27_CUVA_224822_Riverbank_Stabilization_DB-RFP.pdf

PDF 580 KB Posted

Attached to
CUVA 224822
Solicitation number
140P2026R0093
Issued by

About this file

This is a Design-Build (DB) Request for Proposal (RFP) for riverbank stabilization work at Cuyahoga Valley National Park in Ohio. The National Park Service Denver Service Center is soliciting proposals for Solicitation 1440P2026R0093 to stabilize the Cuyahoga riverbank along the Towpath Trail near Mile Marker (MM) 20 South. The project involves clearing banks, placing natural rock riprap, implementing bioengineering techniques, planting native vegetation, and remediating construction sites and equipment access routes. The design-build contractor will be responsible for both design and construction phases with a preferred alternative utilizing brush mattress with live staking below the water line and toe armor rock, maintaining a 2.5:1 maximum slope. Architect-Engineer services must be performed by licensed professionals registered in Ohio.

The contract includes two line items: Towpath MM 20 South construction work and Design DD/CD services. Design Development Documents are due 30 calendar days after notice to proceed, with NPS review completed within 21 days. One hundred percent Draft Construction Documents follow within 30 days, with NPS review in 21 days. One hundred percent Complete Construction Documents are due 20 days later, reviewed within 15 days. Stamped and signed final documents are due 10 days after receiving comments. Construction must be completed within 90 calendar days (310 days from Notice to Proceed). As-Constructed Drawings are due 21 days after Substantial Completion. The contractor must secure required permits including Coast Guard Notice to Mariners, Ohio EPA Stormwater Construction Permit, and Section 404/401 Clean Water Act approvals. Key environmental requirements include archaeological monitoring during excavation, threatened and endangered species protections (Indiana bat tree removal restrictions October 1-March 31, northern long-eared bat protections, Migratory Bird Treaty Act compliance, Bald and Golden Eagle Protection Act site surveys), wetland mitigation, cultural resource protection, visitor experience management with minimal trail closures, invasive species prevention, and waste management with documented recycling/diversion goals. The contractor must provide project management software supporting communication, documentation, scheduling, RFI processing, and submittal management for up to 15 NPS team members, and submit monthly progress documentation including quality control reports, daily construction logs, and schedule updates throughout the project duration.

View the file

Other files

File Type Posted
Sol_140P2026R0093_Amd_0002.pdf PDF
QA_Tracker_8_5_26_0002.pdf PDF
Sol_140P2026R0093_Amd_0001.pdf PDF
B08_140P2026R0093_CUVA_224822_Solicitation_0001.pdf PDF
25_ContractPriceSchedule.xlsx XLSX spreadsheet
01_2_2023_CUVA224822_MM20_BODR_Combined_Redacted1.pdf PDF
03_1_NPS_Sustainability_Checklist-1_Filliable.xlsx XLSX spreadsheet
10_NPS_Clean_Fill_Protocol-1.pdf PDF
17_WSOF_MM20_2024-08-19.docx DOCX document
24_Q_A_Tracker.xlsx XLSX spreadsheet
01_1_2021_CUVA224822_Riverbank_Stab_BODR_Combined.pdf PDF
04_Constructability_Checklist-1.pdf PDF
08_CUVA_Access_and_Staging_Maps_2.pdf PDF
09_CUVA_224822_Permit_Submittal_List.docx DOCX document
11_CUVA_224822_Closeout_OM_Requirements-1.pdf PDF
12_CUVA_224822_SubmittalList_RevEst-1.pdf PDF
14_CUVA224822_MM20_DD_Plan_Set-1.pdf PDF
19__PastPerf.docx DOCX document
20_Project_Experience_Questionnaire.docx DOCX document
21_Bid_Bond.pdf PDF
23_Construction_Contract_Administration.docx DOCX document
26_MM20_POR.pdf PDF
22_General_References.docx DOCX document
05_Division_01_Specifications_Redacted.pdf PDF
06_Division_02_Specifications_Redacted2.pdf PDF
07_2021_CUVA_224822_Survey_-_MM20-1.pdf PDF
13_PEPC_116064_CE_2023_05_22-1.pdf PDF
18__LmtOnSubconRpt.xlsx XLSX spreadsheet
02_CUVA_224822_App_SD_Prefer_Alt_Drawings-MM20-1.pdf PDF
Sol_140P2026R0093.pdf PDF
03_NPS_Sustainability_Checklist-1.pdf PDF
15_2021_CUVA_MM20_Riverbank_Stab_PermittingAssessment_Form.xlsx XLSX spreadsheet
16_CUVA_WRD-Letter_MM20_SOF_memo_Aug2024.docx DOCX document
28_Wage_Determination_OH20260001.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cuyahoga Valley National Park Ohio

SOLICITATION 1440P2026R0093

STABILIZE RIVERBANK ALONG TOWPATH TRAIL NEAR MM 20

CUVA 224822

DESIGN-BUILD (DB) PROJECT SCOPE

(DB Request for Proposal (RFP))

NATIONAL PARK SERVICE (NPS)

DENVER SERVICE CENTER (DSC)

Template Date 10-19-21 | Page 2 of 42

Table of Contents

............................................................................................................................ PROJECT INTRODUCTION

1.1 SCOPE

1.2 PROJECT MANAGEMENT WEBSITE

1.3 LOCATION

1.4 BACKGROUND

1.5 DESCRIPTION

1.6 SCHEDULE

1.7 NPS CONTACTS & ADDRESS:

1.8 DATA AND MATERIALS PROVIDED BY NPS

............................................................................................................................ PROJECT REQUIREMENTS

2.1 GENERAL REQUIREMENTS

2.1.1 SCOPE OF WORK AND PROJECT SUMMARY/REQUIREMENTS

2.1.2 DEFINITION OF CONTRACT LINE ITEMS

2.1.3 PROGRESS PAYMENTS

2.1.4 PROJECT MEETINGS

2.1.5 PROJECT SCHEDULE

2.2 DESIGN REQUIREMENTS

2.2.1 EVALUATION OF SCHEMATIC DESIGN DOCUMENTS

2.2.1.1 DELIVERABLES

2.2.2 DB DESIGN DEVELOPMENT (DD) DOCUMENTS AND DB CONSTRUCTION

DOCUMENTS (CD)

