This document is a Technical Exhibit for Heating and Cooling Services as part of a federal contract opportunity. It outlines the scope of services required, including operating government-owned heating and cooling equipment, purchasing fuels, and performing daily inspections and maintenance on chiller units. Key details include:

The contractor shall provide boiler operators, operate unattended heating equipment, perform monthly inspections, coordinate boiler inspections, and respond to operational emergencies. The contractor shall also supply chemicals for boiler water treatment and submit monthly water samples to a government-designated lab. The contract includes both fixed-price and cost-reimbursable line items for a base period of 11 months with four 12-month option periods. This is part of the solicitation for a larger Base Operations Support Services contract at Fort Hamilton, New York, which is set aside for HUBZone small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services - Fort Hamilton, NY, newest first.
File Type Posted
25-R-5001 - BASOPS CDRLs A001_A057.pdf PDF
DBA_WD_New York_NY20240003_Mod._No._9_Rev._Date_09.27.2024.txt TXT text file
25-R-5001 - Site Visit Attendees List.docx DOCX document
25R5001 - Attachment 0073 - Personnel Licensing and Certs (v1).pdf PDF
25-R-5001 - Solicitation Amendment 0006.pdf PDF
Attachment 0075 - CBA October 1 2023 - September 30 2026.pdf PDF
25R5001 - Tech Exhibit 0204 Tree and Shrub Locations.pdf PDF
25R5001 - Tech Exhibit 0004 Integrated Cultural Resources Management Plan.pdf PDF
SCA_WD_New York_2015-4187_Rev._No._29_Rev._Date_07.22.2024.txt TXT text file
25-R-5001 - Solicitation Amendment 0005.pdf PDF
25-R-5001 - Solicitation Amendment 0004.pdf PDF
25-R-5001 - Solicitation Amendment 0001.pdf PDF
25R5001 - Tech Exhibit 0807 Utilities Map.docx DOCX document
25R5001 - Tech Exhibit 0602 ArMA.pdf PDF
25R5001 - Tech Exhibit 0808 Natural Gas Utility Map.docx DOCX document
25R5001 - Tech Exhibit 0901 Paving Plan.docx DOCX document
25R5001 - Attachment 0073 - Personnel Licensing and Certs.pdf PDF
25R5001 - Tech Exhibit 0605 GSA VEHICLES.pdf PDF
25R5001 - Tech Exhibit 0601 IBE list per building GFEBS 2019_Revised.xlsx XLSX spreadsheet
25R5001 - Tech Exhibit 0603 lead lag procedures in the buildings.docx DOCX document
25R5001 - Tech Exhibit 0412 Auxiliary Generators.xlsx XLSX spreadsheet
25R5001 - Tech Exhibit 0410 Gas and Oil fired boilers.docx DOCX document
25R5001 - Tech Exhibit 0415 Sprinkler Systems.docx DOCX document
25R5001 - Tech Exhibit 0409 Grease Traps.docx DOCX document
25R5001 - Tech Exhibit 0407 Sump Pumps.docx DOCX document
25R5001 - Tech Exhibit 0008 Personnel Licensing and Certs.docx DOCX document
25R5001 - Annex A - Performance Work Statement (PWS).pdf PDF
25R5001 - Tech Exhibit 0506 Storm Water Management Plan (w comments).pdf PDF
25R5001 - Tech Exhibit 0503 Crosswalks.pdf PDF
25R5001 - Tech Exhibit 0001 Performance Locations.docx DOCX document
25R5001 - Tech Exhibit 0804 Waste Water Management.docx DOCX document
25R5001 - Tech Exhibit 0507 List of Portable Generators.xlsx XLSX spreadsheet
25R5001 - Tech Exhibit 0420 Swimming and wading pools.docx DOCX document
25R5001 - Tech Exhibit 0418 Barracks.docx DOCX document
25R5001 - Tech Exhibit 0411 Non-Heated Facilities.docx DOCX document
25R5001 - Tech Exhibit 0417 Playground.docx DOCX document
25R5001 - Tech Exhibit 0404 Overhead Doors.docx DOCX document
25R5001 - Annex H - Facility Maintenance Vertical PWS.pdf PDF
25R5001 - Annex E - Solid Waste Management PWS.pdf PDF
25R5001 - Annex F - Grounds Maintenance PWS.pdf PDF
25R5001 - Annex M - Pest Management PWS.pdf PDF
25R5001 - Tech Exhibit 0205 Irrigation Systems.docx DOCX document
25R5001 - Tech Exhibit 0010 Priority Facilities.docx DOCX document
25R5001 - Tech Exhibit 0509 Backflow Preventers.xlsx XLSX spreadsheet
25R5001 - Attachment 0074 - Accounting System Checklist.pdf PDF
25R5001 - Tech Exhibit 0504 Uninterruptible Power Supply (UPS) Systems.docx DOCX document
25R5001 - Tech Exhibit 0416 Hood Systems.docx DOCX document
25R5001 - Tech Exhibit 0501 Utilities Not Included.docx DOCX document
25R5001 - Tech Exhibit 0414 Fire Alarm Systems.docx DOCX document
25R5001 - Tech Exhibit 0408 Hot Water Tanks.docx DOCX document
Show all 50

