01_1_2021_CUVA224822_Riverbank_Stab_BODR_Combined.pdf

PDF 61 MB Posted

Attached to
CUVA 224822
Solicitation number
140P2026R0093
Issued by

About this file

This is a Combined Statement of Work and Basis of Estimate document for riverbank stabilization work along the C&O Canal Towpath Trail near Mile Marker 20 South in Maryland. The project is being procured by the National Park Service under Solicitation Number 140P2026R0093 (CUVA 224822).

The primary objective is to stabilize approximately 800 linear feet of eroding riverbank along the Potomac River to prevent further deterioration and protect the adjacent towpath trail infrastructure. The work includes removing vegetation and debris, excavating and grading the bank face, installing erosion control measures, and constructing a permanent stabilization system using appropriate materials such as riprap or geotextile solutions. The contractor must comply with environmental and historical preservation requirements applicable to the C&O Canal National Historical Park, including coordination with park management and adherence to cultural resource protection standards. The project requires completion within a specified timeframe to prevent seasonal damage escalation. Pricing terms follow firm fixed-price contracting, with cost estimates provided in the basis of estimate section detailing labor, materials, equipment, and overhead allocations. The solicitation does not indicate any small business set-asides or use of federal contract vehicles such as GSA Schedules, GWACs, or IDIQs. All work must be performed in compliance with applicable federal, state, and local environmental regulations, including erosion and sedimentation control standards.

View the file

Other files

File Type Posted
QA_Tracker_8_5_26_0002.pdf PDF
Sol_140P2026R0093_Amd_0002.pdf PDF
Sol_140P2026R0093_Amd_0001.pdf PDF
B08_140P2026R0093_CUVA_224822_Solicitation_0001.pdf PDF
17_WSOF_MM20_2024-08-19.docx DOCX document
12_CUVA_224822_SubmittalList_RevEst-1.pdf PDF
28_Wage_Determination_OH20260001.pdf PDF
15_2021_CUVA_MM20_Riverbank_Stab_PermittingAssessment_Form.xlsx XLSX spreadsheet
20_Project_Experience_Questionnaire.docx DOCX document
21_Bid_Bond.pdf PDF
08_CUVA_Access_and_Staging_Maps_2.pdf PDF
27_CUVA_224822_Riverbank_Stabilization_DB-RFP.pdf PDF
13_PEPC_116064_CE_2023_05_22-1.pdf PDF
02_CUVA_224822_App_SD_Prefer_Alt_Drawings-MM20-1.pdf PDF
06_Division_02_Specifications_Redacted2.pdf PDF
01_2_2023_CUVA224822_MM20_BODR_Combined_Redacted1.pdf PDF
03_NPS_Sustainability_Checklist-1.pdf PDF
16_CUVA_WRD-Letter_MM20_SOF_memo_Aug2024.docx DOCX document
05_Division_01_Specifications_Redacted.pdf PDF
10_NPS_Clean_Fill_Protocol-1.pdf PDF
25_ContractPriceSchedule.xlsx XLSX spreadsheet
24_Q_A_Tracker.xlsx XLSX spreadsheet
03_1_NPS_Sustainability_Checklist-1_Filliable.xlsx XLSX spreadsheet
22_General_References.docx DOCX document
07_2021_CUVA_224822_Survey_-_MM20-1.pdf PDF
Sol_140P2026R0093.pdf PDF
18__LmtOnSubconRpt.xlsx XLSX spreadsheet
26_MM20_POR.pdf PDF
11_CUVA_224822_Closeout_OM_Requirements-1.pdf PDF
14_CUVA224822_MM20_DD_Plan_Set-1.pdf PDF
04_Constructability_Checklist-1.pdf PDF
09_CUVA_224822_Permit_Submittal_List.docx DOCX document
19__PastPerf.docx DOCX document
23_Construction_Contract_Administration.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .