This Excel file is a Contractor Scheduled Work Bid Form template for Light Rail Transit (LRT) Maintenance covering a five-year period from 06/16/2025 to 06/15/2030, consisting of one base year and four one-year option periods. The maintenance scope involves quarterly and monthly inspections and maintenance of various infrastructure components in the Laredo sector, including:

  1. Fence and gate maintenance: Inspecting, cleaning, and lubricating pedestrian and vehicular gates at multiple locations, with tasks including debris removal, track cleaning, and gate adjustment.
  2. Grate maintenance: Monthly inspections of 28 grates across multiple locations, involving cleaning, exercising access doors, lubricating hardware, vegetation control, and bird nest surveys. Quality control requirements include taking before and after photos and performing maintenance after major rain events.

The document is associated with a Department of Homeland Security Customs and Border Protection pre-solicitation notice (Solicitation Number: 70B01C25R00000038) for Tactical Infrastructure Maintenance along the international border in the Del Rio/Big Bend South, Laredo, and Rio Grande Valley Sectors. The contract will be firm-fixed price, and mandatory site visits were conducted in April, which were required for potential offerors to be considered for contract award.

View the file

Other files

File Type Posted
01C25R0038 Pre-Soliciation Questions 05142025.pdf PDF
01C25R0038 Pre-Soliciation Questions_05082025.pdf PDF
01C25R0038 Pre-Soliciation Questions_05072025.pdf PDF
01C25R0038 Pre-Soliciation Questions.pdf PDF
2.2.1 - Attachment 4b - Statement of Work Exhibit B - Shelter Specifications_.pdf PDF
2.2.1 - Attachment 5c - DRT.BBT.S Contractor Unit Pricing Bid Sheet - 10hr days_Template.xlsx XLSX spreadsheet
2.2.1 - Attachment 4a - Statement of Work (SOW)_DRAFT.docx DOCX document
2.2.1 - Attachment 5b - RGV Contractor Unit Pricing Bid Sheet - 10hr days_Template.xlsx XLSX spreadsheet
2.2.1 - Attachment 2 - Evaluation Criteria_RGV.LRT.DRT BBT S TI Maint_DRAFT.docx DOCX document
2.2.1 - Attachment 5e - LRT Contractor Unit Pricing Bid Sheet - 10hr days_Template.xlsx XLSX spreadsheet
2.2.1 - Attachment 5a - DRT.BBT.S Contractor Scheduled Work Bid Form_Template.xlsx XLSX spreadsheet
2.2.1 - Attachment 1 - Cover Letter_TIMaintenance_DRAFT.docx DOCX document
2.2.1 - Attachment 6 - Corporate Interview Questions_TIMaintenance_DRAFT.docx DOCX document
2.2.1 - Attachment 3 - Proposal Instructions_TIMaintenance_DRAFT.docx DOCX document
2.2.1 - Attachment 5f - RGV Contractor Scheduled Work Bid Form_Template.xlsx XLSX spreadsheet
2.2.1 - Attachment 4c - Statement of Work Exhibit C - TI Design Standards_v5.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

RequirementBase Period:
06/16/2025 - 06/15/2026Option 1:
06/16/2026 - 06/15/2027Option 2:
06/16/2027 - 06/15/2028Option 3:
06/16/2028 - 06/15/2029Option 4:
06/16/2029 - 06/15/2030Total
Scheduled (LRT) - FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
PMO (LRT) - FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Coefficient Price (Profit+OH+Bonds/Ins (1%))$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Estimated Cost:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL CONTRACT VALUE: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

