Roswell Office Building Project Manual and RFP Summary

This project manual and request for proposals (RFP) document the construction of a new approximately 9,800 square foot, single-story Type IIB fully sprinklered office building for the New Mexico Department of Health's Public Health Division in Roswell to serve Chaves County. The project scope encompasses a complete new building structure and associated site improvements, with construction documents including detailed specifications across 33 divisions covering general requirements, concrete work, structural steel, masonry, thermal and moisture protection, openings, finishes, specialties, fire suppression systems, plumbing, HVAC, electrical systems, communications, fire alarm systems, earthwork, exterior improvements, and utilities. The procurement will be conducted under the Competitive Sealed Proposals for Construction and Facility Maintenance, Services and Repairs rule per New Mexico Administrative Code (NMAC) 1.4.8, resulting in a single-source award. The construction documents contain additive alternates that become part of the work only if enumerated in the Agreement, with future funding potentially required to add alternatives.

The contract term may extend to eight years from the date of the last signature if necessary, with the procurement resulting in a contractual agreement exclusively between two parties. Key project specifications include an elevation of 5,500 feet above sea level, seismic design category D with specific response coefficients, ambient temperatures ranging from freezing to above 40 degrees Fahrenheit, fire-rated construction elements, and compliance with 2021 International Building Code and applicable New Mexico state codes. The project requires performance-based design specifications for fire alarm systems by a NICET Level III designer with approval by the New Mexico State Fire Marshal's Office, comprehensive coordination drawings, manufacturer representatives for equipment installation checks, one-year warranties on all furnished equipment, and detailed operation and maintenance manuals. Construction quality assurance includes field testing by approved testing laboratories, compaction requirements of 85-95 percent maximum dry density depending on application, pressure testing of fire suppression and plumbing systems, and final inspection and certification by the contractor prior to acceptance.

View the file

Other files

File Type Posted
13-Attachment J.pdf PDF
19-Attachment H.pdf PDF
7-Appendix E.pdf PDF
2-Attachment B.pdf PDF
21-Attachment F.pdf PDF
15-Appendix D-2.pdf PDF
8-Appendix C.pdf PDF
4-Appendix B.pdf PDF
25-100% CD Project Manual Vol 1 - Roswell New Office Building f.pdf PDF
17-Attachment L.pdf PDF
3-Appendix F.pdf PDF
5-Attachment C.pdf PDF
16-Appendix H.pdf PDF
18-Appendix G.pdf PDF
10-Attachment D.pdf PDF
24-2025-11-10 ROB 100% CD Drawings.pdf PDF
9-Attachment I.pdf PDF
12-Attachment G.pdf PDF
11-Appendix A.pdf PDF
1-RFP 60-35000-26-08788 DOH Roswell Office Bldg. F.pdf PDF
14-Attachment K.pdf PDF
6-Appendix D-1.pdf PDF
23-Attachment M.pdf PDF
22-Attachment A.pdf PDF
20-Attachment E.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roswell Office Building

SMPC Architects Table of Contents 11/04/2025 - 24006 00 0110 - 1

SECTION 00 0110

TABLE OF CONTENTS

VOLUME 1: DIVISIONS 00 THROUGH 12

PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0110 - Table of Contents 00 0115 - List of Drawing Sheets Facilities Management Division Advertisement for Bids Facilities Management Division Contract for Construction

Part A - Contract Agreement Part B - General Conditions Part C - Supplementary Conditions Part D - Notice to Proceed

00 3100 - Available Project Information Geotechnical Engineering Services Report

SPECIFICATIONS

DIVISION 01 -- GENERAL REQUIREMENTS

01 1000 - Summary 01 2300 - Alternates 01 2500 - Substitution Procedures 01 2500.10 - Substitution Request Form 01 3000 - Administrative Requirements 01 4000 - Quality Requirements 01 5000 - Temporary Facilities and Controls 01 6000 - Product Requirements 01 7000 - Execution and Closeout Requirements 01 7800 - Closeout Submittals 01 7900 - Demonstration and Training

DIVISION 02 -- EXISTING CONDITIONS

DIVISION 03 -- CONCRETE

03 1000 - Concrete Formwork 03 2000 - Concrete Reinforcement 03 3000 - Cast-in-Place Concrete 03 3510 - Polished Concrete Finishing 03 4816 - Precast Concrete Splash Blocks

DIVISION 04 -- MASONRY (NOT USED)

DIVISION 05 -- METALS

05 1200 - Structural Steel 05 2100 - Steel Joists 05 3100 - Steel Deck 05 4000 - Cold-Formed Metal Framing

11/04/2025 - 24006 00 0110 - 2

05 5000 - Metal Fabrications 05 5133 - Metal Ladders

DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

06 1000 - Rough Carpentry 06 4100 - Architectural Wood Casework

DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

07 2100 - Thermal Insulation 07 2400 - Exterior Insulation and Finish Systems 07 5423 - Thermoplastic Membrane Roofing 07 6200 - Sheet Metal Flashing and Trim 07 7100 - Roof Specialties 07 7200 - Roof Accessories 07 8400 - Firestopping 07 9200 - Joint Sealants

DIVISION 08 -- OPENINGS

08 1113 - Hollow Metal Doors and Frames 08 1416 - Flush Wood Doors 08 3100 - Access Doors and Panels 08 4113 - Aluminum-Framed Storefronts 08 7100 - Door Hardware 08 8000 - Glazing

DIVISION 09 -- FINISHES

09 2216 - Non-Structural Metal Framing 09 2900 - Gypsum Board 09 3000 - Tiling 09 5100 - Acoustical Ceilings 09 5400 - Specialty Ceilings 09 5421 - Metal Pan Ceilings 09 6500 - Resilient Flooring 09 6813 - Tile Carpeting 09 9100 - Painting

