Attachment Ca - QASP Dental by CA_02_24_26 v2.pdf
PDF 485 KB Posted
- Attached to
- Q503--CCN Next Gen - Dental Network
- Solicitation number
- 36C10G26R0004
About this file
This is a Quality Assurance Surveillance Plan (QASP) for the VA Community Care Network Next Generation Dental contract, dated February 24, 2026. The document establishes procedures and guidelines for the Department of Veterans Affairs – Veteran Health Administration (VHA), Office of Integrated Veteran Care (IVC) to monitor contractor performance in delivering dental services to eligible United States Veterans, including provider network management and claims payment. The QASP employs a performance-based surveillance approach focused on measurable outcomes and service levels defined in the accompanying Performance Work Statement (PWS) and Performance Requirement Summary (PRS), rather than prescriptive process reviews. Performance standards will be evaluated monthly, quarterly, semi-annually, and/or annually depending on the specific performance objective, with the Contracting Officer's Representative (COR) responsible for technical administration and surveillance oversight.
The plan outlines comprehensive surveillance methodologies including audits, direct observation, management information system analysis, periodic and random sampling, user surveys, validated customer complaints, and 100% inspection for critical deliverables. Performance Monitors designated by the Program Manager assist the COR in technical assessment. Acceptable Quality Levels (AQLs) are structured to provide contractor flexibility in execution while ensuring compliance with contract requirements. The Contractor must maintain an effective Quality Assurance program with self-monitoring and corrective action procedures. Performance is evaluated through standardized calculation methodologies detailed in Appendix A, covering network adequacy metrics (PO1.1, PO1.2), customer service metrics including call blockage and abandonment rates and answer time performance (PO2.1-PO2.6), claims processing and adjudication timelines (PO3.1-PO3.2), and medical documentation submission timeliness (PO4.1-PO4.2). Assessment results are submitted within specified timeframes, with the CO providing results to the contractor within 10 calendar days of evaluation completion; contractors may dispute findings with supporting documentation for CO determination.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE
PLAN (QASP)
VA Community Care Network Next Generation
Dental
DATE: 02/24/26
Contract Information and Approval
Contract Number Contractor
Contracting Officer: Date
Contracting Officer’s Representative Date
Table of Contents
Purpose of Quality Assurance Surveillance Plan
Intent
Scope
Government Performance Surveillance Approach
Contractor Quality Assurance
ROLES AND RESPONSIBILITIES
Contracting Officer
Contract Specialist
Program Manager
Contracting Officer’s Representative
Performance Monitors / Subject Matter Experts
Performance Evaluation
Evaluation Assessment Periods
Performance Standards Evaluation Methods
Surveillance Techniques
Customer Feedback
Acceptable Quality Levels
Ensuring Performance
Quality Assurance Documentation
Determining Performance
Reporting Results
Reviews and Resolution
Incentives and Disincentives
Changes And/Or Modifications to the QASP and PRS
Proposed Changes
Method for Making Changes
Performance Objective Calculations
Sample Quality Assurance Monitoring Form
Acronym List
Purpose of Quality Assurance Surveillance Plan
This Quality Assurance Surveillance Plan (QASP) is developed pursuant to the requirements listed in the
Performance Work Statement (PWS), entitled Community Care Network (CCN) Medical. This plan sets forth the procedures and guidelines Department of Veterans Affairs – Veteran Health Administration (VHA), Office of Integrated Veteran Care (IVC) will use in ensuring the required performance standards or services levels are achieved by the Contractor.
Purpose
The purpose of this plan is to identify the methods and procedures the Government will use to ensure it receives the services/products under this contract as identified in the Performance Work Statement (PWS).
This plan shall provide the Contracting Officer’s Representative (COR) with a proactive way to avoid unacceptable or deficient performance and provide verifiable input for the required performance report via the Contractor Performance Assessment Reporting System (CPARS).
