28-SBE Subcontractors Material Suppliers List SBE-1 Form Final.pdf
PDF 115 KB Posted
- Solicitation number
- IFB-26-00005
- Issued by
- Hillsborough County, St. Petersburg City, Florida
About this file
This document is a Small Business Enterprise (SBE-1 Form) from Hillsborough County's Small Business Encouragement Program for construction contracts. The form is designed for bidders to list registered and non-registered Small Business Enterprise (SBE) subcontractors and material suppliers to be utilized on a specific project. Bidders are required to provide detailed information including the business name, scope of work/work item number, and estimated dollar amount for each subcontractor or supplier.
The form includes important provisions regarding SBE participation, noting that material suppliers who furnish but do not manufacture supplies will be partially credited at 50% towards the project's SBE participation goal. A critical warning is provided that a bidder's failure to complete the requirements of this form may result in their entire bid being rejected. The form is structured to track both registered SBE subcontractors/suppliers and non-SBE subcontractors/suppliers, with separate tables for each category to ensure comprehensive documentation of the project's subcontracting approach.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBE – 1 FORM
(Revised 10/2025)
HILLSBOROUGH COUNTY
SMALL BUSINESS ENCOURAGEMENT PROGRAM
SUBCONTRACTORS/MATERIAL SUPPLIERS LIST – CONSTRUCTION CONTRACTS (SBE-1 FORM)
BID NO.: BIDDER NAME:
List all registered Small Business Enterprise (SBE) subcontractors/material suppliers1 to be utilized on this project.
Include business name, scope of work/work item number to be performed, and estimated dollar amount of each item.
If the solicitation is a “Work Order/Term Contract”, the “Estimated Dollar Amount” may be left blank. All SBEs that are listed as “registered” must either be registered with Hillsborough County or have reciprocal registration as specifically set forth in the County’s solicitation document.
A Bidders failure to complete the requirements of this page may result in their entire Bid being rejected.
Registered SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated
Dollar Amount
1Material Suppliers: Registered SBE firms that furnish supplies for Construction projects, but do not manufacture the supplies, will be partially credited at fifty percent (50%) towards the project’s SBE participation goal.
List all other subcontracted scope of work or work item numbers to be performed by non-registered SBE subcontractors/material suppliers on this project and estimated dollar amount of each item:
Non-SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated
Dollar Amount
| BID NO: |
| BIDDER NAME: |
| Scope of Work Work Item NumberRow1: |
| Estimated Dollar AmountRow1: |
| Scope of Work Work Item NumberRow2: |
| Estimated Dollar AmountRow2: |
| Scope of Work Work Item NumberRow3: |
| Estimated Dollar AmountRow3: |
| Scope of Work Work Item NumberRow4: |
| Estimated Dollar AmountRow4: |
| Scope of Work Work Item NumberRow5: |
| Estimated Dollar AmountRow5: |
| Scope of Work Work Item NumberRow6: |
| Estimated Dollar AmountRow6: |
| Scope of Work Work Item NumberRow7: |
| Estimated Dollar AmountRow7: |
| Scope of Work Work Item NumberRow8: |
| Estimated Dollar AmountRow8: |
| Scope of Work Work Item NumberRow1_2: |
| Estimated Dollar AmountRow1_2: |
| NonSBE SubcontractorsMaterial SuppliersRow2: |
| Scope of Work Work Item NumberRow2_2: |
| Estimated Dollar AmountRow2_2: |
| NonSBE SubcontractorsMaterial SuppliersRow3: |
| Scope of Work Work Item NumberRow3_2: |
| Estimated Dollar AmountRow3_2: |
| NonSBE SubcontractorsMaterial SuppliersRow4: |
| Scope of Work Work Item NumberRow4_2: |
| Estimated Dollar AmountRow4_2: |
| NonSBE SubcontractorsMaterial SuppliersRow5: |
| Scope of Work Work Item NumberRow5_2: |
| Estimated Dollar AmountRow5_2: |
| NonSBE SubcontractorsMaterial SuppliersRow6: |
| Scope of Work Work Item NumberRow6_2: |
| Estimated Dollar AmountRow6_2: |
| NonSBE SubcontractorsMaterial SuppliersRow7: |
| Scope of Work Work Item NumberRow7_2: |
| Estimated Dollar AmountRow7_2: |
| NonSBE SubcontractorsMaterial SuppliersRow8: |
| Scope of Work Work Item NumberRow8_2: |
| Estimated Dollar AmountRow8_2: |
| NonSBE SubcontractorsMaterial SuppliersRow1: |
| SBE SubcontractorsMaterial SuppliersRow1: |
| SBE SubcontractorsMaterial SuppliersRow3: |
| SBE SubcontractorsMaterial SuppliersRow4: |
| SBE SubcontractorsMaterial SuppliersRow2: |
| SBE SubcontractorsMaterial SuppliersRow6: |
| SBE SubcontractorsMaterial SuppliersRow7: |
| SBE SubcontractorsMaterial SuppliersRow5: |
| SBE SubcontractorsMaterial SuppliersRow8: |
File details come from the government source that posted it. Updated .