DIVISION 10 -- SPECIALTIES

10 2600 - Wall and Door Protection 10 2800 - Toilet, Bath, and Laundry Accessories 10 4400 - Fire Protection Specialties

DIVISION 11 -- EQUIPMENT

DIVISION 12 -- FURNISHINGS

12 3600 - Countertops

11/04/2025 - 24006 00 0110 - 3

DIVISION 13 -- SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14 -- CONVEYING EQUIPMENT (NOT USED)

VOLUME 2: DIVISIONS 21 THROUGH 33

DIVISION 21 -- FIRE SUPPRESSION

21 0500 - Common Work Results for Fire Suppression 21 0503 - Trenching and Backfill for Fire Suppression 21 0504 - Pipe and Pipe Fittings for Fire Suppression 21 0505 - Piping Specialties for Fire Suppression 21 0523 - Valves for Fire-Suppression 21 0548 - Vibration and Seismic Controls for Fire Protection 21 0549 - Fire Suppression and Electrical Installation Coordination 21 1313 - Fire Protection System, Automatic Wet-Pipe Sprinkler

DIVISION 22 -- PLUMBING

22 0500 - Common Work Requirements for Plumbing 22 0503 - Trenching and Backfilling for Plumbing 22 0504 - Pipe and Pipe Fittings for Plumbing 22 0505 - Piping Specialties for Plumbing 22 0523 - Valves for Plumbing 22 0549 - Plumbing and Electrical Installation Coordination 22 0700 - Plumbing Insulation 22 1100 - Domestic Water Piping 22 1123 - Facility Natural Gas System 22 1316 - Sanitary Waste and Vent Piping 22 1400 - Facilty Roof Drainage 22 4000 - Plumbing Fixtures and Trim 22 6801 - On Site Natural Gas

DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 0500 - Common Work Requirements for HVAC 23 0503 - Trenching and Backfilling for HVAC 23 0504 - Pipe and Pipe Fittings 23 0505 - Piping Specialties 23 0523 - Valves 23 0548 - Vibration and Seismic Controls for HVAC 23 0549 - HVAC and Electrical Installation Coordination 23 0593 - Testing, Adjusting and Balancing of Mechanical Systems 23 0700 - Mechanical Systems Insulation 23 0800 - Mechanical Facility Startup/Commissioning for HVAC 23 0900 - Facility Management Systems (DDC Controls) 23 2313 - Refrigerant Piping System and Equipment 23 3000 - Air Tempering System and Equipment

11/04/2025 - 24006 00 0110 - 4

23 7413 - Packaged Outdoor Central-Station Air-Handling Units

DIVISION 24 -- RESERVED (NOT USED)

DIVISION 25 -- INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 -- ELECTRICAL

26 0500 - Common Work Results for Electrical 26 0519 - Low-Voltage Electrical Power Conductors and Cables 26 0526 - Grounding and Bonding for Electrical Systems 26 0529 - Hangers and Supports 26 0533 - Raceway and Boxes for Electrical Systems 26 0543 - Underground Ducts and Raceways 26 0544 - Sleeves and Sleeve Seals for Electrical Raceways & Cabling 26 0548.16 - Seismic Controls for Electrical Systems 26 0553 - Identification for Electrical Systems 26 0573 - Electrical System Studies 26 0880 - Electrical Acceptance Testing 26 0923 - Lighting Control Devices 26 2416 - Panelboards 26 2726 - Wiring Devices 26 2729 - EV Charging Station 26 2816 - Enclosed Switches and Circuit Breakers 26 4313 - Transient Voltage Suppressor for Low Voltage Electrical Power Circuits 26 5219 - Emergency and Exit Lighting 26 5612 - Exterior Lighting 26 5613 - Interior Lighting Fixtures

DIVISION 27 -- COMMUNICATIONS (NOT USED)

DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY

28 3111 - Digital, Addressable Fire-Alarm System

DIVISION 29 -- RESERVED (NOT USED)

DIVISION 30 -- RESERVED (NOT USED)

DIVISION 31 -- EARTHWORK

31 2000 - Earthwork 31 2213 - Rough Grading 31 2316 - Excavation 31 2323 - Fill

DIVISION 32 -- EXTERIOR IMPROVEMENTS

32 1123 - Aggregate Base Courses 32 1216 - Asphalt Paving 32 1313 - Concrete Paving 32 1723 - Pavement Markings

DIVISION 33 -- UTILITIES

33 1116 - Site Water Distribution Piping

11/04/2025 - 24006 00 0110 - 5

33 3100 - Sanitary Utility Sewerage Piping

END OF SECTION

11/04/2025 - 24006 00 0110 - 6

This page intentionally left blank

SMPC Architects Common Work Requirements for Fire Suppression 2025-11-04 - 24006 21 0500 - 1

SECTION 21 0500

COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION

PART 1 - GENERAL

1.01 SCOPE OF WORK

A. See General Conditions and Supplemental General Conditions.

B. The requirements listed under General Conditions and Supplemental General Conditions and the

General Requirements are applicable to this section and all subsequent sections of Division 21 and form a part of the contract.

C. Division 22 for Plumbing Systems.

D. Division 23 for Heating, Ventilating and Air Conditioning (HVAC) Systems.

E. Division 26 for Electrical Systems.

F. Division 28 for Fire Alarm Systems.

G. Civil Engineering Drawings, for Trenching, Backfilling and Compaction requirements.

H. Civil Engineering Drawings for requirements of site utility systems, including sanitary sewer, storm sewer, domestic water distribution system, and fire main water distribution system.

I. All electrical work, regardless of voltage which is provided under Division 21 shall comply with the requirements of the National Electric Code (NEC) and Division 26.

