This document is a service report for cooling tower maintenance at the VA Albany Stratton Building in Albany, New York. It provides details of chemical treatment and water quality testing conducted on July 28, 2023 for three cooling towers. Parameters tested include conductivity, chlorine, polymer, pH, and bacteria levels. Notes indicate the towers and chemical pumps were checked for operation and leaks. The strainer for towers 1 and 2 was dirty and cleaned. Future routine water testing between service visits is recommended to ensure proper performance of the water treatment program. The report also includes contact information for the service provider, Barclay Water Management, and instructions on monitoring and flushing distal outlets under low flow conditions to maintain adequate monochloramine residuals.

View the file

Other files

File Type Posted
Albany SOW 2024 - Boiler-Chiller Chemical Treatment.doc DOC document
C03. 36C24223Q1082_3.pdf PDF
Questions II.docx DOCX document
36C24223Q1082_2.pdf PDF
36C24223Q1082_1.docx DOCX document
Cooling report June 2023 6-7-2023.pdf PDF
June Boiler Service 2023 6-23-2023.PDF PDF
Boiler report July 2023 7-28-2023.PDF PDF
P07. Wage (ALBANY).pdf PDF
36C24223Q1082.docx DOCX document
VAAR 819 219 77 VA Notice of Limitation on subcontracting.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Test Cooling Towers 1 & 2 Cooling Tower 3

Conductivity (Controller) (as uS/cm)

800 - 1200

800 - 1200

Conductivity (as uS/cm) 1181 800 - 1200

800 - 1200

Polymer, ppm 5.1 5 - 7

6.5 5 - 7

Chlorine, total (ppm as Cl2) 0.95

0.5 - 1.5

1.3

0.5 - 1.5

Bacteria, CFU/ml 0 0 - 10000

0 - 10000 pH 8.2

7.5 - 9

8.8

7.5 - 9

Opening Comment Towers 1-2 and 3 were online. Both towers chemical pumps were checked for operation, dosing, and leaks.

Tower 1 and 2 strainer was dirty and was pulled and cleaned. Chemical inventory was Ok at this time. Please keep up with daily checks during the warmer temperatures. Dip slides were taken during this visit and will be updated on the NYS DOH website after 48hr incubation. Thank you.

Cooling Towers 1 & 2 Online

Service Report 2 cooling service July 2023

Friday, July 28, 2023 9:23 AM EDT

VA Albany Stratton Bldg 113 Holland Ave Albany NY 12208

(518) 626-5000

Report Number: 588941 Recorded By: Logan Cote

(800) 253-2908 lcote@barclaywater.com

Stratton Bldg - Cooling Towers

Barclay Water Management, Inc. - 55 Chapel Street, Newton MA 02458 (800) 253-2908

Service Report 2 cooling service July 2023

Friday, July 28, 2023 9:23 AM EDT

VA Albany Stratton Bldg 113 Holland Ave Albany NY 12208

(518) 626-5000

Report Number: 588941 Recorded By: Logan Cote

(800) 253-2908 lcote@barclaywater.com

Stratton Bldg - Cooling Towers

Cooling Tower 3 Online

2 cooling service July 2023

Friday, July 28, 2023 9:23 AM EDT

VA Albany Stratton Bldg 113 Holland Ave Albany NY 12208

(518) 626-5000

Report Number: 588941 Recorded By: Logan Cote

(800) 253-2908 lcote@barclaywater.com

Stratton Bldg - Cooling Towers

2 cooling service July 2023

Friday, July 28, 2023 9:23 AM EDT

VA Albany Stratton Bldg 113 Holland Ave Albany NY 12208

(518) 626-5000

Report Number: 588941 Recorded By: Logan Cote

(800) 253-2908 lcote@barclaywater.com

Stratton Bldg - Cooling Towers

How are we doing? Let us know at feedback@barclaywater.com. We recommend that our customers perform routine water testing between service visits, to assure the proper performance of the water treatment program on a continuous basis. For supplemented potable water systems, it’s important to remember that monochloramine, like all oxidants, will degrade based on several factors, including but not limited to residence time, temperature, pH and presence of organic material. The iChlor system is designed to increase the monochloramine levels measured at the discharge of the unit. However, monochloramine residuals at distal outlets will vary based on the aforementioned factors in the building water system. Flushing may be required, under low/no flow conditions, to increase monochloramine level at distal points. REV. 07/05/2023