240149_Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- FA813725R0016
About this file
The provided file is a set of architectural and engineering drawings for a renovation project at Tinker Air Force Base, Oklahoma. The project, designated WWYK240149, involves renovating the northeast area of the South Project, Building 3 (B3). The drawings include detailed floor plans for architectural demolition, architectural renovation, life safety analysis, and fire protection renovation.
Key elements of the renovation include: repairing/replacing HVAC systems, relocating and adding lighting fixtures, updating electrical feeds, modifying fire alarm devices and sprinklers, relocating fire extinguisher cabinets, replacing flooring and ceiling tiles, and constructing new walls and doors in the conference room. The project is specifically for MAC BOA (Multiple Award Contract Basic Ordering Agreement) holders, with a required initial site visit on 07 Apr 2025 from 9:30-10:30 AM CT at Building 3, Door C. Potential bidders must RSVP by 02 April 2025 at 2:00 PM CT and bring appropriate construction personal protective equipment (PPE) to the site visit.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
WWYK240149
RENOVATE NE AREA OF
SOUTH PROJECT,
B3
KEY PLAN:
GENERAL NOTES:
ARCHITECTURE
1 G-101 GENERAL NOTES & VICINITY MAP
SHT.SEQ. SHEET TITLE
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
SOW
W W
YK
RE
NO
VA
TE
N E
AR
EA
O F
SO
UT
H
PR
OJ
EC
T, B3
JA
N
TE
PA
M N
O
EL
G-101
F
BA
KE
R
N B
IR
C
H U
M
En gr
\D es ig n\
T:
\E ng r\D es ig n\ s\
\2
9\
0_ Su pp or t\0 _3
_D ra w in gs \M od el
GE
NE
RA
L N
OT
ES
AN
D
VI
CI
NI
TY
M
AP
01 03
ARCHITECTURAL DEMOLITION FLOOR PLAN
ARCHITECTURAL RENOVATION FLOOR PLAN
AD-101
A-101
PROJECT
LOCATION
B3
3 10
50414
"A " A ve
"B " A ve
3rd Ave.
6th St.6th St.
5th Ave
7th St.
1st St.
"D " A ve
"C " A ve
"C " A ve
"D " D riv e
1st St.
R U
N W
AY
8/
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm C reek
Crutcho Creek
Kuhlman Creek
Soldier Creek
Kuhlman Creek
Elm C reek
East Crutcho Creek
Elm Creek
El m
C re ek
Elm Creek
Elm C reek
Elm CreekElm C reek
Ku hlm an C re ek
Ea st
C ru tc ho
C re ek
Elm C ree k
West Crutcho Creek
W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
Elm C reek
Soldier CreekSoldier Creek
Ea st
C ru tc ho
C re ek
Elm Creek
Ea st
C ru tc ho
C re ek
East C rutcho C reek
Soldier Creek
So ld ie r C re ek
East C rutch o Creek
Soldier C reek
Soldier C reek
So ld ie r C re ek
East Crutcho Creek
416506
21222121
59475946
11401128
62540
61089
838837
62509
62528
62523
62501X
43774
62512
62516
62525
3592135916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
45134
96022
43120
41157
44045
45815
40592
43610
62522
41163
15930
15930
11824
SE 74th St
SE 59th St.
Ai r D ep ot
St af f D r.
"A " A ve
M un iti on s R d.
W ar eh ou se R d.
"B " A ve
"H " A ve
M cN ar ne y Av e.
Al er t R d.
"E "A ve
Sentry Rd.
5th Ave.
Jo ne s
To w er R d.
Vanaman Rd.
So ut h St
Ai r D ep ot
Ai r D ep ot
Rapcon Rd.
Reserve Rd
Mercury Rd.
O ld
A ir
De po t
Airey Dr.
General Motors Dr
Vandenberg Dr.
Hi llt op R d.
Dormitory Rd.
Chennault Dr.
M itc he ll A ve
Spaatz Dr.
3rd Ave.
