About this file

This document outlines a federal contract opportunity for indefinite-delivery/indefinite-quantity multiple award construction contracts. The solicitation was issued by the Department of the Air Force Pacific Air Forces for construction services at U.S. Army installations within Honshu, Japan and Yokota Air Base and its geographically separated units in Japan. Offerors are invited to submit proposals by September 30, 2019 for multiple IDIQ contracts to provide minor and major construction, repair, alteration, and renovation services for a five year period. The total estimated value of all contracts awarded is $500 million. The scope of work includes but is not limited to projects involving airfield pavements, facilities, utilities, and environmental requirements.

View the file

Other files

File Type Posted
Amendment FA520919RA0060010.pdf PDF
34 RFP Atch J11 Questions and Answers (Added by Amendment 0010).pdf PDF
23 RFP Atch J4a(PPQCoverletter) Amend 0009.pdf PDF
33 RFP Atch J10 Questions and Answers (Added by Amendment 0009).pdf PDF
Amendment FA520919RA0060009.pdf PDF
Amendment FA520919RA0060008.pdf PDF
32 RFP Atch J9 Questions and Answers (Added by Amendment 0008).pdf PDF
Attachment 3. Q and A No. 6 and 7 - Yokota Composite utilities 20.PDF PDF
Pre-proposal Conf Minutes FA520919RA006 19 Dec 23.pdf PDF
Attachment 1. MACC PreProposal Briefing Slides 18 Dec 23 - 2nd ON RAMP.pdf PDF
Attachment 2. Q and A No. 6 and 7 - Utility Map from Geobase.pdf PDF
29 Atch J7c Question No. 40 AMRS spec.pdf PDF
30 Atch J7d Question No. 38 MACC Mock Project Comm.jpg JPG image
25 RFP Atch J5 EnvelopeLabel(OF-17).pdf PDF
19 RFP AtcJ3d11_B907AnnexConceptPlan(Com).pdf PDF
9 RFP AtcJ3d1_Spec15011.pdf PDF
21 RFP AtcJ3d13_B907LeadPaintReport.pdf PDF
31 RFP Atch J8 Questions and Answers (Added by Amendment 0006).pdf PDF
16 RFP AtcJ3d8_B907AsBuilt (Sprinkler).pdf PDF
20 RFP AtcJ3d12_B907WaterFlowTR.pdf PDF
17 RFP AtcJ3d9_B907AnnexDemoPlan.pdf PDF
8.RFP AtcJ3c2(TaxExemp_Mock).docx DOCX document
22 RFP AtcJ3d14_AbestosSurveyReport.pdf PDF
1 Solicitation Amendment - FA520919RA0060007.pdf PDF
18 RFP AtcJ3d10_B907AnnexConceptPlan.pdf PDF
27 Atch J7a Question No. 48 Geotechnical Investigation Report for B906.pdf PDF
11.RFP AtcJ3d3_DispRec.xlsx XLSX spreadsheet
4 Atc J2b AFGP.pdf PDF
13 RFP AtcJ3d5_B907AnnexAsBuilt(Elec).pdf PDF
23 RFP Atch J4a(PPQCoverletter) Amend 0007.pdf PDF
14 RFP AtcJ3d6_B907AnnexAsBuild (Arch).pdf PDF
10 RFP AtcJ3d2_EnvProtection.pdf PDF
15 RFP AtcJ3d7_B906AsBuilt.pdf PDF
26 RFP Atch J6 QAs - FA520919RA006.pdf PDF
7.RFP AtcJ3c1(MockSectionB).xlsx XLSX spreadsheet
3 Atc J2a ArmyGP.pdf PDF
28 Atch J7b Question No. 33 Fire Alarm B907 Annex.pdf PDF
2 Atc J1 Other Req 30 Apr 21.pdf PDF
24 RFP Atch J4b(PPQ).docx DOCX document
5 RFP AtcJ3a MockSOW.pdf PDF
6 RFP AtcJ3b(SOW Addendum).pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 PLOT PLAN & DWG LIST.TIF

02 C1 SITE PLAN & DETAILS.TIF
03 A1 FLOOR PLAN, FOUNDATION PLAN, FRAMING ELEVATION & ELEVATION.TIF
04 A2 TYP SECTION & DETAILS.TIF
05 A3 ROOF PLAN & WALL DETAILS.TIF
06 A4 DOOR & FRAMING DETAILS.TIF
07 E1 ELEC LAYOUT.TIF
08 E2 ELEC LAYOUT.TIF

File details come from the government source that posted it. Updated .