Intent
The intent of this QASP is to provide a structured framework for assessing the Contractor’s performance, ensuring that the Contractor maintains effective quality controls, and promoting continuous quality improvement through the period of performance (PoP). The Contractor is responsible for developing an efficient methodology to ensure they meet and/or exceed the required thresholds of service as outlined in the PWS. The Government intends to perform surveillance on this contract in accordance with this QASP but may make updates to this QASP, as required, to ensure that the rendered services conform to contract requirements. Any non-conforming services discovered with the Contractor, subcontractors or providers will be addressed with the Contractor for resolution.
Scope
This QASP has been developed to evaluate contractor performance while implementing the Performance
Work Statement (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective on the Performance Requirement Summary (PRS) (PWS Attachment
C). The contract is for the delivery of dental services for eligible United States Veterans. The delivery of dental services also includes provider network management and claims payment.
Government Performance Surveillance Approach
The Government will use a structured performance surveillance approach to monitor and evaluate the
Contractor's delivery of medical services in accordance with the PWS. Oversight will be conducted by the
COR. This approach focuses on outcomes and measurable results, consistent with performance-based acquisition principles. Rather than prescribing how the Contractor performs the work, VA will assess the extent to which performance outcomes and services levels identified in the PWS are achieved.
Consistent and effective performance surveillance allows for the ability to properly manage contract performance. This is largely dependent on implementing a mature capability for reviewing and analyzing the information generated through performance assessment. The COR will review Contractor self-assessment results and reporting of performance and perform ad hoc audit/inspection of the results of the
Contractor’s self-assessment or reassess performance at VA’s discretion to ensure compliance with the contractual requirements. VA will leverage automation and/or technological solutions, such as the VA ticketing system, to the maximum extent to objectively assess the Contractor’s performance using raw data that VA either receives or has access to via contractual requirements (e.g. electronic data transmission, EDI claims data, Contractor’s geo-mapping solution, etc.). As VA technology, tools, processes, etc. mature, VA will increase use of direct assessment by VA and decrease use of Contractor self-assessment for performance surveillance with ad-hoc audits/inspection.
This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to take responsibility for how the work is performed, as long as the processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
Contractor Quality Assurance
The Contractor is responsible for developing and maintaining an effective Quality Assurance (QA) program that ensures all services and deliverables provided under this contract meet the performance standards set forth in the PWS. The Contractor's QA program should include procedures for self-monitoring, identifying performance issues, implementing corrective actions, and continuously improving service delivery. The
COR will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. However, the Contractor will be responsible for making required changes in staffing, processes, and practices to ensure performance is managed effectively.
The Contractor shall comply with the PWS requirements and meet or exceed the performance standards identified in the PRS. The PRS includes key performance objects and their associated minimum performance standards. The Contractor’s performance will be assessed by the Government against the requirements of the PWS and the PRS. Minimum acceptable quality level (AQL) compliance will be calculated using the methodology defined in this QASP. The process and anticipated calculations for determining Contractor’s performance is set forth in sections of this plan.
ROLES AND RESPONSIBILITIES
Contracting Officer (CO) TBD
Contracting Officer’s Representative (COR) TBD
Contracting Officer
The CO is responsible for the overall administration of the contract. It ensures that the performance monitoring and quality assurance activities conducted under this plan align with the terms and conditions of the contract.
The CO’s responsibilities include approving and maintaining the QASP; appointing CORs to perform technical oversight in accordance with this plan; reviewing surveillance results and COR reports for contractual compliance; taking contractual actions when performance issues arise, including the application of any remedies.
Contract Specialist
The CS is responsible for serving as an acquisition advisor in support of the CO and acting as a liaison between the CO, IVC, and the COR(s).
Contracting Officer’s Representative
The Contracting Officer Representative (COR) is designated by the Program Officer and delegated by the
CO to assist in administering this contract. COR limitations are contained in a written appointment letter. The Contractor will receive a copy of the COR appointment letters. The COR is responsible for technical administration of the project and ensures proper Government surveillance of the Contractor’s performance. The COR does not have the authority to make any contractual agreement, modification, or commitments on behalf of the Government. Any changes that may affect the contract price, terms, or conditions shall be referred to the CO for action. The COR must maintain the quality assurance file and ensure QA monitoring forms are used to document the inspection and evaluation of the Contractor’s work performance.
