About this file

This document contains questions and answers regarding a solicitation for an Indefinite-Delivery/Indefinite-Quantity (IDIQ) Multiple Award Construction Contract to provide construction services to U.S. Army and Air Force installations in Honshu, Japan, including Yokota Air Base and its Geographically Separated Units. The solicitation seeks proposals for a one-year base period with four one-year options and an estimated value between $25 million to $500 million. Services include new construction, repairs, alterations, and maintenance for facilities such as buildings, utilities, roads, grounds, and airfields. Responses are due by August 23, 2019. Offerors must demonstrate experience with similar MACC contracts valued between $25 million to $100 million. Past performance will be evaluated based on relevancy, recency, and customer satisfaction on up to five contracts.

View the file

Other files

File Type Posted
Amendment FA520919RA0060010.pdf PDF
34 RFP Atch J11 Questions and Answers (Added by Amendment 0010).pdf PDF
23 RFP Atch J4a(PPQCoverletter) Amend 0009.pdf PDF
33 RFP Atch J10 Questions and Answers (Added by Amendment 0009).pdf PDF
Amendment FA520919RA0060009.pdf PDF
Amendment FA520919RA0060008.pdf PDF
32 RFP Atch J9 Questions and Answers (Added by Amendment 0008).pdf PDF
Attachment 3. Q and A No. 6 and 7 - Yokota Composite utilities 20.PDF PDF
Pre-proposal Conf Minutes FA520919RA006 19 Dec 23.pdf PDF
Attachment 1. MACC PreProposal Briefing Slides 18 Dec 23 - 2nd ON RAMP.pdf PDF
Attachment 2. Q and A No. 6 and 7 - Utility Map from Geobase.pdf PDF
29 Atch J7c Question No. 40 AMRS spec.pdf PDF
30 Atch J7d Question No. 38 MACC Mock Project Comm.jpg JPG image
25 RFP Atch J5 EnvelopeLabel(OF-17).pdf PDF
19 RFP AtcJ3d11_B907AnnexConceptPlan(Com).pdf PDF
9 RFP AtcJ3d1_Spec15011.pdf PDF
21 RFP AtcJ3d13_B907LeadPaintReport.pdf PDF
31 RFP Atch J8 Questions and Answers (Added by Amendment 0006).pdf PDF
16 RFP AtcJ3d8_B907AsBuilt (Sprinkler).pdf PDF
20 RFP AtcJ3d12_B907WaterFlowTR.pdf PDF
17 RFP AtcJ3d9_B907AnnexDemoPlan.pdf PDF
8.RFP AtcJ3c2(TaxExemp_Mock).docx DOCX document
22 RFP AtcJ3d14_AbestosSurveyReport.pdf PDF
1 Solicitation Amendment - FA520919RA0060007.pdf PDF
18 RFP AtcJ3d10_B907AnnexConceptPlan.pdf PDF
27 Atch J7a Question No. 48 Geotechnical Investigation Report for B906.pdf PDF
11.RFP AtcJ3d3_DispRec.xlsx XLSX spreadsheet
4 Atc J2b AFGP.pdf PDF
13 RFP AtcJ3d5_B907AnnexAsBuilt(Elec).pdf PDF
23 RFP Atch J4a(PPQCoverletter) Amend 0007.pdf PDF
14 RFP AtcJ3d6_B907AnnexAsBuild (Arch).pdf PDF
10 RFP AtcJ3d2_EnvProtection.pdf PDF
15 RFP AtcJ3d7_B906AsBuilt.pdf PDF
7.RFP AtcJ3c1(MockSectionB).xlsx XLSX spreadsheet
3 Atc J2a ArmyGP.pdf PDF
28 Atch J7b Question No. 33 Fire Alarm B907 Annex.pdf PDF
2 Atc J1 Other Req 30 Apr 21.pdf PDF
24 RFP Atch J4b(PPQ).docx DOCX document
5 RFP AtcJ3a MockSOW.pdf PDF
12 RFP AtcJ3d4_B907AnnexAsBuilt.pdf PDF
6 RFP AtcJ3b(SOW Addendum).pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QAs #2 for FA5209-19-R-A006 Sheet 1 of 8

Question No.

Reference QUESTION Answers

1 Mock Project Fire suppression system and fire alarm equipment were equipped in As-built drawings.

Please clarify equipment to be kept or to be newly designed.

