240149_Drawings.pdf

PDF 5 MB Posted

Attached to
TINKER AFB MAC BOA WWYK240149 RENOVATE NE AREA OF SOUTH PROJECT, B3
Solicitation number
FA813725R0016
Issued by

About this file

The provided file is a set of architectural and engineering drawings for a renovation project at Tinker Air Force Base, Oklahoma. The project, designated WWYK240149, involves renovating the northeast area of the South Project, Building 3 (B3). The drawings include detailed floor plans for architectural demolition, architectural renovation, life safety analysis, and fire protection renovation.

Key elements of the renovation include: repairing/replacing HVAC systems, relocating and adding lighting fixtures, updating electrical feeds, modifying fire alarm devices and sprinklers, relocating fire extinguisher cabinets, replacing flooring and ceiling tiles, and constructing new walls and doors in the conference room. The project is specifically for MAC BOA (Multiple Award Contract Basic Ordering Agreement) holders, with a required initial site visit on 07 Apr 2025 from 9:30-10:30 AM CT at Building 3, Door C. Potential bidders must RSVP by 02 April 2025 at 2:00 PM CT and bring appropriate construction personal protective equipment (PPE) to the site visit.

View the file

Other files

File Type Posted
240149_pre-bid_RFIs_responses_COR.pdf PDF
WWYK240149 MAC BOA Site Visit.pdf PDF
Solicitation - FA813725R0016.pdf PDF
Solicitation - FA813725R0016.pdf PDF
2020 TAFB Facility Standard.pdf PDF
00 80 00.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
01 45 00.00 10.pdf PDF
01 42 00.pdf PDF
Headhouse-Widow-Elevation.pdf PDF
00003A-FP01.pdf PDF
240149_Submittal_Register.xlsx XLSX spreadsheet
240149 SOW att2 Design Narrative.pdf PDF
UMRL.pdf PDF
01 78 23.pdf PDF
240149_SOW.pdf PDF
Original AsBuilts.pdf PDF
00 71 00.pdf PDF
240149_Submittal_Register.pdf PDF
01 32 16.00 20.pdf PDF
090069 Sustain RAC Structural Failures In B3.pdf PDF
00 70 00.pdf PDF
940084A.pdf PDF
2023 TAFB Fire Protection Standard.pdf PDF
00 72 00.pdf PDF
970116 Repr Wooden Trusses.pdf PDF
240149 SOW att1 Draft RMDF.pdf PDF
2020 TAFB Mechanical Standard.pdf PDF
880371.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
00 80 05.pdf PDF
01 50 00.pdf PDF
2024 TAFB Electrical Standards.pdf PDF
20200083 As Built Drawings.pdf PDF
01 78 00.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

WWYK240149

RENOVATE NE AREA OF

SOUTH PROJECT,

B3

KEY PLAN:

GENERAL NOTES:

ARCHITECTURE

1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

SOW

W W

YK

RE

NO

VA

TE

N E

AR

EA

O F

SO

UT

H

PR

OJ

EC

T, B3

JA

N

TE

PA

M N

O

EL

G-101

F

BA

KE

R

N B

IR

C

H U

M

En gr

\D es ig n\

T:

\E ng r\D es ig n\ s\

\2

9\

0_ Su pp or t\0 _3

_D ra w in gs \M od el

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

01 03

ARCHITECTURAL DEMOLITION FLOOR PLAN

ARCHITECTURAL RENOVATION FLOOR PLAN

AD-101

A-101

PROJECT

LOCATION

B3

3 10

50414

"A " A ve

"B " A ve

3rd Ave.

6th St.6th St.

5th Ave

7th St.

1st St.

"D " A ve

"C " A ve

"C " A ve

"D " D riv e

1st St.

R U

N W

AY

8/

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY E

E

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm C reek

Crutcho Creek

Kuhlman Creek

Soldier Creek

Kuhlman Creek

Elm C reek

East Crutcho Creek

Elm Creek

El m

C re ek

Elm Creek

Elm C reek

Elm CreekElm C reek

Ku hlm an C re ek

Ea st

C ru tc ho

C re ek

Elm C ree k

West Crutcho Creek

W es t C ru tc ho

C re ek

Elm Creek

Soldier Creek

Elm C reek

Soldier CreekSoldier Creek

Ea st

C ru tc ho

C re ek

Elm Creek

Ea st

C ru tc ho

C re ek

East C rutcho C reek

Soldier Creek

So ld ie r C re ek

East C rutch o Creek

Soldier C reek

Soldier C reek

So ld ie r C re ek

East Crutcho Creek

416506

21222121

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

62501

15930

15908

15904

15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

45134

96022

43120

41157

44045

45815

40592

43610

62522

41163

15930

15930

11824

SE 74th St

SE 59th St.

Ai r D ep ot

St af f D r.

"A " A ve

M un iti on s R d.

W ar eh ou se R d.

"B " A ve

"H " A ve

M cN ar ne y Av e.

Al er t R d.

"E "A ve

Sentry Rd.

5th Ave.

Jo ne s

To w er R d.

Vanaman Rd.

So ut h St

Ai r D ep ot

Ai r D ep ot

Rapcon Rd.

Reserve Rd

Mercury Rd.

O ld

A ir

De po t

Airey Dr.

General Motors Dr

Vandenberg Dr.

Hi llt op R d.

Dormitory Rd.

Chennault Dr.

M itc he ll A ve

Spaatz Dr.

3rd Ave.

Ai r D ep ot

B lv d

Turbine Dr.

Central Plant Dr.

6th St.6th St.

Blackb ird

Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Co rs ai r D r.

Ra pt or Ct

N ig ht H aw k

Ct

Fr an kl in

Po w er ho us e

Dr

Sk ym as te r D r.

Spaatz Ct.

M un de ll

Nabors Dr.

M cN ickle

Ta il

Fe at he r D r.

Holden Dr.

Smith Ct.

Air Dep ot

1st St.

TAXIWAY F

Mercury Rd.

Ra ily ar d

Rd

He rc ul es

R d.

"F " A ve

96021

Arnold St.

Ea st

D r.

Patrol Rd.

Reserve Rd.

5th Ave

7th St.

Mitchell Ave

Co ok

A ve

W es t D r.

Extender Dr.

34th St.

Twining Dr.

Globemaster Dr.

In du st ria l B lv d.

1st St.

Do ol itt le

A ve

Pi cn ic R d.

Ja m es D r.

W ol fe D r.

"D " A ve

Perimeter Rd.

"L " A ve

1st St.

Br ow n Dr

Po nd

R d.

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Do rm ito ry

R d.

"M " A ve

Co m m od ity D r.

Doolittle Ave

W hi te D r.

"D " D riv e

Ba ll

Pa rk

R d.

Joint STARS Dr.

Turbine Dr.

Falco n Dr.

W ey la nd

L oo p

Pegasus Dr.

Chidlaw Ct.

Ph an to m

D r.

La w re nc e

In tr ud er

D r.

M cN ic kl e

M ill er D r.

Ai re y C ir.

Ra ve n Ct

. Ai r D ep ot

Vanaman Rd.

1st St.

Ra w li ng s A ve

Mitc he ll A ve

Pr op ul sio n Dr

Stratofortress Dr.

Arnold St.

TINKER AFB, OK

VICINITY MAP

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER

GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400 PROJECT

LOCATION

BASE

OPERATIONS

B240

HRUSKOCY

GATE

G-102 LIFE SAFETY PLAN2

4 FIRE PROTECTION RENOVATION FLOOR PLANA-101

FIRE PROTECTION

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

W W

YK

LIF

E

SA

FE

TY

A

NA

LY

SI

S

PR

O

JE

C

T

AR

EA

LI

FE

S

AF

ET

Y

PL

AN

G-102

R M

JR

M D

E

BU

IL

D

IN

G

LIFE SAFETY PLAN - FIRST FLOOR PLAN VIEW

SCALE: 1/16" = 1'-0"

G-101

KEYPLAN

LIFE SAFETY SYMBOLS:

EGRESS TRAVEL DISTANCEXX'

EXIT DISCHARGE

-CAPACITY FACTOR

-EXIT WIDTH

-EXIT CAPACITY

XXin

XXX

XXX

EXISTING EXIT SIGN

EXISTING PORTABLE FIRE EXTINGUISHER

EXISTING 2 HOUR FIRE BARRIERuu uu uu uu uu

EXISTING 1 HOUR FIRE BARRIERu u u u u u

8 16 3216

SCALE: 1/16"=1'-0"

NEW EXIT SIGN

NEW PORTABLE FIRE EXTINGUISHER

ARROW INDICATE DIRECTION

ARROW INDICATE DIRECTION

TRAINING

FMAO

WAITING

SM / SHARED

STORAGE

DEPUTY

COMMANDER

VAULT

125A

MAIN COMP.

