About this file

This is an internal policy document from Lawrence Berkeley National Laboratory establishing requirements for safe electrical installations. The Safe Electrical Installations Policy (RPM-2) defines the roles, responsibilities, and processes for planning, inspecting, testing, and energizing electrical work at Berkeley Lab's main site and facilities.

The policy establishes the Electrical Authority Having Jurisdiction for Safe Installations (IAHJ) as the delegated authority overseeing electrical distribution and supply systems throughout Berkeley Lab. The IAHJ Program implements compliance with NFPA 70 (National Electrical Code), NFPA 70E (Electrical Safety in the Workplace), federal OSHA regulations (10 CFR 851), and Berkeley Lab's Facilities Master Specifications and Standards. The policy applies to all employees, visitors, and subcontractors involved in new electrical installations, modifications to existing systems, and demolitions. Specific exclusions include incidental maintenance and troubleshooting work, scientific research equipment, utility provider equipment, and designated facilities including Building 1 (Donner Lab), Building 23 (Guest House), Building 32 (UC Berkeley substation), and various off-site locations (JGI facilities in Walnut Creek, Oakland Scientific Facility, Emeryville facilities, and external research programs). The policy requires IAHJ review and approval of all electrical work including transmission lines, transformers, switchgear, distribution wiring, power generation equipment, control panels, and associated hardware. Key personnel include the IAHJ (qualified individual with code interpretation authority), Lead Electrical Inspector, Compliance Engineer/Electrical Codes and Standards Compliance Professional, Inspectors of Record, Design Professionals (licensed PE), and Qualified Electrical Workers (California-certified electricians). The effective code of record for projects is determined at preliminary drawing submission, with that edition of the NEC applied for the project's duration. All inspection reports, test results, and IAHJ Review forms must be maintained in the IAHJ Program database and organized according to project record requirements.

View the file

Other files for this federal contract opportunity

Other files attached to UPDATED ALS SHB pulsed RF HPA, newest first.
File Type Posted
RFP-SHB pulsed RF HPA Rev. 1.pdf PDF
Updated - SHB pulsed HPA ESD MARKUP Rev.1.pdf PDF
Rep Cert- SHB pulsed RF HPA Rev1.docx DOCX document
Price Proposal Schedule Attachment B.xlsx XLSX spreadsheet
RFP SHB pulsed RF HPA ESD Response sheet.xlsx XLSX spreadsheet
Updated SHB pulsed HPA SOW MARKUP Rev.1.pdf PDF
Sample Subcontract.pdf PDF
1 LBNL Electrical Equipment Build Standard V6.pdf PDF
1c Appendix C Ground Hook Safety.pdf PDF
4 LBNL ES_H Manual (PUB-3000) Chapter 08 Electrical Safety Program.pdf PDF
8 LBNL RPM on Cranes Hoists and Rigging Safety.pdf PDF
10 LBNL LBNL Facilities Master Specifications 260519.11_600 Volt Conductors and Cable.docx DOCX document
RFP-SHB pulsed RF HPA.pdf PDF
AL-1887-8783A SHB pulsed RF HPA SOW.pdf PDF
1b Appendix B Electrical Equipment Fabrication.pdf PDF
2 LBNL Electrical Safety Manual Revision 1.pdf PDF
6 LBNL RPM on Seismic Safety.pdf PDF
7 LBNL Lateral Force Design Criteria Resource Document (RD3.22) (version 18).pdf PDF
9 LBNL ES_H Manual (PUB-3000) Chapter 27 Cranes Hoists and Rigging Safety.pdf PDF
12 LBNL ES_H Manual (PUB-3000) Chapter 43 Non Ionizing Radiation.pdf PDF
13 LBNL PUB 3111 Quality Assurance Program Description.pdf PDF
Rep-Cert Form - SHB pulsed RF HPA.docx DOCX document
Past Performance Reference Information Form.docx DOCX document
RFP SHB pulsed RF HPA ESD Response sheet.xlsx XLSX spreadsheet
1a Appendix A Electrical Equipment Hazard Labeling.pdf PDF
11 LBNL Facilities Master Specifications 260523_Low-Voltage Electrical Power Conductors and Cables.docx DOCX document
Price Proposal Schedule Attachment B.xlsx XLSX spreadsheet
AL-1887-8780A SHB pulsed RF HPA ESD.pdf PDF
1d Appendix D Rack Build Standard.pdf PDF
5 LBNL ES_H Manual (PUB-3000) Chapter 14 Electrical Equipment Safety Program.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Safe Electrical Installations Policy - RPM-2 RPM-2 https://commons.lbl.gov/display/rpm2/Safe+Electrical+Installations+Policy#SafeElectricalInstallationsPolicy--1898802862[4/7/2020 6:02:25 PM]

