S06 Drawings - Full Size Retro-Commissioning 12-02-20.pdf
PDF 36 MB Posted
- Attached to
- Z1DA--Retro-Commissioning Mechanical Corrections Federal contract opportunity
- Solicitation number
- 36C24421R0005
About this file
This document provides details on an upcoming federal contract opportunity for retro-commissioning mechanical corrections. The Veterans Integrated Service Network #04 Contracting Office/Lebanon Veteran Administration Medical Center will issue a Request for Proposal for construction services related to the Retro-Commissioning Mechanical Corrections project located at the Lebanon VA Medical Center in Pennsylvania. The contractor will provide all labor, materials, permits, licenses, tools, and supervision to complete the project in accordance with applicable codes, VA policies and standards, and contract terms within 545 calendar days of receiving the notice to proceed. The estimated construction cost is between $1,000,000 and $2,000,000. The solicitation will be issued on or around October 28, 2020 and set aside 100% for Service-Disabled Veteran Owned Small Businesses. Questions regarding the solicitation must be submitted in writing to the named contact by email. Respondents must be registered in SAM and verified in CVE at the time of proposal submission to be considered.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Retro-Commissioning Mechanical Corrections Lebanon VA Medical Center
Final Bid Documents Submission November 2019
Achieving swift results
Appendix A
100% Drawings
Provided as separate attachment
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
GI001
COVER SHEET
F i l e
P a t h
P
M
U.S. Department of
Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
RETRO-COMMISSIONING
MECHANICAL CORRECTION
Lebanon, PA
595-18-101
Revisions: Date:
Office of
Construction and
Facilities
Management
1100 CHURCH STREET HONESDALE, PA 18431
570-253-0846 OFFICE 570-253-1935 FAX
WWW.NEINFRA.COM
ALARES ENGINEERING 248 COPELAND
STREET, QUINCY, MA 02169 PHONE:
617-481-6390
WWW.ALARESENGINEERING.COM
NV5 70 FARGO STREET, SUITE
800, BOSTON, MA 02210 TEL:
857-221-5942
RETRO-COMMISSIONING MECHANICAL CORRECTIONS
PROJECT LOCATION
LEBANON VA MEDICAL CENTER
1700 SOUTH LINCOLN AVENUE
LEBANON, PENNSYLVANIA 17042
VA PROJECT NO.: 595-18-101
ARCHITECTS + ENGINEERS
ALARES ENGINEERING
248 COPELAND STREET
QUINCY, MASSACHUSETTS 02169
PHONE: 617-481-6390
WWW.ALARESENGINEERING.COM
LEBANON VA MEDICAL CENTER
SMHL / DMNovember 22, 2019
FINAL BID DOCUMENTS
SUBMISSION
FINAL BID DOCUMENTS
1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE OR ABOVE HARD SUSPENDED CEILING,
OR ACOUSTICAL CEILING.
2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN
OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL
VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS
PANELS SHALL BE FURNISHED AND INSTALLED UNDER THE
ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH
MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT
SERVED.
4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT
SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL
BE FOR FILTERS AT 50% LOADING.
5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT,
SEE STANDARD EQUIPMENT DETAILS.
6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE
NECK SIZES.
7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL
BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
ABBREVIATIONS
A/E ARCHITECT / ENGINEER
AC AIR CONDITIONER
ACCU AIR-COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,
TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AQST AQUASTAT
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE AS AIR
SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR CONDITIONING
ENGINEERS
AXF AXIAL FLOW
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BIW BACKWARD INCLINED WHEEL (FAN)
BR BOTTOM REGISTER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS
(SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS
(SUBMISSION2)
CENT CENTRIFICAL
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CM CARBON MONOXIDE
CO CLEAN OUT
CO2 CARBON DIOXIDE
COP COEFFICIENT OF PERFORMANCE
CR CEILING REGISTER
CV CONSTANT VOLUME
CWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERU ENERGY RECOVERY UNIT
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
ABBREVIATIONS
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRW HEAT RECOVERY WHEEL
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN WC INCH WATER COLUMN
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IU INDUCTION UNIT
IV INLET VANES
J INTENTIALLY LEFT BLANK
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
ABBREVIATIONS
MA MIXED AIR
MALL MIXED AIR LOW LIMIT
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY
REPORTING VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MTD MEAN TEMPERATURE
DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC &
ATMOSPHERIC ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH –
GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
RA RETURN AIR
RAD RETURN AIR DAMPER
RAF RADIO FREQUENCY
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
REAH RELIEF AIR HOOD
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER
MINUTE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN
(SUBMISSION1)
SD-2 SCHEMATIC DESIGN
(SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
ST STEAM TRAP
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
UC UNDER CUT
UH UNIT HEATER
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VPS VARIABLE PRIMARY SYSTEM
VSD VARIABLE SPEED DRIVE
W WATTS
Wb WET-BULB (TEMPERATURE)
YR YEAR
H4
H7
A
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
DRAWING NUMBER WHERE DRAWN
LIMIT OF DEMOLITION
(WALL TYPE)
(WALL TYPE)
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
EXHAUST OR RETURN REGISTER OR TOP GRILLE
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP
RETURN DUCT (UP & DOWN)
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
LINEAR SLOT DIFFUSER
SQUARE 1-WAY CEILING DIFFUSERS
BACK DRAFT DAMPER
BDD
SECTION.)
FC
10x8
FLEXIBLE CONNECTION, EQUIPMENT,
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL
FIRE DAMPER
FD
VD
DUCT WITH SOUND LINING
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
VIBRATION, OR SEISMIC
DUCT MOUNTED COIL
DUCT MOUNTED COIL (HOT WATER OR STEAM COIL)
SUPPLY
RETURN
45°
RETURN, NO SPLITTER (45° TAP)
STANDARD BRANCH SUPPLY OR
MANUAL SPLITTER DAMPER
45°
N
2 1
POINT OF CHANGE IN DUCT CONSTRUCTION BY
STATIC PRESSURE CLASS. THE NUMBER ASSIGNS
PRESSURE CLASS (IN. OF WATER) WHICH WILL
ACCOMMODATE MAXIMUM OPERATING PRESSURE
1/2
IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES
THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR
ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT
INDICATES NEGATIVE PRESSURE.
STAINLESS STEEL DUCT
(ELECTRIC)
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
//FIRE//SMOKE// DAMPER
(VA DOES NOT ALLOW COMBINATION FIRE/SMOKE
DAMPERS.)