Performance Monitors / Subject Matter Experts
The COR will work with subject matter experts (SMEs) whom will be designated by the PM as Performance
Monitors to assist in monitoring performance. The COR will maintain a list, by position and name, of the designated Performance Monitors and will validate this list with the PM at least annually. However, the PM is responsible for providing the COR with updates (e.g. replacements, additions, deletions, etc.) to the list when changes are required outside of the annual validation. The Performance Monitors will provide technical feedback on specific areas of performance. Performance Monitors have no authority to make changes or decisions but will provide feedback and technical advice to the COR as a part of the performance evaluation process outlined in this QASP and throughout the contract as necessary.
Performance Evaluation
The required performance standards and/or quality levels are included in the PWS and the PRS. If the
Contractor meets the required service or performance level, it will be paid the monthly amount agreed in the contract. Failure to meet the required service or performance level will be documented in CPARS.
Surveillance results may be used as the basis for actions against the Contractor, such as reducing the contract price to reflect the reduced value of the services performed. In such cases, the Inspection of
Services clause in the Contract becomes the basis for the CO’s actions.
Evaluation Assessment Periods
The Government has identified key performance objectives which will be monitored for minimum compliance based upon the surveillance methods below.
The following are parameters for evaluation of contract performance:
• The Contractor’s performance against stated AQLs will be calculated monthly, quarterly, semi-annually, and/or annually as specified in the PRS.
• Continuous evaluation of performance will serve to advise the Contractor of trends indicating the likelihood of the exercising of optional tasks or option periods.
• All evaluation periods will include calculations of the performance objectives identified in the PRS.
The purpose of the performance evaluations is to jointly assess Contractor’s performance during the period, identify strengths and improvements that occurred during the period, and recommend appropriate actions to achieve contract objectives.
• For each evaluation period, the COR and the Contractor will prepare the appropriate performance and evaluation reports, documenting the Contractor’s performance and corresponding rating recommendation in accordance with the performance assessment methodology set forth in the
Surveillance Plan.
• Performance assessment results and supporting rationale will be reviewed by the Contracting
Officer.
• The Contractor will receive the performance assessment results and/or recommendations or concerns about the results of performance assessments along with necessary supporting material.
Performance Standards Evaluation Methods
Surveillance Techniques
To minimize the performance management burden, simplified surveillance methods will be used by the
Government to evaluate Contractor performance when appropriate. The methods of surveillance may include, but are not limited to, and may change in terms of method, schedule, frequency, and surveillant as need to adequately monitor performance:
a. AUDIT. Typically performed by internal and external organization to the VA under the direction of the
CO/COR.
b. DIRECT OBSERVATION. Can be performed periodically or through 100% surveillance.
c. MANAGEMENT INFORMATION SYSTEMS (MIS). Evaluates output using management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.
d. PERIODIC INSPECTION. Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.
e. USER SURVEY. Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. Appropriate for high quantity activities that have historically been satisfactory. May also generate periodic and 100% inspections.
f. VALIDATED USER/CUSTOMER COMPLAINTS. Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.
g. 100% INSPECTION. Evaluates all outputs. Most applicable to small quantity, but highly important services. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.
h. PERIODIC SAMPLING. Variation of random sampling. Good follow-up to MIS analysis. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.
i. RANDOM SAMPLING. Designed to evaluate the outputs of the award requirement by randomly selecting and inspecting a statistically significant sample. Highly recommended for large quantity repetitive activities with objective and measurable quality attributes.
j. Progress or status meetings.
k. Analysis of Contractor's progress reports. (Evaluate cost, schedule, etc.)
l. Performance reporting. Evaluate metrics for a specific time period. Develop metrics or use metrics found in MIS.
Acceptable Quality Levels
The AQLs included in the PRS are structured in a way that allows the Contractor to manage how the work is performed, motivating them to comply with the contract requirements and meet the overall contract objectives.
The following actions will be taken to ensure the AQLs are assessed accurately and in a timely way:
• Performance Monitors will submit performance assessments of each performance objective in the PRS to the COR NLT 10 calendar days after the evaluation period ends. – OR – No later than the 15th day of each Month, the Contractor shall submit the Contract Performance Reports as required in PWS section 2.5.1, Performance Surveillance and Assessment: Network Adequacy, Customer Service, and Claims/Invoicing to the COR.