Ai r D ep ot
B lv d
Turbine Dr.
Central Plant Dr.
6th St.6th St.
Blackb ird
Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Co rs ai r D r.
Ra pt or Ct
N ig ht H aw k
Ct
Fr an kl in
Po w er ho us e
Dr
Sk ym as te r D r.
Spaatz Ct.
M un de ll
Nabors Dr.
M cN ickle
Ta il
Fe at he r D r.
Holden Dr.
Smith Ct.
Air Dep ot
1st St.
TAXIWAY F
Mercury Rd.
Ra ily ar d
Rd
He rc ul es
R d.
"F " A ve
96021
Arnold St.
Ea st
D r.
Patrol Rd.
Reserve Rd.
5th Ave
7th St.
Mitchell Ave
Co ok
A ve
W es t D r.
Extender Dr.
34th St.
Twining Dr.
Globemaster Dr.
In du st ria l B lv d.
1st St.
Do ol itt le
A ve
Pi cn ic R d.
Ja m es D r.
W ol fe D r.
"D " A ve
Perimeter Rd.
"L " A ve
1st St.
Br ow n Dr
Po nd
R d.
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
"C " A ve
Do rm ito ry
R d.
"M " A ve
Co m m od ity D r.
Doolittle Ave
W hi te D r.
"D " D riv e
Ba ll
Pa rk
R d.
Joint STARS Dr.
Turbine Dr.
Falco n Dr.
W ey la nd
L oo p
Pegasus Dr.
Chidlaw Ct.
Ph an to m
D r.
La w re nc e
In tr ud er
D r.
M cN ic kl e
M ill er D r.
Ai re y C ir.
Ra ve n Ct
. Ai r D ep ot
Vanaman Rd.
1st St.
Ra w li ng s A ve
Mitc he ll A ve
Pr op ul sio n Dr
Stratofortress Dr.
Arnold St.
TINKER AFB, OK
VICINITY MAP
CONTRACTING
B3
GOTT
GATE
TINKER GATE
PASS & ID B6611
EAKER GATE
FIRE DEPARTMENT
B117
VANCE
GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400 PROJECT
LOCATION
BASE
OPERATIONS
B240
HRUSKOCY
GATE
G-102 LIFE SAFETY PLAN2
4 FIRE PROTECTION RENOVATION FLOOR PLANA-101
FIRE PROTECTION
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
YK
LIF
E
SA
FE
TY
A
NA
LY
SI
S
PR
O
JE
C
T
AR
EA
LI
FE
S
AF
ET
Y
PL
AN
G-102
R M
JR
M D
E
BU
IL
D
IN
G
LIFE SAFETY PLAN - FIRST FLOOR PLAN VIEW
SCALE: 1/16" = 1'-0"
G-101
KEYPLAN
LIFE SAFETY SYMBOLS:
EGRESS TRAVEL DISTANCEXX'
EXIT DISCHARGE
-CAPACITY FACTOR
-EXIT WIDTH
-EXIT CAPACITY
XXin
XXX
XXX
EXISTING EXIT SIGN
EXISTING PORTABLE FIRE EXTINGUISHER
EXISTING 2 HOUR FIRE BARRIERuu uu uu uu uu
EXISTING 1 HOUR FIRE BARRIERu u u u u u
8 16 3216
SCALE: 1/16"=1'-0"
NEW EXIT SIGN
NEW PORTABLE FIRE EXTINGUISHER
ARROW INDICATE DIRECTION
ARROW INDICATE DIRECTION
TRAINING
FMAO
WAITING
SM / SHARED
STORAGE
DEPUTY
COMMANDER
VAULT
125A
MAIN COMP.
EQ. RM.
