCH ITEMS SHALL NOT BE
LOCATED AN UNREASONABLE DISTANCE ABOVE THE CEILINGS.
IN GENERAL ALL SUCH ITEMS UNLESS INDICATED OTHERWISE
SHALL BE MOUNTED SIX TO TWELVE INCHES ABOVE THE
CEILING. IF IN DOUBT, CONTACT ENGINEER PRIOR TO
INSTALLING.
T. WHEN RUNNING ANY TYPE OF PIPING BELOW A FOOTER, OR IN
THE ZONE OF INFLUENCE THE PIPING SHALL BE BACKFILLED
WITH CEMENTITIOUS FLOWABLE FILL PER SPECIFICATIONS.
WHENEVER POSSIBLE, LOCATE PIPING OUTSIDE OF THE ZONE
OF INFLUENCE. THE ZONE OF INFLUENCE IS THE AREA UNDER
THE FOOTER WITHIN A 45 DEGREE ANGLE PROJECTING DOWN
FROM THE BOTTOM EDGE OF THE FOOTER OF ALL SIDES OF
THE FOOTER. ADDITIONALLY, GREASE TRAPS, MANHOLES,
VAULTS AND OTHER UNDERGROUND STRUCTURES SHALL BE
HELD AWAY FROM BUILDING WALLS FAR ENOUGH TO BE
OUTSIDE OF THE ZONE OF INFLUENCE.
U. WORK IN CONFINED AREAS SHALL BE IN ACCORDANCE WITH
THE OWNER'S SAFETY POLICY REQUIREMENTS.
PLUMBING DEMOLITION NOTES:
A. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR
AREAS IN WHICH THE CEILING IS REMAINING. THE CONTRACTOR IS
RESPONSIBLE FOR REMOVING THE EXISTING CEILING AS REQUIRED AND
REINSTALLATION. TEMPORARILY SUPPORT LIGHTS, DIFFUSERS, CEILING
ETC. REPLACE BROKEN CEILING TILES WITH NEW AT NO ADDITIONAL COST
TO OWNER. FIELED VERIFY EXACT REQUIREMENTS.
B. ALL OUTAGES SHALL BE SCHEDULED THROUGH THE PROJECT
REPRESENTATIVE FOR PROPER COORDINATION. A REQUEST FOR AN
OUTAGE SHALL BE SUBMITTED IN WRITING A MINIMUM OF TWO WEEKS IN
ADVANCE.
C. DURING SPRINKLER SYSTEM OUTAGES THE CONTRACTORS SHALL
PROVIDE FIRE WATCH OF AREAS WITH OUTAGES.
D. ALL WALLS AND FLOOR SLABS SHALL BE REPAIRED TO MATCH EXISTING
AND TO A LIKE NEW CONDITION. ALL RATED WALLS AND FLOOR SLABS
SHALL BE PATCHED AND REPAIRED TO MAINTAIN RATING.
E. ALL EXISTING BUILDING FINISHES SHALL BE PROTECTED DURING THE
DEMOLITION PHASE.
F. HEAVY DASHED LINES INDICATE ITEMS FOR REMOVAL (U.O.N) AND LIGHT
SOLID LINES INDICATE EXISTING ITEMS TO REMAIN.
G. COORDINATE DISPOSAL OF ALL FIXTURES, DEVICES, ETC. (INDICATED FOR
DEMOLITION) WITH THE OWNER.
TMV
PLUMBING FIXTURE SCHEDULE (BASIS OF DESIGN)
TAG MANUFACTURER MODEL FAUCET/VALVE MANUFACTURER FAUCET/VALVE MODEL
P104 AMERICAN STANDARD 3351.511 INTEGRAL INTEGRAL
P107
P401 AMERICAN STANDARD 0356.028 INTEGRAL INTEGRAL
P418 AMERICAN STANDARD 0356.015 CHICAGO FAUCETS 116.706.AB.1
AMERICAN STANDARD 3353.101.020 SLOAN 1150-1.6-DFB-SG
DESCRIPTION
WALL HUNG WATER CLOSET (MANUAL)
LAVATORY (MANUAL)
LAVATORY (SENSOR)
WALL HUNG WATER CLOSET (SENSOR)
P528 ELKAY PSR1716 CHICAGO FAUCETS 1100-GN8AE3-317ABKITCHEN SINK
3/4"
2"
2"
3/4"
1-1/2"
2"
E(HWR)
E(HW)
E(CW)
1-1/2"
1"
2"
1-1/2"
3/4"
2"
1/2"1-1/4"
1/2"
E(HWR)
E(HW)
E(CW)
E(HWR)
E(HW)
E(CW)
E(HWR)
E(HW)
E(CW)
E (H
W R
E
(H W
E
(C W
E (H
W R
)E (H
W
E (C
W
E(HWR)
E(HW)
E(CW)
E(HWR)
E(HW)
E(CW)
E(HWR)
E(HW)
E(CW)
E(HWR)
E(HW)
E(CW)
E(HWR)
E(HW)
E(CW)
E(HWR)
E(HW)
E(CW)
E(V)
E(V)
E (V
1/2"
1-1/2"
1-1/2"
3/4"
1/2"1-1/4"
2" 1"
2"
3/4"
1-1/2" 1" 1-1/2"
3/4" 1/2" 1-1/4" 3/4"
1-1/2" 2"
3/4"
1-1/4" 1-1/2"
3/4"
2"
1-1/2"
2"
1-1/2"
1-1/4" 1-1/2"
1-1/2"
1-1/2"
1" 1-1/2"
1-1/4"
2"
1-1/2"
1" 1-1/2"
1-1/2"
1-1/4"
2"
2"
1-1/4"
3/4"
1/2"
2"
1-1/4"
1/2"
3/4"
2-1/2" 1-1/2"
1-1/4" 1"
1-1/4"
2"
3/4"
1-1/2"
2-1/2"
3/4" 1/2"2"
2"
1-1/2"
1/2"
1/2"
1-1/2"
2-1/2" 1-1/2"1-1/4"
1/2" 1-1/2"
2"
1-1/2"
1-1/4"
2-1/2"
1/2"
2"
1-1/2"
1/2"
1-1/2"
1-1/4"
1-1/2"
3/4"
1-1/4" 3/4"
2"
1/2"
1-1/2" 1-1/2"
1/2"
1/2" 1/2"
2"
1/2"
2"
1/2"
1"
1/2"
1-1/2" 3/4"
1-1/2"
2" 2-1/2"3"
3/4"
1-1/2" 2"
2"
1-1/2"
1-1/4"
1/2"
2"
1/2"
3/4"
3/4"3/4"
2"
2-1/2"
3/4"
1-1/2"
2"
3/4"
1-1/2"
3/4"
1-1/2"
2-1/2"
3/4"
1-1/2"
3/4"
3/4"
1-1/2"
1/2"
1-1/2" 2-1/2"
3/4"
2"
1/2"
1-1/2"
1/2"
2"
1-1/2"
3/4"
1-1/2"
1-1/2"
3/4"
1/2"
3/4"
1-1/2"
3/4"2-1/2"1-1/2" 1-1/2" 2-1/2"
1/2"
1-1/2"1-1/2" 3/4"
1-1/2"
1-1/4"
1/2"
1 2 4 5 6
7 9
10 11
6.9
A
B
C D
E
F
7.7 8.3
B.6
EXISTING C/HW MAINS SERVE 3A, 3B, AND THE 4TH FLOOR. NEW C/HW MAINS
MUST BE INSTALLED PRIOR TO DEMOLITION OF THE C/HW MAINS.