EQ. RM.

COMMANDER

ADMIN

11A

ADMIN

1ST SGT

SEL

FMAS

OPEN

OFFICE

ENTRY

2 CORRIDOR

RECEPTION

OFFICE

OFFICE

OFFICE

CORRIDOR

STORAGE

FUTURE OPEN

OFFICE

FUTURE OPEN

OFFICE

BREAK ROOM

MEN'S

WOMEN'S

JAN

OPEN OFFICE

16A

OPEN OFFICE

16B

CONF ROOM

CONFERENCE

BREAK

ROOM

BREAK

ROOM

PZIE #4

PZIY #1

PZIY

OPEN OFFICE

PZIE #3

PZIE#2

PZIO #5

PZIO #1

PZIO #4

PZIO #3

PZIO #2

SS OFFICE #1

PZIO

OPEN OFFICE

VESTIBULE

CONFERENCE

ROOM

PZI #2

PZI #1

SNCO

FMF

FMF FIT CHIEF

116IT STORAGE

SS#1

102A

SS#2

102B

SS#3

102C

SS#4

102D

IT/STORAGE

155B

PZIY #3

155C

PZIE #1

155A

STORAGE

PZIE & PZIY

OPEN OFFICE

155 PZIY #2

155D

SOURCE

SELECTION

CONFERENCE

WOMENS

RESTROOM

VESTIBULE

WOMENS

RESTROOM

MENS

RESTROOM

MAIN

CORRIDOR

CORRIDOR

CORRIDOR

72in 0.2

72in 0.2

72in 0.2

72in 0.2

36in 0.2

72in 0.2

36in 0.2 uu u u uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu

36in 0.2 uu uu u u uuuuu u u u uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u

ELEVATOR

EQUIPMENT

ROOM

ELEVATOR

LOBBY

u u u u u u u u u u u u u u

PROJECT

AREA

TRAVEL DISTANCE - 54 FT 0 IN

TRAVEL DISTANCE - 195 FT 0 IN

TRAVEL DISTANCE - 118 FT 6 IN

36in 0.2

36in 0.2

JAN

12A

JAN

149A

RISER

ROOM

D

EA

D -E

N D

C O

R R

ID

O

R

F

T

IN

COMMON PATH - 65 FT 0 IN

FUTURE OPEN

OFFICE

FUTURE OPEN

OFFICE

CORRIDOR

MAIN

CORRIDOR

103 MAIN

CORRIDOR

WOMEN'S

MEN'S

ELEC

JAN

VESTIBULE

LARGE STORAGE

72in 0.2 u u u u u u uuu u u u u u u uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu uu u u u u u u u u u u u u uu uu uu u u u u u u u u u u u u u u u u uuuu u u u u u u uu uu u u u u uu uu uu

ELECTRICAL

MECH ROOM

TRAVEL DISTANCE - 70 FT 0 IN

COMMON PATH - 37 FT 0 IN

TRAVEL DISTANCE -

85 FT 0 IN

COMMON PATH -

57 FT 0 IN

TRAVEL DISTANCE - 79 FT 0 IN

36in 0.2

36in 0.2

36in 0.2

TRAVEL DISTANCE

- 73 FT 0 IN

RUMILLER

Snapshot

RUMILLER

Polygon

RUMILLER

Polygon

RUMILLER

Rectangle

RUMILLER

Polygon

RUMILLER

Rectangle

RUMILLER

Rectangle

RUMILLER

Rectangle

RUMILLER

Text Box

KEYNOTE:

RUMILLER

Text Box

RUMILLER

Text Box

1. Relocate existing sprinklers or add new ones as required for a code-compliant system, in accordance with UFC 3-600-01, NFPA 13, and the Tinker Fire Protection Design Standard.

2. Relocate existing fire alarm notification devices or add new notification devices as required for a code-compliant system, in accordance with UFC 3-600-01, NFPA 72, and the Tinker Fire Protection Design Standard.

