10-BEH-FRM-602.SAW.pdf
PDF 118 KB Posted
- Attached to
- IRON BRIDGE PUMP STATION REHABILITATION
- Solicitation number
- CIZ-DWU 25 523
- Issued by
- Uvalde County, Texas
About this file
This document is a Small Business Enterprise (SBE) Affidavit form (BEH-FRM-602.SAW) issued by the City of Dallas under its Dallas Regional Inclusive Vendor Enterprise (DRIVE) Policy, adopted via City Council Resolution #25-1879. The affidavit applies to the Iron Bridge Pump Station Rehabilitation project located at 4077 Co Rd 3706, Wills Point, Texas, on Lake Tawakoni, which encompasses civil work including dredging and lake bank reinforcement; structural work involving concrete repair and upper level rehabilitation; architectural improvements such as roof replacement and elevator rehabilitation; process-mechanical items including intake gates, pump discharge valving, and hydraulic system demolition; electrical rehabilitation for low and medium-voltage equipment and backup generator installation; and instrumentation related to process-mechanical systems. All respondents to City solicitations must acknowledge and comply with the DRIVE Policy's SBE participation requirements and support the City's goals of increasing small business participation across the Dallas-Fort Worth-Arlington Metropolitan Statistical Area.
The City establishes both annual aspirational SBE benchmarks by procurement category and contract-specific SBE subcontracting goals, with aspirational benchmarks set at 33 percent for Goods and Construction, 34 percent for Architecture & Engineering, 38 percent for Professional Services, and 30 percent for Other Services. Only work performed by subcontractors executing a Commercially Useful Function (CUF) through managing, supervising, and performing contracted scope with their own labor and resources may be counted toward SBE participation. Respondents must submit accurate information regarding SBE participation and subcontractor commitments, and any proposed changes to SBE subcontractors require prior submission of revised documentation and approval from the Business Enterprise Hub before implementation. The City conducts monthly compliance audits through its designated compliance system, requiring both prime contractors and all subcontractors to respond to audit inquiries regarding payment verification, CUF confirmation, and progress reporting, with failure to provide timely responses potentially resulting in payment delays or impacts to future contract eligibility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18-25 523 SPECIFICATIONS VOLUME 3 OF 4.pdf | ||
| 17-25 523 SPECIFICATIONS VOLUME 2 OF 4.pdf | ||
| 2-BDPS-FORM-146 Non Disclosure Statement City of Dallas.doc | DOC document | |
| 3-BID-FRM-216 Change of MWBE Subcontractor Form.pdf | ||
| 13-BEH-FRM-607.SAW.pdf | ||
| 4-Bid Bond.docx | DOCX document | |
| 11-BEH-FRM-603.SAW.xlsx | XLSX spreadsheet | |
| 12-BEH-FRM-604.SAW.pdf | ||
| 1-Acknowledgement of Addendum.docx | DOCX document | |
| 7-Experience Record.pdf | ||
| 5-Bidders Affidavit.docx | DOCX document | |
| 19-25 523 DRAWINGS VOLUME 4 OF 4.pdf | ||
| 20-25 523 Bid Proposal Spreadsheet.xlsx | XLSX spreadsheet | |
| 21-25 523 SPECIFICATIONS VOLUME 1 OF 4.pdf | ||
| 9-OPS-FRM-640 -Team Make-Up and Local Workforce Form.xlsx | XLSX spreadsheet | |
| 8-Form 25 Cement Preference Certification.pdf | ||
| 15-BEH-FRM-610.SAW.pdf | ||
| 16-Bid Proposal Submittal Form.pdf | ||
| 14-BEH-FRM-609.SAW.pdf | ||
| 6-Environmental Record Affidavit.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dallas Regional Inclusive Vendor Enterprise Small Business Enterprise (SBE) Affidavit
BEH-FRM-602.SAW
BEH-FRM-602.SAW Revision Date: 2026.03.01 Page 1 of 3
Solicitation Name: Solicitation #:
Prime Vendor Information Prime Vendor Legal Business Name:
Headquarters (HQ) Address:
City: State: County:
Local Office Address (if different than HQ):
City: State: County:
Primary Contact Name:
Title:
Email:
Phone:
SBE Program Acknowledgement
It is the policy of the City of Dallas to promote contracting and broaden opportunities for small businesses through the Dallas Regional Inclusive Vendor Enterprise (DRIVE) Policy, adopted by City Council under Council Resolution #25-1879. All respondents to City solicitations are required to support the City’s goals of increasing small business participation, strengthening the regional vendor marketplace, and advancing economic impact across Dallas and the Dallas–Fort Worth–Arlington Metropolitan Statistical Area (MSA).