Remove all existing equipment and install all new equipment based on SOW.

2 Mock Project Please indicate wet sprinklers shall be used or not. Wet sprinklers in accordance with NFPA.

3 Mock Project Please indicate vertical axis electric motor driven fire pump and underground tank shall be used or not. New vertical axis electric motor driven fire pump and underground tank shall be required.

4 Mock Project Please specify criteria for newly designed fire equipment to be adapted. (Example: NFPA13-2019 Sprinkler System, or NFPA11 Foam System, ETL, UFC)

The Contractor shall consult this matter with the US certified Protection Engineer to determine which chapter is applicable after verifying the site condition. Refer SOW IV. A. 5.

5 Mock Project In the case of designing foam fire suppression system, please indicate which shall be used for ones discharging from ceiling, high foaming type or low foaming type.

Foaming type shall not be required based on the existing usage situation.

6 Mock Project Please indicate classification of hazard level by building use. Ordinary group 2 hazard shall be adapted in accordance with NFPA.

7 Mock Project Please indicate if the capacity for existing main sprinkler piping is enough. The Contractor shall consult this matter with the US certified Fire Protection Engineer to determine if the capacity is sufficient. Refer the SOW paragraph II.D.8 and Attachment 5, Water Flow Test report.

8 RFP, Section L May we submit CCASS evaluation sheet in lieu of asking customers evaluation regarding with past performance evaluation? Should we submit both Attachment J-4 and hard copy of CCASS evaluation sheets with our proposal, if CCASS evaluation sheet is acceptable?

The Government requests the submissions of Past Performance Questionnaires(PPQs). See Section L, L-100, Para B.3.

9 RFP, Section L In accordance with L-100 of RFP, page 32,3. Part III (a) Quality and Satisfaction Ration of Contract, Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) that demonstrates customer satisfaction with overall job performance and/or quality of completed and/or ongoing contracts and other items. However those information are written in Past performance information PART III (C) and evaluation will be in the answer of evaluator Part III (b). Therefore, may we write as a answer to Part III(a) “Please refer items (b) and (c) of Part III” ?

Please carefully read L-100, Part III, sections (a) through (e) to understand the different past performance information requested. It is up to the contractor to determine how to prepare its past performance appraisal.”

10 RFP, Section L Should we submit our proposal documents including SF1442 in two rings binding holder? As stated in L-100, paragraph 4.(j), elaborate formats, bindings, and color presentations are not desired or required.

11 RFP, Section J We received J-3.c.2, EXEMPTION FROM JAPANESE CUSTOMS DUTIES AND TAXES PURSUANT TO STATUS OF FORCES AGREEMENT. Should Type and Percentage or Tax and Amount of Duty or Tax Excluded in Yen be for Mock Project?

Yes (Refer to Attachment J1, Para K003)

12 RFP, Section M In accordance with the solicitation Section M, B(2) page 35, the value ranging of past performance project is from PY25,000,000 to JPY100,000,000. We have very relevant past performed project, but value is about JPY 670,000,000. Would such over value ranging project be out of your evaluation or lower rating?

PPI relevancy will be evaluated based on scope, complexity and magnitude. Very Relevant contract performance efforts involved essentially the same scope, magnitude of effort, and complexities to that required by this solicitation. In addition, the performance must have been concurrent (overlapping performance periods) with at least one other project of equal or greater magnitude and performed at a separate geographic location.

Any project greater than the range will not be negatively evaluated for the magnitude of effort portion to determine relevancy.

QAs #2 for FA5209-19-R-A006 Sheet 2 of 8

No.

Reference QUESTION Answers

13 RFP, Section M 1. RFP-a, page35, section M (2), past performance project value ranging from JPY25,000,000 to JPY100,000,000, We have work experiences in Design Build project value over JPY100,000,000. Is it possible for us to submit the DB projects each values over JPY100,000,000 as past performance proposal?

Same answer as above

14 Mock Project There was no description regaring Bid Guarantee for the Mock Project in the RFP.

Do we need one for the Mock project? If so, please provide us information.

Bid Guarantee is not required for the Mock Project.

For the actual task order, only Performance Bonds will be required.

Refer to Attachment J-1, H003 & K002.