BASE PERIOD

BASE PERIOD: LRT SCHEDULED MAINT (FFP)Description of ServiceQty of AssetCount of EventsDurationLaborMaterialsEquipment
LCC Fence/Riverbend Road- Primary Pedestrian Aesthetic Fence- (TI) Inspect, clean,and lubricate gates. (Quarterly Task) 5 pedestrian manual swing gates, 5 double manual swing gates for vehicular access. Remove debris interfering with gate operation, including cleaning out the tracks (if applicable). Adjust gates if necessary for smooth operation. Written COR Approval is needed if it is found that additional work or materials are necessary.Routine: Primary Pedestrian Aesthetic Fence- (TI) Inspect, clean,and lubricate gates. (Quarterly Task) Remove debris interfering with gate operation, including cleaning out the tracks (if applicable). Adjust gates if necessary for smooth operation. Written COR Approval is needed if it is found that additional work or materials are necessary.10 EACH4
AWR South - Vehicle Swing Pipe Gates - Inspect, clean, and lubricate gates. (Quarterly task) 2 gates LCC in North station, 2 gates LCC south station, 3 gates AWRS south station, 2 cattle guards south station. 4 areas with 9 count to date. Remove debris interfering with gate operation. Check hinges and welds for signs of failure. Adjust gates if necessary for smooth operation. Written COR Approval needed if it is found that additional materials or work are needed.Routine: Inspect, clean, and lubricate gates. (Quarterly task) remove debris interfering with gate operation. Check hinges and welds for signs of failure. Adjust gates if necessary for smooth operation. Written COR Approval needed if it is found that additional materials or work are needed.4 EACH4
LRT Post and Cable Inspections - inspect posts and cables at Riverbend LRN, Riverbend LCC, Dr. Pena and Slaughter Tower for damages. (Quarterly task). Written COR approval needed for repairs.Routine: Inspect posts and cables at Riverbend LRN, Riverbend LCC, Dr. Pena and Slaughter Tower for damages. (Quarterly task). Written COR approval needed for repairs.4 EACH4
Scheduled_LRT Grates_North/South Stations - Inspect, Clean, exercise and lubricate grate access door. Inspect locking hardware for damage and function, replace if needed. Inspections to be performed monthly at a minimum. Work is for 23 grates in the Laredo sector, monthly. OY-4 Cycle 3 Grates following are currently captured in this task order: LCC 07 Bridge 1 27.49972 -99.51275 LCC 07B 27.500106 -99.507259 07C 27.540788 -99.521333 08 Water Street Las Palmas 27.50138 -99.50215 LCC 09 Las Palmas 27.50120 -99.50101 LCC 10 27.502654 -99.492962 LCC 11 Tex Mex Slaughter 27.50099 -99.49309 LCC 12 Tex Mex Slaughter Access 27.493818, -99.458318 Dr. Penas 27.49059 -99.48183 LCC 13 Santa Rita 60 in 27.44160 -99.49402 LCC 14 Santa Rita 36 in 27.44103 -99.49394 LCC16 Frank Sciaraffa 27.435282 -99.492858 LCC 17 Alfonzo Ornelas 27.43635 -99.49326 LCC Riddle Dr. 27.430532 -99.490237 World Trade Bridge 60" 2 grates 27.59725, -99.53474 Ready Mix area 60" 27.55259, -99.51621 Markley north 27.53682, -99.52174 Markley CT 20 grates 27.27.59725, -99.53474 Markley south 27.53203, -99.52313 Markley Anna street 27.52836, -99.52313 LCC College Grate 27.49881, -99.52409, # 24 Masterson Grate_(27.450973,-99.492981), #25 Orphanage Grate_(27.463163,-99482232), #26 Oleander St/Riverhill_(27.459909,-99486976), #27 El Cenizo_(27.329120,-99.510727), #28 Santa Maria_(27.499903, -99.510816). Vegetation control to be performed during inspections or as needed 5 feet around grates. Perform Bird Nest Surveys from 03/15 to 09/16 and report any findings. QC Notes: Task requires that at a minimum 8 grates will have 1- Before/1-After, (16 minimum pictures taken per event). Photos shall show a good representation of cleaning any debris at outlet, exercising of grate door if so equipped, greasing of barrel hinges is so equipped, brush trimming of 5’ nominal around each grate outfall.Inspections & monthly maintenance to be performed once a month. Inspect and clean grates after major rain events.28 EACH12
Total:$0.00$0.00$0.00
Sub Total:$0.00
PMOPM, Sector Supervisor & AnalystTotal:$0.00
Grand Total:$0.00

