240149 SOW att2 Design Narrative.pdf

PDF 309 KB Posted

Attached to
TINKER AFB MAC BOA WWYK240149 RENOVATE NE AREA OF SOUTH PROJECT, B3
Solicitation number
FA813725R0016
Issued by

About this file

This document is a Design Narrative for renovating the northeast area of the south project in Building 3 at Tinker Air Force Base, Oklahoma. The renovation involves reconfiguring existing office and conference room spaces, with comprehensive modifications to mechanical, electrical, fire protection, and architectural systems. Specific scope includes installing systems furniture walls, relocating and adding lighting fixtures, electrical feeds, fire alarm devices, fire protection sprinklers, and modifying flooring, acoustical ceiling tiles, walls, doors, and frames.

The project will address four primary areas within Building 3, each requiring specific mechanical, electrical, and architectural adjustments. Existing HVAC systems, including air handling units and dedicated outside air systems, will be reconfigured to accommodate new room layouts. The renovation will maintain current occupancy classifications and adhere to multiple building codes and standards, including International Building Code, NFPA Life Safety Code, and various Unified Facilities Criteria. Fire protection modifications include sprinkler system adjustments, fire alarm device relocations, and ensuring continued compliance with safety regulations. The project is targeted for completion in 2025 and is specifically designated for Tinker AFB MAC BOA (Multiple Award Construction) holders.

View the file

Other files

File Type Posted
240149_pre-bid_RFIs_responses_COR.pdf PDF
WWYK240149 MAC BOA Site Visit.pdf PDF
Solicitation - FA813725R0016.pdf PDF
Solicitation - FA813725R0016.pdf PDF
2020 TAFB Facility Standard.pdf PDF
240149_Drawings.pdf PDF
00 80 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 45 00.00 10.pdf PDF
01 42 00.pdf PDF
Headhouse-Widow-Elevation.pdf PDF
00003A-FP01.pdf PDF
240149_Submittal_Register.xlsx XLSX spreadsheet
UMRL.pdf PDF
01 78 23.pdf PDF
240149_SOW.pdf PDF
Original AsBuilts.pdf PDF
00 71 00.pdf PDF
240149_Submittal_Register.pdf PDF
01 32 16.00 20.pdf PDF
090069 Sustain RAC Structural Failures In B3.pdf PDF
00 70 00.pdf PDF
940084A.pdf PDF
2023 TAFB Fire Protection Standard.pdf PDF
00 72 00.pdf PDF
970116 Repr Wooden Trusses.pdf PDF
240149 SOW att1 Draft RMDF.pdf PDF
2020 TAFB Mechanical Standard.pdf PDF
880371.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
00 80 05.pdf PDF
01 50 00.pdf PDF
2024 TAFB Electrical Standards.pdf PDF
20200083 As Built Drawings.pdf PDF
01 78 00.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design Narrative_v3_05/02/23

Design Narrative

Renovate NE area of south project, B3

Project Number: WWYK240149 Work Task: 14532124

Tinker Air Force Base, Oklahoma

March 12, 2025

Prepared By:

Tepa Companies 7535 5th Street, Building 400

Tinker AFB, OK 73145

Design Narrative WWYK240149 - Renovate NE area of south project, B3

January 25, 2025 | i

CONTENTS

1. Overview

2. Applicable Codes and Standards

2.1 General

2.2 Architectural

2.3 Mechanical / Plumbing

2.4 Electrical

2.5 Fire Protection

3. Architectural Design Narrative

3.1 General Design Parameters and Assumptions

3.1.1 Life Safety

3.2 Architectural Demolition

3.3 Architectural Construction

4. Mechanical Design Narrative

4.1.1 Elevation, Latitude/Longitude, Climate Zone

4.1.2 General Indoor Temperature/Relative Humidity Parameters

4.2 Building HVAC Loads

4.3 Indoor Air Quality

4.4 Validation of Existing HVAC Systems

4.5 Life Cycle Cost Analysis (LCCA)

4.6 Mechanical Design

4.6.1 Existing Mechanical Equipment

4.6.2 Area 1 (Rm 102A-D)

4.6.3 Area 2 (Rm 129-138, 140-146, and 148)

4.6.4 Area 3 (Rm 159 & 160)

4.6.5 Area 4 (Rm 155)

4.6.6 Building Pressure

4.6.7 Air Distribution

4.6.8 Ductwork

4.6.9 Controls

4.6.10 System Commissioning, Testing and Balancing

5. Electrical Design Narrative

5.1 General Design Parameters and Assumptions

5.2 Electrical Demolition

5.3 Electrical Construction

6. Fire Protection / Life Safety Design Narrative

6.1 General Design Parameters and Assumptions

6.1.1 Jurisdictional Authority

6.1.2 Fire Protection Approach

6.2 Building Use and Occupancy

ii | January 25, 2025

6.2.1 Existing Occupancy Classification

6.2.2 New Occupancy Classification

6.3 Passive Fire Protection Features

6.3.1 Fire and Smoke Protection Features

6.3.2 Fire Department (Emergency) Vehicle Access

6.4 Fire Protection Systems

6.4.1 Automatic Sprinkler Protection

6.4.2 Fire Extinguishers

6.4.3 Fire Alarm / Mass Notification

6.4.4 Impairment Coordination

6.5 Means of Egress

6.5.1 Arrangement of Means of Egress

6.5.2 Illumination of Means of Egress

6.5.3 Marking of Means of Egress

6.5.4 Egress Travel Distance

6.5.5 Egress Capacity

6.6 Safeguards During Construction

6.6.1 Hot Work

6.6.2 Fire Protection Impairment Supervision

APPENDICES

Appendix A: Acronyms and Abbreviations

January 25, 2025 | 1

1. Overview Interior renovation of existing space at B3 to accommodate new furniture layout provided by PZ’s furniture vendor. Furniture has been purchased by PZ and will be installed by their furniture vendor.

2. Applicable Codes and Standards

2.1 General

• IBC 2021 International Building Code (as amended by UFC 1-200-01)

• IEBC 2021 International Existing Building Code (as amended by UFC

1-200-01)

• NFPA 101 Life Safety Code (as amended by UFC 3-600-01)

• TAFB Facility Standard

• UFC 1-200-01 DoD Building Code

2.2 Architectural

• ABA Architectural Barriers Act Standards

• UFAS Uniform Federal Accessibility Standards

• UFC 3-101-01 Architecture

• UFC 3-120-10 Interior Design

• UFC 3-190-06 Protective Coatings and Paints

2.3 Mechanical / Plumbing

• ANSI/ASHRAE/ Peak Cooling and Heating Load Calculations in Buildings Except ACCA Standard 183 Low-Rise Residential Buildings

• ASHRAE 55 Thermal Environmental Conditions for Human Occupancy

• ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality

• ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential

Buildings

• IECC International Energy Conservation Code

• IMC International Mechanical Code (as amended by UFC 3-410-01)

• IPC International Plumbing Code (as amended by UFC 3-420-01)

