26_0327-Spec-000110-Add2 B4Elev 523A5-18-371.pdf

PDF 130 KB Posted

Attached to
Z2DA--523A5-18-371 Building 4 Elevator Replacement (Brockton)
Solicitation number
36C24126Q0250
Issued by

About this file

This is a Table of Contents document for VHA Master Specifications for a Building 4 Elevator Replacement project at the Department of Veterans Affairs Medical Center (VAMC) in Brockton, Massachusetts. The document is Addendum #2, dated March 27, 2026, for VA Project No. 523A5-18-371.

The specifications are organized across two volumes and cover 28 divisions of construction work following the MasterFormat standard. Volume 1 includes Division 00 (Special Sections), Division 01 (General Requirements), and Divisions 02-14, addressing demolition, existing conditions remediation (asbestos and lead-based paint removal), structural elements (masonry, metals, wood), thermal protection, openings, finishes, specialties, and conveying equipment. The primary focus is Division 14 Section 14 21 23 (Electric Traction Elevators), dated October 2018, which represents the core elevator replacement work. Additional related systems include fire suppression, plumbing, and HVAC. Volume 2 covers Divisions 23-28 and Division 32, addressing HVAC systems, integrated automation, electrical installations, communications systems, electronic safety and security systems, and exterior improvements. The document references a Regulated Building Materials Survey Report as an appendix. Each specification section is dated, with revision dates ranging from 2011 to 2018, indicating the specifications draw from VA standard technical requirements. The Table of Contents serves as the organizational framework for the complete project specifications and does not specify pricing, response dates, award dates, or other contract performance terms.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 4 Elevator Replacement 03-27-2026 Dept of Veterans Affairs VAMC Brockton Addendum #2 940 Belmont St., Brockton, MA 02301 VA Project No. 523A5-18-371

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

VOLUME 1

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 10 Table of Contents 00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 10-17 01 32 16.15 Project Schedules 04-13 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 05-16 01 45 00 Quality Control 01-18 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 99 99 Project Closeout

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 09-15 02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

DIVISION 03 – CONCRETE

No Sections included in this Division

DIVISION 04 – MASONRY

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

00 01 10-2

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 60 00 Flashing and Sheet Metal 07-14 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16 08 31 13 Access Doors and Frames 02-16 08 71 00 Door Hardware 03-26 08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 06-18 09 51 00 Acoustical Ceilings 12-16 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10-15 10 26 00 Wall and Door Protection 10-15 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

No Sections included in this Division

DIVISION 12 – FURNISHINGS

No Sections included in this Division

DIVISION 13 - SPECIAL CONSTRUCTION

No Sections included in this Division

DIVISION 14– CONVEYING EQUIPMENT

14 21 23 Electric Traction Elevators 10-18

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

00 01 10-3

22 05 11 Common Work Results for Plumbing 07-16 22 05 12 General Motor Requirements for Plumbing Equipment 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 14 29 Sump Pumps 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 09 23 Direct-Digital Control System for HVAC 09-11

VOLUME 2

23 23 00 Refrigerant Piping 02-15 23 31 00 HVAC Ducts and Casings 03-13 23 81 43 Air-Source Unitary Heat Pumps 04-11

DIVISION 25 – INTEGRATED AUTOMATION

No Sections included in this Division

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Telecommunications Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 51 16 Public Address and Mass Notification Systems 10-18 27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 10-18

00 01 10-4

28 05 26 Grounding and Bonding for Electronic Safety and Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

09-11

28 13 00 Physical Access Control System 10-11 28 13 16 Physical Access Control System and Database Management 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

No Sections included in this Division

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 90 00 Plantings

DIVISION 33 – UTILITIES

No Sections included in this Division

DIVISION 34 – TRANSPORTATION

No Sections included in this Division

DIVISION 48 – Electrical Power Generation No Sections included in this Division

APPENDIX

01 Regulated Building Materials Survey Report

File details come from the government source that posted it. Updated .