COMMANDER
ADMIN
11A
ADMIN
1ST SGT
SEL
FMAS
OPEN
OFFICE
ENTRY
2 CORRIDOR
RECEPTION
OFFICE
OFFICE
OFFICE
CORRIDOR
STORAGE
FUTURE OPEN
OFFICE
FUTURE OPEN
OFFICE
BREAK ROOM
MEN'S
WOMEN'S
JAN
OPEN OFFICE
16A
OPEN OFFICE
16B
CONF ROOM
CONFERENCE
BREAK
ROOM
BREAK
ROOM
PZIE #4
PZIY #1
PZIY
OPEN OFFICE
PZIE #3
PZIE#2
PZIO #5
PZIO #1
PZIO #4
PZIO #3
PZIO #2
SS OFFICE #1
PZIO
OPEN OFFICE
VESTIBULE
CONFERENCE
ROOM
PZI #2
PZI #1
SNCO
FMF
FMF FIT CHIEF
116IT STORAGE
SS#1
102A
SS#2
102B
SS#3
102C
SS#4
102D
IT/STORAGE
155B
PZIY #3
155C
PZIE #1
155A
STORAGE
PZIE & PZIY
OPEN OFFICE
155 PZIY #2
155D
SOURCE
SELECTION
CONFERENCE
WOMENS
RESTROOM
VESTIBULE
WOMENS
RESTROOM
MENS
RESTROOM
MAIN
CORRIDOR
CORRIDOR
CORRIDOR
72in 0.2
72in 0.2
72in 0.2
72in 0.2
36in 0.2
72in 0.2
36in 0.2 uu u u uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu
36in 0.2 uu uu u u uuuuu u u u uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u
ELEVATOR
EQUIPMENT
ROOM
ELEVATOR
LOBBY
u u u u u u u u u u u u u u
PROJECT
AREA
TRAVEL DISTANCE - 54 FT 0 IN
TRAVEL DISTANCE - 195 FT 0 IN
TRAVEL DISTANCE - 118 FT 6 IN
36in 0.2
36in 0.2
JAN
12A
JAN
149A
RISER
ROOM
D
EA
D -E
N D
C O
R R
ID
O
R
F
T
IN
COMMON PATH - 65 FT 0 IN
FUTURE OPEN
OFFICE
FUTURE OPEN
OFFICE
CORRIDOR
MAIN
CORRIDOR
103 MAIN
CORRIDOR
WOMEN'S
MEN'S
ELEC
JAN
VESTIBULE
LARGE STORAGE
72in 0.2 u u u u u u uuu u u u u u u uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu u u u u u u u u u u u u uu uu uu u u u u u u u u u u u u u u u u uuuu u u u u u u uu uu u u u u uu uu uu
ELECTRICAL
MECH ROOM
TRAVEL DISTANCE - 70 FT 0 IN
COMMON PATH - 37 FT 0 IN
TRAVEL DISTANCE -
85 FT 0 IN
COMMON PATH -
57 FT 0 IN
TRAVEL DISTANCE - 79 FT 0 IN
36in 0.2
36in 0.2
36in 0.2
TRAVEL DISTANCE
- 73 FT 0 IN
RUMILLER
Snapshot
RUMILLER
Polygon
RUMILLER
Polygon
RUMILLER
Rectangle
RUMILLER
Polygon
RUMILLER
Rectangle
RUMILLER
Rectangle
RUMILLER
Rectangle
RUMILLER
Text Box
KEYNOTE:
RUMILLER
Text Box
RUMILLER
Text Box
1. Relocate existing sprinklers or add new ones as required for a code-compliant system, in accordance with UFC 3-600-01, NFPA 13, and the Tinker Fire Protection Design Standard.
2. Relocate existing fire alarm notification devices or add new notification devices as required for a code-compliant system, in accordance with UFC 3-600-01, NFPA 72, and the Tinker Fire Protection Design Standard.
3. Add new exit sign in Conference Room 160, Room 102B and Room 102.
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
RUMILLER
Text Box
1408068246E Rectangle
1408068246E Rectangle
1408068246E Rectangle
1408068246E Rectangle
1258024164E Stamp
1258024164E Stamp
1258024164E Stamp
1258024164E Stamp
B3 KEY PLAN
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
SOW
W W
YK
RE
NO
VA
TE
N E
AR
EA
O F
SO
UT
H
PR
OJ
EC
T, B3
JA
N
TE
PA
-S R
M
R F
O G
LE
AD-101
F.