• TAFB Mechanical Standard

• UFC 1-200-02 High Performance and Sustainable Building Requirements

• UFC 3-400-02 Design: Engineering Weather Data

• UFC 3-401-01 Mechanical Engineering

• UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems

• UFC 3-410-02 Direct Digital Control for HVAC and Other Building Control

Systems

• UFC 3-430-01FA Heating and Cooling Distribution Systems

• UFC 3-450-01 Noise and Vibration Control

2 | January 25, 2025

2.4 Electrical

• ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings

• NFPA 70 National Electrical Code

• NFPA 780 Standard for Installation of Lightning Protection Systems

• TAFB Electrical Standard

• UFC 3-501-01 Electrical Engineering

• UFC 3-520-01 Interior Electrical Systems

• UFC 3-530-01 Interior and Exterior Lighting Systems and Controls

2.5 Fire Protection

• TAFB Fire Protection Standard

• DAFI 32-2001 Fire and Emergency Services (F&ES) Program

• UFC 3-600-01 Fire Protection Engineering for Facilities

• UFC 3-601-02 Operation and Maintenance: Inspection, Testing and

Maintenance of Fire Protection Systems

• UFC 4-021-01 Design and O&M: Mass Notification Systems

• NFPA 1 Fire Code

• NFPA 10 Standard for Portable Fire Extinguishers

• NFPA 13 Standard for the Installation of Sprinkler Systems

• NFPA 51B Standard for Fire Prevention during Welding, Cutting, and Other

Hot Work

• NFPA 70 National Electric Code

• NFPA 72 National Fire Alarm Code

• NFPA 90A Standard for the Installation of Air-Conditioning and Ventilation

Systems

• NFPA 241 Standard for Safeguarding Construction, Alteration, and

Demolition Operations

3. Architectural Design Narrative Removal/Replacement of ceilings to accommodate the mechanical work. Repair of architectural finishes to match existing in support of and to accommodate the mechanical work.

Removal of a portion of the conference room wall and the addition of a new recessed vestibule and door and frame assembly. Recessed vestibule to have a new wall added over existing west portion of wall and a gypsum wallboard cap over the hallway portion of the vestibule.

Vestibule on hallway side will have new LVT to match existing LVT installed with rubber base to match existing hallway.

Patch, repair and paint all existing walls where new electrical feeds are installed for the furniture system, and where fire extinguisher cabinets have been removed and relocated.

3.1 General Design Parameters and Assumptions

3.1.1 Life Safety

Life Safety plan is part of the drawing set and produced by others and approved by CE through a previous project.

3.2 Architectural Demolition

Remove section of wall at conference room up to approximately 6’ wide and prepare for new wall construction, new door and frame.

Remove ceilings and grids as required to complete the reconfiguration of the HVAC ductwork.

Demolish and remove existing exterior egress door and frame between Offices 155A – 155C.

3.3 Architectural Construction

Replace acoustical ceiling tile and grid where removed to complete the HVAC and Electrical Lighting work.

Rebuild wall and add door at Conference Room 160. Wall shall be up to approximately 8’-0” AFF with new hollow metal door and frame. Door to match existing in the area.

Rebuild ceiling at the conference room side to attach to the new wall using acoustical ceiling tile and grid.

Construct new gypsum board ceiling on the corridor side of the conference room.

Repaint areas affected by the demolition and rebuilding of the vestibule at the conference room to match existing.

New LVT and base to match existing flooring at corridor side of new vestibule at conference room.

Provide and install new exterior egress metal door and frame between Offices 155A – 155C.

Hardware to include egress configuration (panic bar) and associated seals and gaskets.

4. Mechanical Design Narrative Building 3 has several different types of HVAC equipment that serves different areas within the building. Area 1 is currently designed as three conference rooms and has its handled by AHU 3-1, AHU 3-2, and receives fresh air from DOAS 3-1. Three VAVs are currently installed in this area, two on the supply ductwork and one on the DOAS ductwork. This space is to be reconfigured into four smaller conference rooms, which should require minimal mechanical alterations. Area 2 is a large open office area with many small perimeter offices and is served by AHU 3-2 and fresh air is provided to this area by DOAS 3-2. Eleven VAVs are installed in this area, three installed on the DOAS ductwork and eight on the supply air ductwork. This space will continue as an open office with small perimeter offices, but locations of offices will be changing, and ductwork will need to be reconfigured to accommodate the new layout. Area 3 is designed as a large open office which is served by AHU 3-2 and fresh air is provided to this area by DOAS 3-2. Two VAVs are present on the supply ductwork, and one is present on the DOAS ductwork. Area 3 will be divided into two conference rooms by a new demountable wall and will need to be rebalanced. Area 4 is a large open office area with four small perimeter offices and is served by AHU 1, which only serves this area and is not equipped with any addition VAVs. This space will remain a large open office with four small offices; however, the locations of the offices are being changed and ductwork will need to be reconfigured. General Design Parameters and Assumptions

4.1.1 Elevation, Latitude/Longitude, Climate Zone

Elevation, latitude/longitude, and climate zone were taken from International Energy Conservation Code 2015. Weather data below was taken from UFC 3-400-02 and 2013 ASHRAE Fundamentals Chapter 14.