//F//S// DPR
DUCTWORK SYMBOLS
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HOT WATER HEATING SUPPLY
CONDENSATE PUMP DISCHARGE
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
VENT LINE
REFRIGERANT SUCTION
REFRIGERANT HOT GAS
REFRIGERANT LIQUID
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
MAKE-UP WATER
HOT WATER HEATING RETURN
S-60
CR-60
S-30
CR-30
S-15
CR-15
PC
HWS
HWR
V
CHR
RL
RS
RHG
CHS
MW
D
X EXISTING PIPE TO BE REMOVED
PIPING SYMBOLS
HWR
HOT WATER RETURN
RH
SCH
SH
TH
PS
RC
RISER CLAMP (TYPE 42)*
FLOOR-SUPPORTED PIPE STAND
CLEVIS-TYPE HANGER
VARIABLE SPRING-TYPE HANGER (TYPE 51)*
ROLLER-TYPE HANGER
TO TRAPEZE EXCEPT WHERE RH ARE INDICATED)
TRAPEZE HANGER (PROVIDE U-BOLT PIPE ATTACHMENT
SPRING CUSHION-TYPE HANGER (TYPE 48 OR 49)*
WB
CSH
SS
SLIDING SUPPORTS (TYPE 35)*
CONSTANT SUPPORT HANGER (TYPE 54, 55, 56)*
WALL BRACKET (TYPE 31, 32, 33)*
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
VENTURI FLOW METER
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
PIPING ACCESSORIES SEE DETAIL
INVERTED BUCKET TRAP SET INCLUDING
PIPE UP
PIPE DOWN
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
AV
MANUAL AIR VENT
MV
THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
QUICK-COUPLE HOSE CONNECTOR
GENERAL PIPING SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLERLC
FLOW METERM
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
HOSE CONNECTOR
VALVE SYMBOLS
GENERAL NOTES
HWS
HOT WATER SUPPLY
LIST OF DRAWING SHEETS
HEATING, VENTILATING, AIR CONDITIONING AND REFRIGERATION
GI001 COVER SHEET
MH001 HVAC GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
MH101 BLDG 01 - HVAC - AC-9-1 REPLACEMENT
MH102 BLDG 22 - HVAC - ERU-1-22 REPLACEMENT
MH103 BLDG 24 - HVAC - AC-1-24 REPLACEMENT FLOOR PLAN
MH104 BLDG 24 - HVAC - AC-1-24 REPLACEMENT SECTION
MH105 BLDG 34 - HVAC - ERU & HVAC UPGRADES
MH106 BLDG 35 - HVAC - ERU & HVAC UPGRADES
MH107 BLDG 36 - HVAC - ERU & HVAC UPGRADES
MH108 BLDG 106 - CHILLED WATER SYSTEM PIPING MODIFICATION
MH501 HVAC DETAILS
MH502 HVAC DETAILS
MH503 HVAC DETAILS
MH600 MECHANICAL SCHEDULE
MH601 MECHANICAL SCHEDULE
MH700 BLDG 35 DUCTWORK FLOW DIAGRAM
MH701 GEOTHERMAL HEAT PUMP - PRIMARY LOOP ISOLATION VALVE REPLACEMENT
MH800 HVAC CONTROL SYMBOLS
MH801 HVAC CONTROLS
MH802 HVAC CONTROLS
MH803 HVAC CONTROLS
MH804 GEOTHERMAL HEAT PUMP - PRIMARY LOOP ISOLATION VALVE REPLACEMENT -
HVAC CONTROLS
MH805 HVAC CONTROLS - POINTS LISTS
MH806 BLDG 101 BACKUP CHILL WATER SYSTEM CONTROL SEQUENCE
MH807 BLDG 101 CHILL WATER SYSTEM CONTROL SCHEMATIC
MI101 BLDG 01 - HVAC - INSULATION REPAIR
MI102 BLDG 18 & 102 - HVAC - INSULATION REPAIRS
MI103 BLDG 34 & 35 - HVAC - INSULATION REPAIRS
MI104 BLDG 01 - HVAC - AC-3 HRW & SENSOR REPLACEMENT
MI105 BLDG 01 - HVAC - BAS IMPROVEMENT & SENSOR CORRECTIONS
MI106 BLDG 17 - HVAC - BAS IMPROVEMENTS
MI107 BLDG 18 - HVAC - PNEUMATIC UPGRADES
MI108 BLDG 19 - HVAC - BAS IMPROVEMENTS
MI109 BLDG 136 - HVAC - ELECTRIC REHEAT CONTROL UPGRADES
MI110 BLDG 34 - HVAC - HUMIDITY SENSOR UPGRADES
MI111 BLDG 35 - HVAC - HUMIDITY SENSOR UPGRADES
MI112 BLDG 36 - HVAC - HUMIDITY SENSOR UPGRADES
MI113 CHILLED WATER TEMPERATURE SENSOR AND FLOW METER REPLACEMENT
MI114 CHILLED WATER TEMPERATURE SENSOR AND FLOW METER REPLACEMENT
MI115 CHILLED WATER TEMPERATURE SENSOR AND FLOW METER REPLACEMENT
MI116 CHILLED WATER CIRCUIT SETTER INSTALLATION
MI117 CHILLED WATER SYSTEM - BYPASS LINE MODIFICATION
MI118 CHILLED WATER SYSTEM - BYPASS LINE MODIFICATION
MI119 CHILLED WATER SYSTEM - BYPASS LINE MODIFICATION
MI120 CHILLED WATER SYSTEM BUILDING LOOP PRESSURE SENSOR UPGRADES
MI121 CHILLED WATER SYSTEM BUILDING LOOP PRESSURE SENSOR UPGRADES
ELECTRICAL
E001 ELECTRICAL SYMBOLS, NOTES AND ABBREVIATIONS
E101 BLDG 01 - ELECTRICAL - AC-9-1 REPLACEMENT
E102 BLDG 22 - ELECTRICAL - ERU-1-22 REPLACEMENT
E103 BLDG 24 - ELECTRICAL - AC-1-24 REPLACEMENT
E104 BLDG 34 - ELECTRICAL ERU & HVAC UPGRADES
E105 BLDG 35 - ELECTRICAL ERU & HVAC UPGRADES
E106 BLDG 36 - ELECTRICAL ERU & HVAC UPGRADES
E107 BUILDING 106 - CHILLED WATER SYSTEM MODIFICATION - ELECTRICAL PLAN
MT,T MOISTURE (HUMIDITY) & TEMPERATURE TRANSMITTER
AC
1-24
POWER REQUIRED EQUIPMENT ABBREVIATION
(AIR CONDITIONER)
EQUIPMENT NUMBER
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
1S-34
CC
NON POWER REQUIRED EQUIPMENT ABBREVIATION
(COOLING COIL)
EQUIPMENT NUMBER
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
DUCTWORK SYMBOLS DUCTWORK SYMBOLS
DRAWING SYMBOLS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
MH001
HVAC GENERAL NOTES, SYMBOLS
AND ABBREVIATIONS
A
F i l e
P a t h
P
M
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
321 4 5 6 7 8 9 10
ALARES ENGINEERING
248 COPELAND STREET,
QUINCY, MA 02169
PHONE: 617-481-6390
WWW.ALARESENGINEERING.COM
RETRO-COMMISSIONING
MECHANICAL CORRECTION
Lebanon, PA
595-18-101
Project Director
HL / DM HL / SW
Office of
Construction and
Facilities
Management
CONSULTANT
Revisions: Date:
1100 CHURCH STREET HONESDALE, PA 18431
570-253-0846 OFFICE 570-253-1935 FAX
WWW.NEINFRA.COM
NV5 70 FARGO STREET, SUITE
800, BOSTON, MA 02210 TEL:
857-221-5942
November 22, 2019
FINAL BID DOCUMENTS
SUBMISSION
FINAL BID DOCUMENTS
AutoCAD SHX Text
VA FORM 08 - 6231
x x
12x13 12x13
PF-9-1
CC-9-1
AC-9-1
TR-23
600 CFM
TR-23
600 CFM
TR-23
600 CFM
TR-23
600 CFM
TR-24
1050 CFM
TR-24
1050 CFM
2"
2"
CHWS
CHWR
TO AC-5-1
GENERAL NOTES FOR DEMOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 2.0
CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR MAINTAINING ADEQUATE TEMPERATURE CONTROL OF THE LIFT EQUIPMENT DURING THE
CONSTRUCTION PERIOD. THIS SHALL INCLUDE, IF NECESSARY, TEMPORARY COOLING OF THE SPACE.
DEMOLITION KEY NOTES:
1. EXISTING AHU (APPROX. 9' ABOVE FLOOR LEVEL) TO BE REMOVED, INCLUDING STRUCTURAL SUPPORT RODS
2. EXISTING SUPPLY DUCTWORK TO BE REMOVED. SUPPLY GRILLES TO BE RETAINED AND REUSED.
3. ISOLATION VALVES TO BE FITTED TO CHWS & CHWR LINES BEFORE DEMOLITION CAN COMMENCE. SEE ITEM 2 OF CONSTRUCTION NOTES.
4. EXISTING CHWS & CHWR PIPING TO BE DEMOLISHED ABOVE ELECTRICAL CABINET.
5. EXISTING THERMOSTAT TO BE RELOCATED TO NEW LOCATION
CONDENSATE LINE TO
REMAIN
CONTROL VALVE
BALANCING VALVE
ISOLATION VALVE
EXISTING EQUIPMENT,
PANEL TO REMAIN
T
BUILDING 1
12x13 12x13
TR-24
1050 CFM
TR-24
1050 CFM
2"
2"
CHWS
CHWR
TO AC-5-1
GENERAL NOTES FOR DEMOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 2.0
CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR MAINTAINING ADEQUATE TEMPERATURE CONTROL OF THE LIFT EQUIPMENT DURING
THE CONSTRUCTION PERIOD. THIS SHALL INCLUDE, IF NECESSARY, TEMPORARY COOLING OF THE SPACE.
KEY NOTES:
1. EXISTING HOIST HOOK ABOVE (13' AFF) TO BE REPAIRED OR REPLACED, & GIVEN AN APPROPRIATE WEIGHT CERTIFICATION.
2. NEW ISOLATION VALVES TO BE FITTED TO CHWS & CHWR LINES, TO MINIMIZE DOWNTIME OF AC-5-1. TEMPORARY SHUTDOWN OF
AC-5-1 TO BE COORDINATED WITH THE VA.