Base Operations Support Services - Fort Hamilton, NY has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 0805 Heating and Cooling Services October 2023

Table of Contents

1.0 GENERAL INFORMATION1
1.1 Overview1
1.2 Air Pollution Regulations1
2.0 DESCRIPTION OF SERVICES1
2.1 Scope1
2.2 Heating and Boiler Plant Staffing1
2.3 Unattended Heating Boilers2
2.4 Central Boiler Plants2
2.5 Summer Overhaul2
2.6 Idle Standby Boilers2
2.7 Monthly Inspections2
2.8 Boiler/Heat Plant Shutdowns2
2.9 Boiler Water Treatment Chemicals2
2.10 Boiler Water Test Samples2
2.11 Prepare Boilers and Coordinate Boiler Inspections2
2.12 Boiler Plant Calibration2
2.13 Emergencies3
2.14 Operational Considerations3
3.0 PURCHASE OF FUELS3
3.1 Fuel Oil3
3.2 Natural Gas Distribution System3
3.3 Other Fuels3
4.0 AC AND REFRIGERATION PLANTS AND SYSTEMS4
4.1 Scope4
4.2 Daily Inspection of Chillers4
4.2.1 Daily Log4

1.0 General Information.

1.1 Overview. Heating and Cooling Services provide steam, hot water, chilled water for heating, cooling, domestic hot water, and facility processes using Government-owned heating and cooling equipment, and distribution systems. Operating Government- owned heating and cooling equipment; and distribution systems includes all contract costs associated with full operation and maintenance (O&M) staff, oversight of contracted plant (other than a Utilities Privatization Contractor), O&M, periodic regulatory inspections and certifications, purchase of fuels (coal, natural gas, fuel oil, etc.), storage of fuels; maintenance, inspection, and certification of fuel storage facilities; periodic operators training and certification, supervision and administration tasks, and purchase of chemicals and supplies.

1.2 Air Pollution Regulations. The Contractor shall operate all heating boilers in compliance with all Federal, State, and local air pollution regulations. The Contractor shall address all non-compliance issues immediately to the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR).

2.0 Description of Services.

2.1 Scope. The Contractor shall operate all heating equipment and systems (steam meters, automatic tank monitoring system, boilers, and furnaces) used in the production of domestic heat (including the provision of unscheduled services) as directed by the COR/ACOR. Major components and all other heating equipment (including Geothermal and domestic hot water heaters) are listed amongst all IBE in Technical Exhibit (TE) 0601 All IBE from GFEBS.

2.2 Heating and Boiler Staffing. The Contractor shall provide boiler operators who are properly certified in conformance with all applicable Federal, State, and local laws and regulations.

2.3 Unattended Heating Boilers. The contractor shall operate all unattended heating boilers, furnaces, and any other heating equipment. Operation shall include seasonal start-up and shut down of heating equipment.

2.4 Central Boiler Plants. N/A

2.5 Summer Overhaul. The Contractor shall schedule summer overhauls for boilers that cannot be overhauled during the heating season because of operational requirements. The Contractor shall perform shutdowns over weekends and holidays when required by the COR/ACOR. The Contractor shall submit a written schedule of boiler shutdowns to the COR/ACOR for approval at least thirty (30) calendar days prior to the beginning of the proposed shutdown period. The approved shutdown schedule shall have minimal disruptions.

2.6 Idle Standby Boilers. All boilers not in use shall be maintained in a fully operational condition, except when deactivated. In the event that any boiler cannot be placed on-line within two (2) hours, a notification that includes the probable cause shall be submitted to the COR/ACOR. Proper lay-up procedures shall be used IAW Technical Manual (TM) 5- 650, Repairs and Utilities: Central Boiler Plants, when deactivating boilers.

2.7 Monthly Inspections. The Contractor shall perform monthly visual inspections of the central steam and hot water distribution and condensation systems. The inspection shall include, but not be limited to, general condition and cleanliness of all exterior and working parts, and evidences of large or small leaks from steam or hot water equipment, emissions, pipes, valves, and covers. The Contractor shall submit a report outlining the results of the inspection to the COR/ACOR within three (3) working days. However, any defects identified by the Contractor shall be submitted in writing to the COR/ACOR on the same work day.

