Amendment 0010.docx

DOCX document 34 KB Posted

Attached to
Y1DA--528A7-20-705 RENOVATE 2nd FLOOR ROME CBOC FOR PACT
Solicitation number
36C24221B0053
Issued by

About this file

This document contains an amendment to a solicitation for renovating the second floor of the Rome, New York VA Community Based Outpatient Clinic to establish a primary care clinic following Patient Aligned Care Team guidelines. The amendment provides revisions to specifications, drawings, and schedules. Revisions include adding cubicle curtains to specifications, revising room finish schedules, and adding a ceiling mounted patient lift system specification. Drawing revisions include identifying partition locations, adding demolition and plan notes, and revising door and window schedules. The estimated value of the construction project is between $5 million and $10 million. The Department of Veterans Affairs will issue an invitation for bid on or around July 22, 2021 via beta.SAM.gov. A site visit will be scheduled for interested parties.

View the file

Other files

File Type Posted
Amendment 0017.docx DOCX document
Amendment 0016.docx DOCX document
EY121B - Rev 1.pdf PDF
Amendment 0015.docx DOCX document
EP121B - Rev 2.pdf PDF
E-604 - Rev 2.pdf PDF
Amendment 0014.docx DOCX document
AE601 - Rev 2.pdf PDF
EY121C - Rev 1.pdf PDF
08 36 16 Sliding Door and Frames - Rev 1.pdf PDF
E-501 - Rev 1.pdf PDF
E-605 - Rev 1.pdf PDF
EY111 - Rev 1.pdf PDF
EY121A - Rev 1.pdf PDF
AE801 - rev 1.pdf PDF
Amendment 0013.docx DOCX document
AE802 - rev 1.pdf PDF
Amendment 0012.docx DOCX document
EL121C - Rev 1 - 211101.pdf PDF
EL121A - Rev 1 - 211101.pdf PDF
AE701 - rev 2.pdf PDF
AE501 - rev 1 - with VA red-marks.pdf PDF
AE121.A - rev 1.pdf PDF
RFI - Electric RFI.pdf PDF
EL121B - Rev 1 - 211101.pdf PDF
spec revised section - 09 06 00 Schedule of Finishes - rev 1.pdf PDF
AE121.C - rev 1.pdf PDF
AE121.B - rev 1 - with VA red-marks.pdf PDF
AE405 - Rev 1.pdf PDF
AE404 - Rev 1 - with VA red-marks.pdf PDF
AE406 - Rev 1.pdf PDF
Amendment 0011.docx DOCX document
AE407 - Rev 1.pdf PDF
AE408 - Rev 1.pdf PDF
AE403 - Rev 1.pdf PDF
AE508 - Rev 1.pdf PDF
AE409 - Rev 1.pdf PDF
AE401 - rev 1.pdf PDF
AE402 - rev 1.pdf PDF
spec added section - 11 73 00 Ceiling Mounted Patient Lift System.pdf PDF
AE507 - rev 1.pdf PDF
AE601 - rev 1.pdf PDF
spec revised section - 10 21 23 Cubicle Curtain Tracks and Curtains - REV 1b.pdf PDF
Asbestos - Lead-based Paint - Regulated Materials - 3-29-2019 report by Skelly and Loy - 92 pages.pdf PDF
spec added section - 08 31 13 Access Doors and Frames.pdf PDF
Amendment 0009.docx DOCX document
AE701 - rev 1.pdf PDF
EL111 - rev 1.pdf PDF
AE702 - rev 1.pdf PDF
Amendment 0008.docx DOCX document
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs Project #528A7-20-705 Renovate 2nd Floor Rome CBOC for PACT Rome, New York October 22, 2021

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 528A7-20-705 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 To all Offerors/Bidders

36C24221B0053 10-27-2021

X

X

AMENDMENT 10 ACKNOWLEDGE ALL AMENDMENTS ON BID

RFI QUESTIONS AND ANSWERS

SPECS AND DRAWING REVISIONS

TONY CLEMENTE

CONTRACTING OFFICER

RFI ANSWERS AND QUESTION

Q1. Fire Protection Specification: Is Schedule 10 pipe with roll grooves acceptable for use for pipes under 2-inch diameter?

A1. Provide the materials specified. After award, the contractor may submit a request for substitution with side by side comparison showing how the substituted material is equivalent to the specified material. The Architect/Engineer (A/E) and the VA will review the request for substitution. The non-specified material is considered NOT-approved until formal approval is given by the A/E and the VA Amendment No. 10 The following changes, additions, or deletions are hereby made a part of the Contract Documents for the above noted project, fully and completely as if the same were fully contained therein.

Specifications:

1. SECTION 10 21 23 CUBICLE CURTAIN TRACKS:

a. The section has been replaced in its entirety. Cubicle curtains have been added to this section.

2. SECTION 09 06 00 SCHEDULE OF FINISHES:

a. This section has been amended to identify finish revisions to the Sheet AE701 Temporary First floor plan and room finish schedule.

3. SECTION 11 73 00 Ceiling Mounted Patient Lift System:

a. This section has been added to the contract documents.