RPM REQUIREMENTS AND

POLICIES MANUAL Search the RPM

Home View Browse

Home RPM Sections A-Z Index Glossary Contact

Home / RPM Sections / Section - Environment, Safety and Health / Policy Area - Electrical Safety Programs

Safe Electrical Installations Policy

Brief IAHJ Processes Document Information

Title: Safe Electrical Installations Policy

Publication date: 1/18/2019

Effective date: 11/24/2014

POLICY

A. Purpose

The Safe Electrical Installations Policy is intended to:

Define distinct roles and responsibilities and describe the required independence between design and approval.

Minimize the risk of personnel injury and property loss.

Maintain the integrity of electrical distribution systems at Lawrence Berkeley National Laboratory (Berkeley Lab).

The Electrical Authority Having Jurisdiction for Safe Installations (IAHJ) is delegated the Electrical AHJ over electrical distribution and supply systems and equipment throughout the Berkeley Lab main site and within Berkeley Lab buildings. The IAHJ has the authority to approve planning, inspection, testing, and energization of new electrical installations and modifications to existing electrical systems and equipment.

The IAHJ Program is designed to implement and ensure compliance with National Fire Protection Association (NFPA) 70, National Electrical Code; NFPA

70E, Standard for Electrical Safety in the Workplace; federal Occupational Safety and Health Administration (OSHA) regulations as identified in the Worker

Safety and Health Program (10 CFR 851); and the Berkeley Lab Facilities Master Specification and Standards.

B. Persons Affected

This procedure applies to all employees, visitors, and subcontractors at the Berkeley Lab main site involved with planning, inspection, testing, or energization of new electrical installations and modifications to existing electrical systems and equipment.

C. Exceptions

This policy does not apply to facilities outside the Berkeley Lab main site or to main-site facilities housing activities not pursuant to the UC-DOE Prime

Contract (Contract 31), and where the University of California (UC) or other state, city, or county Authority Having Jurisdictions (AHJs)/Building Code Official jurisdictions apply.

This policy does not apply to incidental work, such as electrical systems and equipment preventive maintenance, troubleshooting, minor repair, or routine switching. In addition, it does not apply to scientific research equipment or to a utility service provider's equipment and wiring maintenance at Berkeley Lab and UC Berkeley substations.

The following sites have been specifically excluded from this procedure:

Building 1 (Donner Lab) on the UC Berkeley (UCB) campus.

Policy https://commons.lbl.gov/display/rpm2/Home https://commons.lbl.gov/display/rpm2/Home http://search.lbl.gov/ http://jobs.lbl.gov/ http://www.lbl.gov/ds/ http://www.lbl.gov/lab-index/ http://www.lbl.gov/ mailto:requirementsmgmt@lbl.gov https://commons.lbl.gov/display/rpm2/Home https://commons.lbl.gov/display/rpm2/RPM+Sections?src=breadcrumbs https://commons.lbl.gov/display/rpm2/Section+-+Environment%2C+Safety+and+Health?src=breadcrumbs https://commons.lbl.gov/display/rpm2/Policy+Area+-+Electrical+Safety+Programs?src=breadcrumbs-parent https://commons.lbl.gov/display/rpm2/Safe+Electrical+Installations+Policy#SafeElectricalInstallationsPolicy--1898802862[4/7/2020 6:02:25 PM]

DOE-funded research activities on the UCB campus.

