EXHIBIT A - Past Performance Relevancy Questionnaire 36C24421R0005.docx

DOCX document 32 KB Posted

Attached to
Z1DA--Retro-Commissioning Mechanical Corrections Federal contract opportunity
Solicitation number
36C24421R0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This document provides details on an upcoming federal contract opportunity for retro-commissioning mechanical corrections at the Lebanon VA Medical Center. The Veterans Integrated Service Network 04 Contracting Office will award a single firm-fixed price contract for construction services with a period of performance of 545 calendar days from notice to proceed. The project value is between $1,000,000 to $2,000,000, and the solicitation will be conducted in accordance with FAR Subpart 15. This opportunity is set aside 100% for Service-Disabled Veteran Owned Small Businesses. Interested parties should monitor the beta.SAM website for the solicitation issuing on or about October 28, 2020, and attend the pre-bid conference scheduled approximately one week later. Responses are due in accordance with the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Retro-Commissioning Mechanical Corrections, newest first.
File Type Posted
S04 Site Visit Agenda - Retro-Commissioning.doc DOC document
S06 Lebanon BOD 100 Percent CHW Study With Appendices 12-01-20.pdf PDF
S06 Amendment A0002 to 36C24421R0005 12-03-20.docx DOCX document
S06 Drawings - Full Size Retro-Commissioning 12-02-20.pdf PDF
S03 SAM Wording for Amend A0002 to 36C24421R0005 12-03-20.docx DOCX document
S06 Lebanon VAMC Infection Prevention Program.docx DOCX document
S06 Roof Curb Detail 12-01-20.pdf PDF
S06 Diversitech Refrigerant Pipe Cover 12-01-20.pdf PDF
S06 Amendment A00001 to 36C24421R0005 11-13-20.docx DOCX document
S03 SAM Wording for Amend A00001 to 36C24421R0005 11-13-20.docx DOCX document
36C24421R0005 0001_2.docx DOCX document
S02 Study Appendix C - Retro-Commissioning.pdf PDF
S02 Study Appendix B - Retro-Commissioning.pdf PDF
S02 Final BOD Chilled Water Study.pdf PDF
S02 Final Bid Documents Submission Nov. 2019.pdf PDF
S02 Drawings File 3 36C24421R0005 Retro-Commissioning.pdf PDF
S02 Drawings File 2 36C24421R0005 Retro-Commissioning.pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form 36C24421R0005.docx DOCX document
S02 Drawings File 1 36C24421R0005 Retro-Commissioning.pdf PDF
S02 Study Appendix E - Retro-Commissioning.pdf PDF
S02 Study Appendix A - Retro-Commissioning.pdf PDF
S02 Site-Plan.pdf PDF
EXHIBIT C - Calculation of Self-Performed Work 36C24421R0005.docx DOCX document
S02 Solicitation 36C24421R0005 10-27-2020.docx DOCX document
S02 Wage Determination 10-02-20.pdf PDF
S02 Study Appendix D - Retro-Commissioning.pdf PDF
S02 Appendix C Cut Sheets File 2 - Retro-Commissioning.pdf PDF
S02 SOW - Retro-Commissioning Mech Corrections Construction 595-18-101_Rev1.docx DOCX document
EXHIBIT E - Past Performance Questionnaire 36C24421R0005.docx DOCX document
P03 J_A - HVAC Controls -Retro-Commissioning - Signed.pdf PDF
S02 Appendix C Cut Sheets File 1 - Retro-Commissioning.pdf PDF
S02 Specifications 36C24421R0005 Retro-Commissioning.pdf PDF
36C24421R0005_2.docx DOCX document
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24421R0005.docx DOCX document
36C24421R0005_1.docx DOCX document
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1: Prepare no more than three (3) Part 1 forms:

Provide the following information requested in this format for each of the projects/contracts being described. Projects may be on going and cannot have been completed any later than five (5) years prior to the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use additional space as required.

A. Offeror (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as Prime or _Subcontractor

2. Contract Number

3. Original Contract $ Value Current/Final Contract $ Value

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Completion Date:

1. Original Date:

2. Current Schedule: _____________________

3. Estimate/Final Completion Date:

4. Primary cause for Contract Modifications

D. Provide detailed description of the work performed under the contract and describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)

In addition, address the following

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on projects awarded under this solicitation. Should you intend to use these same subcontractors, please list their company names and described their principal areas of work that they will perform.

3. Address any technical areas about this project you consider uniquely relevant to this solicitation.

E. Point of Contact for Owner/Government agency Contracting Officer and or inspector (COR / COTR); include a current phone number and email address for each.

EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE

End of Part 1- Questionnaire Requirements – Prepare and send Exhibit B Package to the reference(s) for each of the no more than three Construction Projects, or Specialty Trade if applicable provided in Exhibit A, Part 1. See below for Exhibit A, Part 2.

Page 1 of Page 1 of

Part 2, Additional offeror information required.

A. Name subcontractors and/or Teaming Partners to be utilized on this contract. Multiple subcontractors may be named for the same discipline but are limited to a maximum of three (3) subcontractors per discipline. As a minimum, provide the name(s) of subcontractors to be utilized in the following areas:

(Specialty Trades will address their specific trade for any major subcontractor or Teaming partner)

Page 1 of Page 1 of

File details come from the government source that posted it. Updated .