1.02 FIRE SUPPRESSION DIVISION INDEX

A. Section 21 0500Common Work Requirements for Fire Suppression B. Section 21 0503Trenching and Backfilling for Fire Suppression C. Section 21 0504Pipe and Pipe Fittings for Fire Suppression D. Section 21 0505Piping Specialties for Fire Suppression E. Section 21 0523Valves for Fire Suppression F. Section 21 0548Vibration and Seismic Control for Fire Suppression G. Section 21 0549Fire Suppression and Electrical Installation Coordination H. Section 21 1313Fire Protection System, Automatic Wet Pipe Sprinkler

1.03 CODES AND PERMITS

A. The fire suppression shall be performed in strict accordance with the applicable provisions of the

International Building Code, 2021 Edition; the Uniform Plumbing Code, 2021 Edition; the Uniform Mechanical Code, 2021 Edition and the International Fire Code, Latest Edition as adopted and interpreted by the State of New Mexico, City of Roswell, and the National Fire Protection Association (NFPA Regulations), current adopted edition, regarding fire protection, heating and ventilating and air conditioning systems and electrical systems. All materials and labor necessary to comply with rules, regulations and ordinances shall be provided. Where the drawings and/or specifications indicate materials or construction in excess of code requirements, the drawings and/or specifications shall govern. The Contractor shall hold and save the Engineer free and harmless from liability of any nature or kind arising from his failure to comply with codes and ordinances.

B. Permits necessary for performance of the work shall be secured and paid for by the Contractor.

All utility connections, extensions, and tap fees shall be paid for by the Contractor, unless otherwise specified herein. See Civil Engineering Drawings for all requirements associated with utility permits and fees, connections and extensions.

C. The following lists some applicable codes and standards that shall be followed.

Applicable county and state mechanical, electrical, gas, plumbing, health and sanitary codes, laws and ordinances National Electrical Manufacturer's Association Standards

2025-11-04 - 24006 21 0500 - 2

National Electrical Code Underwriters Laboratories, Inc. Standards American National Standards Institute American Society for Testing Materials Standards Standards and requirements of local utility companies National Fire Protection Association Standards American Society of Mechanical Engineers Boiler and Pressure Vessel Codes Occupational Safety and Health Act The American Society of Sanitary Engineering

1.04 RECORD DRAWINGS

A. See Division 1, for requirements associated with Project Record Drawings.

B. The Contractor shall be responsible to maintain a complete and accurate set of marked up blue-line prints showing information on the installed location and arrangement of all mechanical work, and in particular, where changes were made during construction. The Contractor shall be responsible for keeping record drawings accurate and up-to-date throughout the construction period. Record drawings may be reviewed and checked by the Architect during the construction and in conjunction with review and approval of monthly pay requests. The Contractor shall include copies of all addenda, RFI's, bulletins, and change orders neatly taped or attached to record drawing set.

C. After installation and acceptance of direct buried underground piping and service lines in trenches, the Contractor shall take 'as-built' measurements, including all depths, prior to commencement of backfilling operations. It will not be sufficient to check off line locations.

Definite measurements shall be taken for each service line. The location of buried piping and trench service lines shall be shown on the drawings and dimensioned from fixed points.

1.05 QUALIFICATIONS

A. All mechanics shall be skilled in their respective trade.

B. All welders shall be certified in accordance with the ASME Boiler Test Code, Section IX, latest issue.

1.06 QUALIFICATION PROCEDURES

A. The storage, handling, and transportation of all refrigerants, oils, lubricants, etc. shall be accomplished in strict compliance with all State, local, and Federal Regulations including all requirements set forth by the Environmental Protection Agency (EPA) for the safe handling of regulated refrigerants and materials. The Contractor shall utilize qualified and/or certified personnel and equipment as prescribed by these requirements.

1.07 HAZARDOUS CONDITIONS

A. Protruding metal (bolts, steel angles, etc.) potentially hazardous to maintenance and operation personnel, shall be cut back and/or protected to reduce the risk of injury.

1.08 HAZARD SIGNS

A. Equipment rooms, fan plenums, and similar areas containing moving or rotating parts, or other potentially hazardous environments shall include signs on all doors entering such spaces that shall read similar to the following: "Hazardous Area - Authorized Personnel Only."

B. Confined Spaces: Areas designated by OSHA Standard 1910.146 as a confined space shall be marked with a sign that reads "Confined Space - Entry by authorized personnel only, by permit."

1. "Confined Space" means a space that:

a. Is large enough and so configured that an employee can bodily enter and perform assigned work; and

b. Has limited or restricted means for entry or exit (for example, tanks, vessels, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry); and

c. Is not designed for continuous employee occupancy.

2025-11-04 - 24006 21 0500 - 3

C. The Contractor shall survey the final premises to determine where any such potentially hazardous areas exist. If the Contractor feels that hazards exist which cannot be suitably provided for through the above typical methods, he shall forward in writing his concerns, and request for a decision concerning the referenced hazard, prior to the final inspection of the facilities.

1.09 SUBMITTALS

A. The Contractor shall submit submittal brochures of all equipment, fixtures and materials to be furnished under Division 21, including but not limited to the following:

1. Piping materials, valves, equipment and installation methods, vibration isolation devices, pipe penetration installation methods and products for fire rated assemblies, and all equipment listed on equipment schedules, and in related construction documents.

2. Materials, certification, shop drawings, and other information as specified in the individual Division 21 Specification Sections within this Specification.

B. Unauthorized Substitutions: If substitute materials, equipment or systems are installed without prior review or are installed in a manner which is not in conformance with the requirement of this Specification and for which the Contractor has not received a written review, removal of all the unauthorized materials and installation of those indicated or specified shall be provided at no change in contract amount.

C. All equipment shall be installed in accordance with the manufacturer's recommendations.

Provide all accessories and components for optimum operation as recommended by the manufacturer.