2.2.3 ENVIRONMENTAL AND SUSTAINABILITY REQUIREMENTS FOR DESIGN

2.3 CONSTRUCTION REQUIREMENTS

2.3.1 ENVIRONMENTAL AND SUSTAINABILITY REQUIREMENTS

2.3.2 SCHEDULE OF VALUES

2.3.3 CONSTRUCTION SUPPORT

2.3.4 SUBMITTALS DURING CONSTRUCTION

2.3.5 CONSTRUCTION COORDINATION

2.3.6 DIGITAL IMAGES

2.3.7 QUALITY CONTROL

2.3.8 WORKING HOUR RESTRICTIONS

2.3.9 TEMPORARY SERVICES

2.3.10 ACCESS

2.3.11 PRESERVATION OF ADJACENT FEATURES

2.3.12 EXISTING UTILITIES

2.3.13 HAULING RESTRICTIONS

2.3.14 ACCIDENT PREVENTION

2.3.15 TEMPORARY CONTROLS

2.3.16 FIELD ENGINEERING

2.3.17 PROJECT CLOSE-OUT

2.3.18 SUBSTANTIAL COMPLETION AND FINAL INSPECTION

2.4 FORMS

....................................................................................................... 3.0 PERFORMANCE REQUIREMENTS

Template Date 10-19-21 | Page 3 of 42

3.1 DESIGN IMPERATIVES

3.2 SUSTAINABILITY

3.3 INTEGRATED DESIGN PRINCIPLES

3.4 FACILITY PERFORMANCE

3.5 ELEMENTS AND PRODUCTS

..................................................................................................................... TECHNICAL REQUIREMENTS

................................................................................................................................................ ATTACHMENTS

Template Date 10-19-21 | Page 4 of 42

PROJECT INTRODUCTION

Park Acronym and PMIS Number: CUVA 224822

Project Title: STABILIZE RIVERBANK ALONG TOWPATH TRAIL NEAR MM 20 Project Drawing Number: CUVA 644/199054

1.1 Scope

In accordance with terms and conditions of the Contract, the Design-Build (DB) Contractor shall perform the work of this Request for Proposal (RFP) for the National Park Service (NPS) as described below.

Architect-Engineer (A/E) Services required in this RFP shall be performed by licensed Architects and Engineers registered in State of Ohio, United States.

The work of this task order shall be performed in accordance with the Denver Service Center (DSC) Design-Build (DB) Workflows website.

The DB homepage includes links to design phases describing required workflow process from Predesign (PD) through Construction Documents (CD). Each design phase webpage contains links to definitions, forms, templates, samples, and guidelines.

The DB homepage also includes links to the Design Standards and Design Deliverables sections which provide design requirements and criteria that shall be used for completing the work of this contract:

• Design Standards are arranged by discipline and/or specialty.

• DB Design Deliverables - Content and Format Requirements:

o Design phase submission requirements for:

o Technical content o Submission format (hard-copy and electronic)

In addition, the Information section has links directly to:

• Definitions: A list of terms relevant to design and construction in National Parks.

• Forms/Templates/Samples/Guidelines: A list of forms, templates, samples, and guidelines used for a typical project.

• Law/Regulations/Polices/Guidance: A list of sources for retrieving laws, regulations, policies, and guidance applicable to NPS projects.

• Quality Assurance (QA) Guideline & Review Checklists: Overview of the DSC QA Process for reviewing Design Documents.

In case of conflict between this task order and the DSC DB Workflows website, this task order shall take precedence and shall be used in lieu of conflicting portions.

https://www.nps.gov/dscw/designbuild.htm https://www.nps.gov/dscw/dstandards.htm https://www.nps.gov/dscw/del_designbuild.htm https://www.nps.gov/dscw/information.htm https://www.nps.gov/dscw/definitions.htm https://www.nps.gov/dscw/publicforms.htm https://www.nps.gov/dscw/laws-policies.htm https://www.nps.gov/dscw/qaguideline.htm

Template Date 10-19-21 | Page 5 of 42

The A/E remains fully responsible for determining if the standards or provisions cited on the DSC DB Workflows website have been revised or updated. Any such conflicts between the website and the identified standard or provisions shall be brought to the attention of the Contracting Officer (CO).

1.2 Project Management Website

Contractor to provide project management software to host and manage project communication and documentation until Final Completion. The project website will be used for:

• Project directory

• Project correspondence

• Meeting agendas and minutes

• Contract modifications documentation and logs

• RFI (Request for Information) form and processing

• Task and issue management

• Photo documentation

• Baseline schedule, schedule updates and calendar management

• Submittal form and processing

• Drawing and specification document hosting, viewing, and updating

• Online document collaboration

• Reminder and tracking functions

• Archiving functions

• Notification of submittal and RFI statuses and current responsible party

Contractor will be responsible to send NPS Team Members an invitation to register. Contractor to provide up to 15 licenses to NPS team members. Contractor to provide login procedures and other website information to the NPS team members.

1.3 Location

This project is located at Cuyahoga Valley National Park (Park), Ohio, Towpath Mile Marker (MM) 20 South. Refer to attached Access and Staging Map for location.

1.4 Background

The Cuyahoga Valley is an important asset to the National Park Service in the Park, south of the Cleveland metropolitan area. The Park includes an historic railroad, known as the Valley Railway, which runs primarily along the left (west) bank of the Cuyahoga River. Along the right (east) bank of the river is another historic asset – the Ohio & Erie Canal and Towpath Trail which was built in the early 1800s to connect Lake Erie to the Ohio River. The Park is very popular with the public, and the National Register Towpath Trail and Scenic Railroad are heavily used by Park visitors daily.

The MM 20 site is a high-priority site that is at risk of failure due to riverbank erosion caused by frequent flooding and high-water events. Riverbank failure would significantly damage the cultural resources and make the path unusable for a significant period of time. Loss of the assets would be detrimental to the Park and its programs. At this location, the Cuyahoga riverbank will be repaired, reconstructed, and stabilized to address the erosion problems that threaten extensive damage to the

Template Date 10-19-21 | Page 6 of 42 historic resources. The proposed remediation will provide a level of protection for this historic resources.