P28
LEGEND: ALTERNATE DEDUCTS
EXCLUDE ALL WORK, FROM CEILING PLANE TO FLOOR
J E
S S
EDWA R DS
FA
R B
E R21735
P
RO
F E S S I O NA L E NG I N E
E
R
R E G I S T E R E
D
W E S T V I R G I N
I A
STATE OF
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\m h e a le y \D o c u m e n ts
\V M
W V
-0
-M
-R m h e a le y c m ta e g rs
.c o m
.r v t
/5
/2
:4
:1
P
M
PD101
THIRD FLOOR PLAN - 3B,
PLUMBING DEMOLITION PLAN
510 BUTLER AVE.
04/07/2021 AJM ISR
BID DOCUMENTS
FULLY
SPRINKLERED
1/8" = 1'-0" PD101
1 THIRD FLOOR PLAN - 3B, PLUMBING DEMOLITION PLAN
NORTH
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
KEY NOTES
P28 DEMOLISH EXISTING FIXTURE AND ASSOCIATED PIPING TO
EXTENTS SHOWN. (TYP)
E(SAN)
4"4"4"
2"
4"
E(SAN) E(SAN)
4" 4" 2"
4" 1-1/2"
4"1-1/2"4"
4"
2"2"4"1-1/2"
4"
E(SAN)
4"
3"
1-1/2"
4"
E(SAN) E(SAN)
4"
1-1/2"
2"
4" 2" 1-1/2"
4"
4" 1-1/2"4" 4" 4"
2"
4"
4" 4" 2" 4"
E(SAN)
4"4"
2"
2"
4"
4"
2" 3" 3"
4"
E(SAN)
2"
E (S
A N
1-1/2" 2" 4"
4"
4"
4"
E(SAN)
3"
1-1/2"
4"
4"
1-1/2"
4"
1-1/2"
4"
4" 4"
1-1/2"
4"
1-1/2"
4"
E(SAN) E(SAN)
4" 1-1/2"
1-1/2"
4"
E(SAN) E(SAN)
4" 4"
4"
1-1/2"
4"
4"
1-1/2"
1-1/2" 1-1/2"1-1/2"
4"
1-1/2"
4"
4"
1 2 4 5 6
7 9
10 11
6.9
A
B
C D
E
F
7.7 8.3
B.6
P28
LEGEND: ALTERNATE DEDUCTS
EXCLUDE ALL WORK, FROM CEILING PLANE TO FLOOR
J E
S S
EDWA R DS
FA
R B
E R21735
P
RO
F E S S I O NA L E NG I N E
E
R
R E G I S T E R E
D
W E S T V I R G I N
I A
STATE OF
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\m h e a le y \D o c u m e n ts
\V M
W V
-0
-M
-R m h e a le y c m ta e g rs
.c o m
.r v t
/5
/2
:4
:2
P
M
PD102
THIRD FLOOR PLAN - 3B,
PLUMBING UNDERFLOOR
510 BUTLER AVE.
04/07/2021 AJM ISR
BID DOCUMENTS
FULLY
SPRINKLERED
1/8" = 1'-0" PD102
1 THIRD FLOOR PLAN - 3B, PLUMBING UNDERFLOOR DEMOLITION
NORTH
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
KEY NOTES
P28 DEMOLISH EXISTING FIXTURE AND ASSOCIATED PIPING TO
EXTENTS SHOWN. (TYP)
E(MA)
E(O2)
E(VAC)
E(MA)
E(O2)
E(VAC)
E(MA)
E(O2)
E(VAC)
E(MA)
E(O2)
E(VAC)
E(MA)
E(O2)
E(VAC)
E(MA)
E(O2)
E(VAC)
E (M
A )E
(O 2)
E (V
A C
E (M
A )E
(O 2)
E (V
A C
E (M
A )E
(O 2)
E (V
A C
E(MA)
E(O2)
E(VAC)
E(MA)
E(O2)
E(VAC)
E (M
A
E (O
2) E
(V A
C
E (M
A )E
(O 2)
E (V
A C
E (M
A
E (O
2) E
(V A
C
E (M
A
E (O
2) E
(V A
C
E (M
A
E (O
2) E
(V A
C
E(MA)
E(O2)
E(VAC)
E(MA)
E(O2)
E(VAC)
E(MA)
E(O2)
E(VAC)
E(MA)
E(O2)
E(VAC)
E (M
A
E (O
2)E (V
A C
E (M
A
E (O
2) E
(V A
C
E (M
A
E (O
2)E (V
A C
E(MA)
E(O2)
E(VAC)
E (M
A
E (O
2) E
(V A
C
E (M
A )E
(O 2)
E (V
A C
1/2" 3/4"
1/2"
1" 3/4"
1/2" 3/4"
1/2" 3/4"
1"
1-1/4" 1/2"
1/2" 3/4"1/2"
1/2" 3/4"
1-1/4"
1/2"
1-1/2"
1/2"
1"
3/4"
1/2"
1-1/2"
3/4"
1-1/2"
3/4"
3/4"
1-1/2"
3/4"
1-1/4"
1/2"
1"
1/2" 3/4"
1/2" 3/4"
1/2"
3/4"
3/4"
2 1/2"ø E(VAC) UP
1 1/4"ø E(O2) UP/DN
3"ø E(VAC) DN
1 1/4"ø E(MA) UP/DN
1 2 4 5 6
7 9
10 11
6.9
A
B
C D
E
F
7.7 8.3
B.6
P15
P15 P15 P15 P15 P15 P15
P15 P15
P15 P15
P15
P15
P15 P15 P15
P15P15P15P15P15P15
P15P15
P16
P17
E(ZVB)
LEGEND: ALTERNATE DEDUCTS
EXCLUDE ALL WORK, FROM CEILING PLANE TO FLOOR
J E
S S
EDWA R DS
FA
R B
E R21735
P
RO
F E S S I O NA L E NG I N E
E
R
R E G I S T E R E
D
W E S T V I R G I N
I A
STATE OF
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\m h e a le y \D o c u m e n ts
\V M
W V
-0
-M
-R m h e a le y c m ta e g rs
.c o m
.r v t
/5
/2
:4
:3
P
M
PD103
THIRD FLOOR PLAN - 3B, MEDICAL
GAS DEMOLITION
510 BUTLER AVE.
04/07/2021 AJM JAA
BID DOCUMENTS
FULLY
SPRINKLERED
1/8" = 1'-0" PD103
1 THIRD FLOOR PLAN - 3B, MEDICAL GAS DEMOLITION
NORTH
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
KEY NOTES
P15 REMOVE EXISTING MEDICAL GAS INLETS/OUTLETS,
ASSOCIATED PIPING, AND HANGERS COMPLETE.
