This document provides details on a federal contract opportunity for retro-commissioning mechanical corrections at the Lebanon VA Medical Center. The Department of Veterans Affairs Veterans Integrated Service Network 4 is seeking a single firm-fixed price contract for construction services including all trades, labor, materials, permits and supervision. The period of performance is 545 calendar days from notice to proceed, and the estimated value is between $1-2 million. This opportunity is set aside as 100% service-disabled veteran-owned small business, and responses are due on or about October 28, 2020. Interested parties must register in SAM and be verified through the VA's Center for Veterans Enterprise by the time of proposal submission. The pre-bid conference will be held approximately one week after posting to the beta SAM site.

View the file

Other files

File Type Posted
S06 Drawings - Full Size Retro-Commissioning 12-02-20.pdf PDF
S06 Lebanon BOD 100 Percent CHW Study With Appendices 12-01-20.pdf PDF
S06 Amendment A0002 to 36C24421R0005 12-03-20.docx DOCX document
S03 SAM Wording for Amend A0002 to 36C24421R0005 12-03-20.docx DOCX document
S06 Diversitech Refrigerant Pipe Cover 12-01-20.pdf PDF
S06 Lebanon VAMC Infection Prevention Program.docx DOCX document
S04 Site Visit Agenda - Retro-Commissioning.doc DOC document
S06 Roof Curb Detail 12-01-20.pdf PDF
36C24421R0005 0001_2.docx DOCX document
S06 Amendment A00001 to 36C24421R0005 11-13-20.docx DOCX document
S03 SAM Wording for Amend A00001 to 36C24421R0005 11-13-20.docx DOCX document
S02 Drawings File 1 36C24421R0005 Retro-Commissioning.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24421R0005.docx DOCX document
EXHIBIT C - Calculation of Self-Performed Work 36C24421R0005.docx DOCX document
S02 Final Bid Documents Submission Nov. 2019.pdf PDF
S02 Study Appendix C - Retro-Commissioning.pdf PDF
S02 Appendix C Cut Sheets File 2 - Retro-Commissioning.pdf PDF
S02 SOW - Retro-Commissioning Mech Corrections Construction 595-18-101_Rev1.docx DOCX document
EXHIBIT E - Past Performance Questionnaire 36C24421R0005.docx DOCX document
S02 Study Appendix D - Retro-Commissioning.pdf PDF
S02 Wage Determination 10-02-20.pdf PDF
S02 Drawings File 3 36C24421R0005 Retro-Commissioning.pdf PDF
S02 Final BOD Chilled Water Study.pdf PDF
S02 Study Appendix E - Retro-Commissioning.pdf PDF
S02 Solicitation 36C24421R0005 10-27-2020.docx DOCX document
S02 Study Appendix A - Retro-Commissioning.pdf PDF
S02 Study Appendix B - Retro-Commissioning.pdf PDF
S02 Drawings File 2 36C24421R0005 Retro-Commissioning.pdf PDF
S02 Site-Plan.pdf PDF
S02 Specifications 36C24421R0005 Retro-Commissioning.pdf PDF
S02 Appendix C Cut Sheets File 1 - Retro-Commissioning.pdf PDF
P03 J_A - HVAC Controls -Retro-Commissioning - Signed.pdf PDF
36C24421R0005_2.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire 36C24421R0005.docx DOCX document
36C24421R0005_1.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit B – Subcontractor Information and Consent Form

Each major subcontractor and/or Teaming Partner must also complete an Exhibit B, “Subcontractor Information and Consent Form” to be considered. Offerors shall have major subcontractors identify on the Exhibit A two (2) references, owners (if they were the Prime) or other Prime contractors they have worked for. References for subcontractors from the proposing offeror are not acceptable. See Exhibit “A” format for information to be provided. Written references for subcontractors may be included and are encouraged; however, subcontractors do not need to send out past performance questionnaires.

A. Multiple Subcontractors may be named for the same discipline but is limited to a maximum of three (3) subcontractors per discipline.

B. Provide information regarding the assessment of liquidated damages on any contracts within the last five (5) years. (Frequency, circumstances, severity of problem, etc.)

C. Offerors are strongly encouraged to include with their proposals information on problems encountered on relevant projects and the specific corrective actions taken to remedy the problems.

D. Other Past Performance Considerations. Information provided, shall be limited to the period starting fine (5) years prior to the solicitation release date.

a. -Effectiveness of value engineering (VEC) proposals you submitted on prior contracts. (Provide a brief description; impact on cost, schedule, efficiency or quality; contract number; name and phone number of the customer benefiting from the VEC).

b. -Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations.

c. -Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).

Subcontractor and/or Teaming Partner Consent for the Release of Past Performance Information to the Prime Contractor and Reference Information:

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance relevancy we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms shall be submitted to the offering contractor for submission with the past performance volume.

(Name of Firm) is currently planning on participating as a (subcontractor and or a teaming partner) with (prime contractor or name of entity providing proposal) in responding to the Request for Proposal Number 36C24421R0005 – Retro-Commissioning Mechanical Corrections - Construction issued by the Department of Veterans Affairs, Lebanon VA Medical Center, 1700 S. Lincoln Avenue, Lebanon, PA 17042.

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.

(Signature) (Title of Individual with authority to sign for and legally bind the company

Address:

City/State/Zip Code: Date:

Reference List (required):

1. Contract No. And Title

Describe your role (Prime/Sub) and work Performed

Reference POC Name Phone Fax

Email address:

2. Contract No. And Title

Describe your role (Prime/Sub) and work Performed

Reference POC Name Phone Fax

Email address:

3. Contract No. And Title

Describe your role (Prime/Sub) and work Performed

Reference POC Name_ Phone Fax

Email address:

Page 1 of Page 1 of