The ongoing river erosion processes are influenced by both natural and manmade causes. Development influences the volume and timing of runoff to the river and influences the river’s planform where embankments, bridges, and other features have been constructed in the river corridor. In the Midwest, the increase in intensity and frequency of rainfall-runoff events has been associated with climate change.

These influences coupled with natural geomorphological process have resulted in appreciable meandering at sites such as Towpath MM 20 South.

This project site requires attention due to the over-steepening of banks that introduces safety concerns for CVSR operation and Towpath Trail use. The loss of soil material along the bank has resulted in drop-offs within just a few feet from the trail’s edge. It has required repeated temporary closures and emergency repairs to address failed trail sections.

1.5 Description

The Project will stabilize the MM 20 portion of the Cuyahoga riverbank. Stabilization will utilize natural rock riprap and bioengineering techniques as identified in the Schematic Design Drawings. The Project includes clearing the banks, placing riprap, rebuilding banks, planting native vegetation to stabilize the soil, and remediation of the construction site and equipment access routes, as necessary. The Schematic Design incorporated bioengineering techniques to the extent practicable. The Schematic Design is described further below. The safety of the public – Park visitors walking or biking along the Towpath Trail, and floating or paddling the river – during and following construction is of paramount importance.

Bendway weirs and root wads were included in the Schematic Design only in limited locations as necessary.

The Basis of Design Reports (see Section 5.0) supports the Schematic Design of stabilization measures that include natural rock riprap and bioengineering techniques. Where required, structural measures are incorporated to address asset protection needs in more challenging hydraulic and geotechnical conditions. Three reports are provided. The Basis of Design Report prepared by HDR addresses the MM 20 site. In a coordinated effort, the Schematic Design of the two (2) CVSR sites and the accompanying Basis of Design Reports were prepared by Environmental Design Group (EDG).

Geotechnical investigation and analyses were performed for the six (6) trail sites. The soils encountered in these areas contain varying amounts of highly erodible, fine-grained silts and clays. Shale bedrock was encountered at depths of about 13 to 17 feet below grade at four of the six trail sites. At the exceptions, MM 20 South, bedrock was not encountered in the borings, which extended 40 to 45 feet below existing grades. Bedrock topography mapping indicates bedrock at depths of about 150 feet below existing grades for the MM 20 South site. The geotechnical analyses informed design considerations including shoulder width (between edge of trail and top of bank), riverbank slope, and the need for rock channel protection to provide a stable working platform.

Hydraulic analyses were performed to evaluate existing and proposed conditions at the six (6) trail sites and the two (2) CVSR Sites. Three hydraulic models from the U.S. Army Corps of Engineers (USACE) Buffalo District provided a basis for the schematic design modeling effort. Flow data was taken from a HEC-RAS 1D model identified as CVNP Eco Restoration Model for all sites.

Template Date 10-19-21 | Page 7 of 42

Geometry and terrain data were adopted from a HEC-RAS 2D model identified simply as Cuyahoga Valley for the six (6) trail sites. Topographic and bathymetric data collected for this CUVA project in 2021 were incorporated into the 2D hydraulic model. For the two (2) CVSR sites, models included geometry and terrain data from a USACE Section 205 Flood Control Feasibility Study model, 2012 LiDAR, and 2018 site topographic survey. Other refinements were implemented to better predict hydraulic conditions along the river at the six trail sites and the two CVSR sites. The hydraulic analyses focused on velocity, shear stress, and water surface elevation results to evaluate performance under existing and proposed conditions.

Based on similar geotechnical and hydraulic conditions, alternatives for the MM 20 area considered were: A) Hybrid Riprap, B) Brush Mattress, and C) Durable Riprap.

Preferred alternatives were selected through a Value Analysis Workshop held with NPS staff. This workshop used Choosing by Advantages (CBA) methodology and selection also considered Life Cycle Costing (LCC). Due to NPS review comments received late in the construction stage the alternate preferred alternative for MM 20 South section has been revised to the Brush Mattress Detail 2, (see Section 5 for details).

The Topographic and Bathymetric Survey (2021 for six trail sites and 2018 for two CVSR sites), Basis of Design Reports, and Geotechnical Reports (included as appendices to the Basis of Design Reports) are not contractual and shall be considered “for information only”. They are intended to inform the final design by the DB Contractor. The DB Contractor is responsible for their use and for any interpretations or conclusions drawn from these and other data and materials provided by NPS.

Due to ongoing riverine erosion processes, the DB Contractor is required to perform and provide topographic and bathymetric surveys to confirm site conditions (see Section 2.1.1).

The Schematic Design 2D hydraulic model, also included in the data and materials provided by NPS, is intended to be used, advanced, and finalized by the DB Contractor for the site within its domain.

Updated topography and bathymetry collected by the DB Contractor shall be applied to the hydraulic models as applicable.

In 2022 a design build contract with River Reach along with team members GPD Group and Environ Science completed Construction Documents for the MM 20 site. During the NPS Water Resource Division review objections to the extent of river realignment that reduced the channel width and amount of Riprap above waterline which effects the Wild and Scenic River characterization of values.

NPS has determined that in the best interest of this resource is to implement the alternative detail 2 – Brush Mattress. By installing below waterline toe armor, brush mattress and live staking through soil protection matting to the top of existing bank elevation at a 2.5:1 max slope, will protect the slope until the existing towpath is moved in another park project.

Design Requirements

The riverbank stabilization design shall adhere to the hydraulic requirements documented below unless otherwise approved by the Contracting Officer.

• The Contractor is required to analyze the existing and proposed conditions using the 1.5-year, 10-year, and 100-year event peak discharges documented in the Basis of Design Reports and applied to the Schematic Design hydraulic models. Provide treatments that meet the following minimum permissible shear stress values:

Template Date 10-19-21 | Page 8 of 42 o Riprap (Median Stone Diameter 18 inches): 7.6 lb/ft2 o Brush Mattress: 6 lb/ft2 o Live Staking: 2.6 lb/ft2

• The maximum shear stress within the footprint of the proposed bank stabilization improvements shall be used to confirm that the design satisfies the minimum permissible shear stress values.