P16 REMOVE EXISTING AREA ALARM PANEL AND ASSOCIATED
SENSORS/TUBING COMPLETE.
P17 REMOVE EXISITNG ZONE VALVE BOX.
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
SS
S S
S S
S
S
S
1 1/4"ø E(MA) UP/DN
1 1/4"ø E(O2) UP/DN 2 1/2"ø E(VAC) UP
3"ø E(VAC) DN
1 1/2" MA
1 1/2" O2
2 1/2" VAC
1" MA1" O2
1 1/2" VAC
1/2" MA
1/2" O2
3/4" VAC
3/4" VAC
1/2" O2
1/2" MA3/4" VAC
1/2" O2 1/2" MA
1/2" MA
1/2" O2
3/4" VAC
1/2" MA
1/2" O2
3/4" VAC
1/2" MA
3/4" VAC
1/2" O2
3/4" VAC
1/2" O2
1/2" MA
1/2" MA
1/2" O2
3/4" VAC
1/2" MA
1/2" O2
3/4" VAC
1/2" MA
1/2" O2
3/4" VAC
1/2" MA
1/2" O2
3/4" VAC
1/2" MA
1/2" O2
3/4" VAC
1/2" MA
1/2" O2
3/4" VAC
1/2" MA
1/2" O2
3/4" VAC
ZVB-1
AAP-1
1 1/2" VAC
1" O2
1" MA
1 1/2" VAC
1" O2
1" MA
1 1/2" VAC
1" O2
1" MA
1/
2" V
A C
1" O
1"
M A
1" MA
1" O2
1 1/2" VAC
1" MA
1" O2
1 1/2" VAC
1 2 4 5 6
7 9
10 11
6.9
A
B
C D
E
F
7.7 8.3
B.6
E(MA)
E(O2)
E(VAC)
E(MA)
E(O2)
E(VAC)
P18
P18
E(ZVB)
P19
P19
P19 P19
P19
P19
P19
P19
P19
P19 P19
P19 P19 P19 P19
P19 P19
P19 P19
P19 P19 P19 P19 P19
P19 P19 P19
EQUIPMENT
STORAGE
3B-321
SOILED UTILITY
3B-319
WORK ROOM
3B-329
NURSE STATION
3B-314 CLEAN SUPPLIES
3B-310
STAFF LOCKER ROOM
3A-343A
STAFF LOUNGE
3A-343
WAITING
3A-301
RECEPTION
3A-344
FAMILY TOILET
3B-305
PUBLIC TOILET
3B-306
PATIENT ROOM
3B-307
OFFICE
3B-304
NURSE SUPERVISOR
OFFICE
3B-303
NURSE MANAGER
OFFICE
3B-301
MECHANICAL ROOM
3B-300
PATIENT ROOM
3B-311
TOILET
3B-311A
PATIENT ROOM
3B-313
TOILET
3B-313A
PATIENT ROOM
3B-316
TOILET
3B-316A
PATIENT ROOM
3B-318
TOILET
3B-318A
PATIENT ROOM
3B-322
TOILET
3B-322A
PATIENT ISO ROOM
3B-326A
TOILET
3B-326B
PATIENT ISO ROOM
3B-327A
PATIENT ISO ROOM
3B-328A
TOILET
3B-330A
PATIENT ROOM
3B-331
PATIENT ROOM
3B-332
PATIENT ROOM
3B-333
TOILET
3B-335A
PATIENT ROOM
3B-336
PATIENT ROOM
3B-338
BARIATRIC PATIENT
ROOM
3A-341
BARIATRIC TOILET
3A-341A
PATIENT ROOM
3A-337
TOILET
3A-337A
PATIENT ROOM
3A-335
TOILET
3A-335A
PATIENT ROOM
3A-334
TOILET
3A-334A
TELE. RM.
3A-300
ELEC. RM.
3A-345
TOILET
3B-309A
TOILET
3B-307A
TOILET
3B-327B
TOILET
3B-333A
TOILET
3B-336A
PATIENT ROOM
3B-324
TOILET
3B-324A
PATIENT ROOM
3B-320
TOILET
3B-320A
PATIENT ROOM
3B-317
TOILET
3B-317A
PATIENT ROOM
3B-315
TOILET
3B-315A
BARIATRIC PATIENT
ROOM
3A-342
BARIATRIC TOILET
3A-342A
PATIENT ROOM
3A-339
TOILET
3A-339A
PATIENT ROOM
3A-336
TOILET
3A-336A
NURSE SUPERVISOR
OFFICE
3B-302
NOURISHMENT
3B-334MEDICATION ROOM
3B-312
ANTE ROOM
3B-325
ANTE ROOM
3B-326
ANTE ROOM
3B-327
ANTE ROOM
3B-328
CORRIDOR
C7
CORRIDOR
C9
CORRIDOR
C11
CORRIDOR
C6
CORRIDOR
C8
CORRIDOR
C10
ELEVATOR LOBBY
C1
CORRIDOR
C2
CORRIDOR
C5
H.A.C.
3B-308
STAFF TOILET
3B-337
PATIENT ROOM
3B-330
TOILET
3B-331A
TOILET
3B-332A
PATIENT ROOM
3B-335
TOILET
3B-338A
SAT. NURSE
STATION
3B-323
PATIENT ROOM
3B-309
PATIENT ISO ROOM
3B-325A
TOILET
3B-325B
TOILET
3B-328B
SAT. NURSE
STATION
3A-338
IT
3A-303
BIOMED
3A-302
NSF DIRTY TRAYS
3A-333
ELEC. RM.
3A-340
P30
P30P30P30P30 P30
P30 P30
P30
P30 P30 P30
P30
P30 P30
LEGEND: ALTERNATE DEDUCTS
EXCLUDE ALL WORK, FROM CEILING PLANE TO FLOOR
J E
S S
EDWA R DS
FA
R B
E R21735
P
RO
F E S S I O NA L E NG I N E
E
R
R E G I S T E R E
D
W E S T V I R G I N
I A
STATE OF
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\m h e a le y \D o c u m e n ts
\V M
W V
-0
-M
-R m h e a le y c m ta e g rs
.c o m
.r v t
/5
/2
:4
:5
P
M
PG101
THIRD FLOOR PLAN - 3B, MEDICAL
GAS
510 BUTLER AVE.
04/07/2021 AJM JAA
BID DOCUMENTS
FULLY
SPRINKLERED
1/8" = 1'-0" PG101
1 THIRD FLOOR PLAN - 3B, MEDICAL GAS
NORTH
NORTH
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
KEY NOTES
P18 ROUTE NEW 1/2" MEDICAL AIR, 1/2" OXYGEN, AND 3/4" MEDICAL
VACUUM PIPING TO NEW BOOM CONNECTIONS.
