These are redline architectural drawings for a roof repair project at Building 3, Section 8 on Tinker Air Force Base in Oklahoma. The documents, prepared by the 72nd ABW Civil Engineer Directorate, detail comprehensive roof renovation work including:
Demolition scope involves removing existing built-up roof system, gutters, downspouts, and metal wall panels, with specific instructions for 18-inch removal from leading edges. New construction includes installing an EPDM roofing system, new gutters and downspouts, metal wall panels, and a built-up roof system matching existing conditions. Structural repairs are extensive, with plans to reinforce wood joists, add new plywood sheathing, and address potential wood rot. Detailed technical drawings provide precise installation specifications for roofing materials, edge metal, penetration pockets, and gutter attachments, with careful attention to manufacturer warranty requirements and existing building infrastructure.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5th Ave
B
A v e
62540
61089
62509
62528
62523
62501X
43774
62512
62516
62525
35921
35916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
99999
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
99999
45134
96022
43120
41157
44045
45815
40592
40935
43610
62522
41163
15930
15930
11824
R U
N W
A Y
R
U
N
W
T A
X I W
G
T
A
X
I
W
H
TAXIWAY B
TAXIWAY C
T
A
X
I
W
M
A
X I W
K
A
X
IW
A Y
E
TAXIWAY A
T
A
X
I
W
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
T
A
X
I
W
J
A
X I W
G
A
X
IW
A Y
A
T
A
X
I
W
H
TAXIWAY C
TAXIWAY D
T
A
X
I
W
TAXIWAY F
E l m
C r e e k
C r u t c h o e e k
K u h lm a n C r e e k
K u h l m a n e e k
E e e k
E a s t u t c e e k
E e e k
E e e k
E e e k
K u h l m e e k
E a u t c e e k
West Crutcho Creek
W e s t
C r u t c h o
C r e e k
E e e k
S o ld ie r C r e e k
S o l d i e e e k
E a s t
C r u t c h o
C r e e k
E e e k
E a s t
C r u t c h o
C r e e k
E a s t
C r u t c h o
C r e e k
S o l d i e e k
E a u t c e e k
S o l d i e r
C r e e k
S o l d i e e k
S o l d i e r
C r e e k
E a u t c e e k
Arnold St.
E a s t
D r
SE 74th St
SE 59th St.
A i r
D e p o t
Patrol Rd.
S t a f f
D r
R e s e r v
R d
5th Ave
A
A v e
M u n i t i o
W a r e h o u s e
R d
B
A v e
7th St.
H
A v e
M c N a r n e y
A v e
Mitchell Ave
A l e r t
R d
C o o k
A v e
W e s t
D r
E
A v e
Extender Dr.
Sentry Rd.
34th St.
T w in in g D r
5th Ave.
J o n e s
Globemaster Dr.
T o w e r
R d
Vanaman Rd.
I n d u s t r i a l
B l v d
S o u t h
S t
1st St.
D o o l i t t l e
A v e
P i c n i c
R d
J a m e s
D r
W o l f
D
A i r
D e p o t
A i r
D e p o t
D
A v e
R a w l i n g s
A v e
P e r i m e t e r
R d
R a p c
R e s e r
L
A v e
Hercules /Mercury Rd.
F
A v e
1st St.
B r o w n
D r
P o n d
R d
O l d
A i r
D e p o t
A ir e y D r.
G e n e r
M t o
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
C
A v e
C
A v e
G arden P lot R d.
H i l l t p
D o r m i t o r y
R d
D o r m i t o y
M
A v e
C h e n n a u lt
D r
M i t c h e e
V a n d e n b u rg
S t.
E n g i n e
T e s t
D r
Doolittle Ave
W h i t e
D r
3rd Ave.
D
D r i v e
B a l l
P a r k
R d
Joint STARS Dr.
A i r
D e p o t
B l v d
Turbine Dr.
T u rb in e D r.
Central Plant Dr.
6th St.6th St.
F a l c
B l a c k b i
W e y l a n d l o o p
Propulsion Dr.
T h u n d e r b o
M uniti ons R
d. E xt.
C o d d in g
R d
Starlifter Dr.
Chidlaw Ct.
C o r s a i r
D r
R a p t
N i g h t
H a w k
C t
P h a n t
F r a n k l i n
P o w e r h o u s e
D r
S k y m a s t e r
D r
Spaatz Ct.
L a w r e n c e
M u n d e l l
Nabors Dr.
I n t r u d e r
D r
M c N i c k l e
M i l l e r
D r
T a i l
F e a t h
H o l d
A i r y i r
S m i
R a v
M i t c h e e
A i p o t
A i r
D e p o t
Vanaman Rd.
1st St.
1st St.
TINKER AFB, OK
VICINITY MAP
EAKER GATE
FIRE DEPARTMENT
B117
BASE OPERATIONS
B240
CONTRACTING
B3
VANCE
GATE
GOTT
GATE
TINKER GATE
PASS & ID
B6611
LIBERATOR
GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TEMPORARILY
CLOSED
TRUCK GATE
PIAZZA GATE
TEMPORARY
TRUCK GATE
HRUSKOCY
GATE
BASE CIVIL
ENGINEER
B400
PEGASUS
GATE
PROJECT
LOCATION
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
G011
PROJECT DRAWING INDEX
SHT.SEQ. SHEET TITLE
SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT: (CEFT)
GENERAL
GENERAL NOTES & VICINITY MAP
1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES OR COMPANIES IS
FOR THE PURPOSE OF ESTABLISHING MINIMUM QUALITY STANDARDS,
IDENTIFICATION AND GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION
OF OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED THE SPECIFIED
ITEMS IN TERMS OF PHYSICAL PROPERTIES, INCLUDING, COLOR RANGE,
FINISH, DURABILITY, APPEARANCE, PERFORMANCE CHARACTERISTICS, AND
OTHER FACTORS. OTHER PRODUCTS, MATERIALS, COLORS AND SYSTEMS,
MAY BE SUBMITTED FOR EVALUATION AND APPROVAL/DISAPPROVAL BY THE
CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE CONSIDERED AS A
WHOLE IN THAT THE GENERAL CONTRACTOR AND ALL THE
SUB-CONTRACTORS ARE RESPONSIBLE FOR THE INFORMATION PRESENTED
ON ALL SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF THE
SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL CONSTRUCTION
FENCING AND BARRICADES AS REQUIRED TO PROTECT CONSTRUCTION
MATERIAL AND TO PREVENT ANY UNAUTHORIZED PERSONNEL FROM
ENTERING THE CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES CAUSED BY
CONSTRUCTION TRAFFIC OR ANY CONSTRUCTION OPERATION SHALL BE
REPAIRED OR REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE UNDERSTOOD BY THE
CONTRACTOR TO REQUIRE ALL NEW LABOR & MATERIALS UNLESS
SPECIFICALLY NOTED TO BE "EXISTING" OR "BY OTHERS".
WWYK200083
REPAIR ROOF
SECTION 8, B3
KEY PLAN:
GENERAL NOTES:
DISCIPLINE
TINKER AFB, OK
1 2 3 4 5
E
D
C
B
A
1 2 3 4 5
E
D
C
B
A
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
T I N
K E
R
A
I
F
O R
B
S
E
O
K L A
H O
M A
M A
R K
D A
T E
D E
S C
R I P
T I O
N
I S
S U
E
D
A T
E
D E
S I G
N
G
R O
U P
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
F
I L
E
L
O C
A T
I O
N
SHEET
SHEET NUMBER
M A
N A
G E
M E
N
F O
R M
A T
I O
N R
E V
I S
I O
N S
P R
O J E
F O
R M
A T
I O
N
OF
PROJECT
LOCATION
G02
B3 AERIAL ROOF LAYOUT
RP01
B3 SECTION 8 NEW ROOF PLAN
DT01
DETAILS
RD01
B3 SECTION 8 ROOF DEMO PLAN
S00
GENERAL STRUCTURAL NOTES, ABBREVIATIONS, AND DETAILS
S01
STRUCTURAL REPAIR / DESIGN LAYOUT
G-01
01 07
G E
N E
R A
L
N
O T
E S
A N
D
V I C
I N
I T
Y
M
A P
T H
S
M
J
U
H L
P
G O
U C
H E
R
C
T
W Y
F O
R D
E n g r D e s i g n s
S u p p o r t
D r a w i n g s
W W
Y K
R E
P A
O
F
S E
C T
I O
N
B
Redline
Drawings
NIC
L A
D D
E R
NIC
NIC
PROJECT
LOCATION
G02
02 07
B
A
E R
I A
L
R O
Y O
U T
T H
M
J
U H
L
P
G O
U C
H E
R
J
U H
L
E n g r D e s i g n s S u p p o r t D r a w i n g s
W W
Y K
R E
P A
O
F
S E
C T
I O
N
B
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
T I N
K E
R
A
R
S
E
O
K L
A H
O M
A
M A
R K
D A
T E
D E
S C
R I P
T I O
N
I S
S U
E
D
A T
E
D E
S I G
N
G
R O
U P
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