• Riprap and brush mattress treatments shall extend half the vertical distance between normal water line and top of bank to protect from frequent runoff flows.

• The 100-year event shall be used to evaluate water surface elevation (WSEL) impacts. WSEL increases shall be minimized throughout each affected reach and cannot exceed the values below.

WSEL increases shall be measured at the upstream end of each site unless otherwise specified.

o Towpath MM 20 South: 0.05 ft

The riverbank stabilization design shall adhere to the geotechnical requirements documented below unless otherwise approved by the Contracting Officer.

• The DB Contractor Team shall thoroughly review the Geotechnical Reports (included as appendices to the Basis of Design Reports) and provide additional borings, laboratory testing, and geotechnical analyses as necessary for their final design activities.

• Permissible Slopes o The Geotechnical Engineer of Record shall perform global stability analyses to evaluate the long-term (drained), short term (undrained), and rapid drawdown stability of the slopes. The target factors of safety for these conditions are as follows:

Short Term and Long Term: 1.30 Rapid Drawdown: 1.10 o Cut and fill slopes shall be no steeper than 2.5H:1V.

o The crest of any slope should be a minimum horizontal distance of 5 feet from the edge of the Towpath Trail.

1.6 Schedule

Complete work in this RFP according to following schedule:

DB Design Development (DD) Documents:

Submit DB Design Development Documents no later than 30 calendar days after receiving the notice to proceed from the Contracting Officer.

Complete NPS Review no later than 21 calendar days after submitting DB Design Development Documents.

100% Draft DB Construction Documents (CD):

Template Date 10-19-21 | Page 9 of 42

Continue work on 100% Draft DB Construction Documents during DB Design Development Documents review. After receiving DB Design Development review comments, address and incorporate comments in 100% Draft DB Construction Documents.

Submit 100% Draft DB Construction Documents and responses to NPS Review form with responses to DB Design Development Documents no later than 30 calendar days after submitting DB Design Development Documents.

Complete NPS Review no later than 21 calendar days after receiving 100% Draft DB Construction Documents.

100% Complete DB Construction Documents (CD):

Submit 100% Complete DB Construction Documents and NPS Review form with responses to 100% Draft DB Construction Documents review comments no later than 20 calendar days after submitting 100% Draft DB Construction Documents.

Complete NPS review no later than 15 calendar days after receiving 100% Complete DB Construction Documents.

Complete Stamped and Signed DB Construction Documents (CD):

Submit Complete Stamped and Signed DB Construction Documents and NPS Review form with responses to 100% Complete DB Construction Documents review comments no later than 10 calendar days after receiving NPS review comments.

Construction:

Construction begins when Contracting Officer issues DB Start Work Notice.

Complete construction no later than 90 calendar days after award of construction contract. The NPS requests to have all eight sites completed, inspected, and accepted at once following one construction season; however, this may be open to discussions based on construction duration, phasing, and weather conditions. Bank stabilization initiated at any site shall be completed during one construction season.

As-Constructed Drawings:

Complete As-Constructed Drawings no later than 21 calendar days after Substantial Completion.

Submit DB Design Development (DD) Documents, DB Construction Documents (CD), and As- Constructed Drawings to NPS Project Manager (PM).

1.7 NPS Contacts & Address:

Contractual:

Contracting Officer (CO): Joseph Halter, 530-933-8687, joseph_halter@nps.gov Contract Specialist (CS): Brian Baugh, brian_baugh@contractor.nps.gov

Template Date 10-19-21 | Page 10 of 42

Technical:

Project Manager (PM): Julie Lawson, 720-908-5283, julie_lawson@nps.gov Project Specialist (PS): TBD DSC Branch Chief: Andrea Lind, 303-969-2983, Andrea_Lind@nps.gov

NPS Consultant (Partner): Jonathan Mitchell, 303-489-1842, jonathan_mitchell@partner.nps.gov

Contracting Officer’s Representative (COR): TBD Park Representative: Janet Popielski, 440-523-0113, janet_popielski@nps.gov Park Resource Manager: Ed Kender, 216-296-7113, edward_kender@nps.gov

Address:

National Park Service - Denver Service Center 1 Denver Federal Center Building 50 Post Office Box 25287 Denver, Colorado 80225

1.8 Data and Materials Provided by NPS

NPS will provide to DB Contractor the following data and materials. (Add as attachments in Section 5.)

• Basis of Design Report (BDR) o MM 20 South Site (Completed in October 2023 by the River Reach DB contractor)

• Approved Schematic Design Preferred Alternative Documents

• NPS Project Sustainability Checklist

• Constructability Checklist

• Division 1 Specifications Templates

• Performance Specifications

• Topographic and Bathymetric Survey (2021)

• Access and Staging Maps

• Geotechnical Reports – Included as appendices to BDRs.

• Schematic Design Hydraulic Models

• Categorical Exclusion (CATEX) – In progress; will be provided when completed.

• Permit List

• Clean Fill Protocol

PROJECT REQUIREMENTS

Contractor to research and resolve constructability issues included in the Constructability Checklist.

mailto:jonathan_mitchell@partner.nps.gov

Template Date 10-19-21 | Page 11 of 42

2.1 General Requirements

2.1.1 Scope of Work and Project Summary/Requirements

The Project will stabilize the identified portions of the Cuyahoga riverbank. Stabilization will utilize natural rock riprap and bioengineering techniques. The Project includes clearing the banks, placing riprap, rebuilding banks, planting native vegetation to stabilize the soil, and remediation of the construction site and equipment access routes, as necessary.

The project will include, but not be limited to:

Upon award, determine and provide design schedule of work.

Provide schedule of construction work.

Secure and provide Contractor-furnished permits.

Review site data.

Review Schematic Design preferred alternative provided in the RFP package.

Perform and provide topographic and bathymetric surveys to confirm site conditions.

Submit DB Design Development and DB Construction Documents for review and approval, as required.

Secure work area and provide adequate signage and detours for pedestrians and visitors.

Construct project.

Provide as-constructed drawings.

