20-25 523 Bid Proposal Spreadsheet.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- IRON BRIDGE PUMP STATION REHABILITATION
- Solicitation number
- CIZ-DWU 25 523
- Issued by
- Uvalde County, Texas
About this file
This is a bid proposal spreadsheet for Dallas Water Utilities' Iron Bridge Pump Station Rehabilitation project (Contract No. 25-523) located at 4077 Co Rd 3706, Wills Point, Texas. The project encompasses civil, structural, architectural, process-mechanical, electrical, and instrumentation work at the pump station situated on Lake Tawakoni. The base bid section includes eight line items: pump station improvements (1 lump sum), intake gate replacement (4 units), mobilization for confined space work in the flume (1 lump sum), concrete mortar repair (325 cubic feet), concrete crack repair (1,500 linear feet), horizontal split case pump unit modifications with baseframe replacement (6 units), horizontal split case pump unit modifications without baseframe replacement (6 units), and storm water pollution prevention plan and dust control (1 lump sum). Bids were received on April 17, 2026, with completion timing governed by special provisions S-6 and S-12.
The spreadsheet includes three additive alternates: Additive Alternate A1 for Lake Tawakoni silt dredging and mobilization (5,000 cubic yards), Additive Alternate A2 for additional intake gate rehabilitation (1 lump sum), and Additive Alternate A3 for a backup generator (1 lump sum). Bidders were instructed to complete information in designated yellow cells and submit the completed proposal spreadsheet in Excel format (.xls) to Bonfire. All pricing fields in the spreadsheet show $0.00 placeholder values, indicating this is a template awaiting contractor bid submissions with unit prices and total amounts for each line item and alternate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18-25 523 SPECIFICATIONS VOLUME 3 OF 4.pdf | ||
| 17-25 523 SPECIFICATIONS VOLUME 2 OF 4.pdf | ||
| 10-BEH-FRM-602.SAW.pdf | ||
| 2-BDPS-FORM-146 Non Disclosure Statement City of Dallas.doc | DOC document | |
| 3-BID-FRM-216 Change of MWBE Subcontractor Form.pdf | ||
| 13-BEH-FRM-607.SAW.pdf | ||
| 4-Bid Bond.docx | DOCX document | |
| 11-BEH-FRM-603.SAW.xlsx | XLSX spreadsheet | |
| 12-BEH-FRM-604.SAW.pdf | ||
| 1-Acknowledgement of Addendum.docx | DOCX document | |
| 7-Experience Record.pdf | ||
| 5-Bidders Affidavit.docx | DOCX document | |
| 19-25 523 DRAWINGS VOLUME 4 OF 4.pdf | ||
| 21-25 523 SPECIFICATIONS VOLUME 1 OF 4.pdf | ||
| 9-OPS-FRM-640 -Team Make-Up and Local Workforce Form.xlsx | XLSX spreadsheet | |
| 8-Form 25 Cement Preference Certification.pdf | ||
| 15-BEH-FRM-610.SAW.pdf | ||
| 16-Bid Proposal Submittal Form.pdf | ||
| 14-BEH-FRM-609.SAW.pdf | ||
| 6-Environmental Record Affidavit.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| DALLAS WATER UTILITIES |
| PROJECT NAME: IRON BRIDGE PUMP STATION REHABILITATION |
| CONTRACT NO. 25-523 |
| TIME OF COMPLETION AS PER SPECIAL PROVISIONS S-6 AND S-12 |
| BIDS RECEIVED: APRIL 17, 2026 |
| Instructions to Bidders: | |
| 1 | Bidder to complete information in yellow cells. |
| 2 | Upload complete Bid Proposal Spreadsheet to Bonfire in Excel (.xls) format. |
CONTRACTOR'S NAME (Below)
| BASE BID ITEMS | ||||||
| SECTION A | ||||||
| ITEM | QTY | UNITS | DESCRIPTION | UNIT PRICE | UNIT PRICE DOLLARS AND CENTS (In Words) | TOTAL AMOUNT |
| 1 | 1 | LS | PUMP STATION IMPROVEMENTS | $0.00 | $0.00 | |
| 2 | 4 | EA | INTAKE GATE REPLACEMENT | $0.00 | $0.00 | |
| 3 | 1 | LS | MOBILIZATION FOR CONFINED SPACE WORK IN THE FLUME | $0.00 | $0.00 | |
| 4 | 325 | CF | CONCRETE MORTAR REPAIR | $0.00 | $0.00 | |
| 5 | 1,500 | LF | CONCRETE CRACK REPAIR | $0.00 | $0.00 | |
| 6 | 6 | EA | HORIZONTAL SPLIT CASE PUMP UNIT MODIFICATIONS (BASEFRAME REPLACEMENT WITH PUMP AND MOTOR LEVELING) | $0.00 | $0.00 | |
| 7 | 6 | EA | HORIZONTAL SPLIT CASE PUMP UNIT MODIFICATIONS (PUMP AND MOTOR LEVELING) | $0.00 | $0.00 | |
| 8 | 1 | LS | STORM WATER POLLUTION PREVENTION PLAN AND DUST CONTROL | $0.00 | $0.00 | |
| TOTAL BASE BID | $0.00 |
SECTION B ADDITIVE ALTERNATES
| ADDITIVE ALTERNATE A1 | ||||||
| ITEM | QTY | UNITS | DESCRIPTION | UNIT PRICE | DOLLARS AND CENTS (In Words) | TOTAL AMOUNT |
| A1 | 5,000 | CY | LAKE TAWAKONI SILT DREDGING AND MOBILIZATION FOR LAKE TAWAKONI SILT DREDGING | $0.00 | $0.00 | |
| TOTAL ADDITIVE ALTERNATE A1 | $0.00 |
| ADDITIVE ALTERNATE A2 | ||||||
| ITEM | QTY | UNITS | DESCRIPTION | UNIT PRICE | DOLLARS AND CENTS (In Words) | TOTAL AMOUNT |
| A2 | 1 | LS | ADDITIONAL INTAKE GATE REHABILITATION | $0.00 | $0.00 | |
| TOTAL ADDITIVE ALTERNATE A2 | $0.00 |
| ADDITIVE ALTERNATE A3 | ||||||
| ITEM | QTY | UNITS | DESCRIPTION | UNIT PRICE | DOLLARS AND CENTS (In Words) | TOTAL AMOUNT |
| A3 | 1 | LS | BACKUP GENERATOR | $0.00 | $0.00 | |
| TOTAL ADDITIVE ALTERNATE A3 | $0.00 |