26_0327-4.GI110-Add2 B4Elev 523A5-18-371.pdf
PDF 463 KB Posted
- Solicitation number
- 36C24126Q0250
About this file
This is a construction document set consisting of architectural and site plans for building and elevator system replacement at a federal facility managed by the U.S. Department of Veterans Affairs (VA). The project involves the installation of a new split elevator machine platform, temporary roof protection systems, construction access areas, and tree protection measures during the renovation work.
Key construction requirements include: providing temporary roof protection with 3/4" exterior grade plywood sheathing over minimum 2" EPS insulation; installing an 18"x18"x2" splash block under new condensate drain; providing temporary ventilation for the elevator shaft; establishing a construction access area with coarse aggregate base (minimum 6" thick) over existing parking; implementing sediment control measures at site entrances including wheel cleaning stations and stabilized washing areas; and protecting existing trees with 6' chain link fencing, burlap wrapping, and snow fence. Site restoration requirements mandate returning all damaged or modified elements (roadway, paving, curbs, trees, shrubs, plantings, signage, and edging) to pre-construction conditions. The document references compliance with a Red Shield Warranty (#700487331) and coordination requirements for laydown areas with load restrictions not exceeding 100 PSF. Construction activities must minimize disruptions to hospital operations during off-hours, and all temporary protective measures must be maintained throughout the project duration.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
UP
DN
EXISTING EXTERIOR
COURTYARD
EXISTING
PARKING
EXISTING
PARKING
EXISTING
WARD B
EXISTING
WARD CEXISTING
WARD A
STANDISH RD
PLYMOUTH AVE
CONSTRUCTION VEHICLE ACCESS FOR PENTHOUSE EQUIPMENT
BASEMENT FLOOR
CONSTRUCTION
ACCESS ENTRY
4.GI110
PENTHOUSE
FLOOR ACCESS
EXISTING
BLDG #20
APPROX. LOCATION
OF EXIST. SIGN
4.AS804
R 50
0"
WALKWAY
40' - 0"
STABALIZE CONSTRUCTION
ACCESS AREA
SA3
SA4
SA1
SA2
SA2TEMPORARY
RAMP
AT END OF CONSTRUCTION CONTRACTOR
SHALL RESTORE SITE TO INITIAL CONDITION
PRIOR TO CONSTRUCTION
ALL CRANE ACTIVITY MUST BE PERFORMED WHEN THERE ARE NO
PEOPLE BELOW THE LIFTING. THIS MAY REQUIRE OFF-HOUR CRANE
LIFTING. THIS MAY REQUIRE PROVIDING TEMPORARY PROTECTION OF
THE ROOF TO ENSURE A LIFT DOES NOT PENETRATE ROOF
13 23
15 17 19 21
14 22
K
E
H
G
15b 16 2016b 17b 18 19b 20b 21b
I
F
ELEVATOR MACHINE
PLATFORM
STAIR
ST1A301
ELEVATOR
MACHINE
ROOM
PHA03
EXISTING WARD B EXISTING WARD C
ALCOVE
A119
VAC PUMP
ROOM
PHC04
LOCATION OF EXISTING
PIPING/CONDUIT
EXISTING
EXHAUST FAN
EXISTING MEDIUM
PRESSURE STEAM &
CONDENSATE LINE
OVERHEAD
LOCATION OF
EXISTING MECH.
EQUIPMENT
LOCATION OF EXISTING
ROOF MECH. EQUIPMENT
PROVIDE PROTECTIVE COVER
OVER ROOF FOR ACCESS PATH
TO ELEVATOR MECH. ROOM,
RAMP OVER EXIST.
PIPING/CONDUIT, TYP.
ROOF PENTHOUSE ACCESS
ASSEMBLY AREA
FOR PHASE 2 & 3
PENTHOUSE
EQUIPMENT
PROVIDE TEMP. VENTILATION
FOR SHAFT AS REQ. TO OBTAIN
NEGATIVE PRESSURE
LOCATION OF NEW SPLIT
DUCTLESS CONDENSOR,
SEE MECHANICAL DRAWINGS
LOCATION OF EXISTING
ROOF MECH. EQUIPMENT
ISOLATE AND PROTECT EXISTING
EQUIPMENT IN THIS SPACE FROM DAMAGE
DURING TRANSFER OF EQUIPMENT
ELEVATOR
MACHINE
PLATFORM
PHA04
SA5
SA5
SA5
SA5
PROVIDE 18"x18"x2"
SPLASH BLOCK UNDER
NEW CONDENSATE DRAIN
PROVIDE 3/4" EXTERIOR
GRADE PLYWOOD SHEATHING
OVER MIN. 2" EPS OR SIMILAR
INSULATION OVER EXIST.