• Elevation: 1,260 ft.

• Latitude: 35.42 N

• Longitude: 97.38 W

• Climate Zone: 3

• Summer: 100°F DB/74°F WB

• Winter: 12°F

4.1.2 General Indoor Temperature/Relative Humidity Parameters

HVAC Design by Building Area

Area Designation

Design Temperature (°F) Relative Humidity (%)

Minimum Winter

Maximum Summer

Minimum Winter

Maximum Summer

Conference/Office 68 78 N/A 50

Classroom 68 78 N/A 50

Storage/Janitor Closet 68 78 N/A N/A

Mechanical Room 68 N/A N/A N/A

Electrical Room 40 78 N/A N/A

4.2 Building HVAC Loads

Load calculations should be performed using software which complies with ANSI/ASHRAE Standard 140. Occupancy loads, equipment and miscellaneous room loads will be coordinated with Tinker AFB and the Using Agency as the design progresses. Internal equipment gain will not be used as part of the heating load calculations (loads are not modeled to allow lowering of the base heating load). For the cooling load, people load is assumed at peak occupancy levels for each space and internal equipment gain is included.

4.3 Indoor Air Quality

Ventilation rates for all areas will be provided per ASHRAE 62.1-2016. Ventilation air will be provided by the existing air handling units and DOAS units whose distribution system will be modified under this project.

4.4 Validation of Existing HVAC Systems

Validation of existing HVAC systems was accomplished by review of existing plans and field observation of the HVAC systems serving the areas within the building where renovation work is taking place.

4.5 Life Cycle Cost Analysis (LCCA)

A LCCA was not performed for this project; since the existing mechanical systems have all been installed within the last four years, and we do not anticipate a need to replace any of the mechanical units during this project, due to no major changes in occupancy or building loads.

4.6 Mechanical Design

4.6.1 Existing Mechanical Equipment

CH 3-1: Trane, CGAM060F2, Air-Cooled Scroll Packaged Chiller, 60 tons

CH 3-2: Trane, CGAM060F2, Air-Cooled Scroll Packaged Chiller, 60 tons

BC 3-1: Fulton, EDR-750, Natural Gas Condensing Boilers, 60 tons.

BC 3-2: Fulton, EDR-750, Natural Gas Condensing Boilers, 60 tons.

AHU 3-1: Trane, CSAA030UA, Indoor Unit, 30-ton, 11660 CFM

DOAS 3-1: Trane, CSAA04UA, Indoor Unit, 4-ton, 1915 CFM

AHU 3-2: Trane, CSAA025UA, Indoor Unit, 25-ton, 10160 CFM

DOAS 3-2: Trane, CSAA04UA, Indoor Unit, 4-ton, 1815 CFM

AHU-1: Indoor Unit, 8-ton, 4185 CFM

4.6.2 Area 1 (Rm 102A-D)

Demolish or reconfigure supply and return ductwork as needed to accommodate the new office and furniture layout for this area. Design, provide, and install new supply and return air distribution system configuration, as needed, to properly condition this space. Relocate existing controls as needed to accommodate furniture wall placement.

January 25, 2025 | 3

4.6.3 Area 2 (Rm 129-138, 140-146, and 148)

Demolish or reconfigure supply and return ductwork as needed to accommodate the new office and furniture layout for this area. Design, provide, and install new supply and return air distribution system configuration, as needed, to properly condition this space. Relocate existing controls as needed to accommodate furniture wall placement.

4.6.4 Area 3 (Rm 159 & 160)

Demolish or reconfigure supply and return ductwork as needed to accommodate the new conference room walls in this area. Design, provide, and install new supply and return air distribution system configuration, as needed, to properly condition this space. Relocate existing controls as needed to accommodate furniture wall placement.

4.6.5 Area 4 (Rm 155)

Demolish or reconfigure supply and return ductwork as needed to accommodate the new office and furniture layout for this area. Design, provide, and install new supply and return air distribution system configuration, as needed, to properly condition this space. Relocate existing controls as needed to accommodate furniture wall placement.