P19 PROVIDE (1) OXYGEN, (1) MEDICAL AIR, (1) MEDICAL VACUUM,
AND (1) SLIDE. REFER TO ARCHITECTURAL DRAWINGS FOR
COORDINATION OF HEADWALL.
P30 NEW LOCKABLE MEDICAL GAS SERVICE BALL VALVE.
(TYPICAL)
P-401P-401
P-401
P-401P-401
P-401
P-401 P-401
P-104
P-104 P-104
P-104
P-104P-104P-104
P-107
P-418
P-107 P-418
P-107
P-418
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104 P-401
P-401
P-104
P-401
P-104
P-401P-401P-401
P-104 P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401 P-401
P-401
P-104 P-104
P-401
P-401 P-401P-401P-401
P-401
P-401
P-401 P-401 P-401
P-528
2"ø E(CW)
3/4"ø 3/4"ø
1 1/2"
1/2"
1 1/2"ø
1 1/2"ø
3/4"ø 3/4"ø
3/4"
3/4"ø
1 1/4"ø E(CW) 3/4"ø E(HW)
2 1/2"
2"
1 1/2"ø
3/ 4" ø
1/
2" ø
3" ø
3/4"ø 1 1/2"ø
3"ø
1/
2" H
W
3/ 4"
R H
W
1/
2" H
W
1/
2" C
W
2" CW
1" HW
1 1/2" HW
3/4" RHW
2" CW
1" HW
1 1/2" HW
3/4" RHW
2 1/2" HW
2 1/2" CW
2 1/2" CW2" CW
2" HW
2 1/2" HW
2" CW
2 1/2" HW
1" CW
1 1/4" CW
2" H
W
2" HW
1 2 4 5 6
7 9
10 11
6.9
A
B
C D
E
F
7.7 8.3
B.6
1/
2" C
W
1/
2" H
W
3/ 4"
R H
W
1/
2" H
W
1/
2" C
W
1 1/2" HW
P22
P22
P22
P22
P22
P23
P21
ALL4TH FLOOR PIPING BACKFED FROM NEW C/HW SYSTEM SHALL
HAVE SHUT OFF VALVES INSTALLED IN ACCESSIBLE LOCATIONS
IF VALVES DO NOT ALREADY EXIST.
P24
P24
P24
P24
P24
P24
P25
P24P21
2 1/2" HW
2 1/2" CW
1 1/2" CW
2" HW
2 1/2" CW
1 1/2" HW
3/4" HW
1" CW 1" CW
3/4" HW
1/2" HW 1/2" CW
2" VT
2" V
T
2" VT2 1/2" VT
1/
2" V
T
2" VT
2" VT
1/
2" V
T
2" VT
2 1/2" VT
1/
2" V
T
2" VT
1 1/2" VT
2" VT1 1/2" VT
1/
2" V
T
2" VT
1/
2" V
T
2" VT 2" VT
1/
2" V
T
2" VT
1/ 2"
C W
1/ 2"
H W
2" VT
1/
2" V
T
2" VT
3/ 4"
C W
3/ 4"
H W
1" C
W
1/2" CW
3/ 4"
H W
3/ 4"
C W
1" C
W
P24
EQUIPMENT STORAGE
3B-321
SOILED UTILITY
3B-319
WORK ROOM
3B-329
NURSE STATION
3B-314 CLEAN SUPPLIES
3B-310
STAFF LOCKER ROOM
3A-343A
STAFF LOUNGE
3A-343
WAITING
3A-301
RECEPTION
3A-344
FAMILY TOILET
3B-305
PUBLIC TOILET
3B-306
PATIENT ROOM
3B-307
OFFICE
3B-304
NURSE SUPERVISOR OFFICE
3B-303
NURSE MANAGER OFFICE
3B-301
MECHANICAL ROOM
3B-300
PATIENT ROOM
3B-311
TOILET
3B-311A
PATIENT ROOM
3B-313
TOILET
3B-313A
PATIENT ROOM
3B-316
TOILET
3B-316A
PATIENT ROOM
3B-318
TOILET
3B-318A
PATIENT ROOM
3B-322
TOILET
3B-322A
PATIENT ISO ROOM
3B-326A
TOILET
3B-326B
PATIENT ISO ROOM
3B-327A
PATIENT ISO ROOM
3B-328A
TOILET
3B-330A
PATIENT ROOM
3B-331
PATIENT ROOM
3B-332
PATIENT ROOM
3B-333
TOILET
3B-335A
PATIENT ROOM
3B-336
PATIENT ROOM
3B-338 BARIATRIC PATIENT ROOM
3A-341
BARIATRIC TOILET
3A-341A
PATIENT ROOM
3A-337
TOILET
3A-337A
PATIENT ROOM
3A-335
TOILET
3A-335A
PATIENT ROOM
3A-334
TOILET
3A-334A
TELE. RM.
3A-300
ELEC. RM.
3A-345
TOILET
3B-309A
TOILET
3B-307A
TOILET
3B-327B
TOILET
3B-333A
TOILET
3B-336A
PATIENT ROOM
3B-324
TOILET
3B-324A
PATIENT ROOM
3B-320
TOILET
3B-320A
PATIENT ROOM
3B-317
TOILET
3B-317A
PATIENT ROOM
3B-315
TOILET
3B-315A
BARIATRIC PATIENT ROOM
3A-342
BARIATRIC TOILET
3A-342A
PATIENT ROOM
3A-339
TOILET
3A-339A
PATIENT ROOM
3A-336
TOILET
3A-336A
NURSE SUPERVISOR OFFICE
3B-302
NOURISHMENT
3B-334
MEDICATION ROOM
3B-312
ANTE ROOM
3B-325
ANTE ROOM
3B-326
ANTE ROOM
3B-327
ANTE ROOM
3B-328
CORRIDOR
C7
CORRIDOR
C9
CORRIDOR
C11
CORRIDOR
C6
CORRIDOR
C8
CORRIDOR
C10
ELEVATOR LOBBY
C1
CORRIDOR
C2
CORRIDOR
C5
H.A.C.
3B-308
STAFF TOILET
3B-337
PATIENT ROOM
3B-330
TOILET
3B-331A
TOILET
3B-332A
PATIENT ROOM
3B-335
TOILET
3B-338A
SAT. NURSE STATION
3B-323
PATIENT ROOM
3B-309
PATIENT ISO ROOM
3B-325A
TOILET
3B-325B
TOILET
3B-328B
SAT. NURSE STATION
3A-338
IT
3A-303
BIOMED
3A-302
NSF DIRTY TRAYS
3A-333
ELEC. RM.