3. DOORS BELOW 46" CLEARANCE WIDTH
4. LIFT DIMENSIONS - 54" WIDE X 85" DEEP X 85" IN HEIGHT. USE OF FREIGHT ELEVATOR TO BE COORDINATED WITH THE VA.
5. AHU SUSPENDED APPROX. 9' AFF.
6. NEW 26X24 SUPPLY AIR DUCT TO BE PROVIDED WITH NEW HANGING ACCESSORIES.
7. EXISTING SUPPLY AIR GRILLES TO BE RE-USED AND REBALANCED TO 565 CFM.
8. NEW 565 CFM SUPPLY AIR GRILLES TO BE PROVIDED. MATCH SIZE OF EXISTING DIFFUSERS. TITUS 300 OR EQUIVALENT.
9. PROVIDE NEW 2" CHWR & CHWS LINES, OFFSET FROM EXISTING ELECTRICAL CABINET.
10. NEW THERMOSTAT LOCATION
AC
9-1
CONDENSATE LINE TO
REMAIN
CONTROL VALVE
BALANCING VALVE
ISOLATION VALVE
565 CFM 565 CFM
565 CFM 565 CFM
X
565 CFM 565 CFM
T
EXISTING EQUIPMENT,
PANEL TO REMAIN
5 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
MH101
BLDG 01 - HVAC AC-9-1
REPLACEMENT
A
F i l e
P a t h
P
M
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
RETRO-COMMISSIONING
MECHANICAL CORRECTION
Lebanon, PA
595-18-101
Project Director
HL / DM SW
Office of
Construction and
Facilities
Management
ARCHITECT/ENGINEER OF RECORD
CONSULTANT
Revisions: Date:
ALARES ENGINEERING 248
COPELAND STREET, QUINCY, MA
02169 PHONE: 617-481-6390
WWW.ALARESENGINEERING.COM
NV5 70 FARGO STREET, SUITE
800, BOSTON, MA 02210 TEL:
857-221-5942
SCALE:
AC-9-1 HVAC DEMOLITION PLAN
1/4"=1'-0"
MH101
SCALE:
AC-9-1 HVAC NEW WORK PLAN
1/4"=1'-0"
MH101
1100 CHURCH STREET HONESDALE, PA 18431
570-253-0846 OFFICE 570-253-1935 FAX
WWW.NEINFRA.COM
November 22, 2019
FINAL BID DOCUMENTS
SUBMISSION
FINAL BID DOCUMENTS
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
BELOW
AutoCAD SHX Text
LIFTS
AutoCAD SHX Text
(BELOW)
AutoCAD SHX Text
UP
AutoCAD SHX Text
LIFT MACHINERY
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
BELOW
AutoCAD SHX Text
LIFTS
AutoCAD SHX Text
(BELOW)
AutoCAD SHX Text
UP
AutoCAD SHX Text
LIFT MACHINERY
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
BELOW
AutoCAD SHX Text
LIFTS
AutoCAD SHX Text
(BELOW)
AutoCAD SHX Text
UP
AutoCAD SHX Text
LIFT MACHINERY
GENERAL NOTES FOR DEMOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL
BID DOCUMENTS BOD SECTION 3.0
CONTRACTOR SHALL MAINTAIN ADEQUATE VENTILATION IN THE SPACES SERVED BY
ERU-22-1 AT FIRST, SECOND & THIRD FLOORS. THIS SHALL INCLUDE BUT NOT BE LIMITED
TO WINDOW-MOUNTED SUPPLY AND EXHAUST FANS. ALL TEMPORARY MEASURES SHALL
BE SUBJECT TO THE APPROVAL OF THE COR. NOTE THAT THE VA HAS A POLICY WHICH
DOES NOT PERMIT WINDOWS TO REMAIN OPEN.
DEMOLITION KEY NOTES:
1. ERU TO BE DEMOLISHED.
2. ROOF CURB TO BE DEMOLISHED.
NOTE: IF EXISTING CURB CAN BE RETAINED FOR NEW ERU, A CREDIT SHALL BE
ISSUED TO THE VA.
3. ALL DUCTWORK TO REMAIN.
4. EXISTING EXHAUST AIR SMOKE DETECTOR TO BE REMOVED.
5. A CRANE WILL BE REQUIRED TO REMOVE THE ERU. COORDINATE LOCATION & ANY
PARKING LOT INTERFERENCES WITH THE VA.
1 2 3 4 5
ACCESS DOOR FROM
MECHANICAL ROOM
LOW ROOF HIGH ROOF
GENERAL NOTES FOR DEMOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID
DOCUMENTS BOD SECTION 3.0
CONTRACTOR SHALL MAINTAIN ADEQUATE VENTILATION DURING CONSTRUCTION IN THE SPACES
SERVED BY ERU-1-22 AT FIRST, SECOND & THIRD FLOORS. THIS SHALL INCLUDE BUT NOT BE
LIMITED TO WINDOW-MOUNTED SUPPLY AND EXHAUST FANS. ALL TEMPORARY MEASURES SHALL
BE SUBJECT TO THE APPROVAL OF THE COR. NOTE THAT THE VA HAS A POLICY WHICH DOES NOT
PERMIT WINDOWS TO REMAIN OPEN.
KEY NOTES:
1. NEW ERU TO BE INSTALLED AND CONNECTED TO EXISTING DUCTWORK AND PLACED ON
EXISTING ROOF CURB. NEW ROOF CURB TO BE PROVIDED IF THE EXISTING CURB CANNOT BE
REUSED.
2. A CRANE WILL BE REQUIRED TO INSTALL THE NEW ERU. COORDINATE LOCATION & ANY
PARKING LOT INTERFERENCE WITH THE VA.
3. EXISTING 4" CAST IRON TOILET VENT. OPENING TO BE EXTENDED SO THE OUTLET IS
POSITIONED AT LEAST 10' AWAY FROM OA INTAKE ON THE NEW ERU. ROOF PENETRATION
REMAINS UNCHANGED. OFFSET TO OCCUR ABOVE THE ROOF.
4. HORIZONTAL VENT SHALL HAVE A PITCH OF 1/8" PER 12" LENGTH. PROVIDE ROOF MOUNTED
PIPE SUPPORT
ERU
1-22
ACCESS DOOR FROM
MECHANICAL ROOM
LOW ROOF HIGH ROOF
M
I
N
BUILDING 22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 -
MH102
BLDG 22 - HVAC - ERU-1-22
REPLACEMENT
A
F i l e
P a t h
P
M
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
RETRO-COMMISSIONING
MECHANICAL CORRECTION
Lebanon, PA
595-18-101
Project Director
HL / DM SW
Office of
Construction and
Facilities
Management
ARCHITECT/ENGINEER OF RECORD
CONSULTANT
Revisions: Date:
1100 CHURCH STREET HONESDALE, PA 18431
570-253-0846 OFFICE 570-253-1935 FAX
WWW.NEINFRA.COM
ALARES ENGINEERING 248
COPELAND STREET, QUINCY, MA
02169 PHONE: 617-481-6390
WWW.ALARESENGINEERING.COM
NV5 70 FARGO STREET, SUITE
800, BOSTON, MA 02210 TEL:
857-221-5942
SCALE:
ERU-1-22 HVAC DEMOLITION PLAN
1/4"=1'-0"
MH102
SCALE:
ERU-1-22 HVAC NEW WORK PLAN
1/4"=1'-0"
MH102
November 22, 2019
FINAL BID DOCUMENTS
SUBMISSION
FINAL BID DOCUMENTS
AutoCAD SHX Text
DN
UP
102 104
103A1
103A
105A
103B
103A1
101A
111A
RAMP
D.F.
DN.
MH104
MH104
24x24 RELIEF DAMPER
SET AT 1/8" SP.
24X24 FIRE DAMPER
(FUSIBLE LINK)
24X24 TRANSFER
GRILL MOUNTED
10'-0"AFF
20X48 FRESH AIR
DUCT UP TO INTAKE
HOOD WITH CURB
ON ROOF
36X30 F.A
GRILLE
4730 CFM
10-30X6
S.A. REG.
@ 473 CFM
10-30X6
S.A. REG.
@ 473 CFM
10-30X6
S.A. REG.
@ 473 CFM
10-30X6
S.A. REG.
@ 473 CFM
10-30X6
S.A. REG.
@ 473 CFM
10-30X6
S.A. REG.
@ 473 CFM
10-30X6
S.A. REG.
@ 473 CFM
10-30X6
S.A. REG.
@ 473 CFM
10-30X6
S.A. REG.
@ 473 CFM
10-30X6
S.A. REG.
@ 473 CFM
3/4" CONDENSATE
103A
111A
"x
"x
"x
"x
"x
24"x20"
2"ø CHR 2"ø CHS
1 1/2"ø LPS
AHU
6"ø
1-1/4" CONDENSATE
DRAIN FROM AHU ON
GRADE
GENERAL NOTES FOR DEMIOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 3.0
DEMOLITION KEY NOTES:
36X30 EXISTING RETURN GRILLE TO REMAIN.
EXISTING OUTDOOR AIR INTAKE HOOD ON ROOF TO REMAIN.