Create and provide operations and maintenance manual.

2.1.2 Definition of Contract Line Items

CONTRACT LINE ITEM 1 – Towpath MM 20 South:

Construct bank stabilization measures including bioengineering techniques and rock riprap.

CONTRACT LINE ITEM 2 – Design DD/CD:

Prepare design development and construction drawings for the identified Cuyahoga riverbank stabilization sites, include the following submittals:

• DB Design Development (DD) Documents,

• 100% Draft DB Construction Documents (CD),

• 100% Complete DB Construction Documents (CD), and

• Complete Stamped and Signed DB Construction Documents (CD).

2.1.3 Progress Payments

Design Phase - Progress payments will be based on submission, review, and acceptance of design deliverables.

Construction Phase - Progress payments will be based on percentage of work completed on items listed in approved schedule of values. Actual construction completed and in place will form basis for payment.

DB Contractor shall verify percent complete under direction of the Contracting Officer Representative unless Contracting Officer waives this requirement in a specific instance. DB Contractor shall make

Template Date 10-19-21 | Page 12 of 42 computations for payment based on Government’s verification of work completed and in place for periods which progress payments are requested.

DB Contractor shall furnish to Contracting Officer originals of field notes and other records relating to basis for payment. Contracting Officer shall use as necessary to determine final amount of progress payments. DB Contractor shall retain copies of material furnished to Contracting Officer.

2.1.4 Project Meetings

2.1.4.1 Design Kick-off Meeting

This meeting is to be held onsite. Visiting the site after the meeting is encouraged. Before scheduling this meeting, Performance and Payment bonds for construction portion of project must be submitted and approved. DB Contractor has 15 calendar days after award to commence with the work, so bonds must be submitted within this time frame to avoid delay to schedule established in Section 1.6.

After award of contract and acceptance of Performance and Payment bonds, Contracting Officer will arrange a design kick-off meeting with DB Contractor. Meeting agenda shall include the following as a minimum:

• Areas available for use by DB Contractor

• Access requirements of the Park

• Commissioning (review requirements in ASHRAE 0-2005 paragraphs 6 and 7)

• Design schedule (minimum two color hard copies).

• Environmental and sustainability requirements

• Natural and Cultural Resource Protection

• Payments to DB Contractor

• Review and emphasize Park needs and design objectives.

• Modifications during design

• Schedule of Values

• Submittals during design

2.1.4.2 Design Weekly Meetings

Contractor shall include weekly team calls each month for the duration of the design phase: 1-hour each for two-three individuals participating. Contractor shall co-facilitate conference/Microsoft Teams calls as needed. Contractor shall provide agenda (electronic format via email) 2 calendar days prior to the call with follow up meeting notes within 2 calendar days of meeting. These shall also be submitted in electronic format via email. AE shall incorporate NPS comments as required.

2.1.4.3 Preconstruction Meeting

Submit following Part 2 Project Requirement deliverables a minimum of one week (7 calendar days) prior to Preconstruction Meeting.

• Accident Prevention Program (APP)

• DB Contractor’s Commissioning Plan (CCxP)

Template Date 10-19-21 | Page 13 of 42

• Evidence of liability insurance coverage and workman’s compensation for DB Contractor and Subcontractors

• Historic Preservation Treatment Program

• Letter designating your Project Superintendent

• List of required permits

• List of Subcontractors for project (same as proposal)

• Project Schedule with construction portion fully developed

• Quality Control Plan

• Schedule of Values

• Storm Water Pollution Prevention Plan (SWPPP) Submittal process

• Waste Management Plan

• Written statements from Subcontractors certifying compliance with applicable labor standard clauses

After 100% Complete DB Construction Documents are approved (or completed portions of DB Construction Documents necessary for fast tracking the project), and before start of construction, Contracting Officer will arrange on-site Preconstruction meeting with DB Contractor. Meeting agenda will include the following as a minimum:

• Accident reporting

• Construction schedule (Provide minimum two (2) color hard copies and electronic copy in software it was created in.)

• Correspondence procedures

• Jobsite safety

• Labor standards

• Lines of Authority

• Modifications

• NPS/DSC SharePoint Project website

• Park Rules and Regulations

• Payroll reports

• Progress Payments

• Resolution to comments provided by NPS on the Part 2 Project Requirements

• Roles and responsibilities

• Schedule of Values

• Submittal process

• Bridge, access road and site constraints.

• Medical emergency processes, availability, emergency numbers, and contacts.

• Park permits, burning construction waste, rules of the road, alcohol use, housekeeping, firearms, pets, natural and cultural resource concerns.

• Visitation and public relations.

• Archeological Resources Protection Requirements.

• Environmental and sustainability requirements for the Project, required tracking for sustainability (related submittals), and use of NPS Project Sustainability Checklist.

• Saturdays, Sundays, holidays and night work.

• Traffic control.

2.1.4.4 Weekly Progress Meetings

Template Date 10-19-21 | Page 14 of 42

DB Contractor shall participate in weekly telephone conference calls with Contracting Officer, CMR, and other project team members with updates to following meeting agenda items:

• Approval of minutes of previous meetings.

• Modifications

• Review of off-site fabrication and delivery.

• Requests for Information (RFI) and issues.

• Schedule update. (Provide updated CPM (Critical Path Method) schedule.)

• Status of Project Record Drawings and O&M (Operation & Maintenance) Manuals.

• Submittal status.

• Work in progress and projected.

• Other business relating to work.

• Safety updates.

2.1.5 Project Schedule

General: DB Contractor shall upload project schedule to the project management website and provide two (2) color copies after award and before design meeting. Schedule shall include detailed design phase with design deliverable submission dates, review periods, and summary construction schedule with important milestones included for both phases.

Fully develop construction portion of project schedule and submit to Contracting Officer on project management website before Preconstruction meeting or construction begins. Update project schedule monthly throughout contract period until project substantial completion. Status date of each schedule update shall be 10 calendar days before progress payment request date.

Construction work cannot begin until Government approval is obtained for either:

• Entire set of 100% Complete DB Construction Documents.

• Fast track construction: 100% Complete DB Construction Documents affecting work to be constructed.

