3-Attachment C Cost Sheet.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- GJ27-18
- Issued by
- Summit County, Utah
About this file
This is a cost sheet for a construction bid submitted to the North Summit Fire District in Utah for the Fire Station 23 Dorm Addition and Interior Remodel project located at 2000 S Hoytsville Road, Coalville, UT 84017. The project encompasses comprehensive renovation work including demolition, framing and carpentry for sleep rooms, interior finishes, kitchen renovation, bathroom upgrades with ADA components, door and window installation, EIFS exterior system application, mechanical systems installation including heat pump and ductless splits, electrical work, concrete work for ramps and landings, site work and landscaping, siding repair, and final cleanup and disposal. The mandatory pre-proposal site visit was scheduled for August 27, 2026, with questions due by September 2, 2026 at 2:00 PM Mountain Time and proposal submissions due by September 4, 2026 at noon Mountain Time via the U3P submission portal.
The cost sheet requests itemized pricing for the base bid, one optional bid alternate for an automatic landscape irrigation system, allowances for owner-directed changes and unforeseen conditions, and unit prices for potential additional work including EIFS repairs, FRP installation, windows, and labor rates for carpentry, electrical, and mechanical trades. Offerors are required to provide estimated start and completion dates and must guarantee all pricing for one year from proposal submission. The spreadsheet includes designated fields for offeror information, including company name, primary contact details, and contractor license number, and requires authorized signature with certification that all proposal requirements have been met and all costs are included and accurate. The document notes that while formulas are provided as a courtesy, offerors are responsible for verifying the accuracy of all calculations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 9-20250120 111534.jpg | JPG image | |
| 4-Attachment E.pdf | ||
| 12-Award Justification.pdf | ||
| 8-25042 - Wanship Fire Station 23 - ADD3.pdf | ||
| 6-Attachment A Standard Terms and Conditions GOODS AND SERVICES.docx | DOCX document | |
| 5-Attachment B2 - Westnet plans.pdf | ||
| 2-Staiton 23 RFP.pdf | ||
| 1-Attachment D Technical Evaluation Scoring Sheet.xlsx | XLSX spreadsheet | |
| 10-Pre-proposal Mtg Attendance Log ADA (1).docx | DOCX document | |
| 7-Attachmetn B - Fire Station 23 Rev. 08.19.26.pdf | ||
| 11-000 U3P Courtesy Posting Closed.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| North Summit Fire District | |
| Station 23 Dorm Addition | |
| Bid Cost Sheet | |
| Project Location: 2000 S Hoytsville Rd., Coalville, UT 874017 | |
| Bid Due Date: August 20, 2026 10:00 AM (Local Time) | |
| Offeror Information | |
| Company Name: | |
| Primary Contact: | |
| Email: | |
| Phone: | |
| Contractor License #: | |
| 1. Base Bid – Station 22 Dorm Addition | |
| Description | Cost ($) |
| General Conditions / Mobilization | |
| Demolition (Interior & Select Exterior) | |
| Framing & Carpentry (Sleep Rooms, Walls) | |
| Interior Finishes (Paint, Trim, Flooring prep) | |
| Kitchen Renovation (Cabinets, Countertops, Fixtures) | |
| Bathroom Upgrades (Fixtures, ADA Components) | |
| Doors, Frames & Hardware | |
| Cut in new windows and window Installation | |
| EIFS Exterior System (3" on Weather Barrier) | |
| Mechanical (Heat Pump, Ductless Splits, Vent Relocation) | |
| Electrical (Lighting, Power, Smoke/CO, Sign Circuit) | |
| Concrete (Ramp, Landing, Patching) | |
| Site Work / Landscaping Repair | |
| Fiber-cement/hard-board lap siding and trim painted | |
| Cleanup & Disposal | |
| Total Base Bid | $ - 0 |
| 2. Optional Bid Alternate | |
| Automatic Automatic Landscpae Irrigation System |
| $ - 0 | ||
| 3. Allowances | ||
| Allowance Description | Allowance Amount ($) | |
| Owner-directed changes (as needed) | ||
| Unforeseen conditions contingency | ||
| Material escalation (if applicable) | ||
| Total Allowances | $ - 0 | |
| 4. Unit Prices | ||
| Unit Item | Unit | Price ($) |
| EIFS Repairs (beyond scope) | Sq. ft. | |
| FRP Installation (additional areas) | Sq. ft. | |
| Windows | Ea. | |
| Carpentry Labor | hr. | |
| Electrical Labor | hr. | |
| Mechanical Labor | hr. | |
| Drywall Patch & Finish | Sq. ft. | |
| 5. Schedule | ||
| Estimated Start Date: | ||
| Estimated Completion Date: | ||
| 6. Price Guarantee | ||
| Offeror guarantees all pricing for one (1) year from proposal submission. | ||
| 7. Acknowledgments | ||
| By signing below, the Offeror certifies: | ||
| The proposal complies with all requirements of the RFP. | ||
| All costs are included and accurate. | ||
| The Offeror has reviewed all drawings, specifications, and addenda. | ||
| Authorized Signature: | ||
| Printed Name: | ||
| Date: | ||
| 8. Total Proposed Contract Amount | ||
| Grand Total (Base Bid + Accepted Alternates + Allowances): | ||
| $ - 0 | ||
| Submit the completed cost sheet with the electronic proposal by the deadline. | ||
| This spred sheet is proved as a curtisy offerer is responsible to determion that all formuls are correct. |
File details come from the government source that posted it. Updated .