3A-340
ELEC. ROOM
ELEC. ROOM
ELEC. ROOM
CORRIDOR
C4
LEGEND: ALTERNATE DEDUCTS
EXCLUDE ALL WORK, FROM CEILING PLANE TO FLOOR
J E
S S
EDWA R DS
FA
R B
E R21735
P
RO
F E S S I O NA L E NG I N E
E
R
R E G I S T E R E
D
W E S T V I R G I N
I A
STATE OF
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\m h e a le y \D o c u m e n ts
\V M
W V
-0
-M
-R m h e a le y c m ta e g rs
.c o m
.r v t
/5
/2
:4
:1
P
M
PP101
THIRD FLOOR PLAN - 3B,
PLUMBING
510 BUTLER AVE.
04/07/2021 AJM ISR
BID DOCUMENTS
FULLY
SPRINKLERED
1/8" = 1'-0" PP101
1 THIRD FLOOR PLAN - 3B, PLUMBING
NORTH
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
KEY NOTES
P21 1"CW AND 1/2"HW DOWN IN WALL. 1"CW TO WC AND 1/2"H&CW
TO SHOWER. (TYP FOR ALL PATIENT RESTROOMS)
P22 CONNECT NEW DOMESTIC WATER PIPING TO EXISTING PIPING
SERVING 3A WING.
P23 CONNECT PIPING INTO MAINS IN CHASE. PROVIDE FLOOR
ISOLATION VALVES IN ACCESSIBLE AREA.
P24 C/HW PIPING UP TO FOURTH FLOOR.
P25 SHOWER HEAD IN PATIENT RESTROOMS SHALL BE P-701 IN
SPECIFICATIONS. (TYP)
P-401P-401
P-401
P-401P-401
P-401
P-401 P-401
P-104
P-104 P-104
P-104
P-104P-104P-104
P-107
P-418
P-107 P-418
P-107
P-418
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104 P-401
P-401
P-104
P-401
P-104
P-401P-401P-401
P-104 P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401
P-104
P-401 P-401
P-401
P-104 P-104
P-401
P-401 P-401P-401P-401
P-401
P-401
P-401 P-401 P-401
P-528
1 2 4 5 6
7 9
10 11
6.9
A
B
C D
E
F
7.7 8.3
B.6
FD-B FD-B FD-B FD-B FD-B FD-B FD-B FD-B FD-B FD-B FD-B
FD-BFD-BFD-BFD-BFD-BFD-BFD-BFD-BFD-BFD-BFD-B
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" S
A N
3" S
A N
3" S
A N
3" S
A N
3" S
A N
2" S
A N
2" S
A N
2" S
A N
2" S
A N
3" S
A N
3" S
A N
4" SAN 4" SAN4" SAN2" SAN4" SAN
4" SAN
4" SAN 2" SAN
4" SAN
3" S
A N
3" S
A N
3" S
A N
4" SAN 2" SAN
4" SAN
2" SAN
4" S
A N
4" SAN
4" SAN 4" SAN
2" S
A N
3" S
A N
2" S
A N
2" S
A N
4" SAN4" SAN
2" S
A N
3" S
A N
2" S
A N
2" S
A N
3" S
A N
2" SAN
4" SAN 4" SAN 4" SAN 4" SAN 4" SAN 4" SAN
4" SAN 4" SAN
3" S
A N
2" S
A N
3" S
A N
2" S
A N
2" S
A N
2" S
A N
4" SAN 4" SAN 4" SAN4" SAN4" SAN4" SAN
4" SAN 4" SAN
EQUIPMENT STORAGE
3B-321
SOILED UTILITY
3B-319
WORK ROOM
3B-329
NURSE STATION
3B-314
CLEAN SUPPLIES
3B-310
STAFF LOCKER ROOM
3A-343A
STAFF LOUNGE
3A-343
WAITING
3A-301
RECEPTION
3A-344
FAMILY TOILET
3B-305
PUBLIC TOILET
3B-306
PATIENT ROOM
3B-307
OFFICE
3B-304
NURSE SUPERVISOR OFFICE
3B-303
NURSE MANAGER OFFICE
3B-301
MECHANICAL ROOM
3B-300
PATIENT ROOM
3B-311
TOILET
3B-311A
PATIENT ROOM
3B-313
TOILET
3B-313A
PATIENT ROOM
3B-316
TOILET
3B-316A
PATIENT ROOM
3B-318
TOILET
3B-318A
PATIENT ROOM
3B-322
TOILET
3B-322A
PATIENT ISO ROOM
3B-326A
TOILET
3B-326B
PATIENT ISO ROOM
3B-327A
PATIENT ISO ROOM
3B-328A
TOILET
3B-330A
PATIENT ROOM
3B-331
PATIENT ROOM
3B-332
PATIENT ROOM
3B-333
TOILET
3B-335A
PATIENT ROOM
3B-336
PATIENT ROOM
3B-338
BARIATRIC PATIENT ROOM
3A-341
BARIATRIC TOILET
3A-341A
PATIENT ROOM
3A-337
TOILET
3A-337A
PATIENT ROOM
3A-335
TOILET
3A-335A
PATIENT ROOM
3A-334
TOILET
3A-334A
TELE. RM.
3A-300
ELEC. RM.
3A-345
TOILET
3B-309A
TOILET
3B-307A
TOILET
3B-327B
TOILET
3B-333A
TOILET
3B-336A
PATIENT ROOM
3B-324
TOILET
3B-324A
PATIENT ROOM
3B-320
TOILET
3B-320A
PATIENT ROOM
3B-317
TOILET
3B-317A
PATIENT ROOM
3B-315
TOILET
3B-315A
BARIATRIC PATIENT ROOM
3A-342
BARIATRIC TOILET
3A-342A
PATIENT ROOM
3A-339
TOILET
3A-339A
PATIENT ROOM
3A-336
TOILET
3A-336A
NURSE SUPERVISOR OFFICE
3B-302
NOURISHMENT
3B-334
MEDICATION ROOM
3B-312
ANTE ROOM
3B-325
ANTE ROOM
3B-326
ANTE ROOM
3B-327
ANTE ROOM
3B-328
CORRIDOR
C7
CORRIDOR
C9
CORRIDOR
C11
CORRIDOR
C6
CORRIDOR
C8
CORRIDOR
C10
ELEVATOR LOBBY
C1
CORRIDOR
C2
CORRIDOR
C5
H.A.C.
3B-308
STAFF TOILET
3B-337
PATIENT ROOM
3B-330
TOILET
3B-331A
TOILET
3B-332A
PATIENT ROOM
3B-335
TOILET
3B-338A
SAT. NURSE STATION
3B-323
PATIENT ROOM
3B-309
PATIENT ISO ROOM
3B-325A
TOILET
3B-325B
TOILET
3B-328B
SAT. NURSE STATION
3A-338
IT
3A-303
BIOMED
3A-302
NSF DIRTY TRAYS
3A-333
ELEC. RM.
3A-340
ELEC. ROOM
ELEC. ROOM
ELEC. ROOM
CORRIDOR
C4
3" SAN
2" SAN 3" SAN
ALL UNDERFLOOR PIPING IS INSTALLED IN
UNDERFLOOR PIPE LOFT.
REFER TO ARCHITECTURAL DRAWINGS
FOR FLOOR DRAIN DETAIL.
LEGEND: ALTERNATE DEDUCTS
EXCLUDE ALL WORK, FROM CEILING PLANE TO FLOOR
J E
S S
EDWA R DS
FA
R B
E R21735
P
RO
F E S S I O NA L E NG I N E
E
R
R E G I S T E R E
D
W E S T V I R G I N
I A
STATE OF
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\m h e a le y \D o c u m e n ts
\V M
W V
-0
-M
-R m h e a le y c m ta e g rs
.c o m
.r v t
/5
/2
:4
:3
P
M
PP102
THIRD FLOOR PLAN - 3B,
PLUMBING UNDERFLOOR
510 BUTLER AVE.
04/07/2021 AJM ISR
BID DOCUMENTS
FULLY
SPRINKLERED
1/8" = 1'-0" PP102
1 THIRD FLOOR PLAN - 3B, PLUMBING UNDERFLOOR
NORTH
0' 4' 8' 16'
SCALE 1/8" = 1'-0"
KEY NOTES
2" SAN
3" SAN
4" SAN
4" SAN3" SAN
2" SAN
3" SAN
2" SAN
4" SAN
4" SAN
3" SAN
4" SAN
2" SAN
2" SAN
3" SAN
4" SAN
4" SAN
4" SAN
4" SAN
3" SAN2" SAN
2" SAN
3" SAN
4" SAN
4" SAN
2" VT
2" VT
2" VT
2" VT
2" VT
2" VT
1 1/2" VT
1 1/2" VT
2" VT
2 1/2" VT
2 1/2" VT
2" VT
2" VT
1 1/2" VT
1 1/2" VT
2" VT2" VT
2" VT
2" VT
2" VT
1 1/2" VT
2" VT
1 1/2" VT
1 1/2" VT
2" SAN
2" SAN
2" VT
2" VT
4" SAN
4" SAN
2" SAN
3" SAN
4" SAN
2" SAN
4" SAN
4" SAN
4" SAN
3" SAN
2" SAN
2" SAN
3" SAN
4" SAN
4" SAN4" SAN3" SAN
2" SAN
2" SAN
3" SAN
4" SAN
4" SAN
4" SAN
3" SAN
2" SAN
2" SAN
2" SAN
3" SAN
4" SAN
4" SAN
2" VT
1 1/2" VT
1 1/2" VT
2" VT
2" VT
2" VT
4" SAN
3" SAN
2" SAN
4" SAN
4" SAN
3" SAN
2" SAN
3" SAN
4" SAN
4" SAN
2" VT
2 1/2" VT
2" VT
2" VT
1 1/2" VT
2" VT
2" VT
2" VT
2" VT
1 1/2" VT
2" VT
1 1/2" VT
2" SAN 4" SAN
3" SAN
2" SAN
3" SAN
4" SAN
2" SAN
4" SAN
1 1/2" VT
2" VT
1 1/2" VT
1 1/2" VT 2" VT
2" VT
2" VT
2 1/2" VT
2" VT
2" VT
1 1/2" VT
1 1/2" VT
2" VT
1 1/2" VT
2" VT
2" VT
2" VT
1 1/2" VT
1 1/2" VT
2" VT
1 1/2" VT 2" VT
1 1/2" VT
2" VT
2" VT
2" VT
2 1/2" VT
2 1/2" VT
2" VT
2 1/2" VT
1 1/2" VT
1 1/2" VT
2" VT
2" VT
2" VT
2" VT
2" VT
2" VT
1 1/2" VT
2" VT
2" VT
2" SAN
3" SAN
4" SAN
3" SAN
4" SAN
1 1/2" VT
2" SAN
4" SAN
2" VT
2" VT
1 1/2" VT
2" VT
1 1/2" VT
2" VT
2" VT
2 1/2" VT
1 1/2" VT
3" SAN
3" SAN
4" SAN
3" SAN
4" SAN
2" SAN
3" SAN
4" SAN
2" SAN
2" VT
1 1/2" VT
1 1/2" VT 2" VT
2" VT
2" VT
2" VT
2 1/2" VT
2" VT
2" VT
1 1/2" VT
1 1/2" VT
2" VT
4" SAN
4" SAN
3" SAN 3" SAN
4" SAN
2" SAN
2" SAN
4" SAN
4" SAN
3" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
3" SAN
4" SAN
3" SAN
4" SAN
2" SAN
2" SAN
2" SAN
4" SAN
4" SAN
2" SAN
P-401
P-104
P-401 P-401
P-401
P-401
P-104
P-401 P-401
P-104
P-104
P-401 P-401
P-104
P-104
P-104 P-401
P-401
P-401
P-401
P-401
P-104
P-104
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
FD-B
J E
S S
EDWA R DS
FA
R B
E R21735
P
RO
F E S S I O NA L E NG I N E
E
R
R E G I S T E R E
D
W E S T V I R G I N
I A
STATE OF
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\m h e a le y \D o c u m e n ts
\V M
W V
-0
-M
-R m h e a le y c m ta e g rs
.c o m
.r v t
/5
/2
:4
:5
P
M
PP201
PLUMBING WASTE AND VENT
ISOMETRIC
510 BUTLER AVE.
04/07/2021 Checker Author
BID DOCUMENTS
FULLY
SPRINKLERED
SCALE: NONE
PLUMBING WASTE AND VENT ISOMETRIC - B
J E
S S
EDWA R DS
FA
R B
E R21735
P
RO
F E S S I O NA L E NG I N E
E
R
R E G I S T E R E
D
W E S T V I R G I N
I A
STATE OF
13100 watertown plank road suite 200 elm grove, wi 53122
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Nagel Architects + Engineers project number:
BLDG 500 RENOVATE 3B 613-19-101
19026
CMTA CONSULTING ENGINEERS, INC.
10411 MEETING STREET,
PROSPECT, KY 40059
(502)326-3085
VOLUME BC
U s e rs
\m h e a le y \D o c u m e n ts
\V M
W V
-0
-M
-R m h e a le y c m ta e g rs
.c o m
.r v t
/5
/2
:4
:5
P
M
PQ101
PLUMBING DETAILS
510 BUTLER AVE.
04/07/2021 AJM ISR
BID DOCUMENTS
FULLY
SPRINKLERED
REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR FINISHES, TOILET ACCESSORIES, AND GRAB BARS.