4.6.6 Building Pressure

The building pressure for the first-floor areas will be designed and balanced to maintain a positive pressure in relation to the exterior and non-conditioned spaces. Toilet rooms, janitor closets, and similar spaces will be maintained negative with respect to adjacent spaces and will continue to be exhausted directly to the outside.

4.6.7 Air Distribution

All new diffusers and grilles will be selected for minimum pressure drop, efficient throw, and minimal sound characteristics

4.6.8 Ductwork

All ductwork upstream of VAV boxes will be rated for +4” WG. All ductwork downstream of VAV boxes will be rated for +2” WG. All outside air ductwork will be rated for -2” WG. All return/relief air ductwork will be rated for -2” WG. All exhaust air ductwork upstream of exhaust fans will be -1” WG. All exhaust air ductwork downstream of in-line exhaust fans will be +1” WG.

All supply ductwork will be provided with external wrap insulation. Exhaust and return ductwork within 20 ft. of an AHU or ERU will be lined for sound. All ductwork shall be SMACNA Seal Class A. Fire, smoke, and combination fire/smoke dampers will be provided in new ductwork where needed as dictated by code.

4.6.9 Controls

The direct digital controls will be tied into the base side Honeywell DDC system to allow monitoring and troubleshooting remotely.

4.6.10 System Commissioning, Testing and Balancing

Provide commissioning of work designed/constructed under this project. Also provide to a firm certified by the Associated Air Balance Council (AABC) or National Environmental Balancing Bureau (NEBB) to perform the testing, adjusting and balancing procedures of air side and water side systems per the requirements of the AABC or NEBB Procedural Standards for Testing, Adjusting and Balancing of Environmental Systems.

4 | January 25, 2025

5. Electrical Design Narrative The electrical requirements for the project include (but are not limited to):

• Relocate lighting in areas 1, 3, and 4.

5.1 General Design Parameters and Assumptions

The existing secondary voltage to Building 3 is 480Y/277V, 3-phase, 4-wire. The building is currently served by an existing 750 kVA utility pad-mounted transformer that will remain in place, as the demand load for the building is not expected to increase. Contractor shall determine anticipated load increases and provide to government during the design process.

The existing electrical service size for Building 3 is currently 1200 amperes.

Contractor shall perform Voltage Drop calculations for all existing/reused branch circuits that have excessive lengths; circuit showing excessive voltage drop will be replaced. New branch circuits for this project will not exceed the maximum allowable length and will not produce excessive voltage drop.

5.2 Electrical Demolition

N/A

5.3 Electrical Construction

In area one (1) the contractor will be required to Provide and install lighting as per UFC 3-530- 01.

In area two (2) provide and install outlets as per UFC 3-501-01 and provide and install lighting as per UFC 3-530-01.

In area 2 relocate lights in old storage room to new storage room, see drawing A-101.

In area 2 relocate lights in old office to new office, see drawing A-101.

In area 3 relocate light at double door to the north, see drawing A-101.

Provide and install new lighted exit signs were shown on drawings. Provide signs and power to them per requirements of UFC 3-501-01, UFC 3-530-01, UFC 3-600-01, and Tinker AFB Electrical Standards.

In area 4 provide and install lighting as per UFC 3-530-01 and provide and install outlets as per UFC 3-501-01.

In area 4 relocate light west wall to the south.

All existing conditions and circuits will be updated and provided on as-built drawings as required for records. Existing ceiling mounted light fixtures and lighting controls for Building 3 will be removed in areas where the ceiling is being removed/reinstalled to accommodate the mechanical work being performed and per the furniture drawings provided by others.

January 25, 2025 | 5

6. Fire Protection / Life Safety Design Narrative Several large areas in an existing office space are having systems furniture walls installed to provide private offices or smaller conference rooms for uses. Review of the facility shows that some fire suppression and fire alarm system modifications will be required.

6.1 General Design Parameters and Assumptions

6.1.1 Jurisdictional Authority

The Contracting Officer and Base Fire Chief are the Authorities Having Jurisdiction (AHJs).