Purpose: Project schedule ensures adequate planning, coordinating, scheduling, and reporting of DB Contractor’s design and construction activities. Project schedule will assist DB Contractor and Contracting Officer to monitor work progress, evaluate proposed changes, and process DB Contractor's monthly progress payment requests.

Software: Latest version of Microsoft Project, Primavera Project Planner, SureTrak, or approved equal.

Schedule Development: Project schedule shall cover entire contract period. Late finish date is same as contract’s established completion date.

DB Contractor shall use Critical Path Method (CPM) with limited use of lead or lag durations between schedule activities. DB Contractor's project schedule shall consist of procurement activities (including mobilization, submittal, and fabrication and delivery of key and long-lead procurement items) and construction activities.

DB Contractor's project schedule shall consist of, but not be limited to, the following for each activity:

Template Date 10-19-21 | Page 15 of 42

• Identify activities and numbers numerically (maximum 5-digit). Number activities in increments of 10.

• Concisely describe work represented by activity (maximum 48 characters). Avoid using non-standard abbreviations. Limit work related to each activity to one work trade.

• Activity duration shall be in whole working days with maximum duration 15 work days each, unless otherwise approved by Contracting Officer, except for non-construction activities including mobilization, shop drawing and sample submittals, fabrication of materials, delivery of materials and equipment, and concrete curing.

DB Contractor shall ensure project schedule includes own work and Subcontractor work.

Project schedule shall show sequence and interdependence of activities required for complete performance of work and shall be cost and resource loaded. DB Contractor shall ensure work sequences are logical and project schedule shows a coordinated work plan. Proposed durations assigned to each activity shall be DB Contractor's best estimate of time required to complete activity, considering scope and resources planned. Resource loading of each activity shall list personnel by labor category and equipment type, and capacity proposed to complete activity in duration shown. Include permit requirements and constraints. Consider and include seasonal weather conditions in planning and scheduling of work influenced by high or low ambient temperatures and wind and/or precipitation, to ensure completion of work within contract time.

Project Schedule Updates

Monthly updates: Monthly updates of project schedule shall be an integral part and basic element of estimate upon which progress payments shall be made under this contract. If, in judgment of Contracting Officer, DB Contractor fails or refuses to provide schedule of values and complete schedule update or revision as specified hereinafter, DB Contractor shall be deemed to have not provided required information upon which progress payment may be made and shall be subject to retainage of a portion of the payment.

Narrative: Include in report:

• Brief description of actual progress made during update period.

• Actual and potential delaying activities.

• Impediments to progress.

• Issues related to inclement weather.

• Progress toward established milestones.

• Project float.

• Brief description of work anticipated to be performed in next month.

• Identify minor revisions to schedule for evaluation and accepted or rejected.

As work progresses, indicate Actual Completion percentage for each activity. If schedule update shows late finish date after contract completion date, at a minimum, include the following in narrative with submission:

• Known delays.

• Actions taken to get back on schedule.

Template Date 10-19-21 | Page 16 of 42

• Pending modifications.

• Impediments or constraints affecting progress.

Progress Payments: Update currently accepted construction schedule monthly. If DB Contractor fails to provide monthly updates or revisions to currently accepted construction schedule, a portion of monthly payment may be retained until updates/revisions made.

Time Impact Analysis for Contract Modifications, Changes, Delays, and Contractor Requests Requirements: When contract modifications or changes are initiated, delays are experienced, or DB Contractor revises project schedule, DB Contractor shall submit to Contracting Officer a written time impact analysis illustrating influence of each modification, change, delay, or DB Contractor’s request on the contract time.

• Time Extensions: Activity delays shall not automatically mean an extension of contract time is warranted or due to DB Contractor. It is possible that modification, change, or delay will not affect existing critical activities or cause non-critical activities to become critical. A modification, change, or delay may result in only absorbing a part of available total float that may exist within an activity chain of the project schedule, thereby not effecting the contract time.

Time extensions will be granted according with terms of contract.

• Float: Float is not for exclusive use or benefit for NPS or DB Contractor. Extension of contract time is granted only to extent the equitable time adjustments to activity or activities affected by modification, change, or delay exceeds total (positive or zero) float available on a particular activity.

As-Constructed Drawings Using previously prepared AutoCAD construction drawing files, provide office services as required to prepare As-Constructed Drawings. The DBC will furnish a set of Project Record drawings, field sketches, construction modification drawings, notes, etc. for inclusion. In addition to incorporating the material into a final drawing set, As-Constructed Drawings shall have the following:

1. Cover Sheet: (Refer to Appendix E of NPS Reference Manual 10A.)

a. Change “Construction Drawings” to “As-Constructed Drawings”

b. Revise Revision Block to:

c. Include As-Constructed Drawing Contractor information.

2. All Sheets:

a. Change drawing numbers to 644/176923A.

b. Drawings shall be prepared in accordance with DSC publications NPS Reference

Manuals 10A: Guideline for Preparation of Design and Construction Drawings (pdf) and 10B: Drawing and Map Numbers (pdf), Contract for A/E Projects, and the January 2007 DSC CAD (Computer Aided Design) Standards Guide (pdf). A/E is advised Government will confirm compliance with these standards prior to final payment for this task order.

(Since original construction drawings were prepared under a separate task order wherein compliance with these standards was a requirement, no additional payment will be made for this provision.)

Mark Sheet Revision Date Initial (A, B, C, etc.) All As-Constructed Drawings https://www.nps.gov/dscw/loader.cfm?csModule=security/getfile&pageid=5417006 https://www.nps.gov/dscw/loader.cfm?csModule=security/getfile&pageid=5417006 https://www.nps.gov/dscw/loader.cfm?csModule=security/getfile&pageid=5534999 https://www.nps.gov/dscw/loader.cfm?csModule=security/getfile&pageid=5417342 https://www.nps.gov/dscw/loader.cfm?csModule=security/getfile&pageid=5417342

Template Date 10-19-21 | Page 17 of 42

3. Deliverables: Reports, reviews, evaluations, design work, etc. shall be delivered to the Contracting Office in the allocated timeframe stated in the Standard Communication Form. No payment will be made for office services until the deliverables are received and accepted.

2.2 Design Requirements

2.2.1 Evaluation of Schematic Design Documents – NOT USED

2.2.1.1 Deliverables

The following deliverables are required for NPS Review:

The DB Contractor shall submit a report detailing the advantages and disadvantages of the proposed alternative(s) compared to the current design including constructability, construction schedule and cost, resilience, reliability/maintenance, and safety. Concept sketches of the alternative(s) shall be provided.

Submit electronic documents, in native and PDF format.

2.2.2 DB Design Development (DD) Documents and DB Construction Documents (CD)

Prepare DB Design Development Documents and DB Construction Documents using English System of Weights and Measurements and according to DSC Design Standards and DSC Design Deliverables - Content and Format Requirements for DB Design Development Documents and DB Construction Documents.

List salient characteristics for products and materials specified. Refer to Guide for Specifiers.

Deliverables

The following deliverables are required (refer to Section 1.6 for schedule) for NPS Review:

• DB Design Development (DD) Documents Submit 2 hard and electronic, in native formats (no PDF (Portable Document Format) files), copies of the following DB Design Development Documents for review:

Draft DB Design Development Drawings Division 1 Specifications Divisions 2 through 49 Outline Specifications Product File Statement of Structural Tests and Special Inspections Hydraulic Model(s) Design Calculations

• 100% Draft DB Construction Documents (CD) Submit 2 hard and electronic, in native formats (no PDF files), copies of the following 100% Draft DB Construction Documents for review:

100% Draft DB Construction Drawings Division 1 Construction Specifications (Construction Specifications Institute (CSI)

Master Format 04 Edition). A/E shall utilize and modify DSC Division 1 Construction Specifications templates.

https://www.nps.gov/dscw/dstandards.htm https://www.nps.gov/dscw/del_designdevelopdb.htm https://www.nps.gov/dscw/del_constructiondb.htm https://www.nps.gov/dscw/del_constructiondb.htm https://www.nps.gov/dscw/loader.cfm?csModule=security/getfile&pageid=242817

Template Date 10-19-21 | Page 18 of 42

Divisions 2 through 49 Construction Specifications (Construction Specifications Institute (CSI) MasterFormat 04 Edition). A/E shall utilize and modify their own Divisions 2 through 49 Construction Specifications templates.

Product File Statement of Structural Tests and Special Inspections Hydraulic Model(s) Design Calculations Checklists for internal review of drawings, specifications, calculations, and cost estimates

• Required documents for each submission are included and complete per contract requirements.

• Required documents have been through a Quality Control (QC) review.

NPS requires documentation and submittal of QC work performed.

NPS Review form with responses to DB Design Development Documents review comments.

• 100% Complete DB Construction Documents (CD)

Submit 2 hard and electronic, in native formats (no PDF files), copies of the following 100% Complete DB Construction Documents for review and final approval:

100% Complete DB Construction Drawings Division 1 Construction Specifications Divisions 2 through 49 Construction Specifications Product File Statement of Structural Tests and Special Inspections Hydraulic Model(s) Design Calculations Checklists for internal review of drawings, specifications, calculations, and cost estimates

• Required documents for each submission are included and complete per contract requirements.

• Required documents have been through a Quality Control (QC) review.

NPS requires documentation and submittal of QC work performed.

NPS Review form with responses to 100% Draft DB Construction Documents review comments

• Complete Stamped and Signed DB Construction Documents (CD) o Upon final approval of 100% Complete DB Construction Documents, submit Complete Stamped and Signed DB Construction Documents per following table for construction, NPS archiving, and general use. For format and media submission requirements, see Design Deliverables - Content and Format Requirements DB Hard Copy and Electronic Submittal Requirements.

o Provide all supplemental documentation and design reports including, but not limited to:

Survey in both native and PDF; Soil testing reports; Hazmat reports; Hydraulic reports;

Geotechnical reports; drilling logs.

COMPLETE STAMPED AND SIGNED

DB CONSTRUCTION DOCUMENTS (CD)

ELECTRONIC

FORMATS *

HARD COPY

FORMATS

DB Construction Drawings AutoCAD Half-Size Drawings https://www.nps.gov/dscw/del_submitformatdb.htm https://www.nps.gov/dscw/del_submitformatdb.htm

Template Date 10-19-21 | Page 19 of 42

Division 1 Construction Specifications PDF & MS (Microsoft)-Word

N/A (Not Applicable)

Divisions 2 through 49 Construction Specifications PDF & MS (Microsoft)-Word

N/A (Not Applicable)

Product File PDF N/A Statement of Structural Tests and Special Inspections PDF & MS-Word N/A Supplemental Design Reports PDF N/A Hydraulic Model(s) HEC-RAS N/A Design Calculations PDF & native formats N/A Checklists for internal review of drawings, specifications, calculations, and cost estimates PDF & MS-Excel N/A

NPS Review form with responses to 100% Complete DB CD review comments PDF & MS-Excel N/A

* The recipient of the electronic files is TIC (Technical Information Center).

2.2.3 Environmental and Sustainability Requirements for Design

NPS established environmental and sustainability requirements for project. Notify Contracting Officer if conflicts arise between performance of work and environmental and sustainability requirements. NPS does not intend to limit alternative means of achieving these requirements.

For sustainability requirements for design, see Part 3 Performance Requirements and NPS Project Sustainability Checklist. Complete checklist by concisely explaining how each credit/requirement will be met.

Government Permitting Responsibilities

Responsibility for securing permits required to construct bank stabilization measures is assigned to the Design Build Contractor (DBC). Anticipated conditions associated with these permits are addressed in Section 2.3.1.

Design Build Contractor Permitting Responsibilities

The Design Build Contractor (DBC) is responsible for securing non-government furnished permits required to construct bank stabilization measures. The DBC shall work collaboratively with the DSC and Park to ensure the project meets DOI, NPS, and Park requirements in addition to applicable federal, state, and local regulations.

Permit List Review

a. The NPS has developed a permit list (see Section 5.0 Attachments) and identified the following permits and approvals are required by the DBC:

• United States Coast Guard – Notice to Mariners

• Ohio Environmental Protection Agency – National Pollution Discharge Elimination System

General Stormwater Construction Permit

• Section 404 Clean Water Act

• Section 10 Rivers and Harbors Act

• Section 401 Water Quality Certification https://www.nps.gov/dscw/loader.cfm?csModule=security/getfile&pageid=387018 https://www.nps.gov/dscw/loader.cfm?csModule=security/getfile&pageid=387018

Template Date 10-19-21 | Page 20 of 42

b. The DBC shall provide a list of appropriate permits (Permit List) and status for each submittal.

c. If there is insufficient information to make a determination for a particular permit, DBC shall communicate what information is required to make that determination and the steps necessary to obtain this information to the CO.

Acquisition Services:

a. Consult with appropriate Agencies.

i. Document agency contact and provide.

ii. Bring any agency requirements to the integrated design team.

iii. Schedule and conduct a pre-application meeting with pertinent agencies as needed.

b. Prepare Schedule for Permit Acquisition.

c. Permits Applications Development

i. Prepare draft application for each permit in Permit Plans. Applications include required documents, products, etc. necessary for successful acquisition of permit.

ii. Bring permit issues to NPS and Park for resolution.

iii. Provide a draft application packet for each permit to the integrated design team for review prior to submittal to the associated agency.

iv. Finalize the application packet incorporating comments from design team review.

v. Communicate and copy NPS and Park on submittals, additional requirements, strategies, and resubmittals as required to secure permit.

d. Permit Acquisition

i. Proactively manage the permitting process to ensure each permit is issued in accordance with the approved schedule.

ii. In consultation with integrated design team, resolve reviewing agencies comments, as required.

e. Provide original versions of issued permits to NPS by scheduled date.

Submittals

• Permitting Documents List of Permits Schedule for Permit Acquisition Draft Application Packet for each permit Copies of signed Application Packets Original versions of all issued permits

2.3 Construction Requirements

The following is a minimum list of construction requirements that shall be followed for all construction at the Park. Additional requirements and refinements will be developed by the DBC and the COR and included in the Division I Specifications.

2.3.1 Environmental and Sustainability Requirements

Compliance for this project is complete.

Specific sustainability requirements generated in design will dictate more stringent environmental requirements for this project. Refer to Part 3 Performance Requirements and NPS Project Sustainability Checklist. General requirements:

Template Date 10-19-21 | Page 21 of 42

• Site Disturbance: Minimize construction limits of project to reduce impact on site.

• Toxic Chemicals: Avoid materials that can leach toxic chemicals into ground water. Do not allow toxic chemicals to enter sewers or storm drains or contaminate land or any body of water.

Refer to NPS Project Sustainability Checklist for additional requirements.

• Soil Erosion: Protect against erosion and topsoil depletion according to Stormwater Pollution Prevention Plan (SWPPP) to be developed and implemented for all project sites by DBC.

• Habitats: Protect natural habitats and ecological systems on facility site as identified in Categorical Exclusion (CE).

• Noise: Minimize noise during construction. Operate power equipment according to local noise restrictions.

• Waste Management: Employ processes ensuring minimal waste output and in landfills. Legally dispose materials unsuitable for recycling at public or private dumping areas outside the Park.

DB Contractor shall designate an on-site party (or parties) responsible for instructing workers and overseeing environmental and sustainability requirements of this project. Distribute copies of environmental and sustainability requirements to Job Site Foreman and each Subcontractor.

Waste Management Plan: Prior to scheduled Preconstruction meeting, DB Contractor shall submit draft Waste Management Plan to Contracting Officer for approval. Develop and implement according to ASTM E1609 and as required in contract documents. Plan shall include, but not be limited to:

• List of recycling facilities, reuse facilities, municipal solid waste landfills, and other disposal area(s) to be used. Include name, location, and phone number.

• List of proposed materials to be reused or recycled.

• List of materials that cannot be recycled or reused with explanation or justification.

• Storage and collection methods of waste and recyclables, handling procedures, and means of keeping recyclables free of contamination.

• Describe means of transporting recyclable materials and estimate frequency of emptying bins.

• Identity person or persons responsible for ensuring project recycling goals are achieved.

• Revise and resubmit Plan per Contracting Officer. Approval of DB Contractor’s Plan does not relieve DB Contractor of complying with applicable environmental regulations.

Progress Documentation: Supplemental to Waste Management Plan, document solid waste disposal, diversion, and cost/revenue analysis, and submit completed worksheet monthly. See Project Waste Management Plan Worksheet Sample, included with Division 1 Specifications, and report totals to date for column headings.

Prior to commencement of work, schedule and conduct meeting with Contracting Officer. Discuss proposed Waste Management Plan and develop mutual understanding of details of environmental protection.

Minimize Construction Impacts

Implement following mitigation measures to minimize impacts of construction activities, note that these measures may have an impact on project schedule:

Template Date 10-19-21 | Page 22 of 42

Threatened and Endangered Species: Contractor is required to follow standard conservation measures for the Indiana and northern long-eared bat, piping plover, rufa red knot, and Migratory Bird Treaty Act (MBTA) species, and Bald and Golden Eagle Protection Act.

There are no special conservation measures for piping plover or rufa red knot.

Indiana bats roost under loose tree bark on dead or dying trees during the summer. Trees should only be cut when the species is hibernating or concentrated near its hibernacula. For this reason, tree removal is restricted to between October 1 and March 31. Trees must not be cut between April 1 and September 30 of any year.

Incidental take of northern long-eared bat is prohibited if it occurs as a result of removing a known occupied maternity roost tree or removing trees within 150 feet of a known occupied maternity roost tree during the pup season from June 1 through July 31 or as a result of removing trees from within 0.25 mile of a hibernaculum at any time of the year. For this reason, tree removal is restricted to between October 1 and March 31.

The provisions of the MBTA are applicable to construction activities (clearing and grubbing, tree removal etc.) that may result in the taking of migratory birds, eggs, or young, including active nests. The MBTA is applicable year round, but in Ohio most migratory bird nesting activities occur during the period of February 1 to August 31. However, there are some raptors (owls) that will begin nesting as early as February and some song birds that may complete nesting as late as mid-September.