OPT 1 PERIOD

OPTION PERIOD 1: LRT SCHEDULED MAINT (FFP)Description of ServiceQty of AssetCount of EventsDurationLaborMaterialsEquipment
LCC Fence/Riverbend Road- Primary Pedestrian Aesthetic Fence- (TI) Inspect, clean,and lubricate gates. (Quarterly Task) 5 pedestrian manual swing gates, 5 double manual swing gates for vehicular access. Remove debris interfering with gate operation, including cleaning out the tracks (if applicable). Adjust gates if necessary for smooth operation. Written COR Approval is needed if it is found that additional work or materials are necessary.Routine: Primary Pedestrian Aesthetic Fence- (TI) Inspect, clean,and lubricate gates. (Quarterly Task) Remove debris interfering with gate operation, including cleaning out the tracks (if applicable). Adjust gates if necessary for smooth operation. Written COR Approval is needed if it is found that additional work or materials are necessary.10 EACH4
AWR South - Vehicle Swing Pipe Gates - Inspect, clean, and lubricate gates. (Quarterly task) 2 gates LCC in North station, 2 gates LCC south station, 3 gates AWRS south station, 2 cattle guards south station. 4 areas with 9 count to date. Remove debris interfering with gate operation. Check hinges and welds for signs of failure. Adjust gates if necessary for smooth operation. Written COR Approval needed if it is found that additional materials or work are needed.Routine: Inspect, clean, and lubricate gates. (Quarterly task) remove debris interfering with gate operation. Check hinges and welds for signs of failure. Adjust gates if necessary for smooth operation. Written COR Approval needed if it is found that additional materials or work are needed.4 EACH4
LRT Post and Cable Inspections - inspect posts and cables at Riverbend LRN, Riverbend LCC, Dr. Pena and Slaughter Tower for damages. (Quarterly task). Written COR approval needed for repairs.Routine: Inspect posts and cables at Riverbend LRN, Riverbend LCC, Dr. Pena and Slaughter Tower for damages. (Quarterly task). Written COR approval needed for repairs.4 EACH4
Scheduled_LRT Grates_North/South Stations - Inspect, Clean, exercise and lubricate grate access door. Inspect locking hardware for damage and function, replace if needed. Inspections to be performed monthly at a minimum. Work is for 23 grates in the Laredo sector, monthly. OY-4 Cycle 3 Grates following are currently captured in this task order: LCC 07 Bridge 1 27.49972 -99.51275 LCC 07B 27.500106 -99.507259 07C 27.540788 -99.521333 08 Water Street Las Palmas 27.50138 -99.50215 LCC 09 Las Palmas 27.50120 -99.50101 LCC 10 27.502654 -99.492962 LCC 11 Tex Mex Slaughter 27.50099 -99.49309 LCC 12 Tex Mex Slaughter Access 27.493818, -99.458318 Dr. Penas 27.49059 -99.48183 LCC 13 Santa Rita 60 in 27.44160 -99.49402 LCC 14 Santa Rita 36 in 27.44103 -99.49394 LCC16 Frank Sciaraffa 27.435282 -99.492858 LCC 17 Alfonzo Ornelas 27.43635 -99.49326 LCC Riddle Dr. 27.430532 -99.490237 World Trade Bridge 60" 2 grates 27.59725, -99.53474 Ready Mix area 60" 27.55259, -99.51621 Markley north 27.53682, -99.52174 Markley CT 20 grates 27.27.59725, -99.53474 Markley south 27.53203, -99.52313 Markley Anna street 27.52836, -99.52313 LCC College Grate 27.49881, -99.52409, # 24 Masterson Grate_(27.450973,-99.492981), #25 Orphanage Grate_(27.463163,-99482232), #26 Oleander St/Riverhill_(27.459909,-99486976), #27 El Cenizo_(27.329120,-99.510727), #28 Santa Maria_(27.499903, -99.510816). Vegetation control to be performed during inspections or as needed 5 feet around grates. Perform Bird Nest Surveys from 03/15 to 09/16 and report any findings. QC Notes: Task requires that at a minimum 8 grates will have 1- Before/1-After, (16 minimum pictures taken per event). Photos shall show a good representation of cleaning any debris at outlet, exercising of grate door if so equipped, greasing of barrel hinges is so equipped, brush trimming of 5’ nominal around each grate outfall.Inspections & monthly maintenance to be performed once a month. Inspect and clean grates after major rain events.28 EACH12
Total:$0.00$0.00$0.00
Sub Total:$0.00
PMOPM, Sector Supervisor & AnalystTotal:$0.00
Grand Total:$0.00

OPT 2 PERIOD

OPTION PERIOD 2: LRT SCHEDULED MAINT (FFP)Description of ServiceQty of AssetCount of EventsDurationLaborMaterialsEquipment
LCC Fence/Riverbend Road- Primary Pedestrian Aesthetic Fence- (TI) Inspect, clean,and lubricate gates. (Quarterly Task) 5 pedestrian manual swing gates, 5 double manual swing gates for vehicular access. Remove debris interfering with gate operation, including cleaning out the tracks (if applicable). Adjust gates if necessary for smooth operation. Written COR Approval is needed if it is found that additional work or materials are necessary.Routine: Primary Pedestrian Aesthetic Fence- (TI) Inspect, clean,and lubricate gates. (Quarterly Task) Remove debris interfering with gate operation, including cleaning out the tracks (if applicable). Adjust gates if necessary for smooth operation. Written COR Approval is needed if it is found that additional work or materials are necessary.10 EACH4
AWR South - Vehicle Swing Pipe Gates - Inspect, clean, and lubricate gates. (Quarterly task) 2 gates LCC in North station, 2 gates LCC south station, 3 gates AWRS south station, 2 cattle guards south station. 4 areas with 9 count to date. Remove debris interfering with gate operation. Check hinges and welds for signs of failure. Adjust gates if necessary for smooth operation. Written COR Approval needed if it is found that additional materials or work are needed.Routine: Inspect, clean, and lubricate gates. (Quarterly task) remove debris interfering with gate operation. Check hinges and welds for signs of failure. Adjust gates if necessary for smooth operation. Written COR Approval needed if it is found that additional materials or work are needed.4 EACH4
LRT Post and Cable Inspections - inspect posts and cables at Riverbend LRN, Riverbend LCC, Dr. Pena and Slaughter Tower for damages. (Quarterly task). Written COR approval needed for repairs.Routine: Inspect posts and cables at Riverbend LRN, Riverbend LCC, Dr. Pena and Slaughter Tower for damages. (Quarterly task). Written COR approval needed for repairs.4 EACH4
Scheduled_LRT Grates_North/South Stations - Inspect, Clean, exercise and lubricate grate access door. Inspect locking hardware for damage and function, replace if needed. Inspections to be performed monthly at a minimum. Work is for 23 grates in the Laredo sector, monthly. OY-4 Cycle 3 Grates following are currently captured in this task order: LCC 07 Bridge 1 27.49972 -99.51275 LCC 07B 27.500106 -99.507259 07C 27.540788 -99.521333 08 Water Street Las Palmas 27.50138 -99.50215 LCC 09 Las Palmas 27.50120 -99.50101 LCC 10 27.502654 -99.492962 LCC 11 Tex Mex Slaughter 27.50099 -99.49309 LCC 12 Tex Mex Slaughter Access 27.493818, -99.458318 Dr. Penas 27.49059 -99.48183 LCC 13 Santa Rita 60 in 27.44160 -99.49402 LCC 14 Santa Rita 36 in 27.44103 -99.49394 LCC16 Frank Sciaraffa 27.435282 -99.492858 LCC 17 Alfonzo Ornelas 27.43635 -99.49326 LCC Riddle Dr. 27.430532 -99.490237 World Trade Bridge 60" 2 grates 27.59725, -99.53474 Ready Mix area 60" 27.55259, -99.51621 Markley north 27.53682, -99.52174 Markley CT 20 grates 27.27.59725, -99.53474 Markley south 27.53203, -99.52313 Markley Anna street 27.52836, -99.52313 LCC College Grate 27.49881, -99.52409, # 24 Masterson Grate_(27.450973,-99.492981), #25 Orphanage Grate_(27.463163,-99482232), #26 Oleander St/Riverhill_(27.459909,-99486976), #27 El Cenizo_(27.329120,-99.510727), #28 Santa Maria_(27.499903, -99.510816). Vegetation control to be performed during inspections or as needed 5 feet around grates. Perform Bird Nest Surveys from 03/15 to 09/16 and report any findings. QC Notes: Task requires that at a minimum 8 grates will have 1- Before/1-After, (16 minimum pictures taken per event). Photos shall show a good representation of cleaning any debris at outlet, exercising of grate door if so equipped, greasing of barrel hinges is so equipped, brush trimming of 5’ nominal around each grate outfall.Inspections & monthly maintenance to be performed once a month. Inspect and clean grates after major rain events.28 EACH12
Total:$0.00$0.00$0.00
Sub Total:$0.00
PMOPM, Sector Supervisor & AnalystTotal:$0.00
Grand Total:$0.00

