This is a memorandum from the National Park Service Water Resources Division to the Cuyahoga Valley National Park (CUVA) Superintendent dated August 28, 2024, regarding concerns about the proposed riverbank stabilization project at Towpath MM20 along the Cuyahoga River in Ohio. The memo expresses significant environmental and safety concerns about the project design, noting that the proposed channel realignment may shorten channel length and reduce channel width, potentially increasing slope, flow velocities, or flood stage. The Water Resources Division identifies potential negative impacts including bed degradation, downstream bank erosion, and substrate grain size changes. Key issues cited include incomplete hydraulic analysis relying on estimated bathymetry without calibration or validation, making it impossible to adequately evaluate impacts to flood risk and visitor safety as required by Executive Orders 11988 and 13690 and Director's Order 77-2.

The memo additionally raises concerns that the Cuyahoga River segment is listed on the Nationwide Rivers Inventory with recognized values in fish, recreation, and scenic resources. The extensive proposed armoring is deemed incompatible with potential Wild and Scenic River designation. The Water Resources Division strongly encourages reevaluating alternatives, including relocating the towpath rather than implementing the proposed design, citing NPS Management Policies Section 4.6.6 which prioritizes avoiding impacts on watershed features and allowing natural fluvial processes to proceed unimpeded. The memo requests that if the project proceeds with armoring, justification be provided in the Wetlands and Floodplain Statements of Findings for not relocating approximately 500 feet of the towpath. Related federal contract solicitation 140P2026R0093 (CUVA 224822) has been issued for this stabilization work.

View the file

Other files

File Type Posted
Sol_140P2026R0093_Amd_0002.pdf PDF
QA_Tracker_8_5_26_0002.pdf PDF
Sol_140P2026R0093_Amd_0001.pdf PDF
B08_140P2026R0093_CUVA_224822_Solicitation_0001.pdf PDF
25_ContractPriceSchedule.xlsx XLSX spreadsheet
01_2_2023_CUVA224822_MM20_BODR_Combined_Redacted1.pdf PDF
03_1_NPS_Sustainability_Checklist-1_Filliable.xlsx XLSX spreadsheet
10_NPS_Clean_Fill_Protocol-1.pdf PDF
17_WSOF_MM20_2024-08-19.docx DOCX document
24_Q_A_Tracker.xlsx XLSX spreadsheet
Sol_140P2026R0093.pdf PDF
03_NPS_Sustainability_Checklist-1.pdf PDF
15_2021_CUVA_MM20_Riverbank_Stab_PermittingAssessment_Form.xlsx XLSX spreadsheet
28_Wage_Determination_OH20260001.pdf PDF
01_1_2021_CUVA224822_Riverbank_Stab_BODR_Combined.pdf PDF
04_Constructability_Checklist-1.pdf PDF
08_CUVA_Access_and_Staging_Maps_2.pdf PDF
09_CUVA_224822_Permit_Submittal_List.docx DOCX document
11_CUVA_224822_Closeout_OM_Requirements-1.pdf PDF
12_CUVA_224822_SubmittalList_RevEst-1.pdf PDF
14_CUVA224822_MM20_DD_Plan_Set-1.pdf PDF
19__PastPerf.docx DOCX document
20_Project_Experience_Questionnaire.docx DOCX document
21_Bid_Bond.pdf PDF
23_Construction_Contract_Administration.docx DOCX document
26_MM20_POR.pdf PDF
22_General_References.docx DOCX document
05_Division_01_Specifications_Redacted.pdf PDF
06_Division_02_Specifications_Redacted2.pdf PDF
07_2021_CUVA_224822_Survey_-_MM20-1.pdf PDF
13_PEPC_116064_CE_2023_05_22-1.pdf PDF
18__LmtOnSubconRpt.xlsx XLSX spreadsheet
27_CUVA_224822_Riverbank_Stabilization_DB-RFP.pdf PDF
02_CUVA_224822_App_SD_Prefer_Alt_Drawings-MM20-1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

Water Resources Division 1201 Oak Ridge Drive, Suite 250 Fort Collins, CO 80525

VIA ELECTRONIC MAIL, NO HARD COPY TO FOLLOW

August 28, 2024 Memorandum

To:Lisa Petit, Superintendent, Cuyahoga Valley National Park
Through:Mike Ward, Deputy Regional Director for Parks and Programs
From:Forrest “Ed” Harvey, Chief, Water Resources Division
Subject:Stabilize Riverbank at Towpath MM20 South along the Cuyahoga River Cuyahoga Valley National Park, Ohio

The purpose of this memo is to highlight concerns about potential impacts to natural resources and public safety resulting from the proposed project at Towpath MM20 along the Cuyahoga River in CUVA. This project is part of a series of bank stabilization projects being undertaken at CUVA to address concerns related to bank erosion. Wetlands Statements of Findings (WSOF) and Floodplain Statements of Findings (FSOF) have been approved for projects occurring at several other sites. Details for the MM20 site, however, are concerning due to several aspects of the proposed design presented in the draft WSOF and FSOF. Specifically, the proposed channel realignment appears to shorten channel length and reduce channel width, potentially resulting in increased slope, flow velocities or flood stage, or a combination of the three. Potential impacts include bed degradation, adjustments in channel planform (e.g. bank erosion) downstream from the project site, and changes in substrate grain size distribution. Although a hydraulic analysis was performed to compare existing and proposed conditions, it relied on estimated channel bathymetry and appears not to have undergone calibration nor validation. Thus, it is not possible thoroughly evaluate impacts to flood risk and visitor safety, as is required by Executive Order (E.O.) 11988, E.O. 13690, and Director’s Order 77-2.

Moreover, this site is listed on the Nationwide Rivers Inventory (NRI), which is currently undergoing an update at the direction of NPS leadership. NPS and other federal agencies are required to manage NRI rivers in a way so as not to preclude Wild and Scenic River designation or affect river values. For the CUVA NRI segment, the rivers values are fish, recreation, and scenic. The proposed armoring project could adversely affect these values and the extensive hardening is incompatible with WSR designation.

We strongly encourage the project team to reevaluate alternatives, including relocating the towpath and discontinue efforts under the proposed design. As described in NPS Management Policies (2006), Section 4.6.6. Watershed and Stream Processes, “the Service will protect watershed and stream features primarily by avoiding impacts on watershed and riparian vegetation and by allowing natural fluvial processes to proceed unimpeded. When conflicts between infrastructure (such as bridges and pipeline crossings) and stream processes are unavoidable, NPS managers will first consider relocating or redesigning facilities rather than manipulating streams.” If the consensus is to continue with the armoring project, please provide justification for not relocating approximately 500 feet of the towpath in the WSOF and FSOF.

cc:

MWR: Herbert Frost, Nancy Finley, James Lange, Hector Santiago DSC: Vicki Freese-Supler, Jason Longshore, NRSS WRD: Kevin Noon, Susannah Erwin image1.png image2.jpeg image3.jpeg