• The COR will compile an evaluation report summarizing the results of the VA assessment and/or review of the Contractor’s self-assessment for each performance objective.
• No later than 20 calendar days after the evaluation period ends, the COR will submit the assessment summary to the CO.
• The CO will submit the results of VA assessments to the Contractor within 10 calendar days after receiving the evaluation(s) from the COR.
• The Contractor must submit any relevant disputes to the CO. The Contractor may present additional pertinent information concerning the assessment for the CO’s consideration. The CO will review the information and make a final determination.
Ensuring Performance
Quality Assurance Documentation
Quality Assurance (QA) surveillance will be continually conducted throughout the contract PoP, with open communication between the Contractor and COR. Certain factors help facilitate this surveillance:
The Performance Management Feedback Loop: The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and PRS and will be assessed in accordance with the PRS and audited using the performance monitoring techniques shown in Appendix A, Performance Objective Calculations.
Monitoring Forms: The Government’s QA surveillance, accomplished by the CORs and PMs, will be reported using the monitoring forms in attachment below. The forms, when completed, will document the Government’s assessment of the Contractor’s performance under the contract to ensure that the required results performance levels are being achieved.
The CO and COR(s) will retain a copy of all completed QA surveillance forms and Contractor Performance
Reports provided by the Contractor. Appendix AB contains an example of Sample Quality Assurance
Monitoring Form.
Determining Performance
The Government and Contractor will use the evaluation methods cited in Section 4 of this QASP to determine whether the performance standards/service levels/AQLs have been met, not met, or exceeded. If the Contractor has not met the minimum requirements, they shall develop a Quality Improvement Plan
(QIP), as required by PWS section 2.5.3, Quality Improvement Plan, to show how and by what date it intends to bring performance up to the required levels.
Reporting Results
At the end of each quarter, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the Contractor’s performance. This written report, which will include the
Contractor’s monthly and quarterly reports and the completed quality assurance monitoring forms
(Appendix B), will become part of the QA documentation. It will enable the Government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
Reviews and Resolution
The Contractor shall meet with the COR and other Government personnel during the quarterly Program
Management Review (PMR) to discuss performance evaluation. The agenda of the reviews may include, but are not limited to:
• Monthly performance assessment data and trend analysis and Monthly Progress Reports (MPRs)
• Quarterly Progress Report (QPR) and PMR agenda
• Corrective Action Plan (CAP)
• Issues and concerns of both parties
• Projected outlook for upcoming months and progress Recommendations for improved efficiency and/or effectiveness
• Additional performance or programmatic concerns
The CO, PM, and COR will coordinate and communicate with the Contractor to resolve issues and concerns regarding performance that fall below the CCN AQL standards listed in the PRS. The CO, COR, PM, and Contractor will jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels will be clearly documented and formalized via contract modification.
Changes and /or Modifications to the QASP
The QASP will be finalized upon contract award and a copy will be provided to the Contractor for informational purposes only. VA will review the QASP annually at a minimum and update as necessary.
Proposed Modifications to the PRS or PWS
Changes to the PRS or PWS as applicable may be proposed by either VA or the Contractor prior to the next relevant evaluation period. Proposed changes must be submitted to the Contracting Officer for review, comment, and modification of the contract, when required.
Method for Making Changes
Proposed changes will be submitted by the COR to the CO. The CO will review and approve all changes to the QASP and / or PRS before any changes take effect. The CO will execute modifications as appropriate.
Performance Objective Calculations
Standard Calculation Methodologies
PO1.1
Data Source: Veteran Address in VA Eligibility File/Referral and the address where services were rendered on the claim calculated using Azure API mapping tool. EDI 837 (Provider Claim
Adjudication Date).
Steps:
See PRS for Calculation Methodology.
PO1.2 Data Source: Veteran Address in VA Eligibility File/Referral and the address where services were rendered on the claim calculated using Azure API mapping tool. Contractor Azure API mapping. EDI
837 (Provider Claim Adjudication Date).