15 Section J-1, K002 We would like to propose as a prime offeror, can we use the Past Performance Information performed with JV in the past five years?

Your firm shall submit past performance solely for your firm. The Government will accept your firm's past performance as a prime contractor. If your firm is proposing as a JV, please refer to L-100, para

16 Peformance Bond RFP-Attach J1, page 9, K002 under Performance Bonds.

Is this Y800,000,000 amount obtained from a surety company or a total amount obtained from a few surety companies?

You may submit the letter of intent either from a single surety or multiple sureties.

17 RFP Section M, B.(2) & Section J-1, H012 Range of Relevant Contract & TO

Section M, B.(2) says "Relevant Contracts ... with a project value ranging from JPY25,000,000 to JPY100,000,000 as anticipated under this contract." while Section J-1, H012 says "TOs will generally range from "Y25 000 000 to Y500 000 000" What is the difference?

Section J-1, H012 refers to the genral range of the contract amount of task orders that will be issued under the MACC.

Section M, M-100, Para B.(2) refers to the range the Government determines the relevancy of past performance in terms of the maginitude of effort for the contracts submitted by the offerors.

18 RFP Section L, 3.(b)&(c) Section L, 3.(b) says "...offeror send out a PPQ to each of the POC identified in ... paragraph (c) below". And Section L, 3.(c) says "... contracting officer (POC)". May I understand that offeror shall send PPQ to the contracting officer?

No. The government requires the offeror send out a PPQ to each of the Points-of-Contact (POCs) identified in the Past Performance Proposal. The offeror shall send out the PPQ, using the Past Performance Evaluation Cover Letter to each of its references. The POCs shall forward their completed questionnaires directly to the government (not back to the offeror).

19 Terms of the solicitation At least one month is required for integration of drawing creation, structural calculation, electric capacity, adiabatic calculation and so on.

Is it possible to extend the RFP closing date?

The Proposal Closing Date has been extended till 23 Aug 19 by Amendment 0002.

20 RFP, Section M Please clarify the definition of ‘separate geographic location’ stated in Sec M-100, paragraph B. (2).

Are different locations at the same military installation still considered geographically separate?

No. Different locations at the same military installation are not considered "separate geographical locations". The example of the geographical locations are Yokota and Tokorozawa, Camp Zama and Sagamihara Housing Area, or Fussa City and Tachikawa City

21 1_RFP

Section B

If an offeror were awarded this MACC, can we consider the offeror was awarded both U.S. Army and Air Force (AF) MACC programs?

Yes. The awarded offerors will be the contractors of Indefinite-Delivery/Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC), U.S. Army Installations within Honshu, Japan and Yokota Air Base and its Geographically-Separated Units (GSUs), Japan.

Also, please refer to RFP Attachment J-1, H010 COMPETITION.

QAs #2 for FA5209-19-R-A006 Sheet 3 of 8

No.

Reference QUESTION Answers

22 RFP

(Page 32 of

36) L-100, B.1.(g) Contractor Teaming Arrangement

Is the word “Teaming” interpreted as a joint venture (JV)? We plan to participate in bidding as a prime contractor, and we will work with design companies and subcontractors for each of the orders (Task Orders). In this case, it is determined that it does not correspond to "Teaming". Is this correct? Or is the “Contractor Teaming Arrangement” to include the design companies and subcontractors? Please advise.

Please refer to FAR Subpart 9.6 -- Contractor Team Arrangements. “Contractor team arrangement" means an arrangement in which --

(1) Two or more companies form a partnership or joint venture to act as a potential prime contractor; or

(2) A potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program.

However, when you propose as a JV, SAM must be registered as JV.

23 RFP

(Page 32 of

36) L-100, 3.(c) Past Performance Information (PPI)

It states “Provide a list of no more than five (5) of the most relevant contracts performed for any customer”. Instead of providing five (5) MACC Contract Task Orders, can we provide Army and Air Force MACC Contracts (FA520915DXXXX) respectively?

The Government requests offerrors to provide a list of no more than five (5) of the most relevant contracts, and does not limit to submit either contract or Task Order.

24 L-100. SECTION B. PART III -PAST PERFORMANCE PROPOSAL on page 32 in RFP states that “ Limited to no more than five (5) pages per contract listed” for the submissions.