3. Add new exit sign in Conference Room 160, Room 102B and Room 102.

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

RUMILLER

Text Box

1408068246E Rectangle

1408068246E Rectangle

1408068246E Rectangle

1408068246E Rectangle

1258024164E Stamp

1258024164E Stamp

1258024164E Stamp

1258024164E Stamp

B3 KEY PLAN

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

CONCEPT

SOW

W W

YK

RE

NO

VA

TE

N E

AR

EA

O F

SO

UT

H

PR

OJ

EC

T, B3

JA

N

TE

PA

-S R

M

R F

O G

LE

AD-101

F.

B

AK

ER

N . B

IR

C

H U

M

En gr

\D es ig n\ s\

\2

9\ 0_

Su pp or t\0

_3 _D ra w in gs

\M od el

AR

CH

IT

EC

TU

RA

L

DE

MO

LIT

IO

N

FL

OO

R

PL

AN

02 03

AD-101

ARCHITECTURAL DEMOLITION FLOOR PLAN

SCALE: 3/32" = 1'-0"

GENERAL NOTES

KEYED NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

DEMOLISH 2-HOUR RATED WALL AND AND ASSOCIATED RUBBER BASE UP TO

8'-0" AFF.

DEMOLISH PORTION OF ACOUSTICAL CEILING TILE AND GRID.

SM / SHARED

248 sf

MAIN COMP.

EQ. RM.

BREAK

ROOM

PZIE #4

(116 sf)

OPEN OFFICE

PZIO

OPEN OFFICE

VESTIBULE

CONFERENCE

ROOM

WAITING

WOMENS

RESTROOM

MAIN

CORRIDOR

CORRIDOR

ME

N'

S

W

OM

EN

'S

JA

N.

9A

NIC

B3 KEY PLAN

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

A-101

ARCHITECTURAL RENOVATION FLOOR PLAN

SCALE: 3/32" = 1'-0"

CONCEPT

SOW

W W

YK

RE

NO

VA

TE

N E

AR

EA

O F

SO

UT

H

PR

OJ

EC

T, B3

JA

N

TE

PA

-S R

M

R F

O G

LE

A-101

F

BA

KE

R

N B

IR

C

H U

M

En gr

\D es ig n\ s\

\2

9\ 0_

Su pp or t\0

_3 _D ra w in gs

\M od el

AR

CH

IT

EC

TU

RA

L

RE

NO

VA

TI

ON

FL

OO

R

PL

AN

03 03

GENERAL NOTES

KEYED NOTES

1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS

FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS FOR ACCURACY.

NEW 1-1/2 HOUR FIRE RATED STAINED WOOD DOOR AND PAINTED METAL

DOOR FRAME WITH STAINLESS STEEL KICKPLATE, DOOR HARDWARE AND

AUTOMATIC CLOSER.

NEW 2 HOUR FIRE RATED WALL USING 6" METAL STUDS SPACED 16" O.C. AND

2 LAYERS OF 5/8" TYPE C GYPSUM BOARD ON BOTH SIDES WITH MINERAL

WOOL BATT INSULATION, RUBBER BASE AND PAINT TO MATCH. REFERENCE

UL RATED WALL ASSEMBLY U419.

NEW 2 HOUR RATED CEILING AT 8'-0" AFF USING 6" METAL STUDS SPACED 16"

O.C. AND 2 LAYERS OF 5/8" TYPE C GYPSUM BOARD ON BOTH SIDES, PAINT

TO MATCH.

NEW CARPET FLOORING TILES TO MATCH CORRIDOR.

AREA 3

AREA 4

AREA 2AREA 1

SM / SHARED

MAIN COMP.

EQ. RM.

Conference 73 seats, shared

BREAK

ROOM

OPEN OFFICE

PZIO

OPEN OFFICE

VESTIBULE

CONFERENCE

ROOM

WAITING

WOMENS

RESTROOM

MAIN

CORRIDOR

ME

N'

S

W

OM

EN

'S

JA

N.

9A

Sheets and Views
G101
02-240149-AD-101-AD-101.pdf
Sheets and Views
AD-101
03-240149-A101-A-101.pdf
Sheets and Views
A-101
06-240149-M101-M-101.pdf
Sheets and Views
M-101

File details come from the government source that posted it. Updated .