OPT 3 PERIOD

OPTION PERIOD 3: LRT SCHEDULED MAINT (FFP)Description of ServiceQty of AssetCount of EventsDurationLaborMaterialsEquipment
LCC Fence/Riverbend Road- Primary Pedestrian Aesthetic Fence- (TI) Inspect, clean,and lubricate gates. (Quarterly Task) 5 pedestrian manual swing gates, 5 double manual swing gates for vehicular access. Remove debris interfering with gate operation, including cleaning out the tracks (if applicable). Adjust gates if necessary for smooth operation. Written COR Approval is needed if it is found that additional work or materials are necessary.Routine: Primary Pedestrian Aesthetic Fence- (TI) Inspect, clean,and lubricate gates. (Quarterly Task) Remove debris interfering with gate operation, including cleaning out the tracks (if applicable). Adjust gates if necessary for smooth operation. Written COR Approval is needed if it is found that additional work or materials are necessary.10 EACH4
AWR South - Vehicle Swing Pipe Gates - Inspect, clean, and lubricate gates. (Quarterly task) 2 gates LCC in North station, 2 gates LCC south station, 3 gates AWRS south station, 2 cattle guards south station. 4 areas with 9 count to date. Remove debris interfering with gate operation. Check hinges and welds for signs of failure. Adjust gates if necessary for smooth operation. Written COR Approval needed if it is found that additional materials or work are needed.Routine: Inspect, clean, and lubricate gates. (Quarterly task) remove debris interfering with gate operation. Check hinges and welds for signs of failure. Adjust gates if necessary for smooth operation. Written COR Approval needed if it is found that additional materials or work are needed.4 EACH4
LRT Post and Cable Inspections - inspect posts and cables at Riverbend LRN, Riverbend LCC, Dr. Pena and Slaughter Tower for damages. (Quarterly task). Written COR approval needed for repairs.Routine: Inspect posts and cables at Riverbend LRN, Riverbend LCC, Dr. Pena and Slaughter Tower for damages. (Quarterly task). Written COR approval needed for repairs.4 EACH4
Scheduled_LRT Grates_North/South Stations - Inspect, Clean, exercise and lubricate grate access door. Inspect locking hardware for damage and function, replace if needed. Inspections to be performed monthly at a minimum. Work is for 23 grates in the Laredo sector, monthly. OY-4 Cycle 3 Grates following are currently captured in this task order: LCC 07 Bridge 1 27.49972 -99.51275 LCC 07B 27.500106 -99.507259 07C 27.540788 -99.521333 08 Water Street Las Palmas 27.50138 -99.50215 LCC 09 Las Palmas 27.50120 -99.50101 LCC 10 27.502654 -99.492962 LCC 11 Tex Mex Slaughter 27.50099 -99.49309 LCC 12 Tex Mex Slaughter Access 27.493818, -99.458318 Dr. Penas 27.49059 -99.48183 LCC 13 Santa Rita 60 in 27.44160 -99.49402 LCC 14 Santa Rita 36 in 27.44103 -99.49394 LCC16 Frank Sciaraffa 27.435282 -99.492858 LCC 17 Alfonzo Ornelas 27.43635 -99.49326 LCC Riddle Dr. 27.430532 -99.490237 World Trade Bridge 60" 2 grates 27.59725, -99.53474 Ready Mix area 60" 27.55259, -99.51621 Markley north 27.53682, -99.52174 Markley CT 20 grates 27.27.59725, -99.53474 Markley south 27.53203, -99.52313 Markley Anna street 27.52836, -99.52313 LCC College Grate 27.49881, -99.52409, # 24 Masterson Grate_(27.450973,-99.492981), #25 Orphanage Grate_(27.463163,-99482232), #26 Oleander St/Riverhill_(27.459909,-99486976), #27 El Cenizo_(27.329120,-99.510727), #28 Santa Maria_(27.499903, -99.510816). Vegetation control to be performed during inspections or as needed 5 feet around grates. Perform Bird Nest Surveys from 03/15 to 09/16 and report any findings. QC Notes: Task requires that at a minimum 8 grates will have 1- Before/1-After, (16 minimum pictures taken per event). Photos shall show a good representation of cleaning any debris at outlet, exercising of grate door if so equipped, greasing of barrel hinges is so equipped, brush trimming of 5’ nominal around each grate outfall.Inspections & monthly maintenance to be performed once a month. Inspect and clean grates after major rain events.28 EACH12
Total:$0.00$0.00$0.00
Sub Total:$0.00
PMOPM, Sector Supervisor & AnalystTotal:$0.00
Grand Total:$0.00