Does it mean that 5 pages are allowed for EACH of PART III (a), (b), and (c) required for the b i i ?

This limitation apply to Section L, L-100, B.3.(a) & (c). Number of pages for L-100, B.3. (b) will NOT be counted in the said page limitation.

25 L-100. SECTION B. PART III -PAST PERFORMANCE PROPOSAL on page 32 in RFP states that POC will directly send out (b) Performance Surveys/Questionnaries to the government upon completions via FAX, e-mail, or mailed to the designated address. Does it indicate that offerers are not required to attach the questionnaires in their submitting package under Part (III)?

Offerors are not required to attach the Questionaires in the proposal.

26 Will the submission of (b) Performance Surveys/Questionnaries need specific cover letter or subject title when they are directly sent out from POC to the government via FAX or email?

The requirement is that the POCs shall forward their completed questionnaires directly to the government. Specific cover letter for facsimile or the subject title for e-mail is not required, as long as it is address to the POC of the government.

27 Does the “1 copy” described in the statement at L-100. SECTION B. PART III -PAST PERFORMANCE PROPOSAL on page 32 in RFP “Submit original plus 1 copy” mean electrical data copy burned in CD or hard copy?

Offeror is required to submit Paper Copy (Original) and Electronic Copy (CD/DVD) for PART III - PAST PERFORMANCE PROPOSAL (see Section L, L-100, Para C Summariy Table for Proposal Submission ).

28 RFP Section L, L-100,B.3. We asked contracting specialist in Yokosuka Navy to fill in PPQ, however they told us that they do not evaluate the PPQ for the construction which has been issued CPARS. May we submit CPARS evaluation sheet instead of submitting PPQ?

To submit the CPARS evaluation sheet to our office is not prohibited. As stipulated in Section L, L- 100, B.3, the government requires the offeror send out a PPQ to each of the Points-of-Contact (POCs) identified in the Past Performance Proposal (paragraph (c) below). The responsibility to send out the past performance questionnaire rests solely with the offeror. Also, be sure to follow instruction outlined in paragraph (c) of Section L-100., B.3.

29 Mock Project Structural

Existing building has some existing columns in the middle of Storage Room.

Shall the new building follow the similar column spanning?

Or Storage Room shall have no steel column in the entire area of the room?

In case of no column in Storage Room, steel truss beams shall be applicable to structural system?

Existing building has some existing columns in the middle of the Storage Room. Newly design shall be without columns in the middle of the strage room.

Steel trusses and beams are applied as a structural system.

30 Mock Project Occupancy Which occupancy shall be applicable among storage occupancy, S1 or S2?

During the MACC meeting, the occupancy in Storage Room was determined as “Storage”.

If Storage Room is S2 occupancy, it is required to be separated from offices with one-hour fire-rated

The office shall be one hour fire-rated.

31 Mock Project Type of Construction should be clarified.

Type II B is applicable?

Apply type II B, except at the area where fire-rated compartments are required.

QAs #2 for FA5209-19-R-A006 Sheet 4 of 8

No.

Reference QUESTION Answers

32 Mock Project According to the following paragraphs, fire suppression system must be designed by U.S. FPE:

II. GENERAL SCOPE, B-7. General Description of Civil Work II. GENERAL SCOPE, D-8. General Description of Mechanical Work with Design

In lieu of U.S. FPE, do we understand that Fire Defense Equipment Officers Licenses Class A, Group 1 and 4 (Shoubou Setsubisi, Kousyu dai 1 rui and 4 rui) are acceptable per IX. REQUIRED LICENSE?

For Fire Alarm/MNS, SOW does not call for U.S. FPE. Thus, we also understand Fire Defense Equipment Officers Licenses Class A, Group 1 and 4 (Shoubou Setsubisi, Kousyu dai 1 rui and 4 rui) are applicable to new Fire Alarm/MNS design Please clarify

US certified fire protection engineer is required for the design of fire sprinkler, fire alarm and mass notification systems in this project.

33 Mock Project Please provide existing fire alarm and suppression drawing for estimating removal cost. Please refer to attached As-Built DWG of F/A.

There is no existing fire sprinkler drawing.

34 Mock Project

SOW II. B. 2.

SOW states that column/beam/member of truss contain LBP, however, domilshing them by hand will be very dangerous.