F
I
C A
T I O
N
SHEET
SHEET NUMBER
M A
N A
G E
M E
F O
R M
A T
I O
N R
E V
I S
I O
N S
P R
O J E
F O
R M
A T
I O
N
OF
TINKER AFB, OK
1 2 3 4 5
E
D
C
B
A
1 2 3 4 5
E
D
C
B
A
B3 AERIAL ROOF LAYOUT
NTS
A/E ARCHITECT / ENGINEER
AB ANCHOR BOLT
ADDL ADDITIONAL
ADH ADHESIVE
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
ALUM ALUMINUM
ANC ANCHOR
APRX APPROXIMATE
APVD APPROVED
ARCH ARCHITECTURAL
BC BOTTOM CHORD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOL BOLLARD
BOT BOTTOM
BP BASE PLATE
BRG BEARING
BTB BACK TO BACK
BTW BETWEEN
C CHANNEL SHAPE
CHD CHORD
CIP CAST-IN-PLACE
CJ CONSTRUCTION JOINT
CL CENTERLINE
CLJ CONTROL JOINT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CTC CENTER TO CENTER
CTR CENTER
CY CUBIC YARD
D DEEP
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DEMO DEMOLITION
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIST DISTANCE
DL DEAD LOAD
DT DOUBLE TEE
DTL DETAIL
DWG DRAWING
DWL DOWEL
E EAST
EA EACH
GENERAL STRUCTURAL ABBREVIATIONS
E EAST
EA EACH
ECC ECCENTRIC
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EW EACH WAY
EWEF "EACH WAY, EACH FACE"
EWTB "EACH WAY, TOP AND BOTTOM"
EXP EXPANSION
EXST EXISTING
FAB FABRICATOR
FD FLOOR DRAIN
FDTN FOUNDATION
FG FINISHED GRADE
FIG FIGURE
FIN FINISH
FLR FLOOR
FOC "FACE OF CONCRETE,
FACE OF CURB"
FR FRAME
FRP FIBERGLASS REINFORCED
PLASTIC
FT "FEET, FOOT"
FTG FOOTING
FV FIELD VERIFY
GA GAGE (METAL THICKNESS)
GALV GALVANIZED
GEN GENERAL
GR GRADE
GRTG GRATING
HC HOLLOW CORE
HDR HEADER
HORIZ HORIZONTAL
HP HIGH POINT
HS HEADED STUD
HSS HOLLOW STRUCTURAL SHAPE
HT HEIGHT
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH
INT "INTERIOR, INTERSECTION"
INV INVERT
JF JOINT FILLER
JST JOIST
JT JOINT
K KIP
KB KNEE BRACE
KLF KIPS PER LINEAR FOOT
KSI KIPS PER SQUARE INCH
L "ANGLE, LENGTH"
LAD LADDER
LB POUND
LF LINEAR FOOT
LG LONG
LIN LINEAR
LLH LONG LEG HORIZONTAL MEMBER
MC MOMENT CONNECTION
MCJ MASONRY CONTROL JOINT
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
ML MASONRY LINTEL
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OVHG OVERHANG
PAR PARALLEL
PCF POUNDS PER CUBIC FOOT
PCLJ PARTIAL CONTROL JOINT
PEN PENETRATION
PL PLATE
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PS "PIPE SUPPORT, PUMP STATION "
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RECT RECTANGULAR
REF REFERENCE
REINF REINFORCING
REQD REQUIRED
REV REVISION
RO ROUGH OPENING
RTW RETAINING WALL
S SOUTH
SCH SCHEDULE
SECT SECTION
SF SQUARE FOOT
SHT SHEET
SIM SIMILAR
SL SLOPE
SLTD SLOTTED
SOG SLAB ON GRADE
SPA SPACING
SPEC SPECIFICATION
SQ SQUARE
SST STAINLESS STEEL
STD STANDARD DETAIL
STIR STIRRUP
STL STEEL
STR "STRUCTURAL, STRAIGHT"
SUSP SUSPENDED
T&B TOP AND BOTTOM
T/ TOP OF
TD TRENCH DRAIN
TEMP TEMPORARY
THK THICK
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOG TOP OF GRATING
TOM TOP OF MASONRY
TOS "TOP OF SLAB, TOP OF STEEL"
TOW TOP OF WALL
TPG "TOPPING, THROUGH PLATE
GIRDER"
TYP TYPICAL
ULT ULTIMATE
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VOL VOLUME
W "WEST, WIDE, WIDE FLANGE
BEAM"
W/ WITH
W/O WITHOUT
WF WIDE FLANGE
WLD WELDED
WM WIRE MESH
WP WORK POINT
WS WATERSTOP
WT WEIGHT
WWF WELDED WIRE FABRIC
A
SECTION 1A
N
O M
I N
A L
6" 6"
8d NAILS
STAGGERED
6" O.C.
ADD NEW 2x10
TO EXISTING 2x10 EXISTING 2x10
CONSTRUCTION
ADHESIVE
E Q
6"
E Q
E Q
E Q
SCALE:
WOOD JOIST REINFORCEMENT
NTS
S00
NEW BENT PL
" ON INTERIOR
FACE WITH
"Ø THRU BOLTS
WITH NUTS AND WASHERS AT
2'-0" O.C. FOR COLUMNS THAT
ARE WARPED, INCREASE DEPTH
OF BENT PL AS REQUIRED.
EXTERIOR WALL
4"
4"
EXIST. (4) - 2x10 COLUMN
SCALE:
WOOD JOIST REINFORCEMENT
NTS
S00
GENERAL
1. SCOPE
THE NOTES ON THIS SHEET AND THE STANDARD STRUCTURAL DETAILS ARE GENERAL AND APPLY TO THE ENTIRE PROJECT WHETHER
SPECIFICALLY CALLED OUT OR NOT, EXCEPT WHERE THERE ARE SPECIFIC INDICATIONS TO THE CONTRARY ON STRUCTURAL SHEETS. IF THERE
ARE QUESTIONS, THEY SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER AND ANSWERED IN WRITING PRIOR TO CONSTRUCTION.
2. APPLICABLE SPECIFICATIONS AND CODES
A. INTERNATIONAL BUILDING CODE, IBC 2015 WITH APPLICABLE EDITIONS OF THE CODE REFERENCED STANDARDS.
B. UNIFIED FACILITIES CRITERIA, UFC 1-200-01
C. UNIFIED FACILITIES CRITERIA, UFC 1-301-01
D. INTERNATIONAL EXISTING BUILDING CODE, IEBC 2015
E. NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION, NDS 2015
3. ROOF DESIGN CRITERIA
A. DEAD LOAD:
· ACTUAL TRIBUTARY STRUCTURE WEIGHT
· SUPERIMPOSED DEAD LOAD: 12 PSF
· COLLATERAL DEAD LOAD: 10 PSF
B. LIVE LOAD:
· ROOF 20 PSF (NOT REDUCIBLE)
C. WIND:
· ULTIMATE DESIGN WIND SPEED: 115 MPH
· RISK CATEGORY: II
· EXPOSURE: B
· ALL STRUCTURES ARE ENCLOSED
D. SEISMIC:
· RISK CATEGORY: II
· IMPORTANCE FACTOR: 1.0
· SPECTRAL RESPONSE ACCELERATION, S
S
: 0.256g
· SPECTRAL RESPONSE ACCELERATION, S
: 0.077g
· SITE CLASS: D
· SEISMIC DESIGN CATEGORY: B
· SPECTRAL RESPONSE COEFFICIENT, SD
S
: 0.272
· SPECTRAL RESPONSE COEFFICIENT, SD
: 0.123
· ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE
· BASIC SEISMIC-FORCE-RESISTING SYSTEMS: LIGHT FRAMED WALLS WITH SHEAR PANELS
· DESIGN BASE SHEAR: 2.3 K
· SEISMIC RESPONSE COEFFICIENT, CS: 0.039
· RESPONSE MODIFICATION FACTOR, R: 7.0
E. SNOW LOAD:
· GROUND SNOW LOAD: 10 PSF
· FLAT ROOF SNOW LOAD: 10 PSF
· EXPOSURE FACTOR: 1.0
· IMPORTANCE FACTOR: 1.0
· THERMAL FACTOR: 1.0
4. SAFETY
SAFETY AND STABILITY OF NEW AND EXISTING STRUCTURE DURING ALL PHASES OF CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
5. STANDARD DETAILS
THE STANDARD DETAILS DEPICT TYPICAL DETAILING TO BE USED ON THIS PROJECT. IF CONDITIONS ARE NOT EXPLICITLY SHOWN ON THE
DRAWINGS THEY SHALL BE MADE SIMILAR TO THE STANDARD DETAILS. OBTAIN APPROVAL OF ENGINEER IN WRITING FOR SIMILAR CONDITIONS
PRIOR TO CONSTRUCTION.
6. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS, DIMENSIONS AND ELEVATIONS OF EXISTING CONSTRUCTION AS REQUIRED TO
COORDINATE NEW CONSTRUCTION. SUBMIT REQUIRED CHANGES TO CONTRACTING OFFICER (CO) FOR APPROVAL.
7. SHOP DRAWINGS MUST INDICATE CHANGES TO CONSTRUCTION DOCUMENTS AND ALL CHANGES MUST BE CLEARLY IDENTIFIED.
8. PROJECT SPECIFICATIONS ARE A PART OF THE CONSTRUCTION DOCUMENTS AND ARE TO BE USED IN CONJUNCTION WITH THE DRAWINGS.
9. ALL PHASES OF CONSTRUCTION SHALL CONFORM TO THE MINIMUM STANDARDS OF THE BUILDING CODE(S) NOTED IN "DESIGN CRITERIA"
10. DO NOT LOAD THE CONCRETE SLAB ON GRADE WITH ERECTION EQUIPMENT ABOVE 600 PSF. THE SLABS HAVE NOT BEEN ANALYZED FOR
ERECTION EQUIPMENT LOADS.
11. DO NOT LOAD RAISED ACCESS FLOOR IN SERVER ROOM WITH ERECTION EQUIPMENT LOADS. ANY LOADING MUST BE SUPPORTED DIRECTLY ON
CONCRETE SLAB ON GRADE BELOW ACCESS FLOOR.
12. CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION, AS WELL AS SEQUENCE OF CONSTRUCTION THAT DOES NOT
IMPACT THE FINAL DESIGN AS SHOWN ON CONSTRUCTION DOCUMENTS.
STEEL
1. STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH THE REQUIREMENTS OF AISC SPECIFICATION FOR
THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL BUILDINGS, AISC MANUAL OF STEEL CONSTRUCTION (LOAD AND RESISTANCE
FACTOR DESIGN), AISC CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES. ALL CODES AND MANUALS SHALL BE THE LATEST
ADOPTED EDITIONS.
2. DESIGN STRENGTHS:
CHANNELS, ANGLES, PLATES, ETC.: A36 (Fy=36 KSI)
BOLTS A325
HARDENED STEEL WASHERS ASTM F436
3. ALL NEW STRUCTURAL STEEL SHALL BE SHOP PAINTED WITH PRIMER PRIOR TO ON SITE APPROVAL
4. SPLICING OF STRUCTURAL STEEL MEMBERS IS NOT ALLOWED, UNLESS SPECIFICALLY DETAILED ON THESE PLANS.
5. DO NOT FIELD CUT ANY STRUCTURAL STEEL MEMBERS IN CONFLICT WITH THE WORK WITHOUT APPROVAL BY THE ENGINEER OR UNLESS
SPECIFICALLY SHOWN ON THE CONSTRUCTION DOCUMENTS.
6. ALL HOLES IN STEEL MEMBERS SHALL BE DRILLED OR PUNCHED. TORCH CUT HOLES ARE NOT ALLOWED.
7. ERECT AND MAINTAIN TEMPORARY BRACING TO ENSURE THE ALIGNMENT AND STABILITY OF THE STRUCTURE DURING CONSTRUCTION UNTIL
PERMANENT CONDITIONS HAVE BEEN COMPLETED.
8. SHOP DRAWINGS ARE REQUIRED TO BE REVIEWED AND APPROVED BY THE GOVERNMENT PRIOR TO FABRICATION.
9. ALL BOLTED STRUCTURAL CONNECTIONS ARE BEARING TYPE CONNECTIONS UNLESS OTHERWISE SPECIFIED TO BE SLIP-CRITICAL. PROVIDE
LOAD INDICATING WASHERS AT SLIP-CRITICAL CONNECTIONS.
WOOD:
1. ALL LUMBER SHALL BE SOUTHERN PINE WITH A MAXIMUM MOISTURE CONTENT OF 19%, AND SHALL CONFORM TO THE GRADING RULES AS
PUBLISHED BY THE AMERICAN LUMBER STANDARD COMMITTEE (ALSC) FOR SOUTHER PINE LUMBER. THE GRADES NOTED BELOW SHALL BE USED
UNLESS OTHERWISE NOTED:
(A) ALL SAWN FRAMING LUMBER #1
(B) ALL SHIMS #2
2. ALL BOLTS BEARING ON LUMBER SHALL HAVE STANDARD CUT WASHERS UNDER THE BOLT HEAD AND NUT, UNLESS NOTED OTHERWISE.
3. LUMBER MAY NOT BE CUT OR NOTCHED FOR PIPES, CONDUIT, ETC. EXCEPT AS SHOWN ON THESE PLANS.
4. ALL NAILS USED OR CALLED OUT IN THESE CONSTRUCTION DOCUMENTS ARE TO BE COMMON NAILS UNLESS SPECIFICALLY SHOWN OTHERWISE.
NO OTHER NAILS SUCH AS SINKERS, RING SHANK, OR BOX NAILS ARE ALLOWED UNLESS SPECIFICALLY INDICATED ON THE CONSTRUCTION
DOCUMENTS. SCREWS ARE NOT AN ACCEPTABLE SUBSTITUTION FOR NAILS.
5. THE USE OF POWER-DRIVEN FASTENERS MAY BE ACCEPTABLE PROVIDED THAT A SUBMITTAL WITH THE REQUESTED SUBSTITUTION COMPLYING
WITH NER-272 BE SUBMITTED TO AND APPROVED BY THE GOVERNMENT PRIOR TO USE. THE CONTRACTOR SHALL CLEARLY INDICATE ON THE
SUBMITTAL THE SIZE, TYPE, QUANTITY, AND LOCATION (AT EACH CONDITION) WHERE THE SUBSTITUTIONS ARE REQUESTED.
6. PLYWOOD ROOF SHEATHING IS APA RATED WITH A SPAN RATING OF
AND
THICKNESS.
7. PLYWOOD ROOF DECK IS TO BE A STRUCTURAL DIAPHRAGM AND SHALL HAVE 1 PANEL CLIP PER SPAN AND BE FASTENED WITH 8D COMMON
NAILS SPACED AT 6" ON SUPPORTED PANEL EDGES AND 12" AT ALL INTERMEDIATE SUPPORTS.
8. THE PLANS INDICATE DECK SPAN DIRECTION.
9. SUSPENDED CEILINGS, LIGHT FIXTURES, DUCTS, AND OTHER UTILITIES SHALL NOT BE SUPPORTED FROM THE WOOD DECK.
S00
03 07
G E
N E
R A
L
S
T R
U C
T U
R A
L
N O
T E
S
A
B B
R E
V I A
T I O
N S
A N
D
D
E T
A I L
S
T H
M
C
T W
Y F
O R
D
P
G O
U C
H E
R
C
T W
Y F
O R
D
E n g r D e s i g n s
S u p p o r t
D r a w i n g s
W W
Y K
R E
P A
O
F
S E
C T
I O
N
B
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
T I N
K E
R
A
R
S
E
O
K L
A H
O M
A
M A
R K
D A
T E
D E
S C
R I P
T I O
N
I S
S U
E
D
A T
E
D E
S I G
N
G
R O
U P
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
F
I
C A
T I O
N
SHEET
SHEET NUMBER
M A
N A
G E
M E
F O
R M
A T
I O
N R
E V
I S
I O
N S
P R
O J E
F O
R M
A T
I O
N
OF
TINKER AFB, OK
1 2 3 4 5
E
D
C
B
A
1 2 3 4 5
E
D
C
B
A
KR
F
V
F
V
16'-10
" (FV)
16'-10
" (FV)
16'-10
" (FV)
16'-10
" (FV)
J N
23 3
1 2 1
NIC
NIC
NIC
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J N
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
J S
6 6
19'-0"
33'-9
" 33'-9
S01
04 07
S T
R U
C T
U R
A L
R E
P A
E S
I G
N
L A
Y O
U T
T H
M
C
T W
Y F
O R
D
P
G O
U C
H E
R
C
T W
Y F
O R
D
E n g r D e s i g n s
S u p p o r t
D r a w i n g s
W W
Y K
R E
P A
O
F
S E
C T
I O
N
B
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
T I N
K E
R
A
R
S
E
O
K L
A H
O M
A
M A
R K
D A
T E
D E
S C
R I P
T I O
N
I S
S U
E
D
A T
E
D E
S I G
N
G
R O
U P
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
F
I
C A
T I O
N
SHEET
SHEET NUMBER
M A
N A
G E
M E
F O
R M
A T
I O
N R
E V
I S
I O
N S
P R
O J E
F O
R M
A T
I O
N
OF
TINKER AFB, OK
1 2 3 4 5
E
D
C
B
A
1 2 3 4 5
E
D
C
B
A
STRUCTURAL REPAIR / DESIGN LAYOUT
KEY PLAN
LEGEND:
= FULL LENGTH WOOD JOIST TO BE ADDED ALONG
SIDE OF EXISTING DAMAGED JOIST
REFER DETAIL 1 / S00
= JOIST NORTH #1JN1
= JOIST SOUTH #1JS1
SCALE:
" = 1'-0"
CONTRACTOR TO FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO ANY DEMOLITION OR NEW WORK.
CONTRACTOR SHOULD TAKE NOTE THAT THE EXISTING
BUILDING HAS AREAS OF WOOD ROT THAT MAY NOT BE
READILY APPARENT. THE CONTRACTOR IS TO
DETERMINE THE MEANS AND METHODS CONCERNING
DEMOLITION AND THE CORRESPONDING SAFETY MEASURES.