The respondent acknowledges that the City establishes two types of SBE goals under the DRIVE Policy: (1) annual aspirational SBE benchmarks by procurement category, and (2) contract-specific SBE subcontracting goals.
Aspirational benchmarks represent the City’s overall, program-wide participation goals for major procurement categories such as Goods, Construction, Architecture & Engineering, Professional Services, and Other Services. These benchmarks are based on regional marketplace conditions and may be adjusted periodically. They are used to measure the City’s overall progress in advancing small business participation.
Category Aspirational Benchmark Goal Category Aspirational
Benchmark Goal
Goods 33% Architecture &
Engineering (A/E) 34%
Construction 33% Professional Services 38%
Other Services 30%
BEH-FRM-602.SAW
BEH-FRM-602.SAW Revision Date: 2026.03.01 Page 2 of 3
The City updates these benchmarks periodically based on market availability, utilization data, and regional capacity. The respondent is responsible for complying with the most current benchmarks as published or referenced in the solicitation.
Contract-specific SBE goals are tailored for each solicitation and reflect the availability of ready, willing, and able SBE firms for the scopes, trades, and disciplines included in that contract. The Business Enterprise Hub (BEH) uses marketplace research, availability analysis, and historical participation data to determine these goals. Contract-specific goals may be higher or lower than the aspirational benchmarks depending on the opportunities associated with the specific solicitation.
By signing this Affidavit, the respondent acknowledges receipt of the SBE Program requirements, including the annual aspirational benchmarks and any contract-specific SBE goals established for this procurement.
The respondent further affirms responsibility for submitting accurate and truthful information regarding SBE participation, subcontractor commitments, SBE self-performance (if applicable), and any documentation required to demonstrate good-faith efforts under the DRIVE Policy.
Subcontracting, CUF Obligation, & Change of Sub Requirements
The respondent understands that the SBE subcontracting commitments submitted with their solicitation response constitute material representations of intent. Only the work performed by subcontractors who execute a Commercially Useful Function (CUF) including managing, supervising, and performing their contracted scope of work with their own labor and resources may be counted toward SBE participation.
Any proposed change involving SBE subcontractors including reductions in scope, reassignment of work, substitution, or removal requires prior submission of:
(1) a revised BEH-FRM-603.SAW — Schedule of Work and Actual Payment, and
(2) a BEH-FRM-501.PAC — Change of SBE Subcontractor Request Form to the Business Enterprise Hub (BEH) for review and approval before any change may be implemented.
Work shall not proceed under a modified subcontracting arrangement until written approval is issued by
BEH.
Misrepresentation of CUF performance, subcontractor participation, certification status, or vendor location may result in corrective actions or sanctions consistent with City policy.
BEH-FRM-602.SAW
BEH-FRM-602.SAW Revision Date: 2026.03.01 Page 3 of 3
Monthly Compliance & Auditing Reporting
The respondent acknowledges that the City conducts monthly compliance audits through its designated City of Dallas Compliance System [https://dallas.gob2g.com/]. Both the Prime and all subcontractors are required to respond to audit inquiries, including payment verification, CUF confirmation, and progress reporting.
A designated point of contact must be identified and updated throughout the contract term.
Failure to provide timely audit responses may result in payment delays, adjustments to SBE participation, corrective actions, or impacts to future contract eligibility.
Audit Reporting Point-of-Contact (POC):
Name:
Phone:
Email:
Affidavit & Certification
By signing below, I certify that all information provided in this Affidavit and accompanying documentation is true and complete. I further acknowledge and will comply with the requirements of the DRIVE Policy and Program.
Officer Signature:
Printed Name:
Title:
Date:
https://dallas.gob2g.com/
File details come from the government source that posted it. Updated .