Is it acceptable if we perform the demolition work by using heavy equipment, with spraying water so that paint chips would not spread out?

Constractor shall perform the demolition work so that paint chips would not spread out. Contractor shall dispose fell lead-containing material as industrial waste properly.

Contractor may perform the demolition work with heavy equipment.

35 REF: Para A of II. Geeral Scope, Mock

SOW:

Shall new electrical distribution system, lighting fixtures etc. be explosion-proof type for this project to make new storage facility for aircraft parts with support equipment ?

It is not necessary.

36 REF: Para 2 of E. Electrical Work, II.

Geeral Scope:

① Can existing high-voltage cables in the cubicle be reused? If yes, can we place additional concrete horizontally to install new larger-size-cubicle on the existing concrete foundation considering rising position of barried conduit and limited length of the high voltage cable?

② Is it acceptable to use FEP that is same as existing one for new burried conduit from outside cubicle

①You can reuse existing high-voltage cables. We do not mandate the location of transformer.

②Yes, it's acceptable.

③Yes, you can use it.

37 ① Is it necessary to connect new Mass Notification System (MNS) to Base Wide/Giant Voice?

② Do we need to install new rack(s) inside the new structure? If yes, please inform of size, height and its layout. ③ Do you need a tamper switch for the post indicator?

(REF: Para 7. of B. Civil Work, II. General Scope) ④As to air conditioner,are there any room whose temperature become below 4℃ inside the new structure? (If yes, heat coil wrapping is needed there)

①No, it is not necessary.

② No. New racks/shelves, approx 3,600mm height x 1,200mm depth x 10,800mm wide shall be installed along the east side wall by the using agency.

③ You don't need a tamper switch for the post indicator.

④ No, there shall be not.

38 REF: b. Subtask 2 of Para1. of F.

Communication Work, II. Geeral Scope:

It is stated that "Install new CAT 6A network cable form B906 Communication room to drop locations in 907 annex." But the location of the communication room of B906 is unknown. Please provide drawing that shows the location of the room for our making estimate, and also provide the information on the location and quantity for the gang boxes to be newly instsalled.

Refer to Attachment #4, MACC Project Comm". Red squares on the drawing are the gang box locations.

39 Electrical Work: Shall the contractor provide back-up generator for fire pump?

If so, please advise its continuous operation time, if any.

It is not necessary to install it.

40 SOW

E. General Description of Electrical Work with Design

Kindly provide specifications for Advanced Meter Reading System (AMRS) meter. The meter is a part of "4. Applicable Clauses:(3) Identification of Contractor-Furnished U.S. Materials".

Please refer to attached AMRS specification for the details (Attachment 3).

QAs #2 for FA5209-19-R-A006 Sheet 5 of 8

No.

Reference QUESTION Answers

41 SOW

F. General Description of Communication Work with Design:

1.All cables shall utilize J-Hooks─Acceptable to use J-hooks inside the storage area? Yes, J-hooks are acceptable.

42 N/A The annex being used for storage after completion of the project─Kindly advise if piping may be damaged by using the annex for us to determine the pipe to use.

Yes. So new piping shall be placed in a location that is hard to receive damage.

43 SOW

D. General Description of Mechanical Work with Design: para2

Install two (2) new heat-pump AC units, outside air intake fans with heat exchanger…─The room is not big enough. Would it be acceptable to install 2 sets of [1] air-cooling, heat pump, packaged type, ceiling mount cassette type and [2] air ventilation fan (i.e. Rosunai)?

Yes, it shall be acceptable.

44 N/A Are existing floor drains (x4) in the storage room necessary? Yes, it shall be necessory.

45 N/A Louver is necessary for air ventilation during the summer?

Or the government will roll the shutter up for ventilation?

No, the louver is not necessary.

46 Existing site condition According to the analysis report, wooden columns and beams are painted with lead-based paint. The columns and beams are bolted and the condition of the paint is not poor.

Do we need any lead based paint removal work when demolishing?

No, lead based paint removal is not necessary. And please see Government Response No. 18

47 Existing site condition The paint on the metal roof is in very poor condition and part of the paint is already peeled off.

Do we need US Lead supervisor / worker qualification to remove the metal roof?

Yes, US Lead supervisor/worker qualifications are necessary. And please see Government Response No.18.

48 N/A Boring data (geological survey) is not available in the FOPR package and we examined boring data for other projects to develop presumed condition.

According to our presumed condition, ground reinforcement work or rubble concrete is necessary and we need to dig 3m (10ft) deep. Also, we will need to dig 3m (10ft) deep for sprinkler water tank. In addition, bracing will be necessary (drive H-shaped steel beam into the ground).

Please refer attached Geotechnical Investigation Report for B906.

①All work shall be included in your proposal.

②We think that currenet work period is sufficient even if contractor considers soil improvements.

49 SOW

E. General Description of Electrical Work with Design

[SOW] Electrical system shall also including interior and exterior LED lighting fixtures with sensor/solar timer control systems, wall control switches...

Acceptable to use sensor/solar timer control system for exterior lighting and wall control switches for interior lighting?

Exterior light shall be solar timer control type, and interior light includes sensor type (solar timer control is not required) in accordace with UFC 3-530-01.

QAs #2 for FA5209-19-R-A006 Sheet 6 of 8

No.

Reference QUESTION Answers

50 Statement of Work Per Section II.D, General Description of Mechanical Work with Design, item 1. Request for clarification regarding replacement of water piping, valves, faucet, etc.

Is it related to fire sprinkler system? The existing plan and the new concept plan does not require any toilets.

No, the water piping are not related to fire sprinkler system. The piping system is for domestic water.

51 Statement of Work Is a new pump room required for the new fire pump? Yes, the new pump room is required for the new fire pump.

52 Soil Bearing Capacity Will it be acceptable to assume an allowable soil bearing capacity of 3000 psf at bid stage? If a deep foundation (pile or soil improvement) be found necessary based on the actual soils investigation, can this be treated as a variation? Request to please clarify.

Please refer attached Geotechnical Investigation Report for B906.

53 7.RFP_AtcJ3c1(MockSectionB) Please specify the extent of the Mock Project.

Can we consider the extent is in-between "Bldg.907-Annex-side surface of the exterior wall of Bldg.906" and "Bldg.907-Annex-side surface of the fire wall on exterior of Bldg.907"?

Yes.

54 7.RFP_AtcJ3c1(MockSectionB) Regarding price breakdown for the Mock Project, can we classify Demolition work and Lead based paint removal work as Civil Work?

Yes. It's Civil Work.

55 7.RFP_AtcJ3c1(MockSectionB) Regarding price breakdown for the Mock Project, please advise as which work we should classify Direct Temporary Equipment expenses, such as exterior scaffolding and interior scissor lifts, etc., which will relate to several disciplines?

Can we classify the direct temporary equipment expenses as "Overhead & Profit"?

Please classify it as "Arch Work".

56 4_RFP_Atc_J2b_AFGP Section 01 11 00 Page 17 Para 3.7.2

Regarding the color selection for exterior and interior finishes for Mock Project, MACC General Provisions for Yokota Air Base states color selections should be coordinated with the installation design guide. There is no design guide included in the solicitation package.

The new Bldg.907 Annex building will have pre-finished metal panel for roof and exterior wall and maybe steel frame.

Can we consider colors of the exterior and interior finish can be selected from standard colors of a munufacturer?

There are rules for the exterior color. Wall=19-80F, Roof/Trim=09-30D. Interior color is selected from the manufacture's color sample.

57 5_RFP_AtcJ3a_MockSOW Page SOW-1

II

Regarding the Mock SOW, referring to International Building Code (IBC) (,which is referred by UFC1-

200) chapter 3 Use and Occupancy Classification, can we consider the new Bldg.907 Annex can be classified as "311.3 Low-hazard storage, Group S-2" defined by the IBC?

Yes, the new Bldg.907 Annex can be classified as "311.3 Low-hazard storage, Group S-2" as defined in the IBC.

QAs #2 for FA5209-19-R-A006 Sheet 7 of 8

No.

Reference QUESTION Answers

58 5_RFP_AtcJ3a_MockSOW Page SOW-6 IV Reference A.10

Mock SOW refers to "UFC 4-211-03F Air Force Fighter Engine Maintenance Facility".

Can we consider that new Bldg.907 Annex is not an engine maintenance facility and not to relate to the above "UFC 4-211-03F Air Force Fighter Engine Maintenance Facility"?