Building 23 (Guest House) on the Berkeley Lab main site.

Building 32 (UCB substation) on the Berkeley Lab main site inclusive of connection with UCB switching and metering.

Building 54A ATM kiosk on the Berkeley Lab main site.

Buildings 100, 310, 400, and 500 (the Joint Genome Institute [JGI], Walnut Creek, CA)

Building 943 (Oakland Scientific Facility, Oakland, CA).

Building 971 (Office of the Chief Financial Officer, Emeryville, CA).

Building 975 (Physical Biosciences Division, KBase, Emeryville, CA).

Building 976 (Materials Sciences Division, the Joint Center for Artificial Photosynthesis [JCAP], Berkeley, CA).

Building 977 (Life Sciences Division at Potter St., Berkeley, CA).

Building 978 (Physical Biosciences Division, the Joint BioEnergy Institute [JBEI] and the Advanced Biofuels Process Demonstration Unit [ABPDU], Emeryville, CA).

Leased facilities and research programs outside the San Francisco Bay Area such as the Sanford Underground Research Facility (SURF), the IceCube

Laboratory, etc.

D. Policy Statement

1. The IAHJ process requires review, inspection, testing, and approval of all electrical work consisting of construction, modifications, and/or demolitions of new electrical installations and modifications to existing electrical systems and equipment. This includes permanent or temporary wiring and connections from the service point or power source through the high-, medium-, and/or low-voltage power distribution to power outlets or hardwired connections to equipment, including but not limited to:

a. Transmission lines and support structures, duct banks, raceways, and conduits

b. Transformers, unit substations, and switchgears

c. High-, medium-, and low-voltage (as defined by Institute of Electrical and Electronics Engineers [IEEE] 141.1993, Recommended Practice for

Electric Power Distribution for Industrial Plants) distribution wiring and equipment

d. Power factor correction capacitor banks

e. Grounding and corrosion-protection systems

f. Meters and instrumentation

g. Switchboards, motor control centers, and panelboards

h. Emergency and standby power-generation equipment, and photovoltaic panels

i. Automatic-transfer switches and uninterruptible power supplies

j. Feeder and branch circuits, electrical control panels, and wiring connections

k. Inverters (variable speed drives), motor drives, and connections to motors

l. Lighting, low-voltage signals, and building controls wiring

m. Information technology systems, networks, and fiber-optic cables

n. Fire detection, fire alarm, security, and notification-systems wiring

o. Facilities monitoring and control systems and

p. Associated hardware, fittings, and wiring devices

2. The IAHJ process is also required to field verify noncompliant electrical equipment, assemblies, and systems, including but not limited to:

a. Field validation of Nationally Recognized Testing Laboratory (NRTL) listed/labeled equipment for electrical distribution and general facility use

(e.g., control panels, switches, cranes, elevators).

b. Acceptance or rejection of equipment that does not comply with National Fire Protection Association (NFPA) 70, or that does not adhere to

Berkeley Lab Facilities Division standards and specifications.

c. When an installation does not meet the requirements of NFPA 70E.

3. If there is uncertainty about the need for an IAHJ review, contact the Berkeley Lab IAHJ for guidance. Furthermore, the project manager, construction https://commons.lbl.gov/display/rpm2/Safe+Electrical+Installations+Policy#SafeElectricalInstallationsPolicy--1898802862[4/7/2020 6:02:25 PM] manager, engineer(s), and/or performing craft may request an IAHJ review at his/her discretion under any circumstances. The IAHJ Program does not define design solutions or remedies to code or specification deficiencies.