Steps:
See PRS for Calculation Methodology
PO2.1 Data Source: Contractor Contact Center system
Steps:
1. Sample from all calls that entered the queue within the period assessed.
2. Determine:
(a) total number of calls that entered the queue
(b) number of calls blocked from entering the queue
3. Calculate the blockage rate:
e.g.
200 calls blocked / 6,000 calls entered queue X 100% = 3.3% blockage rate
*% will NOT be rounded down or up
4. Use % calculated in step 3 to determine if AQL has been met or not met.
*% will NOT be rounded down or up e.g. 3.3% < 5% = MEETS AQL
PO2.2 Data Source: Contractor Contact Center system
Steps:
1. Sample from all calls that entered the queue within the period assessed.
2. Determine:
(a) total number of calls that entered the queue
(b) number of calls that abandoned (disconnected) after entering the queue
3. Calculate the abandonment rate:
(b) / (a) X 100% = Abandonment rate e.g.
122 calls abandoned / 5,870 calls entered queue X 100% = 1.1% abandonment rate
*% will NOT be rounded down or up
4. Use % calculated in step 3 to determine if AQL has been met or not met.
*% will NOT be rounded down or up e.g. 1.1% < 5% = MEETS AQL
NOTE: So-called short abandonments will NOT be excluded from the calculation.
PO2.3 Data Source: Contractor Contact Center system
Steps:
1. Sample from all calls that entered the queue within the period assessed.
2. Determine:
(a) total number of calls that entered the queue
(b) number of calls that reach a live agent in 30 seconds or less.
3. Calculate the % of calls that reach a live agent in 30 seconds or less:
(b) / (a) X 100% = % Calls that reached a live agent in 30 seconds or less e.g.
5,600 calls reach live agent in 30 seconds or less / 6,000 total calls entered queue X 100% = 93.3% of calls reached a live agent in 30 seconds or less
*% will NOT be rounded down or up
4. Use % calculated in step 3 to determine if AQL has been met or not met.
*% will NOT be rounded down or up e.g. 93.3% >80% =MEETS AQL
PO2.4
Data Source: VA Ticketing Tool
From: Ticket Creation Date
To: Ticket Submission Date
Steps:
1. Sample from all tickets, per Tier, resolved within the period assessed (e.g. query conducted on
September 15th for August 1st – August 30th).
2. Analyze sample in query, for each Tier, to determine:
(a) total number of Tickets created per Tier during the period assessed.
(b) total number of tickets, per Tier, submitted / fully resolved within the maximum number of days allotted for each Tier.
*Sample time calculation:
Ticket Creation Date: 8/1/2999
Ticket Submission/Resolution Date: 8/4/2999
Ticket resolution time = 3 days
3. Calculate % of tickets, for each Tier, that were fully resolved within the number of days allotted for each Tier (from step 2 above):
(b) / (a) X 100% = % of tickets fully resolved within the number of days allotted
*% will NOT be rounded down or up
4. Use % calculated in step 3 to determine if AQL has been met or not met.
*% will NOT be rounded down or up
PO2.5 Data Source: VA Ticketing Tool
Steps:
1. Sample from all tickets submitted within the period assessed (e.g. query conducted on September
15th for August 1st – August 30th).
2. Analyze sample in query to determine:
(a) total number of Tickets submitted during the period assessed
(b) number of tickets fully resolved on the first submission. This is determined by calculating the number of tickets “Approved” by VA without having been previously rejected*.
*Rejected tickets are those tickets that were resolved by the Contactor in the ticketing tool but upon review by VA, they were determined to NOT be fully resolved and were thus “rejected” and sent back to the Contractor for additional information or further resolution.
3. Calculate % of tickets fully resolved on the first submission (from step 2 above):
(b) / (a) X 100% = % of tickets fully resolved on the first submission
*% will NOT be rounded down or up
4. Use % calculated in step 3 to determine if AQL has been met or not met.
*% will NOT be rounded down or up
PO2.6 Data Source: VA Ticketing Tool
From: First Ticket Rejection Date
To: Final Submission Date
Steps:
1. Sample from all tickets, per Tier, Approved by VA within the period assessed that were previously rejected (e.g. query conducted on September 15th for August 1st – August 30th).