NUMBERED JOISTS ARE TO BE STRENGTHENED WITH THE
ADDITION OF A NEW 2X10 WOOD JOIST. REFER DETAIL 1/S00
NUMBERED COLUMNS ARE TO BE STRENGTHENED WITH
THE ADDITION OF A NEW STEEL BENT PLATE. REFER 2/S00
REFER GENERAL NOTES SHEET S00 FOR PLYWOOD
SHEATHING INFORMATION (THICKNESS, SPAN RATING,
ATTACHMENT, ETC...)
1.
2.
3.
4.
5.
SHEET NOTES
KEYED NOTES
EXSITING 16"x36" REINFORCED CONCRETE BEAM
EXSITING REINFORCED CONCRETE TEE BEAM
EXISTING 3' DEEP WOOD TRUSS
EXISTING 2x10 WOOD BLOCKING AT CENTERLINE OF JOISTS
EXISTING 2x10 WOOD JOISTS AT 16" O.C. TYPICAL
EXISTING (4)-2X10 WOOD COLUMN
NEW PLYWOOD SHEATHING SPAN DIRECTION
KR
RTU
ELECTRICAL LINE
L A
D D
E R
GAS LINE
G A
S
L
I N
E
S L
O P
E
S
T R
U C
T U
R A
L
18"18"
3 33
DUCT
DUCT
RD01
05 07
C
T I O
N
R O
M
O
P L
A N
T H
M
J
U H
L
P
G O
U C
H E
R
J
U H
L
E n g r D e s i g n s
S u p p o r t
D r a w i n g s
W W
Y K
R E
P A
O
F
S E
C T
I O
N
B
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
T I N
K E
R
A
R
S
E
O
K L
A H
O M
A
M A
R K
D A
T E
D E
S C
R I P
T I O
N
I S
S U
E
D
A T
E
D E
S I G
N
G
R O
U P
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
F
I
C A
T I O
N
SHEET
SHEET NUMBER
M A
N A
G E
M E
F O
R M
A T
I O
N R
E V
I S
I O
N S
P R
O J E
F O
R M
A T
I O
N
OF
TINKER AFB, OK
1 2 3 4 5
E
D
C
B
A
1 2 3 4 5
E
D
C
B
A
B3 SECTION 8 ROOF DEMO PLAN
KEY PLANKEY PLAN
SHEET NOTES
REMOVE EXISTING BUR SYSTEM DOWN TO
THE DECK PER SOW
EXISTING 15KV ARMOUR CLAD CABLE
TO BE RELOCATED BY OTHERS
REMOVE EXISTING GUTTER AND DOWN
SPOUTS
REMOVE EXISTING METAL WALL PANELS
REMOVE EXISTING BUR SYSTEM 18" FROM
LEADING EDGE PER SOW
GENERAL NOTES
THE EXISTING STRUCTURE HAS A
" PER FOOT SLOPE
NTS
DUCT
NIC
L A
D D
E R
S L
O P
E
P
DT01
DT01
DT01
DT01
TYP
SADDLE
DT01
TYP
SADDLE
18"18"
2 2
KR
RTU
L A
D D
E R
GAS LINE
G A
S
L
I N
E
18"18"
DUCT
2 2 2
RP01
06 07
C
T I O
N
N E
W
R
O O
F
P L
A N
T H
M
J
U H
L
P
G O
U C
H E
R
J
U H
L
E n g r D e s i g n s
S u p p o r t
D r a w i n g s
W W
Y K
R E
P A
O
F
S E
C T
I O
N
B
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
T I N
K E
R
A
R
S
E
O
K L
A H
O M
A
M A
R K
D A
T E
D E
S C
R I P
T I O
N
I S
S U
E
D
A T
E
D E
S I G
N
G
R O
U P
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
F
I L
E
L
O C
A T
I O
N
SHEET
SHEET NUMBER
M A
N A
G E
M E
F O
R M
A T
I O
N R
E V
I S
I O
N S
P R
O J E
F O
R M
A T
I O
N
OF
TINKER AFB, OK
1 2 3 4 5
E
D
C
B
A
1 2 3 4 5
E
D
C
B
A
B3 SECTION 8 NEW ROOF PLAN
INSTALL NEW EPDM ROOFING SYSTEM PER SOW
INSTALL NEW GUTTER AND DOWN SPOUTS
INSTALL NEW METAL WALL PANELS PER SOW
INSTALL NEW BUR SYSTEM TO MATCH EXISTING
PER SOW
NTS
KEY PLANKEY PLAN
SHEET NOTES
WOOD NAILER
PREFABRICATED METAL CURB
2 X 6 MIN. WOOD NAILER
ATTACHED TO SUBSTRATE
OVERALL THICKNESS TO
MATCH INSULATION
REINFORCED MEMBRANE
ATTACHMENT STRIP WITH
SEAM PLATES AND FASTENERS
ADHERED 90 MIL WHITE
EPDM MEMBRANE FLASHING
F L
A S
H I N
G
H
E I G
H T
M
I N
I M
U M
BONDING ADHESIVE
ROOFTOP EQUIPMENT FRAME
24 GAUGE REMOVABLE
SHEET-METALCOUNTERFLASHING
GASKETED FASTENER
MIN. TWO FASTENERS
PER SIDE
CORNER FLASHING PIECE
AT EACH CORNER
SEAL ALL EXPOSED EDGES
FASTENERS
APPROX. 8" O.C.