Drawings:

1. Sheet AD121, Second Floor Demolition Plan:

a. Add Demolition Plan General Note L to read as follows:

L. Existing second floor perimeter (exterior) 6-inch CMU wall to remain. Protect 6-inch CMU wall during demolition. Selective Demolition to be completed prior to main demolition as follows:

1. Break connection of existing partitions perpendicular to existing perimeter wall without damaging the existing CMU perimeter wall. Repair any damage to the perimeter wall that remains.

2. Break connection of existing hard (plaster) ceiling to existing perimeter wall without damaging the existing CMU perimeter wall. Repair any damage to the perimeter wall that remains.

3. Repair damage to existing perimeter wall caused by other demolition.

4. Repair damage to existing floor caused by demolition.

b. Add Demolition Plan Notes M to read as follows:

M. Existing plaster on interior face of perimeter 6-inch CMU wall shall remain, because it is believed that removal will damage the existing 6-inch CMU. Remove loose plaster. See AE501 partition type [GK] and repair plaster surface where flat surface is required for furring or provide shims for metal furring. At window heads and jambs repair plaster that remains.

c. Replace Note 13 to read as follows:

13. The existing opening at the 6-inch exterior CMU wall between Columns A-19 and A-21 may be used for construction access. This is a suggested temporary 2ND floor exterior wall opening for moving material in and out of the building, and the following are contractor responsibilities if the option is selected:

- At the 2ND floor near grid A-19.7 disassembly of the wall system includes the following:

o Contact the VA to photograph the removal at each layer (for backup information).

o Remove existing Trespa panels.

o Remove existing vertical Trespa aluminum sub-framing members. Select structurally acceptable cut locations.

o Remove existing 2-inch rigid insulation pieces.

o Remove existing horizontal Z-purlins screwed to Cold Formed Metal Framing (CFMF). Select structurally acceptable cut locations.

o Remove existing DensElement sheathing.

o Remove existing Rockwool batt insulation.

o Remove existing CFMF and bridging from 1’-4” Above Finished Floor (AFF) to 8’-0” AFF.

o Store existing exterior wall materials (including screws) for reinstallation.

- Provide a temporary lockable access-opening that protects the building from weather.

- OSHA and other safety regarding this access-opening is 100% contractor responsibility.

- Reassemble wall system when construction access is no longer required including the following:

o Fill the existing interior masonry opening with CFMF 6” x 1 5/8” x 16 gage at 16-inches on center (OC) with bridging 4-foot OC.

o Provide sheathing at each face of interior CFMF.

o Assume existing exterior CFMF removed is damaged and replace with CFMF 6” x 1 5/8” x 16 gage at 16-inches OC with bridging 4-foot OC.

o Reinstall existing Rockwool batt insulation.

o Assume existing DensElement is damaged and replace with DensElement plus Prosoco sealant at all joints and screws.

o Reinstall existing horizontal Z-purlins screwed to Cold Formed Metal Framing (CFMF).

o Reinstall existing 2-inch rigid insulation pieces.

o Reinstall existing vertical Trespa aluminum sub-framing members.

o Reinstall existing Trespa panels with 3/8-inch joint between panels.

- Contractor is responsible for replacing any damaged or lost exterior wall materials.

- Contractor shall warranty installation for 2-year period.

- Contractor is NOT responsible for any product warranty for existing products that are removed and reinstalled.

d. Change Demolition Plan Key Note 17 to read as follows:

17. Remove concrete block enclosure at steel columns. Repair damage to existing 6-inch CMU perimeter wall and finish plaster. Column plan details on AE504 and AE505 are typical, so use most similar detail if specific column is not drawn.

2. Sheet AE121, SECOND FLOOR OVERALL PLAN:

a. Add Architectural Plan Key Note 15 as follows:

15. Anchor top of existing exterior (perimeter) 6-inch Concrete Masonry Unit (CMU) walls at 4’-0” on center, and design anchors to resist 150 pounds per foot laterally at the top of wall. Assume top of all existing perimeter walls require support at 4’-0” on center.

b. Add Floor Plan General Note [H] as follows:

H. All sections and details on drawings are typical, use similar details where no specific detail is drawn.

3. Sheets AE121.A, AE121.B and AE121.C, Second Floor Plan Area A, B and C:

a. See revised drawings where Partition Types have been located and labeled.

4. Sheet AE501:

a. On drawing AE501, at partition type [GK], add the following note: Remove existing loose paint and loose plaster and repair plaster surface where flat surface is required for furring or provide shims for metal furring. At window heads and jambs repair plaster that remains.

1. Sheet AE601, DOOR AND WINDOW TYPES AND SCHEDULE:

0. The door and frame schedule has been revised as shown on the attached document. Revisions are noted in red text.

1. Sheet AE701 TEMPORARY FIRST FLOOR PLAN AND ROOM FINISH SCHEDULE:

1. Basis of Design – Finishes Schedule and Room Finish schedule has been revised as shown on the attached drawing.

1. Sheet AE702 SECOND FLOOR FINISH PLAN AND SCHEDULE:

2. Recessed Corner guards are located on this sheet.

End of Amendment No. 10 See attached document: AE401 - rev 1.

See attached document: AE402 - rev 1.

See attached document: AE507 - rev 1.

See attached document: AE601 - rev 1.

See attached document: spec added section - 11 73 00 Ceiling Mounted Patient Lift System.

See attached document: spec revised section - 10 21 23 Cubicle Curtain Tracks and Curtains - REV 1b.

Amendment No. 10 - 5