B
AK
ER
N . B
IR
C
H U
M
En gr
\D es ig n\ s\
\2
9\ 0_
Su pp or t\0
_3 _D ra w in gs
\M od el
AR
CH
IT
EC
TU
RA
L
DE
MO
LIT
IO
N
FL
OO
R
PL
AN
02 03
AD-101
ARCHITECTURAL DEMOLITION FLOOR PLAN
SCALE: 3/32" = 1'-0"
GENERAL NOTES
KEYED NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
DEMOLISH 2-HOUR RATED WALL AND AND ASSOCIATED RUBBER BASE UP TO
8'-0" AFF.
DEMOLISH PORTION OF ACOUSTICAL CEILING TILE AND GRID.
SM / SHARED
248 sf
MAIN COMP.
EQ. RM.
BREAK
ROOM
PZIE #4
(116 sf)
OPEN OFFICE
PZIO
OPEN OFFICE
VESTIBULE
CONFERENCE
ROOM
WAITING
WOMENS
RESTROOM
MAIN
CORRIDOR
CORRIDOR
ME
N'
S
W
OM
EN
'S
JA
N.
9A
NIC
B3 KEY PLAN
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
A-101
ARCHITECTURAL RENOVATION FLOOR PLAN
SCALE: 3/32" = 1'-0"
CONCEPT
SOW
W W
YK
RE
NO
VA
TE
N E
AR
EA
O F
SO
UT
H
PR
OJ
EC
T, B3
JA
N
TE
PA
-S R
M
R F
O G
LE
A-101
F
BA
KE
R
N B
IR
C
H U
M
En gr
\D es ig n\ s\
\2
9\ 0_
Su pp or t\0
_3 _D ra w in gs
\M od el
AR
CH
IT
EC
TU
RA
L
RE
NO
VA
TI
ON
FL
OO
R
PL
AN
03 03
GENERAL NOTES
KEYED NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
NEW 1-1/2 HOUR FIRE RATED STAINED WOOD DOOR AND PAINTED METAL
DOOR FRAME WITH STAINLESS STEEL KICKPLATE, DOOR HARDWARE AND
AUTOMATIC CLOSER.
NEW 2 HOUR FIRE RATED WALL USING 6" METAL STUDS SPACED 16" O.C. AND
2 LAYERS OF 5/8" TYPE C GYPSUM BOARD ON BOTH SIDES WITH MINERAL
WOOL BATT INSULATION, RUBBER BASE AND PAINT TO MATCH. REFERENCE
UL RATED WALL ASSEMBLY U419.
NEW 2 HOUR RATED CEILING AT 8'-0" AFF USING 6" METAL STUDS SPACED 16"
O.C. AND 2 LAYERS OF 5/8" TYPE C GYPSUM BOARD ON BOTH SIDES, PAINT
TO MATCH.
NEW CARPET FLOORING TILES TO MATCH CORRIDOR.
AREA 3
AREA 4
AREA 2AREA 1
SM / SHARED
MAIN COMP.
EQ. RM.
Conference 73 seats, shared
BREAK
ROOM
OPEN OFFICE
PZIO
OPEN OFFICE
VESTIBULE
CONFERENCE
ROOM
WAITING
WOMENS
RESTROOM
MAIN
CORRIDOR
ME
N'
S
W
OM
EN
'S
JA
N.
9A
| Sheets and Views |
| G101 |
| 02-240149-AD-101-AD-101.pdf |
| Sheets and Views |
| AD-101 |
| 03-240149-A101-A-101.pdf |
| Sheets and Views |
| A-101 |
| 06-240149-M101-M-101.pdf |
| Sheets and Views |
| M-101 |
File details come from the government source that posted it. Updated .