D. Expense: All costs for the preparation, correction, delivery, and return of the submittals shall be borne by the Contractor.

E. Submittals and one resubmittal will be reviewed by the Architect/Engineer. If the Contractor fails to provide the required data with his second submittal, he will be charged for the third and subsequent reviews.

F. See Division 1 for additional submission requirements.

G. Complete data must be furnished showing performance, quality and dimensions. No equipment or materials shall be purchased prior to receiving written notification that submittals have been reviewed and marked either "NO EXCEPTIONS TAKEN" or "EXCEPTIONS AS NOTED."

Submittals returned marked "EXCEPTIONS AS NOTED" do not require resubmittal provided that the Contractor agrees to comply with all exceptions noted in the submittal, and so states in a letter.

H. Review of Submittals: Submittals will be reviewed with reasonable promptness, but only for conformance with the design concept of the Project and for conformance with the information indicated on the Drawings and stated in the Specifications. Review of a separate item as such will not indicate review of the assembly in which the item functions. Review of submittals shall not relieve the Contractor of responsibility for any deviation from the requirements of the Contract Documents, nor for errors or omissions in the submittals; or for the accuracy of dimensions and quantities, the adequacy of connections, and the proper and acceptable fitting, execution, functioning and completion of the work. Review shall not relieve the Contractor of responsibility for the equipment fitting within the allotted space shown on the drawings with all clearances required for equipment operation, service and maintenance including minimum clearances required by applicable codes, manufacturer's installation instructions and as necessary for proper clearance in front of all electrical panels as defined by the National Electric Code (NEC). Any relocation of mechanical and/or electrical equipment, materials and systems required to comply with minimum clearances shall be provided by the Contractor without additional cost under the Contract.

I. Shop drawings will be returned unchecked unless the following information is included: cover sheet shall be provided for each submittal of equipment, products and material proposed for use on the project. A common cover sheet for similar equipment (example: all air handling units or all fire protection products) is acceptable. The cover sheet shall list equipment by

2025-11-04 - 24006 21 0500 - 4 symbol number; reference all pertinent data in the Specifications or on the drawings; provide size and characteristics of the equipment, name of the project and a space large enough to accept a review stamp. The data submitted shall reflect the actual equipment performance under the specified conditions and shall not be a copy of the scheduled data on the drawings. Cover sheet shall clearly identify any deviations from the specifications for submitted equipment, products, and materials.

J. Use of substitutions reviewed and checked by the Engineer does not relieve the Contractor from compliance with the Contract Documents. Contractor shall bear all extra expense resulting from the use of any substitutions where substitutions affect adjoining or related work required in this Division or other Divisions of this Specification.

K. If Contractor substitutes equipment for that drawn to scale on the drawings, he shall prepare a 1/4" = 1'-0" installation drawing for each equipment room where a substitution is made, using dimensions of substituted equipment, and including piping, and electrical equipment requirements, to verify that equipment will fit space with adequate clearances for maintenance.

This 1/4" = 1'-0" fabrication drawing shall be submitted for review with the shop drawing submittals of the substitution. Failure to comply with this requirement will result in the shop drawings being returned unchecked.

1.10 COORDINATION DRAWINGS

A. The Contractor shall, in advance of the work, prepare coordination drawings for:

1. Mechanical equipment rooms.

2. Piping and piping chases.

3. Complete fire suppression system piping and sprinkler head layout.

4. Layout of all fire suppression equipment.

B. Show the location of piping openings through the building floors, walls and roofs coordinated with Architectural and Structural, as well as the location and elevations of building fire suppression equipment and systems and piping, coordinated with plumbing, HVAC and electrical systems.

Coordination drawings, including plans, elevations and sections, as appropriate, shall clearly show the manner in which the fire suppression systems fit into the available space and coordinates with HVAC and plumbing equipment, ductwork, piping, and electrical equipment, including conduits, light fixtures, motor control centers, transformers, panels, variable frequency drives, etc. Drawings shall demonstrate required code clearances for mechanical and electrical equipments, control panels, etc., and proper operation, maintenance and replacement of fire suppression devices and equipment. Coordination drawings shall be of appropriate scale to satisfy the previously stated purposes, but not smaller than 1/8 inch scale for floor plans and 1/4 scale of equipment rooms and chase areas. Drawings may be composite or may be separate but fully coordinated drawings of the same scale. Every subcontractor must sign-off on coordination drawings prepared by each craft. Failure to sign-off will indicate that subcontractor is proceeding at his own risk. Any cost required to relocate systems to comply with required clearance and equipment installation requirements shall be provided by the Contractor without additional cost under the contract.

C. Seven (7) complete sets of coordination drawings shall be submitted prior to the scheduled start of the work in the area illustrated by the drawings, for the purpose of showing the Contractor's planned method of installation. The objectives of such drawings are to promote carefully planned work sequence and proper coordination, in order to assure the expeditious solutions of problems, and the installation of lines and equipment as contemplated by the contract documents while avoiding or minimizing additional costs to the Contractor and to the Owner.

D. In the event the Contractor, in coordinating the various installations and in planning the method of installation, finds a conflict in location or elevation of any of the mechanical systems, with the structural items or with other construction items, such conflicts shall immediately be documented and submitted for clarification. In doing so, the Contractor shall explain the proposed method of solving the problem, or shall request instructions as to how to proceed if adjustments beyond those of usual trades coordination are necessary.

2025-11-04 - 24006 21 0500 - 5

E. Installation of fire suppression work shall not proceed prior to the submission and completion of the review of the coordination drawings, and any conflicts which are disclosed by the coordination drawings. It is the responsibility of the Contractor to submit the required drawings in a timely manner consistent with the requirements for completing the work covered by this contract within the prescribed contract time.