6.1.2 Fire Protection Approach

The fire protection and life safety systems design approach will follow UFC 1-200-01, UFC 3-600-01, Chapter 34, the International Building Code (IBC), the International Existing Building Code (IEBC) and NFPA 101 (Life Safety Code).

The scope of work is defined as a Level 2 Alteration per IEBC. Level 2 Alterations include the addition or elimination of any door or window, the reconfiguration or extension of any system, or the installation of any additional equipment. Per UFC 3-600-01, this work is classified as a Renovation, defined as the reconfiguration of any space; the addition, relocation, or elimination of any door or window; the addition or elimination of load-bearing elements; the reconfiguration or extension of any system; or the installation of any additional equipment.

In accordance with UFC 3-600-01 §34-1.2.1, the work in this existing facility shall conform to the Modifications chapter of NFPA 101 for design and construction projects. Under NFPA 101 terms, this project would be classified as a Modification. The work shall additionally adhere to UFC 3- 600-01 §34-1.4.1, which states “All work must conform to the existing occupancy provisions of NFPA 101. The work must not make the building or occupancy less conforming with this UFC and NFPA 101 than before the Renovation project was undertaken.

6.2 Building Use and Occupancy

6.2.1 Existing Occupancy Classification

The existing IBC occupancy classification of Building B3 is Mixed Use, Non-separated.

Occupancies present include Business Use with accessory conference rooms, and Residential Use; mechanical/electrical rooms and storage rooms.

Per NFPA 101, Building B3 has an occupancy classification Mixed Use, Separated and Non-separated. Occupancies present include Business Use, Assembly Use, and Storage Use. with accessory conference rooms, and Residential Use; mechanical/electrical rooms and storage rooms.

6.2.2 New Occupancy Classification

The occupancy will remain unchanged.

6.3 Passive Fire Protection Features

6.3.1 Fire and Smoke Protection Features

6.3.1.1 Penetration Requirements

All existing penetration protectives and sealants through fire and smoke rated barriers and walls shall be maintained. Any new penetrations into or through fire-and smoke

6 | January 25, 2025 rated barriers and walls shall be in accordance with the Tinker Air Force Base Fire Protection Design Guide, and IBC §714.

6.3.1.2 Interior Finish

Interior finish ratings will not be affected by construction and will remain unchanged.

6.3.1.3 Fire and Smoke Dampers

The protection of duct penetrations through fire and smoke resistive rated construction shall be in accordance with Tinker Air Force Base Fire Protection Standard, NFPA 90A, and IBC §717.

6.3.2 Fire Department (Emergency) Vehicle Access

Adjacent parking lots and service drives provide adequate hard surface access for fire department apparatus as required by UFC 3-600-01.

6.4 Fire Protection Systems

6.4.1 Automatic Sprinkler Protection

Automatic wet-pipe fire sprinkler protection is provided throughout the proposed renovation areas of Building 3. Modular furniture is being installed to accommodate employees. The fire sprinkler modifications are proposed to accommodate the installation of modular walls. The sprinkler riser is located within the first floor Mechanical Room located outside of the north wall of the building or within the building entry on the south end. Multiple sprinklers are required to be installed new, and some are required to be relocated. No more than nine (9) fire sprinkler are to be modified. Locations shown on plans.

In accordance with NFPA 13, §6.2.1, all sprinkler heads removed shall be replaced with new sprinkler heads of the same style, having the same temperature rating, pipe thread size, K- Factor, etc.

Additionally, all sprinkler system drop piping and fittings removed from the existing branch lines will be replaced with like sized piping and fitting diameters and lengths on a one-for-one basis.

All new sprinkler pipe will be Schedule 40.

6.4.2 Fire Extinguishers

Portable fire extinguishers were noted throughout the building and were generally found to be well distributed.

The contractor shall provide portable fire extinguishers suitable for the combustible present during construction. Where existing building extinguishers are blocked, removed or generally made inaccessible to the building occupants, supplemental extinguishers shall be provided such that a portable fire extinguisher is located within 75 travel distance of all areas of the building.

The contractor shall regularly inspect (at least weekly) portable extinguishers located within the work area to ensure that they are charged, free from damage and accessible.