4. Under the direction of the Electrical AHJ for Safe Installations (IAHJ), the Lead Electrical Inspector, Compliance Engineer(s)/Electrical Codes and

Standards Compliance Professional, and Inspector(s) of Record have the responsibility to administer and enforce the IAHJ Program. The authority to perform assigned tasks may be delegated to another qualified position in the same organization, but the responsibility for the action remains with the position named. The Berkeley Lab position description for each staff member includes a full listing of the job duties, responsibilities, and education and certification/license requirements.

5. The effective code date (code of record) for new and remodeled Berkeley Lab building projects is the edition of the NFPA 70 National Electrical Code

(NEC) as adopted by the Laboratory per 10 CFR 851, formalized by Berkeley Lab's Worker Safety & Health Program document (PUB-3851) at the time of the final submittal of Preliminary Drawings (Design Development Drawings and Specifications). The date of receipt of this submittal is the official

"date of record" for the project. The edition of the NEC in effect on that date as adopted by Berkeley Lab will be applied for the duration of the project. In the event Preliminary Drawings are not submitted to the Berkeley Lab Fire Marshal prior to submission of Construction Documents (defined as Working

Drawings and Specifications), the edition of the NEC in effect on the date of receipt of the Construction Documents by the Berkeley Lab Fire Marshal will apply.

6. Generally, consensus codes and standards do not obligate an owner to retrofit existing installations to more current editions of the document. However, modifications to existing facilities or infrastructure equipment, assemblies, and wiring are subject to inspection to verify compliance with the codes and standards as of the date of record for the installation. If the modification presents a hazard to life, equipment, or property, current codes and standards shall be used to define requirements for mitigating the hazard. Any NRTL listing invalidated by a modification will require an NRTL field examination by the Berkeley Lab Electrical AHJ for Safe Equipment and re-listing prior to acceptance by the IAHJ.

7. The Design Professional, whether a Berkeley Lab employee or a subcontracted Electrical Engineer, is responsible for designing the electrical installation in accordance with applicable codes and in adherence to the Berkeley Lab Master Specifications and Standards and Construction Design and Detail Guidelines.

8. When an outside Design Professional and a Berkeley Lab Electrical Engineer subject matter expert (SME) have a difference of interpretation regarding the NEC code or Berkeley Lab Master Specifications and Standards, then a binding interpretation will be provided by the IAHJ. The Design

Professional shall submit supporting documentation, including but not limited to a concise statement on the scope of work, applicable code or specification sections, calculations, a description of the difference of interpretation, etc., to inform the IAHJ's interpretation.

E. Roles and Responsibilities

Under the direction of the Electrical AHJ for Safe Installations (IAHJ), the Lead Electrical Inspector, Compliance Engineer(s)/Electrical Codes and Standards

Compliance Professional, and Inspector(s) of Record have responsibility to administer and enforce the IAHJ Program. The authority to perform assigned tasks may be delegated to another qualified position in the same organization, but the responsibility for the action remains with the position named in the table below. The position description for each Berkeley Lab staff member includes a full listing of the position's job duties, responsibilities, and education and certification/license requirements.

Role Responsibility

Building Code

Official

The Berkeley Lab Building Code Official (BCO) oversees major organizational components of code enforcement and is accountable for ensuring building codes are met in new facilities, and that a path to compliance is developed and implemented for older infrastructures.

This accountability is informed by engineering staff, Electrical Authorities Having Jurisdiction (AHJs), the Fire Marshal, and inspectors.

Electrical AHJ for Safe

Installations

(IAHJ)

The IAHJ is the qualified individual delegated the Electrical AHJ over the electrical distribution and supply systems and equipment throughout the Berkeley Lab main site and within all Berkeley Lab buildings. The IAHJ:

Interprets the requirements of electrical codes, regulations, standards, and Berkeley Lab specifications.

Maintains the related Berkeley Lab and Facilities Division policy, implementation, and enforcement documents.

Manages the Electrical AHJ for Safe Installations Program and staff.

Attends the Electrical Safety Advisory Board and DOE Berkeley Site Office AHJ meetings.

Is a member of the Electrical Safety Committee.