ROOF
BUILD UP INSULATION TO RAMP
OVER CONDUITS, PARRAPETS,
AND OTHER ROOF TOP
CONDITIONS AS REQ.
2"-3" COARSE AGGREGATE
MIN. 6" THICK
EX
IS
TI
NG
P
AR
KI
NG
NOTES:
1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT
TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY
REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED
TO TRAP SEDIMENT.
2. WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO
PUBLIC RIGHT-OF-WAY.
3. WHEN WASHING IS REQUIRED IT SHALL BE DONE ON AN AREA STABILIZED WITH
CRUSHED STONE WHICH DRAINS TO AN APPROVED SEDIMENT TRAP OR
SEDIMENT BASIN.
4. RESTORE & REPAIR TO CONDITION PRIOR TO CONSTRUCTION ALL DAMAGED &
MODIFIED SITE ELEMENTS INCLUDING BUT NOT LIMITED TO ROADWAY, PAVING,
STRIPING, CURBS, TREES, SHRUBS, PLANTINGS & GRASSES, SIGNAGE & EDGING.
SITE AND ACCESS KEYNOTES:
EXISTING PARKING SPACES TO BE BLOCKED DURING ROOFTOP EQUIPMENT LOADING / UNLOADING ONLY, PARKING TO REMAIN OTHERWISE. 14-CALENDAR DAY WRITTEN NOTICE TO VA IS REQUIRED TO TAKE OVER PARKING SPACES FOR CRANE ACCESS FOR LOADING/UNLOADING EQUIPMENT.
PROTECT EXISTING STRUCTURES, SITE ELEMENTS, AND TREES FROM DAMAGE. WRAP EXISTING TREES WITH TWO LAYERS OF BURLAP AND WITH TWO LAYERS OF STANDARD SNOW
FENCE, WIRE TO FASTEN SECURELY.
PROVIDE TEMPORARY PREFABRICATED METAL RAMP (WOOD RAMP SYSTEM SHALL BE PROHIBITED) AT BUILDING #20 TO ACCOMODATE FOOD TRANSFER TO BUILDING #4. BASIS OF
DESIGN PRODUCT: AMRAMP, PRO SERIES COMMERCIAL RAMP.
CONTRACTOR TO USE LOADING DOCK FOR EQUIPMENT AND SUPPLY DELIVERIES. CONTRACTOR SHALL COORDINATE SCHEDULE OF DELIVERIES WITH VA AND HAVE LIMIT TIME
AVAILABLE.
SAFETY RAILING SYSTEM: SAFETY RAILING SYSTEM SHALL BE NEW AND REMAIN IN PLACE UNTIL AFTER PROJECT IS COMPLETED. SAFETY RAILING SYSTEM SHALL BE INSTALLED PRIOR TO CONTRACTOR ACCESSING ANY PORTION OF WORK INCLUDING BUT NOT LIMITED TO REPLACEMENT OF ROOF ACCESS DOOR. BASIS OF DESIGN PRODUCT: GARLOCK
RAILGAURD 200 NON-PENETRATING SAFETY GUARDRAIL SYSTEM.
SA1
SA2
SA3
SA4
SA5
SITE AND ACCESS GENERAL NOTES:
1. COORDINATE AND IMPLIMENT ALL SAFETY PROTOCOLS IDENTIFIED BY VA TO ENSURE SAFETY OF WORKERS, STAFF, AND RESIDENTS.
2. STAGING DRAWINGS FOR REFERENCE ONLY. CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR STAGING, DELIVERY, REMOVAL OF EXISTING SALVAGE AND PATCHING AND REPAIRING DAMAGED AND DISTURBED CONDITIONS. PROVIDE COR WITH DETAILED STAGING AND SEQUENCE PLAN. MINIMIZE ON-SITE DISTURBANCE AND EXTERIOR HOSPITAL
INTERRUPTION.
3. CONTRACTOR SHALL VERIFY IN FIELD AND COORDINATE ALL ASPECTS OF STAGING.
4. DELIVERIES AND STAGING SHALL BE JIT (JUST IN TIME). EQUIPMENT DELIVERY AND CONTRACTOR CIRCULATION ROUTES ARE TENTATIVE AND SUBJECT TO OTHER CONCURRENT PROJECTS AT THE TIME WORK COMMENCES. CONTRACTOR MUST COORDINATE WITH VA TO ACCOMPLISH PROJECT GIVEN CONDITIONS AT HAND.