DEMO TRANSFER DUCT AND ACCESSORIES AND PATCH THE WALL.
DEMO TRANSFER DUCT AND ACCESSORIES AND PATCH THE WALL.
DEMO PART OF COOLING COIL CONDENSATE PIPING UP TO THIS POINT ON THE DRAWING.
DEMO ENTIRE HEATING COIL STEAM CONDENSATE TO PIPE CHASE. EXISTING 2" CHWS/R , 1-1/2" LPS TO REMAIN.
DOUBLE DOOR PANELS SHALL BE REMOVED FROM HINGES AND SAFELY STORED DURING MECHANICAL RENOVATION.
MH104
MH104
103A1
111A
MOUNT DUCTSOX ON
UNDERSIDE OF BEAM,
AS CLOSE TO BEAM
AS POSSIBLE.
2"ø CHR 2"ø CHS
1 1/2"ø LPS
S A
D U
C T
S O
X
26X26SA
METAL DUCT
20X48 OA DUCT UP TO
EXISTING OUTDOOR AIR
INTAKE HOOD ON ROOF
S A
D U
C T
S O
X
S A
D U
C T
S O
X
CONNECT DUCTSOX
TO METAL DUCT
EXISTING
10X6 SA REG.
100 CFM
6"⌀
16"⌀ SA
METAL DUCT
16"⌀ SA METAL DUCT
REUSE EXISTING 36X30
RETURN GRILLE AND
BALANCE TO 4000 CFM
RUN 1-1/4" STEAM CONDENSATE ALONG
THE BOTTOM OF THE WALL AND DROP
DOWN THE PIPE CHASE. PROVIDE PIPE
COVER.
CLEAR OUTSIDE AHU TO ALLOW
HEATING AND COOLING COILS TO
BE REMOVED FOR MAINTAINENCE.
CP
1-24
CONNECT NEW 1-1/4"
CONDENSATE DRAIN TO
EXISTING 1-1/4" PIPE.
MOUNT DUCTSOX ON
UNDERSIDE OF BEAM,
AS CLOSE TO BEAM
AS POSSIBLE.
MOUNT DUCTSOX ON
UNDERSIDE OF BEAM,
AS CLOSE TO BEAM
AS POSSIBLE.
DUCTSOX (1250 CFM)
DUCTSOX (2000 CFM)
DUCTSOX (1250 CFM)
20"⌀ SA METAL DUCT
CONNECT TO
DUCTSOX
1-1/4" CONDENSATE
DRAIN FROM AHU ON
GRADE
20X48 EXHAUST
DUCTUP TO RELIEF
HOOD ON ROOF
GENERAL NOTES FOR DEMIOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 3.0
NEW WORK KEY NOTES:
PROVIDE 2" DUCT PRESSURE CLASS.
PROVIDE CONDENSATE PIPE PITCH AT 1/8" FOR EVERY 12" PIPE RUN FOR PROPER CONDENSATE FLOW.
THE AHU STEEL BASE SHALL BE HIGH ENOUGH TO MAINTAIN AT LEAST 24" FROM STEAM COIL CONDENSATE
CONNECTION TO THE FLOOR FOR PROPER CONDENSATE FLOW.
REFER TO DETAIL 5 OF DWG MH502 FOR DUCTSOX CONFIGURATION.
DOUBLE DOOR PANEL TO BE INSTALLED AFTER RENOVATION WORK IS COMPLETE
VFD
2-24
VFD
1-24
AC
1-24
RF
1-24
20"x30" (RA)
20"x30" (EA)
18"x26" (RA)
ACD
ACD
ACD
1 1/4"ø LPC
36"x30" (RA) 30"x20" (OA)
VD
CONNECT DUCTSOX
TO METAL DUCT
VDVD
VD
20"x30" (RA)
REAH
1-24
(TYP.)
SD
1/4" = 1'-0"
AC-1-24 HVAC DEMOLITION PLAN
1/4" = 1'-0"
AC-1-24 HVAC NEW WORK PLAN
1100 CHURCH STREET HONESDALE, PA 18431
570-253-0846 OFFICE 570-253-1935 FAX
WWW.NEINFRA.COM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ALARES ENGINEERING
STAMPCONSULTANT
321 4 5 6 7 8 9 10
FINAL BID DOCUMENTS
248 COPELAND STREET, QUINCY, MA 02169
PHONE: 617-481-6390
WWW.ALARESENGINEERING.COM
NV5 70 FARGO STREET, SUITE
800, BOSTON, MA 02210
TEL: 857-221-5942
C U se rs
\h ly
\D o cu m e n ts \B
L a yo u t_ h ly
.r v t
/2 /2
:2
:5
A
M
MH103
RETRO-COMMISSIONING
October 24, 2019 HL/DM SW
FINAL BID DOCUMENTS
SUBMISSION
BLDG 24 - HVAC - AC-1-24
REPLACEMENT FLOOR PLAN
595-18-101
Lebanon, PA
Revisions: Date:
GENERAL NOTES FOR DEMIOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 3.0
DEMOLITION KEY NOTES:
EXISTING SUPPLY DUCTWORK TO BE DEMOLISHED ENTRIRELY
TRANSFER DUCT AND ACCESSROIES TO BE DEMOLISED AND WALL TO BE PATCHED
AHU STEAM CONDENSATE PIPE TO BE DEMOLISHED BACK TO PIPE CHASE
GENERAL NOTES FOR DEMIOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 3.0
DEMOLITION KEY NOTES:
36X30 EXISTING RETURN GRILLE TO REMAIN.
EXISTING OUTDOOR AIR INTAKE HOOD ON ROOF TO REMAIN.
DEMO PART OF COOLING COIL CONDENSATE PIPING UP TO THIS POINT ON THE DRAWING.
DEMO ENTIRE HEATING COIL STEAM CONDENSATE TO PIPE CHASE. EXISTING 2" CHWS/R , 1-1/2" LPS TO REMAIN.
"x
(S
A ) 16"ø
16"ø
20"x30" (OA)
REAH
1-24
OAIH
EXIST
AC
1-24
RF
1-24
VD
ACD
VD
"x
(R A
EXISTING RETURN
GRILL TO REMAIN
30"x36"
NEW PITCHE D
ROOF CURB
ACDACD
30"x20" (RA) 30"x20" (EA)
VFD
2-24
VFD
1-24
SD-2
SD-1
AC
1-24
20"ø
"x
30"x20"
20"x30"
VD
ACD
ACD
CP
1-24
VFD
2-24
GENERAL NOTES FOR DEMIOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 3.0
NEW WORK KEY NOTES:
PROVIDE CONDENSATE PIPE PITCH AT 1/8" FOR EVERY 12" PIPE RUN FOR PROPER CONDENSATE FLOW.
THE AHU STEEL BASE SHALL BE HIGH ENOUGH TO MAINTAIN AT LEAST 24" FROM STEAM COIL CONDENSATE
CONNECTION TO THE FLOOR FOR PROPER CONDENSATE FLOW.
2" CHS/R
1-1/2" LPS
1-1/4 CD
1-1/4 LPC
1100 CHURCH STREET HONESDALE, PA 18431
570-253-0846 OFFICE 570-253-1935 FAX
WWW.NEINFRA.COM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ALARES ENGINEERING
STAMPCONSULTANT
321 4 5 6 7 8 9 10
FINAL BID DOCUMENTS
248 COPELAND STREET, QUINCY, MA 02169
PHONE: 617-481-6390
WWW.ALARESENGINEERING.COM
NV5 70 FARGO STREET, SUITE
800, BOSTON, MA 02210
TEL: 857-221-5942
C U se rs
\h ly
\D o cu m e n ts \B
L a yo u t_ h ly
.r v t
/2 /2
:2
:0
A
M
MH104
RETRO-COMMISSIONING
October 24, 2019 HL JW
FINAL BID DOCUMENTS
SUBMISSION
BLDG 24 - HVAC - AC-1-24
REPLACEMENT SECTION
595-18-101
Lebanon, PA
1/4" = 1'-0"
AC-1-24 HVAC DEMOLITION SECTION 1
1/4" = 1'-0"
AC-1-24 HVAC DEMOLITION SECTION 2
1/4" = 1'-0"
AC-1-24 HVAC NEW WORK SECTION 2
1/4" = 1'-0"
AC-1-24 HVAC NEW WORK SECTION 1
Revisions: Date:
ERU-1S
ERU-2S
EXISTING OA DUCT
E X
I S
T I N
G
E
A
D
U C
T
16X14 EA DUCT TOP
16X14 SA DUCT BOTTOM
20X14 EA DUCT TOP
20X12 SA DUCT BOTTOM
ERU-1S
ERU-2S
EXISTING OA DUCT
E X
I S
T I N
G
E
A
D
U C
T
16X14 EA DUCT TOP
16X14 SA DUCT BOTTOM
20X14 EA DUCT TOP
20X12 SA DUCT BOTTOM
1S-34
CC
2S-34
CC
ACCU
1S-34
ACCU
2S-34
SF
1S-34
SF
2S-34
WL-4S
EXHAUST AIR
OUTSIDE AIR
WL-3S
ERU-1S
ERU-2S
EXISTING OA DUCT
E X
I S
T I N
G
E
A
D
U C
T
16X14 EA DUCT TOP
16X14 SA DUCT BOTTOM
20X14 EA DUCT TOP
20X12 SA DUCT BOTTOM
GENERAL NOTES FOR DEMOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 5.4, 5.7 AND 5.8
DEMOLITION KEY NOTES:
1. EXISTING SUPPLY AIR DUCTWORK TO BE DEMOLISHED TO FACILITATE INSTALLATION OF RELOCATED HOT GAS REHEATS & ADAPTOR.
2. EXISTING SUPPLY AIR FAN TO BE REMOVED FROM ERU-1S.
3. EXISTING SUPPLY AIR FAN TO BE REMOVED FROM ERU-2S.
4. EXISTING FLEXIBLE DUCT CONNECTION BETWEEN OUTSIDE AIR DUCT & EXHAUST AIR DUCT TO BE DEMOLISHED.
NOTE - THE CONTRACTOR SHALL MINIMIZE THE DURATION OF ANY ERU SHUTDOWN BY COMPLETING AS MUCH WORK AS PRACTICAL WITHOUT INITIATING A
SHUTDOWN. NOTICE OF AN IMPENDING ERU SHUTDOWN SHALL BE CAREFULLY COORDINATED WITH THE COR WITH ADVANCED NOTICE.
GENERAL NOTES FOR DEMOLITION & CONSTRUCTION:
1. REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 5.4, 5.7 AND 5.8
2. CONTRACTOR SHALL HAVE ERU HEAT PUMP SERVICED AT ANY TIME, BY A MANUFACTURER-CERTIFIED TECHNICIAN.
NEW WORK KEY NOTES:
1. EXISTING HOT GAS REHEAT COIL TO BE REMOVED FROM ERU & INSTALLED ALONG EXISTING SUPPLY AIR DUCT.
2. NEW DUCT ADAPTOR TO BE INSTALLED TO SUPPLY AIR DUCT & NEW POSITION OF HOT GAS REHEAT COIL.
3. HOT GAS REHEAT PIPING SERVING HOT GAS REHEAT COIL TO BE REPIPED TO NEW POSITION OF HOT GAS REHEAT COIL.
4. NEW SUPPLEMENTAL DX COOLING COIL TO BE INSTALLED WITHIN EXISTING ERU, IN THE PREVIOUS POSITION OF THE HOT GAS REHEAT COIL. SEE DETAIL #7 ON
MH502 FOR FAN AND DRAIN PAN CONFIGURATION. EXISTING DRAIN PAN SHALL BE ABLE TO COLLECT CONDENSATE FROM BOTH EXISTING AND SUPPLEMENTAL
COOLING COILS. OTHERWISE NEW CONDENSATE PAN SHALL BE INSTALLED.
5. REFRIGERANT PIPING SERVING DX COOLING COIL TO BE PLUMBED TO NEW EXTERNAL DX UNIT.
6. EXTERNALLY POSITIONED REFRIGERANT PIPING SHALL BE OBSCURED FROM VIEW. PROVIDE OUTDOOR COVER FOR REFRIGERANT PIPE.
7. TWO NEW 3.5-TON CONDENSING UNITS TO BE POSITIONED ON GROUND OUTSIDE. UNITS SHALL BE MOUNTED ON A CONCRETE PAD, POSITIONED NO LESS THAN
24" FROM THE PERIMETER WALL. UNITS SHALL BE POSITIONED NO LESS THAN 24" APART. CONCRETE PAD SHALL BE 6" THICK & APPROX. 6" WIDER THAN THE
UNIT (I.E. APPROX. 37" x 34").
8. NEW SUPPLY AIR FAN SF-1S-34 TO BE INSTALLED WITHIN ENERGY RECOVERY UNIT ERU-1S.
9. NEW SUPPLY AIR FAN SF-2S-34 TO BE INSTALLED WITHIN ENERGY RECOVERY UNIT ERU-2S.
10. OPENINGS ON OUTSIDE AIR & EXHAUST AIR DUCT TO BE CLOSED, PATCHED AND SEALED. DUCTS SHALL UNDERGO LEAK TESTING.
11. PROVIDE NEW DUCT WITH 2" CLASSIFICATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
MH105
BLDG 34 - HVAC ERU & HVAC
UPGRADES
A
F i l e
P a t h
P
M
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
RETRO-COMMISSIONING
MECHANICAL CORRECTION
Lebanon, PA
595-18-101
Project Director
HL / DM SW
Revisions: Date:
Office of
Construction and
Facilities
Management
1100 CHURCH STREET HONESDALE, PA 18431
570-253-0846 OFFICE 570-253-1935 FAX
WWW.NEINFRA.COM
ALARES ENGINEERING 248
COPELAND STREET, QUINCY, MA
02169 PHONE: 617-481-6390
WWW.ALARESENGINEERING.COM
NV5 70 FARGO STREET, SUITE
800, BOSTON, MA 02210 TEL:
857-221-5942
SCALE:
BUILDING 34 - HVAC DEMOLITION PLAN - ATTIC
1/4"=1'-0"
SCALE:
BUILDING 34 - HVAC NEW WORK PLAN - ATTIC
1/4"=1'-0"
MH105
MH105
November 22, 2019
FINAL BID DOCUMENTS
SUBMISSION
FINAL BID DOCUMENTS
AutoCAD SHX Text M
M
GENERAL NOTES FOR DEMOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 5.5, 5.7 AND 5.8
DEMOLITION KEY NOTES:
1. EXISTING SUPPLY AIR DUCTWORK TO BE DEMOLISHED TO FACILITATE INSTALLATION OF RELOCATED HOT GAS REHEATS & ADAPTOR.
2. EXISTING SUPPLY AIR FAN TO BE REMOVED FROM ERU-1C.
3. EXISTING FLEXIBLE DUCT CONNECTION BETWEEN OUTSIDE AIR DUCT & EXHAUST AIR DUCT TO BE DEMOLISHED.
4. EXISTING DUCTWORK RUN TO DUCT MAIN TO BE DEMOLISHED. JUNCTION BETWEEN EXISTING DUCT & DEMOLISHED DUCT SHALL BE CAPPED & SEALED.
NOTE - THE CONTRACTOR SHALL MINIMIZE THE DURATION OF ANY ERU SHUTDOWN BY COMPLETING AS MUCH WORK AS PRACTICAL WITHOUT INITIATING A
SHUTDOWN. NOTICE OF AN IMPENDING ERU SHUTDOWN SHALL BE CAREFULLY COORDINATED WITH THE COR WITH ADVANCED NOTICE.
DD
ERU-1C
EXISTING
CONDENSING UNIT
TO REMAIN
DD
ERU-1C
EXISTING
CONDENSING UNIT
TO REMAIN
8X8
8X8
100 CFM
100 CFM
100 CFM
100 CFM
100 CFM
275 CFM
EF
1-35
ACCU
1C-35
20Ø
14X12
14X12
1C-35
CC
SF
1C-35
GENERAL NOTES FOR DEMOLITION & CONSTRUCTION:
1. REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 5.5, 5.7 AND 5.8
2. CONTRACTOR SHALL HAVE ERU HEAT PUMP SERVICED AT ANY TIME, BY A MANUFACTURER-CERTIFIED TECHNICIAN.
NEW WORK KEY NOTES:
1. EXISTING HOT GAS REHEAT COIL TO BE REMOVED FROM ERU & INSTALLED ALONG EXISTING SUPPLY AIR DUCT.
2. NEW DUCT ADAPTOR TO BE INSTALLED TO SUPPLY AIR DUCT & NEW POSITION OF HOT GAS REHEAT COIL.
3. HOT GAS REHEAT PIPING SERVING HOT GAS REHEAT COIL TO BE REPIPED TO NEW POSITION OF HOT GAS REHEAT COIL.
4. NEW SUPPLEMENTAL DX COOLING COIL TO BE INSTALLED WITHIN EXISTING ERU, IN THE PREVIOUS POSITION OF THE HOT GAS REHEAT COIL. SEE DETAIL #7 ON MH502 FOR FAN AND DRAIN PAN
CONFIGURATION. EXISTING DRAIN PAN SHALL BE ABLE TO COLLECT CONDENSATE FROM BOTH EXISTING AND SUPPLEMENTAL COOLING COILS. OTHERWISE NEW CONDENSATE PAN SHALL BE
INSTALLED.
5. REFRIGERANT PIPING SERVING DX COOLING COIL TO BE PLUMBED TO NEW EXTERNAL DX UNIT.
6. EXTERNALLY POSITIONED REFRIGERANT PIPING SHALL BE OBSCURED FROM VIEW. PROVIDE OUTDOOR COVER FOR REFRIGERANT PIPE.
7. NEW 7.5-TON CONDENSING UNIT TO BE POSITIONED ON GROUND OUTSIDE. UNIT SHALL BE MOUNTED ON A CONCRETE PAD, & POSITIONED NO LESS THAN 24" FROM THE PERIMETER WALL.
8. NEW SUPPLY AIR FAN SF-1C-35 TO BE INSTALLED WITHIN ENERGY RECOVERY UNIT ERU-1C.
9. INSTALL NEW RIGID DUCT CONNECTION BETWEEN THE EXHAUST AIR AND OUTSIDE AIR DUCTS. BALANCING DAMPER TO BE INSTALLED, WHICH SHALL LIMIT RETURN AIR TO 1,388 CFM. DUCTS SHALL
UNDERGO LEAK TESTING.
10. NEW EXHAUST FAN TO BE PROVIDED.
11. NEW EXHAUST DUCT MAIN TO BE PROVIDED, INCLUDING CONNECTION TO EXISTING DUCT RUN. DUCTS SHALL UNDERGO LEAK TESTING.
12. NEW EXHAUST DUCT MAIN TO BE PROVIDED, INCLUDING DISCHARGE AT EXISTING EXHAUST PLENUM AND MOTORIZED DAMPER. DUCTS SHALL UNDERGO LEAK TESTING.
13. PROVIDE NEW DUCT WITH 2" CLASSIFICATION.
14. EXISTING CONCRETE PATHWAY WALKAROUND TO BE EXTENDED TO ALLOW ADEQUATE SPACE FOR PEDESTRIANS TO PASS THE NEW CONDENSING UNIT. WALKWAY SHOULD ALLOW AT LEAST 4.5' OF
CLEARANCE. CONTRACTOR SHALL ENSURE THAT NEW PATHWAY WILL MATCH THE DESIGN FOR THE EXISTING PATHWAY.
15. THE EXISTING ERU EXHAUST FAN SHALL BE RAMPED DOWN BY 600 CFM (OR EQUIVALENT TO EXHAUST RATE FROM EF-35-1) TO MAINTAIN EXISTING PRESSURIZATION CONDITIONS OF BUILDING 35.
16. EXISTING DUCT BRANCHES TO BE CAPPED AND SEALED
17. EXISTING SIDEWALK CONTINUES AROUND BUILDING, BUT IS NOT DEPICTED IN DRAWING
18. DRIVEWAY NEXT TO BUILDING SHOULD REMAIN CLEAR DURING CONCRETE POURING FOR SIDEWALK EXTENSION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
MH106
BLDG 35 - HVAC ERU & HVAC
UPGRADES
A
F i l e
P a t h
P
M
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
RETRO-COMMISSIONING
MECHANICAL CORRECTION
Lebanon, PA
595-18-101
Project Director
HL SW
Revisions: Date:
Office of
Construction and
Facilities
Management
1100 CHURCH STREET HONESDALE, PA 18431
570-253-0846 OFFICE 570-253-1935 FAX
WWW.NEINFRA.COM
ALARES ENGINEERING 248
COPELAND STREET, QUINCY, MA
02169 PHONE: 617-481-6390
WWW.ALARESENGINEERING.COM
NV5 70 FARGO STREET, SUITE
800, BOSTON, MA 02210 TEL:
857-221-5942
SCALE:
BUILDING 35 - HVAC DEMOLITION PLAN - ATTIC
1/8"=1'-0"
SCALE:
BUILDING 35 - ATTIC HVAC NEW WORK PLAN - ATTIC
1/8"=1'-0"
MH106
MH106
November 22, 2019
FINAL BID DOCUMENTS
SUBMISSION
FINAL BID DOCUMENTS
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
M
GENERAL NOTES FOR DEMOLITION & CONSTRUCTION:
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 5.4, 5.7 AND 5.8
DEMOLITION NOTES:
1. EXISTING SUPPLY AIR DUCTWORK TO BE DEMOLISHED TO FACILITATE INSTALLATION OF RELOCATED HOT GAS REHEATS & ADAPTOR.
2. EXISTING SUPPLY AIR FAN TO BE REMOVED FROM ERU-1P.
3. EXISTING FLEXIBLE DUCT CONNECTION BETWEEN OUTSIDE AIR DUCT & EXHAUST AIR DUCT TO BE DEMOLISHED.
NOTE - THE CONTRACTOR SHALL MINIMIZE THE DURATION OF ANY ERU SHUTDOWN BY COMPLETING AS MUCH WORK AS PRACTICAL WITHOUT INITIATING A
SHUTDOWN. NOTICE OF AN IMPENDING ERU SHUTDOWN SHALL BE CAREFULLY COORDINATED WITH THE COR WITH ADVANCED NOTICE.
1P-36
CC
ACCU
1P-36
SF
1P-36
GENERAL NOTES FOR DEMOLITION & CONSTRUCTION:
1. REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS FINAL BID DOCUMENTS BOD SECTION 5.4, 5.7 AND 5.8
2. CONTRACTOR SHALL HAVE ERU HEAT PUMP SERVICED AT ANY TIME, BY A MANUFACTURER-CERTIFIED TECHNICIAN.
NOTES:
1. EXISTING HOT GAS REHEAT COIL TO BE REMOVED FROM ERU & INSTALLED ALONG EXISTING SUPPLY AIR DUCT.
2. NEW DUCT ADAPTOR TO BE INSTALLED TO SUPPLY AIR DUCT & NEW POSITION OF HOT GAS REHEAT COIL.
3. HOT GAS REHEAT PIPING SERVING HOT GAS REHEAT COIL TO BE REPIPED TO NEW POSITION OF HOT GAS REHEAT COIL.
4. NEW SUPPLEMENTAL DX COOLING COIL TO BE INSTALLED WITHIN EXISTING ERU, IN THE PREVIOUS POSITION OF THE HOT GAS REHEAT COIL. SEE DETAIL
#7 ON MH502 FOR FAN AND DRAIN PAN CONFIGURATION. EXISTING DRAIN PAN SHALL BE ABLE TO COLLECT CONDENSATE FROM BOTH EXISTING AND
SUPPLEMENTAL COOLING COILS. OTHERWISE NEW CONDENSATE PAN SHALL BE INSTALLED.
5. REFRIGERANT PIPING SERVING DX COOLING COIL TO BE PLUMBED TO NEW EXTERNAL DX UNIT.
6. EXTERNALLY POSITIONED REFRIGERANT PIPING SHALL BE OBSCURED FROM VIEW, PROVIDE OUTDOOR COVER FOR REFRIGERANT PIPE.
7. NEW 4-TON CONDENSING UNIT TO BE POSITIONED ON GROUND OUTSIDE. UNIT SHALL BE MOUNTED ON A CONCRETE PAD, POSITIONED NO LESS THAN
24" FROM THE PERIMETER WALL. CONCRETE PAD SHALL BE 6" THICK & APPROX. 6" WIDER THAN THE UNIT (I.E. APPROX. 37" x 34").
8. NEW SUPPLY AIR FAN SF-1P-36 TO BE INSTALLED WITHIN ENERGY RECOVERY UNIT ERU-1P.
9. OPENINGS ON OUTSIDE AIR & EXHAUST AIR DUCT TO BE CLOSED, PATCHED AND SEALED. DUCTS SHALL UNDERGO LEAK TESTING.
10. PROVIDE NEW DUCT WITH 2" CLASSIFICATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 -
MH107
BLDG 36 - HVAC ERU & HVAC
UPGRADES
A
F i l e
P a t h
P
M
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
RETRO-COMMISSIONING
MECHANICAL CORRECTION
Lebanon, PA
595-18-101
Project Director
HL / DM SW
Revisions: Date:
Office of
Construction and
Facilities
Management
1100 CHURCH STREET HONESDALE, PA 18431
570-253-0846 OFFICE 570-253-1935 FAX
WWW.NEINFRA.COM
ALARES ENGINEERING 248
COPELAND STREET, QUINCY, MA
02169 PHONE: 617-481-6390
WWW.ALARESENGINEERING.COM
NV5 70 FARGO STREET, SUITE
800, BOSTON, MA 02210 TEL:
857-221-5942
SCALE:
BUILDING 36 - HVAC DEMOLITION PLAN - ATTIC
1/4"=1'-0"
SCALE:
BUILDING 36 - HVAC NEW WORK PLAN - ATTIC
1/4"=1'-0"
MH107 MH107
November 22, 2019
FINAL BID DOCUMENTS
SUBMISSION
FINAL BID DOCUMENTS
AutoCAD SHX Text
ERU-1P
AutoCAD SHX Text
DD
AutoCAD SHX Text 20x16
AutoCAD SHX Text 20x16
AutoCAD SHX Text
WL-4P
AutoCAD SHX Text M
AutoCAD SHX Text
EXHAUST AIR
AutoCAD SHX Text
IN EXHAUST AIR STREAM
AutoCAD SHX Text
ERU-1P
AutoCAD SHX Text
DD
AutoCAD SHX Text 20x16
AutoCAD SHX Text 20x16
AutoCAD SHX Text
WL-4P
AutoCAD SHX Text M
AutoCAD SHX Text
EXHAUST AIR
IN EXHAUST AIR STREAM
3" CHWS/R FROM
CENTRAL CHILLER PLANT
3" CHR
3" CHS
ISOLATION VALVES ARE
ON VERTICAL RISER
3" CHWS/R FROM
CENTRAL CHILLER PLANT
DP
F M
F M
P
1-106
P
2-106
3" CHR
3" CHS
ISOLATION VALVES ARE
ON VERTICAL RISER
VFD
1-106
VFD
2-106
D P
S
FM FM
FM-1-XX
FM-2-XX
PCWS FROM
CENTRAL CHILLER
PCWR TO
CENTRAL CHILLER
P-1-XX
P-2-XX
BALANCING VALVE
DIFFERENTIAL
PRESSURE
SENSOR
BUILDING LOAD
T2 T3
VFD
VFD
T1
T5T4
MINIMUM
BYPASS
CONTROL
VALVE
HYDRONIC
DECOUPLER
SIGNAL
TO BAS
WALL MOUNTED
READ-OUT PANEL
FOR FM (TYP)
SIGNAL
TO BAS
FM
FM-2-XX
SIGNAL
TO BAS
OPTIONAL SECONDARY
CHW FLOW METER
LOCATION
PRIME CHW FLOW
METER
SECONDARY CHW
FLOW METER
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS CHILLED WATER INVESTIGATION FINAL BID DOCUMENTS
BOD SECTION 5.9
NEW WORK NOTES:
1. OTHER EQUIPMENTS, PIPING, ACCESSORIES WHICH ARE NOT RELATED TO CHILLED WATER SYSTEM ARE HIDDEN FOR CLARITY
2. PROVIDE N+1 PUMP AS SPECIFIED ON THE SCHEDULE DRAWING
3. CONFIRM IF LOCATION OF EACH VFD IS ACCEPTABLE IN THE FIELD. ENSURE EQUIPMENT IS ACCESSIBLE AND THAT NO PIPES RUN
ABOVE EITHER UNIT.
4. REFER TO BELOW PRIMARY/SECONDARY CHILLED WATER BYPASS MODEL FOR MORE DETAIL ON REQUIRED EQUIPMENT AND
ACCESSORIES.
5. REFER TO CONTROL SEQUENCE FOR MORE DETAIL OF PUMP CONTROL.
REFERENCE DOCUMENT - RETRO-COMMISSIONING MECHANICAL CORRECTIONS CHILLED WATER INVESTIGATION FINAL BID DOCUMENTS BOD
SECTION 5.9
DEMOLITION NOTES:
1. THE EXISTING CHILLED WATER SYSTEM SERVING AHU 106-AC-1 WAS DRAWN BASED ON OBSERVATION IN THE FIELD AS THERE IS NO
ACCURATE AS-BUILT DRAWING AVAILABLE.
2. OTHER EQUIPMENTS, PIPING, ACCESSORIES WHICH ARE NOT RELATED TO CHILLED WATER SYSTEM MAY BE HIDDEN FOR CLARITY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
MH108
BUILDING 106 CHILLED WATER
SYSTEM PIPING MODIFICATION
A
F i l e
P a t h
P
M
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
RETRO-COMMISSIONING
MECHANICAL CORRECTION
Lebanon, PA
595-18-101
Project Director
HL / DM HL
Office of
Construction and
Facilities
Management
ARCHITECT/ENGINEER OF RECORD
CONSULTANT
Revisions: Date:
ALARES ENGINEERING 248
COPELAND STREET, QUINCY, MA
02169 PHONE: 617-481-6390
WWW.ALARESENGINEERING.COM
NV5 70 FARGO STREET, SUITE
800, BOSTON, MA 02210 TEL:
857-221-5942
1100 CHURCH STREET HONESDALE, PA 18431
570-253-0846 OFFICE 570-253-1935 FAX
WWW.NEINFRA.COM
SCALE:
BUILDING 106 CHILLED WATER SYSTEM PIPING MODIFICATION - DEMO
3/8"=1'-0"
MH108
SCALE:
BUILDING 106 CHILLED WATER SYSTEM PIPING MODIFICATION - NEW WORK
3/8"=1'-0"
MH108
SCALE:
PRIMARY/SECONDARY CHILLED WATER BYPASS MODEL
NTS
MH108
November 22, 2019
FINAL BID DOCUMENTS
SUBMISSION
FINAL BID DOCUMENTS
AutoCAD SHX Text 14"x8" T.R.
AutoCAD SHX Text
225 CFM
AutoCAD SHX Text 8"x6" TR- 75 CFM
AutoCAD SHX Text 13"x13" UP
AutoCAD SHX Text
TO 106-RVI
AutoCAD SHX Text
425 CFM
AutoCAD SHX Text 13"x6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 10"x6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"x6" DN
AutoCAD SHX Text
WALL FIN CONVECTOR
AutoCAD SHX Text
3 LINEAL FEET
AutoCAD SHX Text
PROVIDE STEAM CONTROL VALVE.
AutoCAD SHX Text 6"x6"
AutoCAD SHX Text 6"x8"C.R
AutoCAD SHX Text
150 CFM
AutoCAD SHX Text 40"x16" DN
AutoCAD SHX Text
5140 CFM
AutoCAD SHX Text M
AutoCAD SHX Text
LOUVER & ¼" MESH
AutoCAD SHX Text
SCREEN - 14 SQ FT MIN
AutoCAD SHX Text
MASONRY OPENING.
AutoCAD SHX Text
2415 CFM
AutoCAD SHX Text
MOTOR
AutoCAD SHX Text
OPERATED
AutoCAD SHX Text
DAMPER D2
AutoCAD SHX Text M
AutoCAD SHX Text
MOTOR
AutoCAD SHX Text
OPERATED
AutoCAD SHX Text
DAMPER D1
AutoCAD SHX Text
LOUVER & ¼" MESH
AutoCAD SHX Text
SCREEN - 14 SQ FT MIN
AutoCAD SHX Text
MASONRY OPENING.
AutoCAD SHX Text
1540 CFM
AutoCAD SHX Text
REHEAT COIL
AutoCAD SHX Text
COOLING COIL
AutoCAD SHX Text
STEAM GRID
AutoCAD SHX Text
HUMIDIFIER
AutoCAD SHX Text
CURTAIN FILTER
AutoCAD SHX Text
PLENUM
AutoCAD SHX Text
FILTER
AutoCAD SHX Text
PREHEAT COIL
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text
106-AC-1
AutoCAD SHX Text
HOT WATER GENERATOR
AutoCAD SHX Text
AutoCAD SHX Text 4A
AutoCAD SHX Text 2D
AutoCAD SHX Text 14"x8" T.R.
AutoCAD SHX Text
225 CFM
AutoCAD SHX Text 8"x6" TR- 75 CFM
AutoCAD SHX Text 13"x13" UP
AutoCAD SHX Text
TO 106-RVI
AutoCAD SHX Text
425 CFM
AutoCAD SHX Text 13"x6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 10"x6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"x6" DN
AutoCAD SHX Text
WALL FIN CONVECTOR
AutoCAD SHX Text
3 LINEAL FEET
AutoCAD SHX Text
PROVIDE STEAM CONTROL VALVE.
AutoCAD SHX Text 6"x6"
AutoCAD SHX Text 6"x8"C.R
AutoCAD SHX Text
150 CFM
AutoCAD SHX Text 40"x16" DN
AutoCAD SHX Text
5140 CFM
AutoCAD SHX Text M
AutoCAD SHX Text
LOUVER & ¼" MESH
AutoCAD SHX Text
SCREEN - 14 SQ FT MIN
AutoCAD SHX Text
MASONRY OPENING.
AutoCAD SHX Text
2415 CFM
AutoCAD SHX Text
MOTOR
AutoCAD SHX Text
OPERATED
AutoCAD SHX Text
DAMPER D2
AutoCAD SHX Text M
AutoCAD SHX Text
MOTOR
AutoCAD SHX Text
OPERATED
AutoCAD SHX Text
DAMPER D1
AutoCAD SHX Text
LOUVER & ¼" MESH
AutoCAD SHX Text
SCREEN - 14 SQ FT MIN
AutoCAD SHX Text
MASONRY OPENING.
AutoCAD SHX Text
1540 CFM
AutoCAD SHX Text
REHEAT COIL
AutoCAD SHX Text
COOLING COIL
AutoCAD SHX Text
STEAM GRID
AutoCAD SHX Text
HUMIDIFIER
AutoCAD SHX Text
CURTAIN FILTER
AutoCAD SHX Text
PLENUM
AutoCAD SHX Text
FILTER
AutoCAD SHX Text
PREHEAT COIL
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text
106-AC-1
AutoCAD SHX Text
HOT WATER GENERATOR
AutoCAD SHX Text
AutoCAD SHX Text 4A
AutoCAD SHX Text 2D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AIR HANDLING UNIT DRAIN TRAP DETAIL
NTS
DRAW THRU
BLOW THRU
2" [50mm]
PLUS X
1" [25mm]
MINIMUM
X
2X
UNIT TYPE
A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME SIZE
AS THE NIPPLE ON THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L OR TYPE
M UNLESS NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
FLOOR SINK
DRAIN
PAN
NOTE:
1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS
INDOORS AND DOES NOT PASS THROUGH RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE
TO BE CONNECTED.
A B m m
DIELECTRIC
FITTING
STEAM COIL - PIPING CONNECTIONS
NTS
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON
VIBRATION ISOLATOR UNITS, THE RUNOUT PIPING FOR
CONNECTIONS TO COIL SHALL BE INSTALLED WITH
SWING JOINTS TO ALLOW FOR THE VIBRATION.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT
WILL NOT BLOCK THE SWING OR USE OF ACCESS DOORS
OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING
OF FILTERS, VALVES, OR EQUIPMENT.
3. TRAP EACH COIL SEPARATELY WHEN INSTALLED IN A
BANK OF TWO OR MORE HIGH. ALSO PROVIDE SEPARATE
VACUUM BREAKER FOR EACH COIL.
4. TWO TRAP ASSEMBLIES IN PARALLEL ARE SHOWN. TWO
TRAPS REQUIRED WHEN CONDENSATE LOAD IS 2400
KG/HR [5,000 LBS/HR] OR GREATER.
5. SUPPLY & RETURN PIPES ARE SHOWN FROM SAME END.
REHEAT COIL MAY HAVE SUPPLY & RETURN PIPES FROM
OPPOSITE ENDS.
PIPE HANGER
SHALL SUPPORT
PIPING
INDEPENDENT OF
COIL (TYP.)
PITCH COIL DOWN 8mm
[1/4"] PER FOOT TO
CONDENSATE OUTLET
FULL SIZE
TAPPING
PRESSURE
GAGE
SCALE POCKET
SEE NOTE
NO. 4
STEAM CONDENSATE
RETURN
m
C
H
E
C
K
V
A
L
V
E
V
A
C
U
U
M
B
R
E
A
K
E
R
INCREASER,
IF REQUIRED
REDUCER,
IF REQUIRED
m m
M
I N m m
M
I N
STEAM SUPPLY
NTS
COIL
TEST PLUG (TYP.)
REDUCER, IF REQUIRED
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS
(TYP.)
WATER SUPPLY
SHUT OFF VALVE
MV
MODULATION CONTROL VALVE
BALANCING VALVE
SHUT OFF VALVE
SHUT OFF VALVE
AHU COOLING COILS -PIPING CONNECTIONS
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE
43 - SEE SPECIFICATIONS
PROVIDE INSULATION
SHIELD & INSERT FOR ALL
PIPING (200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE
CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON
TRAPEZE.
NOM. SIZE
PIPE
TUBING
m m
M
A X mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU
[7]
[5]
[1]
[7]
[6]
[1
[7]
[7]
[1
[9]
[8]
[2]
[10]
[8]
[2
[11]
[9]
[3]
[12]
[10]
PIPE HANGER
NTS
STEAM TRAP ASSEMBLY
m m
M I m m m m
M I N
M I N m m
DRIP LEG (TYP.)
20mm [3/4"] DRAIN
(ALTERNATE LOCATIONS)
(TYPICAL)
STEAM LINE
(TYPICAL)
CAP (TYPICAL)
PIPE T0 STEAM
TRAP (TYPICAL)
NOTE:
DRIP POCKET PIPE SIZE SAME AS
STEAM MAIN UNLESS OTHERWISE
NOTED.
STEAM LINE DRIP POCKET
20mm [3/4"] MIN.
FROM DRIP
CONNECTION
DRIP
RETURN
10mm [3/8"] TEST
CONNECTION
STEAM LINE DRIP POCKET AND STEAM TRAP ASSEMBLY
NTS
(WITH EQUIPMENT MOUNTED IN DUCT)
DUCTWORK TRANSITIONS
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
M
A
X
M
A
X
E Q
U I P
M E
N T
AIR
FLOW
AIR
FLOW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEW
TYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
M
A
X
M
A
X
M A
X
M
A
X
NTS
SUPPLY DUCTWORK TAKE-OFFS
AIR SPLIT DUCT TAKE-OFF PLAN
VIEW
BRANCH DUCT TAKE-OFF PLAN VIEW
SUPPLY REGISTER TAKE-OFF
PLAN VIEW
AIR
FLOW
AIR
FLOW
A I R
F L O
W
SUPPLY REGISTER
OR BRANCH DUCT
TURNING VANES
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN FOR
SPLIT DIMENSION
PROVIDE VOLUME
DAMPER
PROVIDE VOLUME
DAMPER
ADJUSTABLE
METAL ROD
OR LINKAGE
TOP REGISTER
MAIN
SUPPLY
DUCT
VOLUME EXTRACTOR; ADJUSTABLE FROM
FULLY CLOSED POSITION TO CFM NOTED
ON FLOOR PLANS
AIR
FLOW
AIR
FLOW
1/4 W OR 4" [100mm] MIN.
AIR
FLOW
MAIN SUPPLY
DUCT
W
A I R
F L O
W
NTS
VOLUME DAMPER DETAIL
NOTE:
1.
2.
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR
MULTI-BLADE DAMPERS & ROUND DAMPERS.
INSULATION SEE
SPECIFICATION
DAMPER BLADE
1/8" [6mm]
CLEARANCE
ALL AROUND
OUTSIDE END BEARING
INSIDE END BEARING
HANDLE WITH
LOCKING
QUADRANT
INSULATION
STAND-OFF
1/2" [15mm] ROUND
ROD PIN
DUCT
STIFFEN BLADE
AS REQUIRED
SIDE ELEVATION SECTION
NTS
ROUND DUCT HANGERS
2500 [1133]
1320 [598]
420 [190]ONE 1 [25] x 18 GA STRAP36 [900]
TWO 1/2 [13]Ø RODS
TWO 3/8 [10]Ø. RODS
ONE 1 [25] x 16 GA STRAP
84 [2100]
60 [1500]
50 [1250] 700 [317]
ONE 1 [25] x 22 GA STRAP
QUANTITY/SIZE
MAX. DUCT Ø
HANGER STRAPS OR RODS
MAX. LOAD
LBS. [kg]
260 [119]
MAX.
144 [3600]
IN. [mm]
SPACING
IN. [mm]
IN. [mm]
144 [3600]
144 [3600]
144 [3600]
144 [3600]
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING AND
INSULATION, BUT NO EXTERNAL LOAD.
BAND
OVER 50"
[1250mm]Ø
HANGER RODS
BAND OF SAME
SIZE AS HANGER
STRAP
LOAD RATED
FASTENERS
50" [1250mm]Ø
& UNDER
NTS
D
R
I
V
Q
U
I
P
M
E
N
T
M
O
T
O
R
VIBRATION ISOLATION BASES
TYPICAL STRUCTURAL
STEEL MEMBER FOR
EQUIPMENT
TYPE"B"
WELDED STEEL BASE
NUMBER OF ISOLATION
UNITS AS REQUIRED
S
H
A
F
T
NTS
C
2.50
A
FRONT VIEW END VIEW
TOP VIEW
LEGEND
- LOUVER HEIGHT --- A = 18.5
- CURB CAP WIDTH ---- B = 28
- CURB CAP LENGTH ---- C = 56
- OVERALL WIDTH ---- D = 34
- OVERALL LENGTH ---- E = 62
-…