Determines applicable electrical code of record for each new project and existing Berkeley Lab buildings.

https://commons.lbl.gov/display/rpm2/Safe+Electrical+Installations+Policy#SafeElectricalInstallationsPolicy--1898802862[4/7/2020 6:02:25 PM]

Approves electrical equipment and wiring installations in new construction, modifications, repairs, and demolitions.

Lead Electrical

Inspector Administers and enforces the requirements of the IAHJ Program procedures.

Supervises the Inspectors of Record (IORs).

Provides backup coverage for the Compliance Engineer and IORs as needed.

Reviews all compliance, inspection, and punch-list-item reports for adherence to procedures.

Confirms that all electrical-related punch-list items are completed.

Validates sign-off affidavits.

Compliance

Engineer/

Electrical Codes and Standards

Compliance

Professional

Enforces and implements the IAHJ Program at the project level for designs, installations, and modifications of new and existing electrical equipment and wiring.

Performs design reviews and provides advice on design requirements, code compliance, specification adherence, and inspection and testing requirements.

Maintains expert-level knowledge of electrical codes, Occupational Safety and Health Administration (OSHA) regulations, the

Facilities Master Specifications and Standards, and other electrical equipment and wiring installation requirements.

Works with the Building Code Official to approve or reject proposed configurations or technologies that deviate from specifications but comply with Berkeley Lab's interpretation of applicable codes.

Reviews energization plans and Energization Validation and Authorization Package (EVAP) documents, and performs field visits to validate electrical equipment and wiring configuration for planning and testing integrity.

Identifies non-NRTL equipment and assemblies, tracks field examinations, and validates completion of corrections for required

NRTL labeling per equipment.

Design and

Construction

Management, Project

Management

Office

The Design and Construction Management (DCM) Department follows the DCM Procedures Manual and is subject to the requirements of the IAHJ Program.

Design

Professional

The Electrical Engineer who is responsible for designing the electrical installation in accordance with applicable codes and in adherence to the Berkeley Lab Master Specifications and Standards. The Design Professional must hold an electrical professional engineer (PE) license issued by the state of California, apply design principles appropriate to the scope of the project, and compile complete drawings and specifications, as needed, for accurate cost estimating, bidding, and constructing with a minimum of changes.

Electrical AHJ for Safe

Equipment

(EAHJ)

The EAHJ is delegated the authority having jurisdiction over all of the Laboratory's electrical utilization equipment. The EAHJ ensures compliance with utilization equipment safety codes, standards, and specifications. The process for accepting electrical equipment is detailed in PUB-3000 Chapter 14, Electrical Equipment Safety Program, and includes the inspection and acceptance of unlisted (non-

NRTL) electrical equipment. The Electrical Engineer who is responsible for designing the electrical installation in accordance with applicable codes and in adherence to the Berkeley Lab master specifications and details.

Electrical AHJ for Safe

Installations

(IAHJ)

The IAHJ is delegated the authority having jurisdiction over all of Berkeley Lab's electrical premises wiring, up to but excluding electrical utilization equipment. The IAHJ ensures compliance with installation codes, standards, and specifications for the infrastructure power distribution and premises wiring of the Laboratory.

Electrical AHJ for Safe Work

Practices

(PAHJ)

The PAHJ is delegated the authority having jurisdiction over electrical safe work practices and workplace conditions. The PAHJ ensures compliance with all electrical safety requirements that pertain to maintaining safe electrical work practices and workplace conditions and thereby for protecting Berkeley Lab employees, contractors, and subcontract personnel from injury or death as a result of electrical hazards.

Facilities Work

Planning &

Control (WPC)

Facilities WPC reviews work requests and coordinates with Berkeley Lab Plant Engineering & Utilities and Maintenance, Repair, and

Operations (MRO) supervisors to schedule facilities and infrastructure maintenance, repair, modification, construction support, and associated activities, such as utility shutdown notifications. WPC also schedules electrical equipment and wiring inspections as defined in the IAHJ Program requirements.