1.11 USE OF CADD FILES

A. Under certain conditions, the Contractor will be permitted the use of the Engineer's CADD files for documentation of as-builts, submittals, or coordination drawings.

B. The Engineer may require compensation for the time necessary to format the CADD files delivery to the Contractor. Such work will include removal of title blocks, professional for seals, calculations, proprietary information, etc.

C. The Contractor shall complete the enclosed License, Indemnity and Warranty Agreement, complete with contractor's name, address, and Contractor's Representative signature prior to request for CADD file usage.

1.12 PRIOR APPROVAL

A. Prior approval (approval prior to bid) of alternate mechanical equipment suppliers and service providers is not required. Please do not request prior approval. Alternate manufacturers and service providers may be submitted after bid in accordance with the submittal process provided they meet or exceed the specifications and the indicated design intent.

B. Equipment manufacturers and service providers are listed within the specifications for the work specified in this division. For the items listed below, the specified manufacturers and providers are the only ones presently approved, and may be the only ones allowed:

1. Fire Pump

2. Plumbing Fixtures and Trim

3. Water Treatment Equipment

C. Manufacturers and service providers who are not listed in these specs, and who offer equivalent or superior products or services, are invited to submit for approval prior to bid (prior approval).

Submit two copies. Requests for prior approval must:

1. Include the substitution request form at the end of this spec section.

2. Include technical data sufficient for the Engineer to generally assess appropriateness for this project.

3. Be submitted minimum ten days prior to the bid date in effect at the time of submission.

4. Comply with any additional requirements per specification Division 1.

D. Any additional prior approved alternate manufacturers and service providers will be published in an addendum prior to bid. Prior approval indicates that based on the information submitted it appears to the Engineer that the alternate might be capable of meeting the specifications and the design intent, and might be appropriate for the project. But prior approval does not guarantee this. Prior approved products and service providers must still go through the submittal process after award, and must still comply with the design intent and all specification requirements.

E. Please do not request prior approval for products and service providers that are not listed above.

Instead, for those items alternate manufacturers and alternate service providers may be submitted after bid in accordance with the submittal process, provided they meet or exceed the specifications and the indicated design intent.

1.13 GUARANTEE-WARRANTY

A. See Division 1 for warranties.

B. The following guarantee is a part of the specifications and shall be binding on the Contractor:

"The Contractor guarantees that this installation is free from mechanical defects. He agrees to replace or repair any part of the installation which may fail within a period of one year after date established below, provided that such failure is due to defects in the materials or workmanship or to failure to follow the specifications and drawings.

2025-11-04 - 24006 21 0500 - 6

Warranty of the Contractor-furnished equipment or systems shall begin on the date the system or equipment is placed in operation for beneficial use of the Owner or occupancy by the Owner, whichever occurs first; such date will be determined in writing, by means of issuing a 'Certificate of Substantial Completion', AIA Form G704," or equivalent.

C. The extent of guarantees or warranties by Equipment and/or Materials Manufacturers shall not diminish the requirements of the Contractor's guarantee-warranty to the Owner.

D. All items of fire suppression equipment shall be provided with a full one (1) year parts and labor warranty, from the date of acceptance by the Owner.

PART 2 - PRODUCTS

2.01 QUALITY OF MATERIALS

A. All equipment and materials shall be new, and shall be the standard product of manufacturers regularly engaged in the production of fire suppression equipment and shall be the manufacturer's latest design. Specific equipment, shown in schedules on drawings and specified herein, is to set forth a standard of quality and operation.

B. Hazardous or Environmentally Damaging Materials: Products shall not contain asbestos, mercury, PCBs, or other materials harmful to people or the environment.

2.02 ALTITUDE RATINGS

A. Unless otherwise noted, all specified equipment capacities are for an altitude of 5500 feet above sea level and adjustments to manufacturer's ratings must be made accordingly.

2.03 ELECTRICAL WIRING AND CONTROL EQUIPMENT

A. All wiring and conduit shall be furnished and installed as scheduled in Section 21 0549, Fire Suppression and Electrical Installation Coordination, unless otherwise noted or directed.

B. The Contractor shall coordinate completely with all trades and Sub-Contractors as required to ensure that all necessary components of control work are included and fully understood. No additional cost shall accrue to the Owner as a result of lack of such coordination.

C. The fire suppression piping system may be bonded to the electrical ground bus at the electrical service equipment, but shall not under any circumstances be used as the main grounding electrode for the electrical service.

2.04 PAINTING

A. All finish painting of fire suppression systems and equipment will be under "Painting," unless equipment is hereinafter specified to be provided with factory applied finish coats.

B. All equipment shall be provided with factory applied prime finish, unless otherwise specified.

C. Touch-Up: If the factory finish on any equipment is damaged in shipment or during construction of the building, the equipment shall be refinished.

2.05 IDENTIFICATION OF VALVES

A. Each valve shall be provided with a stamped metal tag secured to the valve. Tag shall indicate the valve number, the service and function of each valve [and system valve numbers and designations shall be coordinated with existing valve identification. The Contractor shall furnish two sets of prints of drawings showing floor plan with all valves accurately located and labeled.

Submitted drawings shall be neat and easily readable. In addition, the Contractor shall provide a valve chart, typed neatly on 8-1/2" x 11" sheets, listing the number, size, location, function, normal operating position, on each valve installed under Division 21. Tags shall be stamped brass 1-1/2" diameter, and secured to valves by heavy copper figure eight hooks, braided stainless steel wire anchor, or other approved means.

B. Division 21 valve tags shall be coordinated with Division 22 and Division 23 valve tags for coordinated format between each division.

2025-11-04 - 24006 21 0500 - 7

2.06 PIPING SYSTEM IDENTIFICATION

A. Means of Identification: All piping shall be identified by each of the means described below. The

Contractor shall provide shop drawing submittal data for proposed labeling system materials and manufacturer's recommended installation procedures.