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ACCH AIR COOLED CHILLER
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,
TWO POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BIW BACKWARD INCLINED WHEEL (FAN)
BR BOTTOM REGISTER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CHP CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CO CLEAN OUT
CO2 CARBON DIOXODE
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CSG CLEAN STEAM GENERATOR
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
E EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FC FLEXIBLE CONNECTION
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FLOOR REGISTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HOA HAND/OFF/AUTOMATIC
HF HEPA FILTER
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HW HOT WATER
HWC HOT WATER COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IS INSECT SCREEN
IV INLET VANES
J INTENTIALLY LEFT BLANK
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPS LOW PRESSURE STEAM
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAT RETURN AIR TEMPERATURE
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SI SQUARE INCHES
SP STATIC PRESSURE
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
ST STEAM TRAP
SV STEAM PRESSURE REDUCING VALVE
SWHX STEAM TO WATER HEAT EXCHANGER
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
U UNDERWRITERS LABORATORY
V VALVE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VSD VARIABLE SPEED DRIVE
W WATTS
Wb WET-BULB (TEMPERATURE)
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
HVAC ABBREVIATIONS
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
SECTION LETTER
DRAWING NUMBER WHERE SHOWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO. 3 IN BUILDING NO. 26
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED
ITEM (TERMINAL UNIT SHOWN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
SERVED BY AIR HANDLER UNIT NO. 1
H4
A
H7
26-SF-3
26-TU-I-I
DRAWING SYMBOLS
DUCTWORK SYMBOLS
UP
UP
UP
DN
DN
DN
SUPPLY DUCT (UP &
DOWN)
EXHAUST DUCT (UP &
DOWN)
RETURN DUCT (UP &
DOWN)
ROUND AND SQUARE CEILING
DIFFUSERS
LINEAR SLOT DIFFUSER
SUPPLY TOP REGISTER OR GRILLE (WALL
TYPE)
EXHAUST OR RETURN CEILING REGISTER OR
GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR
GRILLE (WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP
GRILLE (WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT
TAKE-OFF
CONNECT NEW DUCT TO EXISTING
DUCT
INCLINED RISE, IN DIRECTION OF AIR
FLOW
INCLINED DROP, IN DIRECTION OF AIR
FLOW
LIMIT OF
DEMOLITION
D
R
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN
IF SYMBOL IS MISSING)
VANED ELBOW (SHORT
RADIUS)
STANDARD RADIUS ELBOW (LONG
RADIUS)
10x8 NEW DUCT (INSIDE DIMENSIONS: WIDTH x
DEPTH)
EXISTING DUCT TO
REMAIN
EXISTING DUCT TO BE
REMOVED
FLEXIBLE DUCTWORK
(INSULATED)
MANUAL VOLUME
DAMPER
VD
N
SD
SMOKE DAMPER
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
STAINLESS STEEL DUCT
STANDARD BRANCH SUPPLY OR
RETURN,
NO SPLITTER (45° TAP)
DUCT MOUNTED COIL (HOT WATER OR STEAM COIL)
SUPPLY45°
RETURN45°
AV
MV
GENERAL PIPING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
FLOAT & THERMOSTATIC TRAP SET
INCLUDING PIPING ACCESSORIES SEE DETAIL
THERMOMETER
PRESSURE GAGE
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
PIPING SYMBOLS
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HIGH PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
CONDENSATE PUMP DISCHARGE
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
MAKE-UP WATER
DRAIN LINE
VENT LINE
CHEMICAL FEED
EXISTING PIPE TO BE REMOVED
V
D
MW
CHR
CHS
HWR
HWS
PC
CR-15
S-15
CR-30
S-30
CR-60
S-60
VALVE SYMBOLS
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN AND QUICK-
COUPLE HOSE CONNECTOR
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
WATER BALANCE DEVICE
CIRCUIT SETTER VALVE
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METERM
LC
PRESSURE DIFFERENTIAL
SWITCH
A
CONTROLS SYMBOLS
ROOM THERMOSTAT/TRANSMITTER - WALL
MOUNT
ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL
MOUNT
TEMPERATURE
TRANSMITTER
TEMPERATURE TRANSMITTER, AVERAGING
ELEMENT
MOISTURE (HUMIDITY)
TRANSMITTER
PRESSURE
TRANSMITTER
STATIC PRESSURE
SENSOR
FLOW
TRANSMITTER
CURRENT
TRANSMITTER
PRESSURE DIFFERENTIAL
TRANSMITTER
CONDUCTIVITY
TRANSMITTER
SMOKE
DETECTOR
HAND SWITCH (HAND-OFF-AUTO
SWITCH)
VALVE OR DAMPER POSITION
CONTROLLER
LOCAL RECORDING TIME CLOCK
(RUNTIME)
TEMPERATURE SWITCH, LOW
(FREEZESTAT)
TEMPERATURE SWITCH, HIGH
(FREEZESTAT)
LEVEL
CONTROLLER
LEVEL
TRANSMITTER
PRESSURE SWITCH
HIGH
PRESSURE SWITCH
LOW
ELECTRONIC TO PNEUMATIC
TRANSDUCER
CARBON DIOXIDE
TRANSMITTER
CARBON MONOXIDE
TRANSMITTER
OCCUPANCY
SENSOR
LOCAL TEMPERATURE CONTROL
PANEL
HVAC CONTROL
PANEL
VARIABLE SPEED MOTOR
CONTROLLER
INTEGRATE CONTROL POINT ON REMOTE
GRAPHICS WORKSTATION AT ENERGY CONTROL
CENTER
TEMPERATURE CONTROLLER. SEE SEQUENCE
OF OPERATION
PRESSURE CONTROLLER. SEE SEQUENCE
OF OPERATION
SPEED CONTROLLER. SEE SEQUENCE
OF OPERATION
FLOW CONTROLLER. SEE SEQUENCE
OF OPERATION
FLOW SWITCH
HIGH
FLOW SWITCH
LOW
TIME CLOCK CONTROLLING EQUIPMENT ON A
SCHEDULE
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm]
MINIMUM LENGTH IN DUCT WHEN
SPACE PERMITS.)
SENSOR WITH AVERAGING ELEMENT TO
TRANSMIT TEMPERATURE TO EMCS
MOTOR
STARTER
ELECTRIC OPERATED CONTROL DAMPER/OR
VALVE
M
KC
FSL
FSH
FC
SC
PC
TC
ECC
VSMC
HVAC
LTCP
OC
AT
CO
CO2
AT
AT
EPT
PSL
PSH
LT
LC
TSH
TSL
KR
ZC
HS
PDS
PDT
SD
CT
IT
FT
SPS
PT
MT
TT
TT
M
T
A. COORDINATE THE LOCATION OF DRAINS, THERMOSTATS, GAS
OUTLETS, ETC., WITH ALL CASEWORK EQUIPMENT, MECHANICAL ROOM
EQUIPMENT, ETC., PRIOR TO COMMENCING INSTALLATION. WORK NOT
SO COORDINATED SHALL BE REMOVED AND PROPERLY INSTALLED AT
THE EXPENSE OF THE CONTRACTOR.
B. THE CONTRACTOR SHALL EXERCISE EXTREME CARE IN THE COURSE
OF THEIR WORK SO AS TO ENSURE THAT THEY DO NOT INTERRUPT
ANY EXISTING SERVICE. FOR SAFETY PURPOSES, PAY PARTICULAR
ATTENTION TO THIS PRECAUTION RELATIVE TO NATURAL GAS AND
ELECTRICAL LINES. VERIFY THE LOCATION, SIZE, TYPE, ETC., OF EACH
UNDERGROUND OR OVERHEAD UTILITY. ALL WORK SHALL BE
PERFORMED IN ACCORD WITH ALL FEDERAL, STATE AND/OR LOCAL
RULES, REGULATIONS, STANDARD AND SAFETY REQUIREMENTS.