2. Analyze sample in query, for each Tier, to determine:
(a) total number of tickets that have been Approved by VA that had previously been rejected*.
(b) total number of previously rejected* tickets submitted within the maximum number of days allotted.
*Sample time calculation:
First Ticket Rejection Date: 8/1/2999
Final Ticket Submission Date: 8/4/2999
Resolution time since first rejection = 3 days
3. Calculate % of tickets, for each Tier, fully resolved within the number of days allotted for each Tier
(from step 2 above):
(b) / (a) X 100% = % of rejected tickets fully resolved within the number of days allotted
*% will NOT be rounded down or up
4. Use % calculated in step 3 to determine if AQL has been met or not met.
*% will NOT be rounded down or up
PO3.1
Data Source: Raw EDI 837 and Raw EDI 835 data
Steps:
1. Sample from all data (claims) adjudicated for that period assessed (e.g. query conducted on
September 15th for August 15th – September 14th). Measured from EDI 837 Provider Claim
Submission Date- Loop 2300, DTP Segment with Qualifier Code 050 to TPA Adjudication Date (EDI
835)
2. Analyze results of query to determine:
(a) total number of claims adjudicated during the period assessed
(b) number of claims adjudicated in 30 days or less from date of submission
*Sample claim adjudication time calculation:
Provider Claim Submission Date: 10/1/2999
TPA Adjudication Date: 10/30/2999
Claim adjudication time = 30 days
3. Calculate % of claims submitted and adjudicated in 30 days or less (from step 2 above):
(b) / (a) X 100% = % of claims submitted and adjudicated in 30 days or less
*% will NOT be rounded down or up
4. Use % calculated in step 3 to determine if AQL has been met or not met.
*% will NOT be rounded down or up
PO3.2 Data Source: Post Payment Data EDI 837 COB. VA Referral
Steps:
1. Sample from all claims submitted within the period assessed (e.g. query conducted on September
10th for August 1st – August 30th).
2. Pull approved services data on related approved VA Referrals.
3. Determine the total number claims in the period assessed.
4. Analyze each claim and its associated VA Referral to determine the total number of claims with billed services that match the services approved on the associated VA Referral. Each claim that contains billed service(s) that do NOT match the service(s) approved on the associated VA Referral equals one (1) failure of that claim as matching a valid referral.
5. Determine the total number of claims with services that correctly matched those on its associated
VA Referral.
6. Calculate % of claims with services that correctly matched with those on its associated VA Referral
(from step 5 above):
Total number of claims with services that correctly matched with those on its associated VA Referral / total number of claims in sample X 100% = % of claims with services that correctly matched with those on its associated VA Referral
*% will NOT be rounded down or up
7. Use % calculated in step 4 to determine if AQL has been met or not met.
*% will NOT be rounded down or up
PO4.1 Data Source: Contractor’s Central Submission System
From: Date of RFS
To: Documentation Submission Date
Steps:
1. Run a report from claims data to determine the number of RFSs within the period assessed.
2. Review a statistically significant sample of medical documentation submitted for RFSs within
Contractor's Central Submission System.
3. For each encounter, calculate timeliness of submission based on the date of RFS to the date of provider documentation submission. If the submission is equal to zero (0) days (the RFS and documentation were received on the same date), it passes. If it is more than zero (0) days after the
RFS submission date, it fails.
4. Determine:
(a) Total number of encounters in the sample
(b) Total number of encounters that failed to meet the timeliness requirement
5. Calculate the fail rate.
number of encounters that failed (b) / total number of encounters in sample (a) X 100 = error rate percentage. (b) / (a) X 100% = error rate.
e.g.
