This document is a site map and access/staging guidance for the Towpath Trail Mile Marker 20 South project located in Cuyahoga Valley National Park, Ohio.

The MM 20 South site map (Figure 23) depicts the project location along the Cuyahoga River with two defined workspace areas: a permanent workspace (0.633 acres) and a temporary workspace (0.442 acres). The map identifies existing access via major south access point at 4,266 feet and shows proposed access routes marked in red and yellow lines. The contractor bears responsibility for determining the means and methods of work completion, including planned access and staging arrangements. Primary access and staging are designated off Standford Road with material staging behind a barn or in another suitable laydown area, with an established haul road across the field to the project site. An alternative staging location option exists north of the site along the tow path; however, this alternative requires temporary removal of a bridge, installation of a culvert designed to accommodate contractor traffic load requirements, and subsequent bridge re-installation upon project completion. The information referenced derives from the 2023 Board of Directors documentation.

View the file

Other files

File Type Posted
Sol_140P2026R0093_Amd_0002.pdf PDF
QA_Tracker_8_5_26_0002.pdf PDF
Sol_140P2026R0093_Amd_0001.pdf PDF
B08_140P2026R0093_CUVA_224822_Solicitation_0001.pdf PDF
Sol_140P2026R0093.pdf PDF
03_NPS_Sustainability_Checklist-1.pdf PDF
15_2021_CUVA_MM20_Riverbank_Stab_PermittingAssessment_Form.xlsx XLSX spreadsheet
16_CUVA_WRD-Letter_MM20_SOF_memo_Aug2024.docx DOCX document
28_Wage_Determination_OH20260001.pdf PDF
25_ContractPriceSchedule.xlsx XLSX spreadsheet
01_2_2023_CUVA224822_MM20_BODR_Combined_Redacted1.pdf PDF
03_1_NPS_Sustainability_Checklist-1_Filliable.xlsx XLSX spreadsheet
10_NPS_Clean_Fill_Protocol-1.pdf PDF
17_WSOF_MM20_2024-08-19.docx DOCX document
24_Q_A_Tracker.xlsx XLSX spreadsheet
01_1_2021_CUVA224822_Riverbank_Stab_BODR_Combined.pdf PDF
04_Constructability_Checklist-1.pdf PDF
09_CUVA_224822_Permit_Submittal_List.docx DOCX document
11_CUVA_224822_Closeout_OM_Requirements-1.pdf PDF
12_CUVA_224822_SubmittalList_RevEst-1.pdf PDF
14_CUVA224822_MM20_DD_Plan_Set-1.pdf PDF
19__PastPerf.docx DOCX document
20_Project_Experience_Questionnaire.docx DOCX document
21_Bid_Bond.pdf PDF
23_Construction_Contract_Administration.docx DOCX document
26_MM20_POR.pdf PDF
22_General_References.docx DOCX document
05_Division_01_Specifications_Redacted.pdf PDF
06_Division_02_Specifications_Redacted2.pdf PDF
07_2021_CUVA_224822_Survey_-_MM20-1.pdf PDF
13_PEPC_116064_CE_2023_05_22-1.pdf PDF
18__LmtOnSubconRpt.xlsx XLSX spreadsheet
27_CUVA_224822_Riverbank_Stabilization_DB-RFP.pdf PDF
02_CUVA_224822_App_SD_Prefer_Alt_Drawings-MM20-1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This information comes from 2023 BOD. The contractor shall determine the means and methods of completing the work which includes planned access and staging.

An alternative locations of staging may be located north of the site along the tow path which will require the temporary removal of a bridge, installation of a culvert sufficient to meet contractors traffic load requirements and re-installation of the bridge after project is complete.

08 CUVA Access and Staging Maps
Access