Inspector of Provides inspection of electrical wiring and equipment installations, and witnesses testing and procedures when electrical http://www.lbl.gov/ehs/pub3000/CH14.html https://commons.lbl.gov/display/rpm2/Safe+Electrical+Installations+Policy#SafeElectricalInstallationsPolicy--1898802862[4/7/2020 6:02:25 PM]

Record (IOR) equipment is being energized to verify adherence to design and specifications.

Performs site inspections as needed to assure compliance with codes, subcontract specifications, Berkeley Lab Master

Specifications and Standards, and NRTL certification.

Responsible for following up by tracking nonconformance issues with re-inspections, and final signoff affidavits as applicable.

Develops and completes all pre-concealment, testing, and final inspection reports.

Uploads and maintains all inspection reports and records accordingly within the IAHJ Program database.

Updates the IAHJ Program metrics.

Maintenance, Repair, and

Operations

(MRO)

MRO functions include maintenance, repair, replacement, and modifications to existing electrical and electronics equipment and wiring systems. MRO is subject to the requirements of the IAHJ Program.

Plant

Engineering and

Utilities

The organization within the Facilities Division with the mission to provide accurate Berkeley Lab infrastructure documentation, facility/equipment capacity verification, and review and/or development of MOPs.

Responsible

Individual (RI)

The RI is responsible for requesting the services of an Inspector of Record or Compliance Engineer in an effective and timely manner.

See the DCM Procedures Manual for a complete RI definition.

Subject Matter

Expert

A Berkeley Lab employee or consultant with specialized knowledge about a certain topic or field of interest. The individual must also be knowledgeable about an operation or activity and be responsible for the quality evaluation and control of the operation or activity.

Qualified

Electrical

Worker (QEW)

California state certified electricians (subcontract and in-house Berkeley Lab personnel) responsible for performing or supervising the electrical work of installing or modifying electrical equipment and wiring. See the Berkeley Lab ES&H Manual (PUB-3000) Electrical Safety requirements for a complete QEW definition.

F. Definitions/Acronyms

Term Definition

Energization

Validation &

Authorization

Package

(EVAP)

An authorized work-control package of documents assembled by the Responsible Individual to establish readiness for energization. Each

EVAP must be reviewed and approved by all applicable Electrical AHJs: the Electrical AHJ for Safe Work Practices (PAHJ); the Electrical

AHJ for Safe Installations (IAHJ); and the Electrical AHJ for Safe Equipment (PAHJ, IAHJ, and EAHJ). The EVAP is required for minor to complex work with adherence to Berkeley Lab's ES&H Core Policy and the Electrical Safety program.

Hold Point A point at which the Responsible Individual (RI) is required to notify the Inspector of Record (IOR) prior to undertaking subsequent work.

Subsequent work may not proceed until the RI requests an inspection; an inspection of the work is performed by the IOR; and the IOR passes the Hold Point, indicating that the subcontractor may proceed with subsequent activities.

IAHJ Review A review by the IAHJ staff of a project's scope of work (construction, installation, modification, and/or demolition) to plan and formalize inspection, testing, and Energization Validation & Authorization Package (EVAP) requirements for electrical work. An IAHJ review may also include a field-condition assessment; pre-concealment, testing, and final inspections; and reviews of test results and engineering evaluations, etc.

Method of

Procedure

(MOP)

A step-by-step procedure followed when performing energization, utility tie-in, or equipment start-up. This document references

Lockout/Tagout permits, equipment numbers, etc., included in a switching tag that documents all steps for shutdown/deactivation and activation/energization of new or existing electrical equipment and wiring installations and modifications.

Nationally

Recognized

Testing

Laboratory

(NRTL)

An NRTL is a U.S. Occupational Safety and Health Administration (OSHA) designation given to testing facilities that provide product safety testing and certification services to manufacturers. The testing and certification are done to U.S. consensus-based product safety test standards issued by organizations such as the American National Standards Institute (ANSI).