OPT 4 PERIOD

OPTION PERIOD 4: LRT SCHEDULED MAINT (FFP)Description of ServiceQty of AssetCount of EventsDurationLaborMaterialsEquipment
LCC Fence/Riverbend Road- Primary Pedestrian Aesthetic Fence- (TI) Inspect, clean,and lubricate gates. (Quarterly Task) 5 pedestrian manual swing gates, 5 double manual swing gates for vehicular access. Remove debris interfering with gate operation, including cleaning out the tracks (if applicable). Adjust gates if necessary for smooth operation. Written COR Approval is needed if it is found that additional work or materials are necessary.Routine: Primary Pedestrian Aesthetic Fence- (TI) Inspect, clean,and lubricate gates. (Quarterly Task) Remove debris interfering with gate operation, including cleaning out the tracks (if applicable). Adjust gates if necessary for smooth operation. Written COR Approval is needed if it is found that additional work or materials are necessary.10 EACH4
AWR South - Vehicle Swing Pipe Gates - Inspect, clean, and lubricate gates. (Quarterly task) 2 gates LCC in North station, 2 gates LCC south station, 3 gates AWRS south station, 2 cattle guards south station. 4 areas with 9 count to date. Remove debris interfering with gate operation. Check hinges and welds for signs of failure. Adjust gates if necessary for smooth operation. Written COR Approval needed if it is found that additional materials or work are needed.Routine: Inspect, clean, and lubricate gates. (Quarterly task) remove debris interfering with gate operation. Check hinges and welds for signs of failure. Adjust gates if necessary for smooth operation. Written COR Approval needed if it is found that additional materials or work are needed.4 EACH4
LRT Post and Cable Inspections - inspect posts and cables at Riverbend LRN, Riverbend LCC, Dr. Pena and Slaughter Tower for damages. (Quarterly task). Written COR approval needed for repairs.Routine: Inspect posts and cables at Riverbend LRN, Riverbend LCC, Dr. Pena and Slaughter Tower for damages. (Quarterly task). Written COR approval needed for repairs.4 EACH4
Scheduled_LRT Grates_North/South Stations - Inspect, Clean, exercise and lubricate grate access door. Inspect locking hardware for damage and function, replace if needed. Inspections to be performed monthly at a minimum. Work is for 23 grates in the Laredo sector, monthly. OY-4 Cycle 3 Grates following are currently captured in this task order: LCC 07 Bridge 1 27.49972 -99.51275 LCC 07B 27.500106 -99.507259 07C 27.540788 -99.521333 08 Water Street Las Palmas 27.50138 -99.50215 LCC 09 Las Palmas 27.50120 -99.50101 LCC 10 27.502654 -99.492962 LCC 11 Tex Mex Slaughter 27.50099 -99.49309 LCC 12 Tex Mex Slaughter Access 27.493818, -99.458318 Dr. Penas 27.49059 -99.48183 LCC 13 Santa Rita 60 in 27.44160 -99.49402 LCC 14 Santa Rita 36 in 27.44103 -99.49394 LCC16 Frank Sciaraffa 27.435282 -99.492858 LCC 17 Alfonzo Ornelas 27.43635 -99.49326 LCC Riddle Dr. 27.430532 -99.490237 World Trade Bridge 60" 2 grates 27.59725, -99.53474 Ready Mix area 60" 27.55259, -99.51621 Markley north 27.53682, -99.52174 Markley CT 20 grates 27.27.59725, -99.53474 Markley south 27.53203, -99.52313 Markley Anna street 27.52836, -99.52313 LCC College Grate 27.49881, -99.52409, # 24 Masterson Grate_(27.450973,-99.492981), #25 Orphanage Grate_(27.463163,-99482232), #26 Oleander St/Riverhill_(27.459909,-99486976), #27 El Cenizo_(27.329120,-99.510727), #28 Santa Maria_(27.499903, -99.510816). Vegetation control to be performed during inspections or as needed 5 feet around grates. Perform Bird Nest Surveys from 03/15 to 09/16 and report any findings. QC Notes: Task requires that at a minimum 8 grates will have 1- Before/1-After, (16 minimum pictures taken per event). Photos shall show a good representation of cleaning any debris at outlet, exercising of grate door if so equipped, greasing of barrel hinges is so equipped, brush trimming of 5’ nominal around each grate outfall.Inspections & monthly maintenance to be performed once a month. Inspect and clean grates after major rain events.28 EACH12
Total:$0.00$0.00$0.00
Sub Total:$0.00
PMOPM, Sector Supervisor & AnalystTotal:$0.00