MIN. TWO PER SIDE
SEALANT WATER BLOCK
2 X 6 MIN. WOOD NAILER
ATTACHED TO SUBSTRATE
OVERALL THICKNESS TO
MATCH INSULATION
SHEET-METAL GUTTER
THE FRONT OF THE
GUTTER SHOULD BE A
MIN. 1'' LOWER THAN
THE BACK TO ALLOW
OVERFLOW
GUTTER BRACKET
SUPPORT
SEALANT
ADHERED MEMBRANE FLASHING
PER THE MANUFACTURER'S
WARRANTY PER THE
MANUFACTURER'S
WARRANTY REQUIREMENTS
24 GAUGE PVDF
SHEET-METAL
EDGE FLASHING
18 GAUGE GUTTER
SPACERS INSTALLED
12" OC BETWEEN
GUTTER BRACKETS
BONDING
ADHESIVE
FIELD SHEET OR SEPARATE
MEMBRANE SHEET EXTENDED
BELOW BLOCKING
SEALANT (IF REQUIRED FOR
THE SPECIFIC SYSTEM)
WEATHERPROOF SHEET-METAL
PENETRATION POCKET
NON-SHRINK
GROUT
ADHERED MEMBRANE FLASHING
EXTEND 1'' MIN. INTO
PENETRATION POCKET
ADHESIVE
2" APPROX.
POURABLE SEALANT
CORNER FLASHING PIECE AT
EACH CORNER--SEAL ALL
EXPOSED EDGES
EXISTING
BUILT-UP
ROOF
NEW
METAL PANEL
3" BATT
INSULATION
HAT
CHANNEL
SHELF
FLASHING
2 PIECE
METAL
FLASHING
EPDM
ISO
" PLYWOOD
EXISTING
WOOD SIDING
M
I N
18" MIN
NEW
24 GAUGE PVDF
COATED GRAVEL
STOP
NEW
BUILT-UP
ROOF
NEW
18 GAUGE
SECURE PLATE
NEW
METAL
PANEL
EXISTING
STRUCTURE
NEW
INSULATION
FASTENED
6" O.C. INTO
EXISTING
DECK
FASTENER
12" O.C.
DT-01
BASE FLASHING AT PREFABRICATED METAL CURB
NTS
DT-01
GUTTER WITH PERIMETER EDGE METAL
NTS
DT-01
PENETRATION POCKET-SINGLE PENETRATION
NTS
DT-01
NEW METAL PANEL TO EXISTING WALL
NTS
DT-01
NEW GUTTER AT TOP OF METAL WALL PANEL
NTS
DT01
07 07
D E
T A
I L
S
T H
M
J
U H
L
P
G O
U C
H E
R
J
U H
L
E n g r D e s i g n s
S u p p o r t
D r a w i n g s
W W
Y K
R E
P A
O
F
S E
C T
I O
N
B
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
T I N
K E
R
A
R
S
E
O
K L
A H
O M
A
M A
R K
D A
T E
D E
S C
R I P
T I O
N
I S
S U
E
D
A T
E
D E
S I G
N
G
R O
U P
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
F
I L
E
L
O C
A T
I O
N
SHEET
SHEET NUMBER
M A
N A
G E
M E
F O
R M
A T
I O
N R
E V
I S
I O
N S
P R
O J E
F O
R M
A T
I O
N
OF
TINKER AFB, OK
1 2 3 4 5
E
D
C
B
A
1 2 3 4 5
E
D
C
B
A
| 01-200083-G01 |
| Sheets and Views |
| G01 |
| 02-200083-G02 |
| Sheets and Views |
| G02 |
| 03-200083-S00 |
| Sheets and Views |
| S00 |
| 04-200083-S01 |
| Sheets and Views |
| S01 |
| 05-200083-RD01 |
| Sheets and Views |
| RD01 |
| 06-200083-RP01 |
| Sheets and Views |
| RP01 |
| 07-200083-DT01 |
| Sheets and Views |
| DT01 |