UTILITIES SHALL BE INSTALLED IN ACCORD WITH THE APPLICABLE
MUNICIPALITY OR UTILITY COMPANY STANDARDS. IN ALL CASES, THE
MOST STRINGENT REQUIREMENT SHALL APPLY.
C. WHERE WORK IS REQUIRED ABOVE EXISTING LAY-IN, PLASTER OR
GYPSUM BOARD CEILINGS, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR REMOVAL AND REINSTALLATION (OR REPLACEMENT, IF
DAMAGED) OF ALL CEILING OR TILE AND GRID MEMBERS NECESSARY
TO PERFORM HIS WORK. NEW TILE AND GRID SHALL MATCH THE
SURROUNDING AREAS. ALL PATCHING WORK SHALL MATCH
ADJACENT SURFACES.
D. ALL NEW WORK SHALL BE HUNG FROM STRUCTURE, NOT FROM THE
WORK OF OTHER TRADES, WHETHER EXISTING OR NEW.
E. COORDINATE ALL WORK WITH PROJECT PHASING REQUIREMENTS.
F. PATCH, REPAIR AND PAINT OR PROVIDE WALL COVERING FOR (TO
OWNER'S STANDARDS) EXISTING WALLS, CEILINGS, ETC., THAT ARE TO
REMAIN IF DAMAGED DURING CONSTRUCTION. REPAIRS SHALL
MATCH ADJACENT SURFACES TO THE SATISFACTION OF THE
ARCHITECT AND OWNER.
G. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS THAT
MAY APPLY TO THE WORK UNDER THIS CONTRACT. (CITY, COUNTY,
LOCAL, FEDERAL, MUNICIPALITY, UTILITY COMPANY, COMMONWEALTH
OF KENTUCKY, ETC.)
H. CONTRACTOR SHALL BE AWARE OF UNSEEN PLUMBING, HVAC AND
ELECTRICAL WORK DURING DEMOLITION. IF ITEMS ARE UNCOVERED
DURING DEMOLITION THEN FIELD VERIFY THE USE OF THE ITEMS AND
PLAN AN ALTERNATE ROUTE TO RUN THESE ITEMS. THEN CONTACT
THE ENGINEERS TO REVIEW THE ROUTING.
I. IF AREA OF CONSTRUCTION HAS A POST TENSION FLOOR SLAB.
CONTRACTOR SHALL USE ULTRA SOUND OR OTHER APPROVED
METHODS TO SURVEY THE EXISTING FLOOR STRUCTURE BEFORE
MAKING ANY AND ALL FLOOR PENETRATIONS.
J. WHERE FIRE PROOFING IS SPRAYED ON EXISTING STRUCTURE ALL
EXISTING CONDUITS, WATER, HYDRONIC, STEAM, CHILLED WATER,
FIRE PROTECTION LINES, MED GAS, ETC. SHALL BE LOWERED TO BE
BELOW FULL THICKNESS OF FIRE PROOFING WITH NO INTERFERENCE.
K. ALL PENETRATIONS OF FIRE AND SMOKE RATED ASSEMBLIES SHALL BE
APPROPRIATELY FIRE STOPPED PER AN APPROVED U.L. LISTED
STANDARD. CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO
INSULATED PIPING PENETRATIONS.
L. ALL WORK REQUIRING DOWNTIME OF ANY AREA IN THE BUILDING
SHALL BE SCHEDULED 2 WEEKS IN ADVANCE, AND SHALL COMPLY
WITH INTERIM LIFE SAFETY MEASURES.
M. ALL DUCTWORK, PIPING, CONDUITS, ETC. IN ROOMS WITH CEILINGS
SHALL BE ABOVE CEILING EXCEPT AS NOTED.
N. INSTALL AIR VENTS AT HIGH POINTS IN PIPING AND DRAINS IN LOW
POINTS. USE CARE TO AVOID FREEZING OF EXTERIOR VENTS.
O. LOCATIONS OF PIPING, DUCTS AND EQUIPMENT ARE APPROXIMATE
AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. DO NOT SCALE
THE DRAWINGS.
P. ALL OFFSETS IN DUCTS AND PIPING ARE NOT NECESSARILY SHOWN.
PROVIDE ADDITIONAL OFFSETS WHERE NECESSARY.
Q. COORDINATE ALL HVAC WORK WITH ELECTRICAL, PLUMBING AND
OTHER TRADES TO AVOID INTERFERENCE WITH PIPING, DUCTS,
CONDUIT AND OTHER EQUIPMENT.
R. INSTALL ALL PIPING, DUCTWORK AND EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTION. IF
IN CONFLICT WITH THE DESIGN INDICATED IN CONTRACT DOCUMENTS,
ADVISE THE ENGINEERS PRIOR TO INSTALLATION FOR CLARIFICATION.
PROVIDE RECOMMENDED ACCESS AND SERVICE CLEARANCES FOR
ALL EQUIPMENT.
S. SEAL AIRTIGHT AROUND ALL DUCTS AND PIPING PENETRATIONS
THROUGH WALLS, FLOORS AND ROOF. PROVIDE FIRE STOPPING IN
FIRE PARTITION.
T. SEAL ALL NEW DUCTWORK JOINTS WITH UNITED MCGILL, IRONGRIP
6O1 OR EQUAL WATER BASED SEALANT.
U. ALL MOTOR DRIVEN EQUIPMENT SHALL BE INSTALLED WITH FLEXIBLE
CONNECTIONS TO DUCTWORK, PIPING, ETC., UNLESS OTHERWISE
NOTED.
V. THE CONTRACTOR SHALL RELOCATE OR AVOID ANY EXISTING
EQUIPMENT APPURTENANCES, ETC., THAT CONFLICT WITH NEW
WORK.
W. WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT
WITH ANY OTHER BUILDING SYSTEM, CONTACT THE ENGINEERS
BEFORE INSTALLATION. REFER ALSO TO ARCHITECTURAL WALL
INTERIOR AND EXTERIOR WALL ELEVATIONS, CEILING HEIGHTS AND
OTHER DETAIL OF THESE DOCUMENTS.
X. DOUBLE WIDTH TURNING VANES SHALL BE INSTALLED IN ALL SUPPLY,
RETURN, AND EXHAUST DUCTWORK ELBOWS. TURNING VANES NOT
REQUIRED FOR KITCHEN EXHAUSTS.
Y. ANY VIBRATING, OSCILLATING OR OTHER NOISE OR MOTION
PRODUCING EQUIPMENT SHALL BE ISOLATED FROM SURROUNDING
SYSTEMS IN AN APPROVED MANNER. NOISY OR STRUCTURALLY
DAMAGING INSTALLATIONS SHALL BE SATISFACTORILY REPLACED OR
REPAIRED AT THE INSTALLING CONTRACTOR'S EXPENSE. THE FINAL
DECISION ON THE SUITABILITY OF A PARTICULAR INSTALLATION'S
ACCEPTABILITY SHALL BE THAT OF THE ENGINEER.
Z. DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT