EXHIBIT C - Calculation of Self-Performed Work 36C24421R0005.docx
DOCX document 39 KB Posted
- Attached to
- Z1DA--Retro-Commissioning Mechanical Corrections
- Solicitation number
- 36C24421R0005
About this file
This document provides details for a federal construction contract opportunity for retro-commissioning mechanical corrections at the Lebanon VA Medical Center. The Department of Veterans Affairs VISN 04 Contracting Office will issue a Request for Proposal seeking a single firm fixed-price contract to provide all required construction services, tools, travel, trades, labor, materials, permits, licenses and supervision. The work must be completed within 545 calendar days of the notice to proceed. This project is set aside as a total small business service-disabled veteran-owned small business set-aside, with an estimated value between $1,000,000 to $2,000,000. The solicitation will be issued on or around October 28, 2020, with a pre-bid conference approximately one week after posting. Responses are due in accordance with the terms of the solicitation.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
SUBMITTED IN RESPONSE TO Request For Proposal 36C24421R0005 Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.
Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work:
B.1 Total Offer Price: $
B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self performed)
B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)
B.4 Remainder is “Total amount of work to be performed under the Contract” = $
B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %