EXHIBIT C - Calculation of Self-Performed Work 36C24421R0005.docx

DOCX document 39 KB Posted

Attached to
Z1DA--Retro-Commissioning Mechanical Corrections
Solicitation number
36C24421R0005
Issued by

About this file

This document provides details for a federal construction contract opportunity for retro-commissioning mechanical corrections at the Lebanon VA Medical Center. The Department of Veterans Affairs VISN 04 Contracting Office will issue a Request for Proposal seeking a single firm fixed-price contract to provide all required construction services, tools, travel, trades, labor, materials, permits, licenses and supervision. The work must be completed within 545 calendar days of the notice to proceed. This project is set aside as a total small business service-disabled veteran-owned small business set-aside, with an estimated value between $1,000,000 to $2,000,000. The solicitation will be issued on or around October 28, 2020, with a pre-bid conference approximately one week after posting. Responses are due in accordance with the terms of the solicitation.

View the file

Other files

File Type Posted
S06 Drawings - Full Size Retro-Commissioning 12-02-20.pdf PDF
S06 Lebanon BOD 100 Percent CHW Study With Appendices 12-01-20.pdf PDF
S06 Amendment A0002 to 36C24421R0005 12-03-20.docx DOCX document
S03 SAM Wording for Amend A0002 to 36C24421R0005 12-03-20.docx DOCX document
S06 Diversitech Refrigerant Pipe Cover 12-01-20.pdf PDF
S06 Lebanon VAMC Infection Prevention Program.docx DOCX document
S04 Site Visit Agenda - Retro-Commissioning.doc DOC document
S06 Roof Curb Detail 12-01-20.pdf PDF
36C24421R0005 0001_2.docx DOCX document
S06 Amendment A00001 to 36C24421R0005 11-13-20.docx DOCX document
S03 SAM Wording for Amend A00001 to 36C24421R0005 11-13-20.docx DOCX document
S02 Drawings File 1 36C24421R0005 Retro-Commissioning.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24421R0005.docx DOCX document
S02 Final Bid Documents Submission Nov. 2019.pdf PDF
S02 Study Appendix C - Retro-Commissioning.pdf PDF
S02 Appendix C Cut Sheets File 2 - Retro-Commissioning.pdf PDF
S02 SOW - Retro-Commissioning Mech Corrections Construction 595-18-101_Rev1.docx DOCX document
EXHIBIT E - Past Performance Questionnaire 36C24421R0005.docx DOCX document
S02 Study Appendix D - Retro-Commissioning.pdf PDF
S02 Wage Determination 10-02-20.pdf PDF
S02 Drawings File 3 36C24421R0005 Retro-Commissioning.pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form 36C24421R0005.docx DOCX document
S02 Final BOD Chilled Water Study.pdf PDF
S02 Study Appendix E - Retro-Commissioning.pdf PDF
S02 Solicitation 36C24421R0005 10-27-2020.docx DOCX document
S02 Study Appendix A - Retro-Commissioning.pdf PDF
S02 Study Appendix B - Retro-Commissioning.pdf PDF
S02 Drawings File 2 36C24421R0005 Retro-Commissioning.pdf PDF
S02 Site-Plan.pdf PDF
S02 Specifications 36C24421R0005 Retro-Commissioning.pdf PDF
S02 Appendix C Cut Sheets File 1 - Retro-Commissioning.pdf PDF
P03 J_A - HVAC Controls -Retro-Commissioning - Signed.pdf PDF
36C24421R0005_2.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire 36C24421R0005.docx DOCX document
36C24421R0005_1.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK

EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK

SUBMITTED IN RESPONSE TO Request For Proposal 36C24421R0005 Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:

B.1 Total Offer Price: $

B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self performed)

B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)

B.4 Remainder is “Total amount of work to be performed under the Contract” = $

B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %

File details come from the government source that posted it. Updated .