B. Piping Systems shall be identified by means of an identifying legend on color coded background appropriately worded to indicate the "service" name of the pipe as shown on the drawings. Color coded banding shall also be provided. Additionally, an arrow shall be included to indicate the direction of flow through the pipe.

C. Locations of Piping System Identification: The identifying legends and directional arrows described in the paragraphs preceding shall be located at the following points on each piping system:

• Adjacent to each valve in piping system.

• At every point of entry and exit where piping passes through a wall.

• On each pipe riser and junction.

• At a maximum interval of 20 feet on pipe lines exposed and concealed above accessible ceilings.

• Adjacent to all special fittings (regulating valves, etc.) in piping systems.

• At every access door.

D. Piping identification shall meet the standards of the Federal Occupational Safety Health Act (OSHA) which refers to the ANSI Standard A13.1. The following standardized color code scheme shall be used:

Yellow - Hazardous Materials Green - Liquid Materials of Inherently Low Hazard Blue - Gaseous Materials of Inherently Low Hazard Red - Fire Protection Materials

E. The size of letter and length of color field shall conform to the ANSI standard and shall be as follows:

Outside Diameter of Length of Size of Pipe or Covering Color Field Letters ------ to 1-1/4" 8" 1/2" 1-1/2" to 2" 8" 3/4" 2-1/2" to 6" 12" 1-1/4" 8" to 10" 24" 2-1/2" Over 10" 32" 3-1/2"

F. All pipe labels exposed within mechanical equipment spaces shall be semi-rigid plastic identification markers. Each label shall have appropriately color-coded background with printed legend. Directional flow arrows shall be included on label. Labels shall "snap-on" around pipe without the requirement for adhesive or bonding of piping sizes 3/4" through 5". Labels for piping 6" and larger shall be furnished with spring attachment at each end of label. Labels shall be "SETMARK" Type SNA, 3/4" through 5" size and Type STR, 6" and larger, as manufactured by Seton Name Plate Corporation, Brady, or equivalent.

G. All pipe labels except pipe labels located exposed within the mechanical equipment spaces] shall be vinyl material with permanent adhesive for application to clear dry pipe and/or insulation jacketing. Each label shall have appropriate color-coded background with printed legend.

Direction arrows shall be placed next to label to indicate flow direction. Color and size of arrows shall correspond to that of label. Pressure sensitive pipe tape matching the background color of the label shall be placed over each end of the label and completely around the pipe.

H. Attach pipe markers to lower quarter of the pipe on horizontal runs and on the centerline of vertical piping where view is not obstructed. Flow indicator arrow shall point away from pipe marker.

2025-11-04 - 24006 21 0500 - 8

I. Provide the following labels, with ANSI/OSHA color for all piping systems as shown on the drawings and as listed below:

Letter Background Service/Legend Color Color Fire Protection Water White Red Fire Auto Sprinkler White Red

2.07 IDENTIFICATION OF CONTROL SYSTEM DEVICES

A. All automatic controls, control panels, pressure electric, electric pressure switches, relays and starters shall be clearly tagged and identified.

2.08 UNDERGROUND PIPING SYSTEM IDENTIFICATION

A. Bury a continuous, preprinted, bright colored, plastic ribbon cable marker with each underground pipe regardless of whether encased. Locate directly over buried pipe, 6" to 8" below finished grade. Marker tape used in conjunction with buried plastic piping systems shall be special detector type. Marker tape used in conjunction with buried plastic piping systems shall be special detection type.

2.09 ACCESS DOORS

A. Provide all access doors required for access to valves, controls, or other items for which access is required for either operation or servicing. All costs incurred through failure to perform this function as the proper sequence of this work shall be borne by the Contractor. The type of access door shall be as required by the room finish schedule. Acoustical tile access doors shall be equal to Krueger Style B, Style A for acoustical plaster, Style C-CE for sidewall drywall or plaster construction, or Milcor institutional 10 gauge security/detention access door with welded joints, welded butt hinge, with detention type deadbolt lock and tamperproof screws.

B. Access doors shall be not less than 24" x 24" in size except that larger panels shall be furnished where required, and panels in tile or other similar patterned ceilings shall have dimensions corresponding to the tile or pattern module.

C. Where access doors are installed in walls required to have a specific fire rating, the access door installed shall be a fire rated access door with UL label, as manufactured by Milcor or equivalent.

Access door in 1-hour construction shall be Class C and access doors in 2-hour construction shall be Class B.

PART 3 - EXECUTION

3.01 COOPERATION WITH OTHER TRADES

A. The Contractor shall refer to other parts of these specifications covering the work of other trades which must be carried on in conjunction with the mechanical work so that the construction operations can proceed without harm to the Owner from interference, delay, or absence of coordination. The Contractor shall be responsible for the size and accuracy of all openings.

3.02 DESIGN AND DRAWINGS

A. The complete design for the project fire suppression system including drawings, hydraulic calculations, piping sizing and arrangement, head layouts, equipment selection, etc., shall be the responsibility of Division 21 Contractor. Preparation of the fire suppression system design shall be in accordance with all Division 21 specification requirements, NFPA requirements and Authorities Having Jurisdiction.

B. The fire suppression drawings show the general arrangement of piping, equipment, etc., and shall be followed as closely as actual building construction and work of other trades will permit.

Whenever discrepancies occur between plans and specifications, the most stringent shall govern.