No. Bldg 907 Annex is not an engine maintenance facility and not applicable to UFC 4-211-03F Air Force Fighter Engine Maintenance Facility.

59 5_RFP_AtcJ3a_MockSOW Page SOW-6 IV Reference A.11

Mock SOW refers to "UFC 4-440-01 Warehouse and Storage Facilities" and this UFC covers several types of storage facilities under section 1-4 Types of Storage Facilities and Special Requirements for Warehouse Types (Table 3-1) under section 3-1.4 Requirements of Specific Buildings.

Can we consider the new Bldg.907 Annex can be classified as "1-4.1 General Purpose Warehouse" defined by this UFC?

Additionally, can we consider any special requirements under section 3-1.4 are not applied?

The new Bldg.907 Annex is classified as "1-4.1 General Purpose Warehouse" defined by this UFC.

Any special requirements under section 3-1.4 are not applicable.

60 5_RFP_AtcJ3a_MockSOW Page SOW-2&3

II. C.

Regarding the Architectural Work for Mock SOW, UFC 4-440-01 Section 3-7.4 requires durable finishes (protective panel, etc.) along the exterior wall inside the warehouse.

There is no requirement for the protective panel on the SOW document or no protection along the exterior wall in the current existing building.

Can we consider it is not required to install durable finishes (protective panel, etc.) along the exterior wall inside the warehouse for the new Bldg.907 Annex?

Yes. Installation of durable finishes (protective panel, etc.) is not required along the exterior wall inside the warehouse for the new Bldg.907 Annex.

61 5_RFP_AtcJ3a_MockSOW Page SOW-3

II. D

Regarding the Mechanical (Plumbing) Work for Mock SOW, UFC 4-440-01 Section 3-13.1.1 requires Emergency Shower/ Eyewash Fixtures and Floor Drains.

There is no description on the SOW regarding the Emergency Shower/ Eyewash Fixtures and Floor Drains for the new Bldg.907 Annex building.

Can we consider it is not required to install Emergency Shower/ Eyewash Fixtures and Floor Drains for the new Bldg.907 Annex?

Yes. Installation of Emergency Shower/ Eyewash Fixtures and Floor Drains for the new Bldg.907 Annex is not required.

62 Mock Projecct/ Civil Work, SOW II.B.4. To determine the size of the new concrete foundation, the existing boring data is necessary.

Does the Government have the existing data? If so, could you kindly forward us the data?

Please refer attached Geotechnical Investigation Report for B906.

63 Mock Projecct/ Mechanical Work, SOW

II.D.3.

Could you kindly inform us of the Model Number and/or capacity of the existing unit heater? Danrei (manufacture name), UH-V (Model name) is installed. New capacity shall be depend on design.

64 RFP

SECTION B

(Attachment J-3c1)

Would you please clarify to what to include in Breakdown for Civil Work and Structural Work?

In addition, should sprinkler work be included in Mechanical Work? and Fire Alarm System work in Electrical Work?

Please classify as follows:

Civil Work : Demolition & Removal, new Concrete slab (except Floor Finish = Arch Work).

Structural Work : Structural members of new building - columns, beams, foundation and so on.

Sprinkler work should be included in Mechanical work and F/A work in Electrical work the same way as GCE.

65 Mock Projecct/ Mechanical & Electrical Work, SOW II.D.8.

Is a standby generator required for the Fire Suppression System?

If the standby generator is required, where is it going to be installed?

Standby generator is not required.

QAs #2 for FA5209-19-R-A006 Sheet 8 of 8

No.

Reference QUESTION Answers

66 1. Government response on the Q & A for FA5209-19-R-A006 for new building’s hazard classification was Ordinary Hazard, Group 2 per NFPA 13. This may not be appropriate since OH, Group 2 requires sprinkler water density of 0.20 GPM/SF and due to the following reasons below a higher sprinkler water density is required.

a. SOW section II.C.1, requires the storage facility to be steel frame structure building. UFC 3-600-01, para. 4-44.4 requires steel columns must be protected as required by NFPA 13. Table 20.15.1, NFPA 13 requires 0.68 GPM/SF (27.7 mm/min) for 4 feet (1.2m) aisle and 0.57 GPM/SF (23.2 mm/min) for 8 feet (2.4m) aisle ceiling sprinkler density for protection of steel columns.

b. UFC 3-600-01, para. 4-44.2.3.1 requires sprinkler protection, at a minimum, must be based on Class IV, non-encapsulated commodities, as defined by NFPA 13, unless a more severe class of storage is anticipated, and must be based on the maximum potential height of storage. To determine the appropriate design sprinkler density, please advise the storage height and storage arrangement like racks/shelves, hazardous materials, etc. The required design sprinkler density could be higher than OH, Group 2 (0.20 GPM/SF) depending on the storage arrangement and materials stored in the facility.

