000_TABLE OF CONTENTS.pdf

PDF 70 KB Posted

Attached to
TINKER AFB MAC BOA WWYK240149 RENOVATE NE AREA OF SOUTH PROJECT, B3
Solicitation number
FA813725R0016
Issued by

About this file

This document is a Table of Contents for Tinker Air Force Base General Requirements, dated January 2022. The table of contents is organized into two primary divisions: Division 00 - Procurement and Contracting Requirements and Division 01 - General Requirements.

The Procurement and Contracting Requirements section includes documents covering general requirements, safety requirements, environmental requirements, and special provisions for working on Tinker Air Force Base, with specific focus on construction activities. The General Requirements section outlines procedural documents such as construction progress schedules, submittal procedures, design data, quality control, contractor facilities, and closeout documentation. These sections provide comprehensive guidelines and administrative frameworks for construction projects at the Tinker Air Force Base facility.

View the file

Other files

File Type Posted
240149_pre-bid_RFIs_responses_COR.pdf PDF
WWYK240149 MAC BOA Site Visit.pdf PDF
Solicitation - FA813725R0016.pdf PDF
Solicitation - FA813725R0016.pdf PDF
2020 TAFB Facility Standard.pdf PDF
240149_Drawings.pdf PDF
00 80 00.pdf PDF
01 45 00.00 10.pdf PDF
01 42 00.pdf PDF
Headhouse-Widow-Elevation.pdf PDF
00003A-FP01.pdf PDF
240149_Submittal_Register.xlsx XLSX spreadsheet
240149 SOW att2 Design Narrative.pdf PDF
UMRL.pdf PDF
01 78 23.pdf PDF
240149_SOW.pdf PDF
Original AsBuilts.pdf PDF
00 71 00.pdf PDF
240149_Submittal_Register.pdf PDF
01 32 16.00 20.pdf PDF
090069 Sustain RAC Structural Failures In B3.pdf PDF
00 70 00.pdf PDF
940084A.pdf PDF
2023 TAFB Fire Protection Standard.pdf PDF
00 72 00.pdf PDF
970116 Repr Wooden Trusses.pdf PDF
240149 SOW att1 Draft RMDF.pdf PDF
2020 TAFB Mechanical Standard.pdf PDF
880371.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
00 80 05.pdf PDF
01 50 00.pdf PDF
2024 TAFB Electrical Standards.pdf PDF
20200083 As Built Drawings.pdf PDF
01 78 00.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tinker AFB Tinker General Requirements

January 2022 Page 1 TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 70 00

00 71 00

00 72 00

00 80 00 00 80 05

GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE

BASE

GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR

FORCE BASE

GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON

TINKER AIR FORCE BASE

SPECIAL PROVISIONS FOR WORKING ON TINKER AFB

SPECIAL PROVISIONS FOR WORKING ON OR NEAR THE AIRFIELD ON

TINKER AFB

DIVISION 01 - GENERAL REQUIREMENTS

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 33 16.00 10 DESIGN DATA (DESGIN AFTER AWARD)

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 50 00 CONTRACTOR FACILITIES

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

-- End of Table of Contents –-