All Contract Documents, including but not limited to Division 22 Plumbing, Division 23 Heating Ventilating and Air Conditioning and Division 26 electrical shall be considered as part of the work insofar as this information furnishes the Contractor with details relating to design and construction of the building. Architectural and structural drawings shall take precedence

2025-11-04 - 24006 21 0500 - 9 over the fire suppression, plumbing, HVAC and electrical drawings. Because of the small scale of the fire suppression drawings, it is not possible to indicate all offsets, fittings and accessories which may be required. The Contractor shall investigate the structural and finish conditions affecting the work and shall arrange his work accordingly, providing such fittings, valves, and accessories as may be required to meet such conditions. Should conditions necessitate a rearrangement of piping, such departures and the reasons therefore shall be submitted by the Contractor for review in the form of detailed drawings showing the proposed changes. No such changes shall be made without the prior written approval. All changes shall be marked on the set of record drawings by the Contractor.

C. Should any doubt or question arise in respect to the true meaning of the drawings or specifications, the question shall be submitted in writing.

D. Installation of all fire suppression equipment and piping systems shall be arranged to provide all clearances required for equipment operation, service, and maintenance, including minimum clearances required by applicable codes, manufacturer's installation instructions and as necessary for proper clearance in front of all electrical panels as defined by the National Electric Code (NEC). Piping systems shall not be routed through or above electrical equipment room or electrical equipment space designed within mechanical equipment rooms.

E. The Contractor's attention is directed to the unique architectural design features and consideration associated with this facility which will require significantly greater levels of coordination and cooperation for the work furnished and installed under Division 21 with the associated architectural, structural, and electrical work than is normally necessary for a more typical facility.

F. The installation of all concealed fire suppression systems shall be carefully arranged to fit within the available space without interference with adjacent mechanical, plumbing, structural and electrical systems. The Contractor shall make all necessary provisions for penetrations of piping, including sleeves and blockouts in structural systems. The exact location of all exposed fire suppression systems, including access doors; sprinkler piping exposed within finished areas; and other equipment and devices as applicable, shall be coordinated with the Architect, who shall have final authority for the acceptance of the work as it specifically relates to the architectural aesthetic design requirements for the facility. In no instance shall the building vapor barrier system be penetrated by the fire suppression system installation without written approval.

3.03 FIELD MEASUREMENTS

A. The Contractor shall verify the dimensions and conditions governing his work at the building. No extra compensation shall be claimed or allowed on account of differences between actual dimensions, including dimensions of equipment, fixtures and materials furnished, and those indicated on the drawings. Contractor shall examine adjoining work, on which his work is dependent for perfect efficiency, and shall report any work which must be corrected.

Coordination of all fire suppression work within the building will be the direct responsibility of the Contractor. Review of submittal data in accordance with paragraph "Submittals" shall in no manner relieve the Contractor of responsibility for the proper installation of the fire suppression work within the available space. Installation of equipment and systems within the building space shall be carefully coordinated by the Division 21 Contractor with all building trades. Each contractor shall so harmonize his work with that of the several other trades that it may be installed in the most direct and workmanlike manner without hindering or handicapping the other trades. Piping interferences shall be handled by giving precedence to pipe lines which require a stated grade for proper operation. Sewer lines shall take precedence over water lines in determination of elevations. In all cases, lines requiring a stated grade for their proper operation shall have precedence over electrical conduit and ductwork. Installation of fire suppression, plumbing and HVAC systems within the ceiling cavity shall be in the following order of priority:

plumbing waste lines; roof drains; supply, return, outside air, makeup, and exhaust ductwork; fire sprinkler mains; fire sprinkler branch piping and sprinkler runouts; domestic hot and cold water;

control piping, wiring and conduit; miscellaneous special piping systems.

2025-11-04 - 24006 21 0500 - 10

3.04 EQUIPMENT SUPPORT

A. Contractor shall provide support for equipment to the building structure. Contractor shall furnish all necessary structures, inserts, sleeves, and hanging devices for installation of mechanical and plumbing equipment, ductwork and piping, etc. Contractor shall completely coordinate installation of such devices with all trades and Sub-Contractors. Contractor must further verify that the devices and supports are adequate as intended and do not overload the building's structural components in any way.

3.05 SEISMIC SUPPORTS

A. The Contractor shall be responsible for all anchors and connections for the mechanical work to the building structure to prevent damage of equipment and systems due to earthquakes. The complete fire protection systems shall be supported as required to resist stresses produced by lateral forces as required by NFPA No. 13. Where fire suppression equipment and piping is connected to the building structure, exact method and means of attachment to the structural system shall be approved by the Architect.

B. See Section 21 0548 for additional requirements for seismic supporting of fire suppression equipment and systems.

3.06 PROTECTION OF MATERIALS AND EQUIPMENT

A. The Contractor shall be responsible for the protection of all work, materials and equipment furnished and installed under this section of the specifications, whether incorporated in the building or not.

B. All items of fire suppression equipment and materials, including piping, valves and fittings, etc., shall be protected from damage and contamination. Equipment and materials shall not be stored outside and exposed to weather and ambient conditions without appropriate protection measures and without the approval of the Architect. Equipment shall be delivered to the jobsite and maintained while on the jobsite with all openings, controls and control panels covered with heavy duty polyethylene wrap or other proper means. Equipment and materials where stored within the building shall be protected at all times from construction damage and contamination from dust, dirt, debris, and especially during fireproofing, painting and gyp board sanding and finishing.

Unprotected equipment and piping will require special field cleaning by the Contractor prior to acceptance by the Architect.

C. The Contractor shall provide protection for all work where necessary and shall be responsible for all damage done to property, equipment and materials. Storage of materials within the building shall be approved by the Architect prior to such storage.

D. Pipe openings shall be closed with caps or plugs, or covered to prevent lodgment of dirt or trash during the course of installation. At the completion of the work, fire suppression equipment and materials shall be cleaned thoroughly and delivered in a condition satisfactory to the Architect.

3.07 TRENCHING AND BACKFILLING

A. All excavation, trenching and backfilling required for the fire suppression installation shall be provided by this Contractor.