6.4.3 Fire Alarm / Mass Notification

The building is equipped with a Siemens fire alarm and mass notification system. A limited number of system circuits will be required to be rerouted to accommodate device type changes.

The fire alarm and mass notification system modifications are proposed to accommodate the installation of modular walls. The fire alarm control panels are located within the first floor at

January 25, 2025 | 7 the south building entry. Multiple speaker-strobes are required to be installed new, and some are required to be relocated.

The existing fire alarm system is equipped with a Monaco BT-XF radio frequency transceiver allowing the fire alarm system to be monitored by the Monaco D-21 Base- Wide fire alarm monitoring system.

6.4.4 Impairment Coordination

The temporary removal and installation of sprinkler heads will require that the existing sprinkler systems be taken out of service. The same will apply to the fire alarm and mass notification system. The impairment procedures detailed in UFC 3-601-02, Chapters 1-12 and 1-13 shall apply to all fire protection impairments. Careful impairment handling includes planning of work to limit impairments to a minimal time period. As sprinkler heads are removed for the day’s work, caps shall be installed on the open pipe ends to allow the sprinkler system to be returned to service. Building occupants shall be notified of fire protection impairments. Warning signs shall be placed at all principle employee and visitor entrances to the building during the impairment period. In certain cases the cessation of hazardous operations and the establishment of fire watch may be required.

6.5 Means of Egress

6.5.1 Arrangement of Means of Egress

All egress components (exit access corridors, exits and exit discharge) will remain unchanged or improved at the conclusion of this project.

6.5.2 Illumination of Means of Egress

Emergency lighting will be provided in accordance with NFPA 101 within the work area.

Emergency lighting for remaining building areas is comprised of light fixtures with emergency ballasts and wall mounted emergency lighting and will remain as is.

6.5.3 Marking of Means of Egress

Marking means of egress (exiting lighting) will be provided in accordance with NFPA 101 within the work area. Illuminated and non-illuminated exit signs are provided for existing building areas and will remain as is.

6.5.4 Egress Travel Distance

The renovation will not alter egress and travel distances. The renovation work will not make the building less conforming with UFC 3-600-01 and NFPA 101 than before the renovation.

6.5.5 Egress Capacity

The renovation will not alter the building egress components. The renovation work will not make the building less conforming with UFC 3-600-01 and NFPA 101 than before the renovation.

6.6 Safeguards During Construction

All work associated with this project shall be performed in accordance with NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations.

6.6.1 Hot Work

All Hot Work associated with demolition and construction shall be performed in accordance with NFPA 51 and with TAFB Hot Work Program requirements. Safeguard for Hot Work

8 | January 25, 2025 operations include but are not limited to the relocation of combustible storage, the use of fire resistive barriers to protect combustibles that cannot be relocated, the establishment of Fire Watch and the termination of hot work operations when fire protection systems are out of service. Additionally, Hot Work should not be performed when alternative methods can be employed to dismantle existing or assemble new systems.

6.6.2 Fire Protection Impairment Supervision

Fire protection impairments will be supervised and performed in accordance with

UFC 3-601-02.

Appendix A

Acronyms and Abbreviations

A Ampere(s)

AABC Associated Air Balance Council

ACCA Air Conditioning Contractors Association

ACI American Concrete Institute

ACS Access Control System

ACT Acoustic Ceiling Tile

AFB Air Force Base

AFF Above Finished Floor

AFI Air Force Instruction

AHJ Authorities Having Jurisdiction

AHU Air Handling Unit

AISC American Institute of Steel Construction

ANSI American National Standards Institute

ASCE American Society of Civil Engineers

ASHRAE American Society of Heating, Refrigeration and Air-Conditioning Engineers

ASTM American Society for Testing and Materials

BTHU British thermal unit

BUR Built-Up Roof

CAC Common Access Card

CBT Computer Based Training

CCTV Closed Circuit Television

CIPS Cyberspace Infrastructure Planning System

CMU Concrete Masonry Unit

COMM Communications

DB Dry Bulb

DoD Department of Defense

DX Direct Expansion

E East

EBI Enterprise Building Integrator

EMI Electromagnetic Interference

EMT Electrical Metallic Tubing

FCI Fire Control Instruments

FCU Fan Coil Unit

FF-L Federal Specification

FPS Feet Per Second

FT Feet

GSA General Services Administration

HR Hour(s)

HSS Hollow Structural Section

HVAC Heating, Ventilation and Air Conditioning

IAW In Accordance With

IBC International Building Code

IC Intelligence Community

ICD Intelligence Community Directive

ICS Intelligence Community Standard

IDS Intrusion Detection System

IEBC International Existing Building Code

IECC International Energy Conservation Code

IMC International Mechanical Code

IN Inches

IPC International Plumbing Code

IT Information Technology kVA Kilovolt-Ampere

LAN Local Area Network

LED Light Emitting Diode

MOD Motorized Damper

N North

NEBB National Environmental Balancing Bureau

NFPA National Fire Protection Association

NIPR Non-Secure Internet Protocol Router

PSF Pounds per Square Foot

RF Radio Frequency

RFI Radio-Frequency Interference

SIPR Secure Internet Protocol Router

SMACNA Sheet Metal and Air Conditioning Contractors' National Association

S South

STC Sound Transmission Class

TAFB Tinker Air Force Base

UFC Unified Facilities Criteria

UPS Uninterruptible Power Supply

V Volts

VAV Variable Air Volume

W West

WB Wet Bulb

WG Water Gauge

§ Subsection

°F Fahrenheit

1. Overview
2. Applicable Codes and Standards
2.1 General
2.2 Architectural
2.3 Mechanical / Plumbing
2.4 Electrical
2.5 Fire Protection
3. Architectural Design Narrative
3.1 General Design Parameters and Assumptions
3.1.1 Life Safety
3.2 Architectural Demolition
3.3 Architectural Construction
4. Mechanical Design Narrative
4.1.1 Elevation, Latitude/Longitude, Climate Zone
4.1.2 General Indoor Temperature/Relative Humidity Parameters
4.2 Building HVAC Loads
4.3 Indoor Air Quality
4.4 Validation of Existing HVAC Systems
4.5 Life Cycle Cost Analysis (LCCA)
4.6 Mechanical Design
4.6.1 Existing Mechanical Equipment
4.6.2 Area 1 (Rm 102A-D)
4.6.3 Area 2 (Rm 129-138, 140-146, and 148)
4.6.4 Area 3 (Rm 159 & 160)
4.6.5 Area 4 (Rm 155)
4.6.6 Building Pressure
4.6.7 Air Distribution
4.6.8 Ductwork
4.6.9 Controls
4.6.10 System Commissioning, Testing and Balancing
5. Electrical Design Narrative
5.1 General Design Parameters and Assumptions
5.2 Electrical Demolition
5.3 Electrical Construction
6. Fire Protection / Life Safety Design Narrative
6.1 General Design Parameters and Assumptions
6.1.1 Jurisdictional Authority
6.1.2 Fire Protection Approach
6.2 Building Use and Occupancy
6.2.1 Existing Occupancy Classification
6.2.2 New Occupancy Classification
6.3 Passive Fire Protection Features
6.3.1 Fire and Smoke Protection Features
6.3.1.1 Penetration Requirements
6.3.1.2 Interior Finish
6.3.1.3 Fire and Smoke Dampers

6.3.2 Fire Department (Emergency) Vehicle Access

6.4 Fire Protection Systems
6.4.1 Automatic Sprinkler Protection
6.4.2 Fire Extinguishers
6.4.3 Fire Alarm / Mass Notification
6.4.4 Impairment Coordination
6.5 Means of Egress
6.5.1 Arrangement of Means of Egress
6.5.2 Illumination of Means of Egress
6.5.3 Marking of Means of Egress
6.5.4 Egress Travel Distance
6.5.5 Egress Capacity
6.6 Safeguards During Construction
6.6.1 Hot Work
6.6.2 Fire Protection Impairment Supervision

File details come from the government source that posted it. Updated .