Total encounters in sample (a)= 100
Total encounters failed (b) = 5
Fail rate = 5%
*% will NOT be up or down
4. Use % calculated in step 5 to determine if AQL has been met or not met.
*% will NOT be adjusted up or down e.g. 100% - 5% = 95%
95% ≥ 90% = MEETS AQL
PO4.2
Data Source: Contractor’s Central Submission System
From: Date of Urgent Care Encounter
To: Documentation Submission Date
Steps:
1. Run a report from claims data to determine the number of urgent requests made by VA within the period assessed.
2. Review a statistically significant sample of medical documentation submitted for urgent request encounters within Contractor's Central Submission System.
3. For each encounter, calculate timeliness of submission from the date of urgent care episode to the date of provider documentation submission. If the submission is less than or equal to three (3) business days from the initial appointment, it passes. If it is more than three (3) business days after the appointment, it fails.
4. Determine:
(a) Total number of encounters in the sample
(b) Total number of encounters that failed to meet the timeliness requirement
5. Calculate the fail rate.
number of encounters that failed (b) / total number of encounters in sample (a) X 100 = error rate percentage. (b) / (a) X 100% = error rate.
e.g.
Total encounters in sample (a)= 100
Total encounters failed (b) = 5
Fail rate = 5%
*% will NOT be up or down
4. Use % calculated in step 5 to determine if AQL has been met or not met.
*% will NOT be adjusted up or down e.g. 100% - 5% = 95%
95% ≥ 90% = MEETS AQL
Sample Quality Assurance Monitoring Form
SAMPLE QUALITY ASSURANCE
MONITORING FORM
PERFORMANCE OBJECTIVE, SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Sampling 100% Inspection Periodic Inspection Customer Complaint
Other: _______________
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: ________________
Acronym List
Acronym Definition
AQL Acceptable Quality Level
CAP Corrective Action Plan
CCN Community Care Network
CO Contracting Officer
COR Contracting Officer’s Representative
IVC Integrated Veteran Care
MPR Monthly Progress Report
PM Program Manager
PMR Program Management Review
PO Performance Objective
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Plan
QASP Quality Assurance and Surveillance Plan
QPR Quarterly Progress Report
SAC Strategic Acquisition Center
VHA Veteran Healthcare Administration
| 1 Purpose of Quality Assurance Surveillance Plan |
| This Quality Assurance Surveillance Plan (QASP) is developed pursuant to the requirements listed in the Performance Work Statement (PWS), entitled Community Care Network (CCN) Medical. This plan sets forth the procedures and guidelines Department of V... |
| 1.1 Purpose |
| 1.2 Intent |
| The intent of this QASP is to provide a structured framework for assessing the Contractor’s performance, ensuring that the Contractor maintains effective quality controls, and promoting continuous quality improvement through the period of performance ... |
| 1.3 Scope |
| This QASP has been developed to evaluate contractor performance while implementing the Performance Work Statement (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective on the P... |
| 1.4 Government Performance Surveillance Approach |
| The Government will use a structured performance surveillance approach to monitor and evaluate the Contractor's delivery of medical services in accordance with the PWS. Oversight will be conducted by the COR. This approach focuses on outcomes and meas... |
| Consistent and effective performance surveillance allows for the ability to properly manage contract performance. This is largely dependent on implementing a mature capability for reviewing and analyzing the information generated through performance a... |
| 1.5 Contractor Quality Assurance |
| 2 ROLES AND RESPONSIBILITIES |
| 2.1 Contracting Officer |
| 2.2 Contract Specialist |
| 2.3 Contracting Officer’s Representative |
| 2.4 Performance Monitors / Subject Matter Experts |
| 3 Performance Evaluation |
| 3.1 Evaluation Assessment Periods |
| 4 Performance Standards Evaluation Methods |
| 4.1 Surveillance Techniques |
| 4.2 Acceptable Quality Levels |
| 5 Ensuring Performance |
| 5.1 Quality Assurance Documentation |
| 5.2 Determining Performance |
| 5.3 Reporting Results |
| 5.4 Reviews and Resolution |
| 6 Changes and /or Modifications to the QASP |
| 7 Proposed Modifications to the PRS or PWS |
| 8 Method for Making Changes |
| Appendix A Performance Objective Calculations |
| Appendix B Sample Quality Assurance Monitoring Form |
| Appendix C Acronym List |
File details come from the government source that posted it. Updated .