About this file

This document contains questions and answers related to solicitation number FA520919RA0060007, an indefinite-delivery/indefinite-quantity multiple award construction contract for the U.S. Army and U.S. Air Force in Japan. The questions and answers provide clarification on amendments to the solicitation, including an extension of the response due date to June 15, 2021. Qualification requirements are clarified for the quality control manager and construction safety supervisor positions. Acceptable safety certifications are also defined.

View the file

Other files

File Type Posted
Amendment FA520919RA0060010.pdf PDF
34 RFP Atch J11 Questions and Answers (Added by Amendment 0010).pdf PDF
23 RFP Atch J4a(PPQCoverletter) Amend 0009.pdf PDF
33 RFP Atch J10 Questions and Answers (Added by Amendment 0009).pdf PDF
Amendment FA520919RA0060009.pdf PDF
Amendment FA520919RA0060008.pdf PDF
32 RFP Atch J9 Questions and Answers (Added by Amendment 0008).pdf PDF
Attachment 3. Q and A No. 6 and 7 - Yokota Composite utilities 20.PDF PDF
Pre-proposal Conf Minutes FA520919RA006 19 Dec 23.pdf PDF
Attachment 1. MACC PreProposal Briefing Slides 18 Dec 23 - 2nd ON RAMP.pdf PDF
Attachment 2. Q and A No. 6 and 7 - Utility Map from Geobase.pdf PDF
29 Atch J7c Question No. 40 AMRS spec.pdf PDF
30 Atch J7d Question No. 38 MACC Mock Project Comm.jpg JPG image
25 RFP Atch J5 EnvelopeLabel(OF-17).pdf PDF
19 RFP AtcJ3d11_B907AnnexConceptPlan(Com).pdf PDF
9 RFP AtcJ3d1_Spec15011.pdf PDF
21 RFP AtcJ3d13_B907LeadPaintReport.pdf PDF
16 RFP AtcJ3d8_B907AsBuilt (Sprinkler).pdf PDF
20 RFP AtcJ3d12_B907WaterFlowTR.pdf PDF
17 RFP AtcJ3d9_B907AnnexDemoPlan.pdf PDF
8.RFP AtcJ3c2(TaxExemp_Mock).docx DOCX document
22 RFP AtcJ3d14_AbestosSurveyReport.pdf PDF
1 Solicitation Amendment - FA520919RA0060007.pdf PDF
18 RFP AtcJ3d10_B907AnnexConceptPlan.pdf PDF
27 Atch J7a Question No. 48 Geotechnical Investigation Report for B906.pdf PDF
11.RFP AtcJ3d3_DispRec.xlsx XLSX spreadsheet
4 Atc J2b AFGP.pdf PDF
13 RFP AtcJ3d5_B907AnnexAsBuilt(Elec).pdf PDF
23 RFP Atch J4a(PPQCoverletter) Amend 0007.pdf PDF
14 RFP AtcJ3d6_B907AnnexAsBuild (Arch).pdf PDF
10 RFP AtcJ3d2_EnvProtection.pdf PDF
15 RFP AtcJ3d7_B906AsBuilt.pdf PDF
26 RFP Atch J6 QAs - FA520919RA006.pdf PDF
7.RFP AtcJ3c1(MockSectionB).xlsx XLSX spreadsheet
3 Atc J2a ArmyGP.pdf PDF
28 Atch J7b Question No. 33 Fire Alarm B907 Annex.pdf PDF
2 Atc J1 Other Req 30 Apr 21.pdf PDF
24 RFP Atch J4b(PPQ).docx DOCX document
5 RFP AtcJ3a MockSOW.pdf PDF
12 RFP AtcJ3d4_B907AnnexAsBuilt.pdf PDF
6 RFP AtcJ3b(SOW Addendum).pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. reference Questions (Should include Specification Section or Drawing Reference) Answers

1 SF1442 amendment Please provide for amendment document 001 to 004. In order to avoid any confusions, the Amendment 0005 has been issued in form of "Conformed Document" for providing the latest information to all offerors. Therefore all changes have been incorporated from previous amendments. Please submit another request to the Government should you wish for which changes were incorporated under each amendment.

2 term of solicitaion At least 2 more weeks is required for integration of calculation.

Is it possible to extend the RFP closing date?

RFP close date has been extended for 2 weeks, from 1 Jun 21 to 15 Jun 21. Please see the amendment 0006.

3 General Provisions

1.19 Key Personnel Clarifications

Regarding QCM and SSHO, due to the influence of COVID- 19,NAVFAC provided QC and SSHO trainings have not been conducted at the moment and qualifications of some our QCM and SSHO have been expired. Since many construction locations are included in this solicitation, we are concerned about the insufficient numbers of certified QCM and SSHO.

In that case, can we possible to negotiate with the Government about construction schedule and qualifications

The certification of QCM shall conform to the paragraph 1.19.3 SECTION 01 11 10 of Army General Provisions.

The CQC manager shall have a minimum of five (5) years of similar work experience as a CQC Manager on Construction quality control similar to this contract, and 1st Class Certified Construction Engineer (1 kyu Sekou Kanri Gishi) which is applicable discipline of task order project.

Per paragraph 1.19.4, b SECTION 01 11 10 of Army General Provisions, the Japan Construction Occupational Safety and Health Association (JCOSHA) provides the construction safety course "Kouji Shunin" or "Course for Construction Site Managers", which is an acceptable equivalent to the 30 hours OSHA Construction Safety Course.

4 23 RFP Atch J4a(PPQCoverletter) Amend 0005

Regarding PPQ attachment J-4, government requested response by 1st June 2021.

Is it possible to extend the response date for 2 weeks?

PPQ close date has been extended for 2 weeks, from 1 Jun 21 to 15 Jun 21. Please see the amendment 0006.

QUESTION & ANSWER FORM

FOR

FA520919RA006

Indefinite-Delivery/Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC), U.S. Army Installations within Honshu, Japan and Yokota Air Base and its Geographically-Separated Units (GSUs), Japan

File details come from the government source that posted it. Updated .