Witness Point A point identified in the Witness and Hold Inspection Plan during the construction of a given element in which the IOR inspects the activity point that has been reached.

https://commons.lbl.gov/display/fac/Design+and+Construction+Management+Procedures+Manual http://www2.lbl.gov/ehs/pub3000/CH08/CH8.html https://commons.lbl.gov/pages/viewpage.action?pageId=74318749 http://www2.lbl.gov/ehs/pub3000/CH08/CH8.html https://commons.lbl.gov/display/rpm2/Safe+Electrical+Installations+Policy#SafeElectricalInstallationsPolicy--1898802862[4/7/2020 6:02:25 PM]

Like Be the first to like this

Commons contains user-contributed content and does not represent the position or endorsement of the Laboratory, DOE, or the University of California.

Your use of this site is subject to our security and privacy policies.

A U.S. Department of Energy National Laboratory Operated by the University of California

Questions & Comments Privacy & Security Notice

G. Recordkeeping Requirements

The Lead Electrical Inspector will ensure that IAHJ Review, Plan, and Inspection forms in the IAHJ Program database are current and tracked for closeout.

Project inspection reports and test results shall also be included with the project records and organized in accordance with the subcontract document record requirements filed under direction of the Project Manager. The inspection reports shall be filed with the IAHJ Review form in the IAHJ database for in-house craft work.

H. Implementing Documents

Document number Title Type

07.07.011.002 Work Process A, Electrical Safety Program Structure Work Process

07.07.011.003 Work Process B, Electrical Authority Having Jurisdiction (AHJ) Work Process

07.07.034.000 Electrical Equipment Safety Program Program

07.07.020.000 Lockout/Tagout Program Program

ADMN-059 Planned Utility Shutdown Coordination Procedure

DCM-001 Work Requiring Responsible Individual (RI) Procedure

FACILGEN-001 Deactivation Plans for Building Electrical and Mechanical Systems and Site Utilities

FM-059-01 Quality Plant Engineering & Utilities Modifications Authority and Roles Form Form

FM-059-02 Application for Utility Service Form

FORM-INS-001 IAHJ Review Form Form

I. Contact Information

Electrical Authority Having Jurisdiction for Safe Installations

Facilities Division

J. Revision History

Date Revision By Whom Revision Description Section(s) Affected Change Type

7/31/2015 0 D. Nielsen Re-formatted for wiki All Major

1/17/2019 1 D. Nielsen Update language to conform with adoption of NEC 2017 Policy Statement

Roles/ResponsibilitiesRecordkeeping

Minor

Return to top Printed or exported copies of this LBNL policy are not official.

Users are responsible for working with the latest approved revision located in the online LBNL Requirements and Policies Manual.

No labels http://www.lbl.gov/Disclaimers.html http://www.universityofcalifornia.edu/ http://www.lbl.gov/websupport.html http://www.lbl.gov/Disclaimers.html http://www2.lbl.gov/ehs/pub3000/CH08/CH8.html#_Work_Process_B.

http://www2.lbl.gov/ehs/pub3000/CH08/CH8.html#_Work_Process_C.

http://www2.lbl.gov/ehs/pub3000/CH14.html http://www2.lbl.gov/ehs/pub3000/CH18/CH18.html https://commons.lbl.gov/download/attachments/76187871/ADMN%20059%20%28Rev.%204%29.pdf?version=1&modificationDate=1374704495879&api=v2 https://commons.lbl.gov/download/attachments/76187871/DCM-001.pdf?version=1&modificationDate=1371585403252&api=v2 https://commons.lbl.gov/download/attachments/76187871/FM-059-01.pdf?version=1&modificationDate=1374705475254&api=v2 https://commons.lbl.gov/download/attachments/76187871/FM-059-02-1.pdf?version=1&modificationDate=1374705492936&api=v2

lbl.gov
Safe Electrical Installations Policy - RPM-2 RPM-2
lvbnNQb2xpY3ktLTE4OTg4MDI4NjIA:
form1:
searchQuery.queryString:
input7:

File details come from the government source that posted it. Updated .