3.08 MANUFACTURER'S INSTRUCTIONS

A. All equipment shall be installed in strict accordance with recommendations of the manufacturer.

If such recommendations conflict with plans and specifications, the Contractor shall report such conflicts to the Architect, who shall make such compromises as he deems necessary and desirable.

3.09 TESTS

A. Tests shall be conducted in the presence of the designated and authorized Owner's

Representative. The Contractor shall notify the Architect a minimum of one week in advance of scheduled tests. Requirements for testing are specified under the sections covering the

2025-11-04 - 24006 21 0500 - 11 various systems. The Contractor shall furnish all necessary equipment, materials, and labor to perform the required tests.

3.10 INSTALLATION CHECK

A. An experienced, competent, and authorized representative of the equipment listed below shall visit the site of the work and inspect, check, adjust if necessary, and approve the equipment installation. In each case, the equipment supplier's representative shall be present when the equipment is placed in operation. The equipment supplier's representative shall revisit the job site as often as necessary until all trouble is corrected and the equipment installation and operation is approved and accepted.

B. Each equipment supplier's representative shall furnish a written report certifying that the equipment (1) has been properly installed and lubricated; (2) is in accurate alignment; (3) is free from any undue stress imposed by connecting piping or anchor bolts; and, (4) has been operated under full load conditions and that it has operated satisfactorily.

3.11 OPERATION AND MAINTENANCE INSTRUCTIONS

A. The Contractor shall furnish complete operating and maintenance instructions covering all units of fire suppression equipment herein specified together with parts lists. Equipment spare parts shall include all components requiring service, including motors, bearings, shafts, etc. Furnish two (2) copies of all the literature; each shall be suitably bound in loose leaf book form.

B. See Division 1 for additional requirements concerning manuals, manual distribution, and maintenance materials.

C. Operating and maintenance manuals as required herein shall be submitted for review and distribution to the Owner not less than two (2) weeks prior to the date scheduled for the Contractor to provide Operating and Maintenance Instructions to the Owner as specified herein.

D. Upon completion of all work and all tests, the Contractor shall instruct the Owner or his representative fully in the operations, adjustment and maintenance of all equipment furnished.

Contractor shall provide at least two weeks notice in advance of this period, with a written schedule of each training session, the subject of the session, the Contractors' representatives who plan to attend the session, and the time for each session.

E. Film the instruction and training sessions submit two copies of the DVD.

F. Equipment startup and operational test shall be conducted by the Contractor with the assistance of the representatives from the fire pump manufacturers and fire pump controller manufacturer.

Test shall be conducted in the presence of the designated and authorized Owner's Representative.

3.12 CERTIFICATIONS

A. Before receiving final payment, the Contractor shall certify in writing that all equipment furnished and all work done is in compliance with the contract documents and all applicable codes. Submit certifications and acceptance certificates, including proof of delivery of O&M manuals, spare parts required, and equipment warranties which shall be bound with O&M manuals.

3.13 CONSTRUCTION PHASING AND SCHEDULE

A. All work furnished and installed under Division 21 of this Specification shall be provided in accordance with the project schedule and phase and schedule requirements as described on the Architectural Drawings and Specifications.

3.14 SITE VISITS AND OBSERVATION OF CONSTRUCTION

A. The design professional shall make periodic visits to the project site at various stages of construction in order to observe the progress and quality of various aspects of the Contractor's work, in order to determine in general if such work is proceeding in accordance with the Contract Documents. This observation, however, shall in no way release the Contractor from his complete responsibility to supervise, direct, and control all construction work and activities. The design team has no authority over, or a responsibility to means, methods, techniques, 2025-11-04 - 24006 21 0500 - 12 sequences, or procedures of construction provided by the Contractor or for safety precautions and programs, or for failure by the Contractor to comply with all law, regulations, and codes.

2025-11-04 - 24006 21 0500 - 13

DIVISION 21 SUBSTITUTION REQUEST FORM (SRF)

TO: BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

PROJECT:

We hereby submit for your consideration the following product instead of the specified item for the above project:

Section: Page: Paragraph/Line: Specified Item:

Proposed Substitution:

Attach complete product description, drawings, photographs, performance and test data, and other information necessary for evaluation. Identify specific Model Numbers, finishes, options, etc.

1. Will changes be required to building design in order to properly install proposed substitutions? YES ☐ NO If YES, explain:

2. Will the undersigned pay for changes to the building design, including engineering and drawing costs, caused by requested substitutions? YES ☐ NO ☐

3. List differences between proposed substitutions and specified item.

Specified Item Proposed Substitution

4. Does substitution affect Drawing dimensions? YES ☐ NO ☐

5. What affect does substitution have on other trades?

6. Does the manufacturer's warranty for proposed substitution differ from that specified? YES ☐ NO ☐ If YES, explain:

7. Will substitution affect progress schedule? YES ☐ NO ☐ If YES, explain:

8. Will maintenance and service parts be locally available for substitution? YES ☐ NO ☐ If YES, explain:

9. Does proposed product contain asbestos in any form? YES ☐ NO ☐

SUBMITTED BY: Firm: Date:

Address:

Signature: Telephone:

For Engineer's Use Only Accepted Not Accepted: Received too Late:

By: Date:

Remarks:

2025-11-04 - 24006 21 0500 - 14

LICENSE AGREEMENT FOR CADD DATABASE OR BIM MODEL

PROJECT: _____________________________________________

LICENSE GRANT: Contractor is granted use of the CADD Database or BIM Model (Database/Model) for the indicated project for the specific purpose of preparing submittal documents for this Project. No other use of the Database/Model is granted. Title to the Database/Model is not transferred to the Contractor.

The Database/Model may be of value to the Contractor in preparing submittals, but use of the model does…