Please confirm if the contractor shall design and install the sprinkler based on Ordinary Hazard, Group 2 Hazard Classification or the Fire Protection Engineer (FPE) shall determine the appropriate Hazard Classification and design density of sprinkler system protection of the new facility.

b. New racks/shelves, approx 3,600mm height x 1,200mm depth x 10,800mm wide shall be installed along the east side wall. Aircraft parts (mostly made from metal that contains some rubber and plastic) and support equipment (machine tools and viecles) are not high rates of heat release and will be stored.

Fuel, oil and combusitble or flammable liquid will not be stored.

The Fire Protection Engineer (FPE) shall determine the appropriate Hazard Classification and design density of sprinkler system protection of the new facility.

67 SOW section II.D.2 SOW section II.D.2, please clarify that the two (2) new heat pump unit is split type with ceiling or wall mounted indoor unit and outdoor unit. The outside air intake fans with heat exchanger is in other technical term an Energy recovery ventilator with associated ducts system for outside air ventilation requirement for the two office spaces. Please confirm.

Yes, it shall be acceptable.

68 Mechanical SOW item 3 Mechanical SOW item 3, requires replacement of existing unit heaters, steam piping, traps, and valve with new and point of connection at building 906 border. This is assuming that the existing steam supply line or capacity is sufficient to support the new space heating requirement of the new storage facility. Please confirm that upgrading or replacement of the existing steam supply line for appropriate new size beyond the building 906 border shall not be part of the contract and shall be by others.

Yes, the capacity of existing steam supply line shall be sufficient to support the new space heating requirement.

69 Mechanical SOW item 1 Mechanical SOW item 1, the concept drawings doesn’t show bathroom and the existing building doesn’t have either. Please clarify for the replacement of existing water piping and valve with new indicated in the SOW.

Refer to Question #34.

70 In SOW Item F. 1 communication works In SOW Item F. 1 communication works stated to install Cat6 shielded twisted pair (UTP), should it be STP instead of UTP? Also subtask 2 Cat6A/UTP is mentioned and subtask 3 Cat6/UTP so to confirm contractor will provide 2 types of cable category Cat6A & Cat6? Please confirm.

All drops should be CAT 6 UTP

71 Mock project Please clarify fire rating and R-value requirements for the new building walls and roofings, for bid purposes.

One hour fire rating shall be applied for the area. As the construction site is located in Japan, please apply Area Division 5 for R value, Building Energy Conservation Act.

72 Mock project Shall new skylight be provided as similar to existing? Please use the same size as the existing one.

Mock Project, SOW Ⅱ.B.6 Is dowel bar required for concrete restoration after electric piping? No, dowel bar is not required.

Mock Project, SOW Ⅱ.C.3 Please advise us the specification and quantity of skylight as required in SOW. Please refer to the existing drawings (page 5/A-3) and ask for the skylight equivalent to the existing one.

Mock Project, SOW Ⅱ.C.4 As non-skid surface is required, which should we consider bloom finish or coating of the slab? Please apply the coating finish.

Mock Project, SOW Ⅱ.E.4 There is description of "Provide and install new fire alarm system and mass notification system (MNS).

" Is a transmitter to fire department also new installation?

Yes, it is. The contractor shall install new fire alarm reporting system including a transmitter.

Mock Project, SOW Ⅱ.E.2 What requirment is applied for designing exterior lighting? (Ex. Entrance light, Magagine, etc.) The contractor shall follow the UFC 3-530-01, 5-4.1 for illuminance and controls and 5-9.1 for type of fixtures.

78 Mock Project, Concept plan for new project:

/200, there is no description for square shape red color points on the plan.

(Please see the attached plan.) We are assuming that these red color points indicate for “COMM.

OUTLET”. Is this correct?