2.8 Boiler/Heat Plant Shutdowns. The Contractor shall inform the COR/ACOR within thirty (30) minutes of shutting down any boiler or heating equipment for unplanned repairs. The Contractor shall provide written notice thirty (30) days in advance of planned repairs that require the shutdown of any boiler or heat plant, unless shutdown is otherwise requested by the COR/ACOR.

2.9 Boiler Water Treatment Chemicals. The Contractor shall supply the chemicals necessary to maintain all boiler water chemistry IAW TM 5-650.

2.10 Boiler Water Test Samples. In addition to the required boiler and distribution system water testing and treatment, the Contractor shall submit monthly, a series of boiler water samples to a Government designated lab as directed by the COR/ACOR. Analysis, results, and comments will be sent to the Contractor. The Contractor shall pay the costs for submission and lab analysis of these samples. The Contractor shall pay lab analysis costs directly to the Government designated lab. The water samples submitted shall include a boiler water sample, a condensate sample, and the Contractor test results for these samples. Test results and water samples from one (1) boiler/condensate system are required from each of the high-pressure boiler plants operated for the Government.

Additional tests may be required if the Contractor's test results and the lab's test results vary by ten (10) percent. Additional tests shall be at the Contractor’s expense. The Contractor shall provide copies of Lab Water Analysis Reports to the COR/ACOR within five (5) days after receipt. Water sample bottles and shipping containers are available from the Government designated lab. The Contractor shall furnish required boiler plant water test kits and test material.

2.11 Prepare Boilers and Coordinate Boiler Inspections. The Contractor shall schedule and prepare high-pressure boilers for the boiler inspections required by AR 420-49, Section VII. Preparation of boilers for inspection shall be IAW TM 5-650, Chapter 3, paragraph 65. The Contractor shall provide to the COR/ACOR in writing, a proposed schedule of high-pressure boiler inspections. The Contractor shall post a copy of the most recent Boiler Inspection Report in the plant where each inspected boiler is located.

2.12 Boiler Plant Calibration. Prior to annual boiler inspections, the Contractor shall calibrate all pressure and temperature gauges. A self-adhesive seal shall be attached on each gauge certifying that it has been calibrated. The date of the calibration and the initials of the person performing the calibration shall be noted on the sticker. The gauges shall be calibrated over the full operational range and accuracy tested for compliance with the manufacturer's published data. The gauges shall be calibrated against standard dead weight tester or a calibrated master gauge. In addition to the normal annual calibration, the Contractor shall at all times recalibrate any gauge that is suspected of being in error. All tests shall be IAW the applicable provisions of the American Society of Mechanical

Engineers (ASME).

2.13 Emergencies. Operational emergencies which reduce the steam rate by ten (10) percent or boiler pressure by twenty (20) percent, for a period exceeding thirty (30) minutes, shall be reported by the Contractor within thirty (30) minutes of occurrence to the COR/ACOR. Such emergencies include, but are not limited to, ruptured tubes, loss of boilers, and loss of power. The Contractor shall report operational emergencies together with identification of the probable cause and the estimated time required before full pressure and steam rate can be restored.

2.14 Operational Considerations. N/A

3.0 Purchase of Fuels.

3.1 Fuel Oil. N/A

3.2 Natural Gas Distribution System. N/A

3.3 Other Fuels. N/A

4.0 AC and Refrigeration Plants and Systems.

4.1 Scope. The AC plants and systems include central systems for multi-building cooling as well as independent systems for single building or partial building cooling. TE 0601 lists the AC inventory.

4.2 Daily Inspection of Chillers. The Contractor shall perform daily inspections during cooling season of all chiller units listed in TE 0604.

4.2.1 Daily Log. During chiller operating season, the Contractor shall observe the complete cycle of the mechanical operation of the chiller plant and cooling tower, and report any problems to the COR/ACOR immediately. The Contractor shall provide and maintain a daily log that includes, but is not limited to, the data listed below.

a. Chiller MCD number,

b. Purifier purge monitor and start-up number,

c. Chiller supply and return water temperature,

d. Compressor suction and discharge pressure and MCD number,

e. Refrigerant temperature in the evaporator,

f. Branch line control pressure,

g. Evaporator pressure,

h. Measure and record pressure drop through the condenser,

i. Oil pressure,

j. Condenser in and out water temperature,

k. Oil temperature in bearings,

l. Oil temperature in sump,

m. Oil pump motor amperage,

n. Outdoor temperature and relative humidity,

o. Any abnormalities occurring in the operation ofthe unit.