11-BEH-FRM-603.SAW.xlsx

XLSX spreadsheet 100 KB Posted

Attached to
IRON BRIDGE PUMP STATION REHABILITATION
Solicitation number
CIZ-DWU 25 523
Issued by
Uvalde County, Texas

About this file

This is a Schedule of Work form (BEH-FRM-603) used by the City of Dallas to document prime contractor team composition, subcontractor participation, and Small Business Enterprise (SBE) utilization for contract awards. The form applies to the Iron Bridge Pump Station Rehabilitation project located at 4077 Co Rd 3706, Wills Point, Texas, a facility situated on Lake Tawakoni operated by DWU. The project encompasses comprehensive rehabilitation work across six primary categories: civil work including dredging, dewatering, lake bank reinforcement, and gate replacement; structural work involving concrete repair, flume rehabilitation, and guard rail improvements; architectural improvements such as roof replacement and elevator rehabilitation; process-mechanical work including intake gates, pump discharge valving, and automation systems; electrical rehabilitation covering low-voltage and medium-voltage equipment along with backup generator installation; and instrumentation work for process-mechanical monitoring systems.

The Schedule of Work establishes the baseline for SBE participation monitoring throughout the contract lifecycle and requires prime contractors to list all firms performing work with corresponding NAICS codes, dollar values, and percentages of total contract value. The form mandates that all listed SBE firms perform a Commercially Useful Function, managing and independently performing their identified scope of work with their own labor and resources. Prime contractors must declare their committed SBE utilization percentage against the goal stated in the specifications and provide detailed payment information including amounts paid to date and current period payments. Any changes to the subcontractor list require submission of a revised schedule with documented explanations and the BEH-FRM-501.PAC Change of Subcontractor Form for City approval. Non-compliance may result in contract termination, sanctions, or ineligibility for future City contracts.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BEH-FRM-603

Contract/Project Name:
Solicitation #:Contract #:
Purpose
This Schedule of Work confirms the Prime Contractor’s final team composition, subcontractor participation, certification status, and planned SBE utilization at time of award. This form establishes the baseline for SBE participation monitoring throughout the life of the contract.
Instructions for Completing this Schedule
1The first row in the Schedule of Work table must list the Prime Contractor and identify SBE certification if applicable.
2Enter only one firm per row
3If a firm performs more than one distinct type of work, list each scope on a separate row.
4Provide all required information for each firm. If a SBE does not apply, leave blank
5Enter dollar values without commas or special characters unless otherwise indicated.
6If the firm is certified as an SBE, provide the certification number exactly as issued.
Definitions
Scope/Work ElementDescription of the specific type of work being performed by the firm (Prime or 1st-tier subcontractor).SBE #SBE certification number (if applicable)
NAICS CodeEnter the code(s) that correspond to the specific scope of work listed in that row.
If multiple distinct scopes are performed, use separate rows.Code LookupValue of WorkTotal dollar value of work assigned to this firm
Company NameLegal business name of the firm performing the work.Percent (%)Percentage of total contract value assigned to this firm (Auto Calculates
Company AddressLocal Address (City, State, ZIP, County) *Use ALT+Enter for new line within the cell*Payments to DateTotal amount paid to the firm to date
Contact Name, Phone & EmailPrimary contact for this firm (name, phone, email) *Use ALT+Enter for new Line*Payment this PeriodAmount paid to the firm during current reporting period
Schedule
Scope/Work ElementNAICS/NIGP CodeCompany NameCompany AddressContact Name, Phone & EmailSBE #Value of WorkPercent
(%)Payments to DatePayment this Period
Totals0.00%
Respondent's SBE Participation Plan Total
Instructions:Enter the "Goal (As Stated in Specifications)" and your "Committed amount. All other fields calculate automatically.
Goal (As Stated in Specifications)Contract Amount to be Paid to Prime$0.00
SBE Utilization Committed %SBE Total Amount$0.00
Committed To dateTotal Contract Amount
Anticipated Total SBE Participation Percentage
Prime Contractor Certification and Signature
The undersigned intends to enter into a formal agreement with the subcontractors listed, conditioned upon being awarded the City of Dallas contract. The Prime contractor further certifies that each listed SBE firm will perform a Commercially Useful Function (CUF), meaning it will manage, supervise, and independently perform its identified scope of work with its own labor and resources, and that only such work is eligible for SBE participation credit under the DRIVE Policy.

If any changes are made to this list, the Prime contractor must submit to the City for approval a revised schedule with documented explanations for the changes and the BEH-FRM-501.PAC Change of Subcontractor Form. Failure to comply with this provision may result in termination of the contract, sanctions against the Prime contractor, and/or ineligibility for future City contracts.

FALSEBy checking this box, I certify that I am authorized to submit this schedule; that the listed SBE firms will perform a Commercially Useful Function as described above; and that I will comply with all requirements regarding changes and approvals. Additionally, I certify that the information provided in this Schedule of Work and Actual Payment form is accurate and complete and that the City may verify all information provided.
Company Name
Printed Name
TitleDate

FALSE

&G &"-,Bold"&12Dallas Regional Inclusive Vendor Enterprise Schedule of Work and Actual Payment

BEH-FRM-603.SAW

BEH-FRM-603.SAW Revision Date 2026.03.01 &P of &N https://www.census.gov/naics/ image1.png

File details come from the government source that posted it. Updated .