5. EXISTING TPO ROOF WARRANTY: THE CONTRACTOR SHALL ARRANGE WITH ELEVATE, (AMRIZE BUILDING ENVELOPE LLC) 800-428-4442, REFERENCE RED SHIELD WARRANTY #700487331 AND PROJECT #4744731, AND SHALL CARRY ALL RELATED COSTS FOR THE MANUFACTURER'S TECHNICAL INSPECTOR/REPRESENTATIVE BE ON-SITE TO VERIFY THAT TEMPORARY PROTECTION IS ADEQUATE, AND THAT THE EXISTING ROOF SYSTEM WAS NOT DAMAGED DURING DELIVERY AND REMOVAL OF NEW EQUIPMENT IN ORDER TO CONTINUE COVERAGE OF
THE MANUFACTURER'S ROOF SYSTEM WARRANTY FOR THE DURATION OF THE WARRANTY TERMS.
6. DO NOT OVERLOAD EXISTING STRUCTURE - PROVIDE TEMPORARY SUPPORT OF ELEVATOR EQUIPMENT SO LOADING ON EXISTING SLAB DOES NOT EXCEED 100 PSF. COORDINATE
EQUIPMENT PATH AS REQUIRED.
7. EXISTING TO BE SALVAGED MAY BE TEMPORARILY STORED IN PENTHOUSE PENDING COMPLETION OF NEW INSTALL.
8. LOCATION, SWING, AND CAPACITY OF BOOM CRANE OR SIMILAR BY GC.
9. CONTRACTOR SHALL NOT USE ROOF AS STORAGE FOR EQUIPMENT OR SUPPLIES.
10. CONTRACTOR LAYDOWN AREA ALLOWED BUT MAY BE LOCATED OUTSIDE OF CONSTRUCTION SITE. CONTRACTOR SHALL MAKE REQUEST FOR LAYDOWN AREA TO COR WITH NO LESS
THAN 21 DAY NOTICE.
11. PROJECT IS CARRY-IN, CARRY-OUT.
12. CONTRACTOR SHALL COORDINATE CRANE LIFT WITH COR AND PROVIDE MINIMUM 21-DAY NOTICE. CRANE OPERATIONS MAY BE REQUIRED OFF-HOURS TO MINIMIZE DISRUPTIONS TO
HOSPITAL OPERATIONS.
EXIST. TREE: WRAP WITH TWO LAYERS OF
BURLAP AND WITH TWO LAYERS OF STANDARD
SNOW FENCE, WIRE TO FASTEN SECURELY.
TREE PROTECTION
FENCE: USE STANDARD
CHAIN LINK FENSE, 6'HT.
METAL POST TO SUPPORT FENCE,
(6 REQUIRED), DRIVEN INTO THE
GROUND 2'-0" MINIMUM., EQUAL
SPACING AROUND TREE.
8'- 0"
M
IN
9'-4" MIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT STAMPCONSULTANTS
321 4 5 6 7 8 9 10
523A5-18-371
VAMC BROCKTON
940 BELMONT STREET
BROCKTON, MA 02301
BUILDING 4 ELEVATOR
REPLACEMENT
872 Massachusetts Avenue, Suite 2-9 Cambridge, MA 02139
T: 617.335.5186
William Pevear Architects, Inc.
63 Pleasant Street
T: 617.926.9300
RSE Associates, Inc.
STRUCTURAL:
101 Summer Street
T: 617.574.5099
Van Deusen & Associates
ELEVATOR CONSULTANT:
142 Hanlon Road
T: 508.397.5417
Hastings Consulting, Inc.
CODE CONSULTANT:
Watertown, MA 02472Boston, MA 02210 Holliston, MA 01746
Drawing Scale
08/16/2019
63 Franklin Street
T: 617.542.0810
Architectural Engineers, Inc.
MECH / ELEC / PLUMBING:
Boston, MA 02110
C :\U se rs
\a do rn .W
PA
\D oc um en ts
\V A_
Br oc kt on
_B
El ev at or
U pg ra de
-2
5_ ad or n@ w illi am pe ve ar
.c om
.rv t
4/ 3/
1:
:2
AM
As indicated
4.GI110
Construction Access for Penthouse Equipment
1" = 40'-0"1 Site Plan - Construction Vehicle Access
N
1/8" = 1'-0"2 Penthouse Equipment Plan
SCALE: 1 1/2" = 1'-0"
31 DETAIL - TEMPORARY ROOF PROTECTION
SCALE: 1 1/2" = 1'-0"
32 DETAIL PLAN - CONSTRUCTION ACCESS AREA
NOT TO SCALE
33 DETAIL PLAN - TREE PROTECTION
Revisions: Date: