This document is a solicitation for the replacement of the hydraulic system for Penstock #5 at Amistad Dam, issued by the United States Section of the International Boundary and Water Commission (USIBWC). The project involves fully inspecting and restoring the penstock's functionality, with work including site preparation, system and structural inspection, hydraulic system replacement, debris disposal, quality control testing, and potentially manufacturing a new penstock bulkhead. The construction site is located in Val Verde County, Texas, with specific constraints including limited working hours (7:00 am to 3:30 pm, Monday through Friday), restricted access through a port of entry, and load limitations on roads and dam infrastructure.
The project is estimated to be valued between $1,000,000 and $5,000,000, with a total contract duration of 485 calendar days (365 days for construction and 120 days for closeout paperwork). The solicitation will be issued under Federal Acquisition Regulation (FAR) Part 14, with a firm-fixed price contract under NAICS Code 237990. Key technical requirements include replacing the hydraulic system, inspecting all systems and structures, and potentially creating a new bulkhead weighing approximately 33,000 pounds. Contractors must provide their own crane and certified operator, coordinate with the Amistad Dam Area Operations Manager, and comply with specific site access and operational restrictions.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Front Cover
International Boundary and Water Commission United States and Mexico United States Section
Technical Specifications Amistad Dam and Reservoir Replacement of Penstock #5 Hydraulic System Val Verde County, Texas
Solicitation 191BWC25B0003
April 7, 2025
International Boundary and Water Commission United States Section Construction Management Division El Paso, Texas
These Technical Specifications may be reprinted after Contract award using the awarded Contract number instead of the Solicitation number currently shown. The reprint shall have all changes indicated incorporated.
Reissuance of the awarded Technical Specifications with the Contract number will proceed without an amendment or modification.
Reissuance with the Contract number will NOT result in a new date being displayed on the Technical
Specifications.
PLEASE NOTE - Technical Specifications should be printed double sided.
Please conserve paper and print double sided.
USIBWC Amistad Dam and Reservoir
April 7, 2025 Division 00 USIBWC Solicitation 191BWC25B0003 Procurement and Contracting Requirements-Page 1
US International Boundary & Water Commission
International Boundary and Water Commission United States Section
TECHNICAL SPECIFICATIONS
DIVISION 00
PROCUREMENT AND CONTRACTING
REQUIREMENTS
Replacement of Penstock #5 Hydraulic System US International Boundary & Water Commission Amistad Dam and Reservoir
Procurement and Contracting
Requirements
Division 00
Division 00-Procurement and Contracting Requirements
Division 00 April 7, 2025 Procurement and Contracting Requirements-Page 2 USIBWC Solicitation 191BWC25B0003
This page intentionally left blank for double sided printing.
April 7, 2025 Table of Contents Governing USIBWC Solicitation 191BWC25B0003 00.01.10-Page 1
SECTION 00.01.10
TABLE OF CONTENTS GOVERNING
00.01.10 Table of Contents Governing 00.01.10-Table of Contents Governing
Table of Contents
DIVISIONS AND SECTIONS
Division 00-Procurement and Contracting Requirements 00.01.10-Table of Contents Governing 00.21.13-Instructions to Bidders 00.31.19-Existing Condition Information 00.31.24-Environmental Information 00.31.26-Existing Hazardous Material Information 00.31.43-Permit Application 00.60.00-USIBWC Forms and Standard Documents 00.70.00-Delivery of Data to USIBWC 00.70.13-Project Data 00.72.00-Order of Precedence 00.73.63-Security Requirements 00.73.73-Requirements for Sensitive But Unclassified Information 00.91.16-Bid Revisions
Division 01-General Requirements 01.11.00-Summary of Work 01.20.00-Measurement and Payment 01.29.00-Payment Procedures 01.29.15-Certified Payroll 01.31.00-Project Coordination 01.32.16-Construction Progress Schedule 01.32.33-Photographic Documentation 01.33.00-Submittal Procedures 01.35.23-Safety 01.42.00-References 01.43.26-Testing and Inspection Agencies 01.45.00-Quality Control 01.51.00-Temporary Utilities 01.52.13-Field Offices and Sheds 01.55.26-Traffic Control and Project Signage 01.57.00-Temporary Controls for Work Areas 01.57.19-Temporary Environmental Controls 01.61.00-Common Product Requirements 01.61.16-Use of Recovered Materials and Biobased Products 01.71.13-Mobilization 01.74.19-Construction Waste Management and Disposal 01.77.19-Closeout Requirements 01.78.23-Operations and Maintenance Data 01.78.36-Warranties 01.78.39-Record Drawings 01.79.00-Demonstration and Training
Division 02-Existing Conditions 02.01.00-Existing Conditions and Facilities 02.21.23-Penstock #5 Inspection
Table of Contents Governing April 7, 2025 00.01.10-Page 2 USIBWC Solicitation 191BWC25B0003
Division 05-Metal 05.15.23-Penstock Bulkhead 05.05.23-Welding 05.50.03-Miscellaneous Metalwork
Division 09-Finishes 09.97.02-Painting Hydraulic Structures
Division 35-Waterway Construction 35.05.40.14-Irrigation Gate Hydraulic Power System
Technical Specification Tables
Table 1 - Technical Specification Reference Protocols Table 2 - Amistad Dam and Penstock #5 Drawings Table 3 - Required Minimum Biobased Content Table 4 - Required Minimum Recovered Content Table 5 - Warranty Priority Code C Table 6 - Warranty Priority Code D Table 7 - Neoprene Gate Seals Table 8 - Current Specification Standards Table 9 - V-102E Table 10 - VZ-108D Table 11 - V-766E Table 12 - System No 3 Table 13 - System No 3-A-Z Table 14 - Vinyl Paint Thinners Table 15 - Minimum Hydraulic Factor of Safety Table 16 - Contamination Limits
Technical Specification Figures
Figure 1 - Fillable Form (not printed) Figure 2 - Printed Fillable Form Figure 3 - Equipment Tag Example
--End of Section--
April 7, 2025 Instructions to Bidders USIBWC Solicitation 191BWC25B0003 00.21.13-Page 1
SECTION 00.21.13
INSTRUCTIONS TO BIDDERS
00.21.13 Instructions to Bidders 00.21.13-Instructions to Bidders
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Reference Standards
1.3. Measurement and Payment
1.4. Definitions
1.5. Technical Specification Reference Protocols
1.6. Duty to Inquire
1.7. Investigation of Site Conditions
1.8. Bid Items
1.9. Specifications
1.10. Bid Submission
Part 2 - Products (Not Used) Part 3 - Execution
3.1. Requests for Interpretation (Duty to Inquire)
--End of Section--
1.2. REFERENCE STANDARDS
1.2.A. Federal Acquisition Regulation (FAR)
1. FAR 52.236-3, Site Investigation and Conditions Affecting the Work
1.3. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4. DEFINITIONS
1.4.A. Within this Section, the following terms are used interchangeably.
1. Bid - Offer - Proposal
2. Solicitation - Request for Proposal - RFP
3. Bidder - Offeror - Contractor
1.5. TECHNICAL SPECIFICATION REFERENCE PROTOCOLS
1.5.A. Use the reference protocols in Table 1 to refer to items within Technical Specifications.
1.5.B. Every Section has three Parts with multiple paragraphs. Always include the section number with the full paragraph number when referencing any item within these Technical Specifications.
1. For example, the proper reference to this paragraph is Section 00.21.13 Paragraph 1.5.B.1.
1.6. DUTY TO INQUIRE
1.6.A. Bidders shall review the full Solicitation and all Contract documents including, but not limited to, Technical Specifications, Contract Drawings, USIBWC provided data, referenced items, attachments, etc.
to determine the full scope of work required.
Instructions to Bidders April 7, 2025 00.21.13-Page 2 USIBWC Solicitation 191BWC25B0003
Table 1 - Technical Specification Reference Protocols
Level Type Example Format Reference Format
Division 1 Numeric 35 Level 1 Division 35
Section 2 Numeric 35.41.00 Level 1.Level 2 Section 35.41.00
Part 3 Numeric Part 3 Part Level 3 Section 35.41.00 Part 3
Subsection 4 Numeric 3.7. Level 3.Level 4. Section 35.41.00 3.7.
Paragraph 5 Alphabet 3.7.E. Level 3.Level 4.Level 5. Section 35.41.00 3.7.E.
Paragraph Subitem 6 Numeric 2. Level 6 Section 35.41.00 3.7.E.2.
Paragraph Subitem 7 Alphabet h. Level 7 Section 35.41.00 3.7.E.2.h.
Paragraph Subitem 8 Numeric (1) Level 8 Section 35.41.00 3.7.E.2.h.(1)
Paragraph Subitem 9 Alphabet (b) Level 9 Section 35.41.00 3.7.E.2.h.(1)(b)
1.6.B. If during review of these items, the Bidder finds discrepancies, omissions, conflicts, defects, errors, or ambiguities, they have a duty to inquire. The Bidder shall also inquire about items that are open to interpretation.
1.6.C. The Bidder shall inquire about items as soon as they are discovered, whether before deadline for submission of bidder questions, whether after deadline for submission of bidder questions, whether after submission of bids, or whether after Contract award.
1.6.D. If the Bidder fails to inquire, they forfeit their right to any claim based upon said discrepancies, omissions, conflicts, defects, errors, ambiguities, or items that are open to interpretation. The Bidder shall be proceeding at their own risk based upon only their unilateral interpretation.
1.6.E. The Bidder shall take no advantage of any item of which they have a duty to inquire.
1.7. INVESTIGATION OF SITE CONDITIONS
1.7.A. The Bidder, as well as their subcontractors, is urged to visit the worksite and project area to become fully aware as to the existing conditions affecting the work to be performed under the Contract documents. A site visit will be announced during the solicitation. Each Bidder shall attend at their own expense. The
Government will not pay for any site visits. This visit is intended to provide the potential Bidders the opportunity to observe site conditions and incorporate into their proposal any required work based on site conditions. The Bidder will have the opportunity to walk around during the site visit. Unless otherwise noted, no other opportunity will exist for visits to the site.
1.7.B. The Bidder shall be responsible for ensuring that all of its suppliers, manufactures and subcontractors have reviewed all applicable Contract documents relative to their work. The Bidder shall provide all labor, material, equipment, and services not provided by the Bidder’s suppliers, manufacturers, fabricators, and/or subcontractors but required for complete and operable facilities as described in the
Contract documents.
1.7.C. Bidder has the sole responsibility to make such independent investigation and examination as they deem necessary in order to satisfy themselves as to the conditions to be encountered in the performance of work and the quantities required to complete the work in accordance with the SOW.
1.7.D. The Government assumes no responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of the Bidder's officers or agents before the execution of this Contract, unless that understanding or representation is expressly stated in the Contract documents.
1.7.E. Any failure of the Bidder to take the actions described and acknowledged in this Section will not relieve the Bidder from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work.
April 7, 2025 Instructions to Bidders USIBWC Solicitation 191BWC25B0003 00.21.13-Page 3
1.8. BID ITEMS
1.8.A. The Contract Line Item Numbers (CLIN) that shall be bid upon are identified in Section B (bid schedule) of the Solicitation.
1.8.B. The Bidder shall include all work related costs within its bid unit prices even if not specifically listed in the bid schedule.
1.8.C. If an error exists on the bid schedule between the CLIN total cost provided and the resultant value of the
CLIN quantity multiplied by the bid unit price, the bid unit price provided shall govern.
1.8.D. If the bid schedule includes CLINs entitled Receiving Lines, No Cost Receiving Lines, No Cost
Receiving Lines for IBWC Use Only, Receiving Lines for Internal Use Only, or similarly, then the Bidder shall not provide a bid price for this CLIN. Receiving lines are used for USIBWC's computer system to make pay estimate processing easier. These are an administrative CLIN and have no value on the
Contract.
1.9. SPECIFICATIONS
1.9.A. The Government does not implicitly warrant performance specifications for complete accuracy or adequacy. Typical performance type specifications set forth an objective or standard to be achieved, and the successful Bidder is expected to exercise their ingenuity in achieving that objective or standard of performance, selecting the means and assuming a corresponding responsibility for that selection.
1.9.B. When a particular product or manufacturer is identified by name, but permits substitution of ‘an approved equal,’ such a specification is ‘performance’ in nature and, as a result, carries no implied warranty.
1.9.C. The Technical Specifications are written in imperative and abbreviated form. This imperative language is directed at the Contractor, unless specifically noted otherwise. Incomplete sentences shall be completed by inserting "shall", "the Contractor shall", and "shall be" or similar mandatory phrases by inference in the same manner as they are applied to notes on the Contract Drawings. The words "shall" are to be placed by inference where a colon (:) is used within sentences or phrases. Except as worded to the contrary, the Contractor shall fulfill (perform) all indicated requirements whether stated imperatively or otherwise.
1.9.D. All equipment and facilities shall be furnished, installed, and constructed by the Contractor to provide the
Government with complete, ready to use components, systems, and facilities. All necessary materials and work required to accomplish this are the responsibility of the Contractor alone, whether or not specifically indicated on the Contract Drawings or stated in the Technical Specifications.
1.9.E. The various Sections of the Technical Specifications may contain references to standards, other specification sections, or items that do not apply to the work covered in this project. These references are to be considered for information only and can be ignored by the Contractor unless work changes and they become relevant. If conflicts arise from references or lack of references to standards or other specification sections, COR will determine the relevancy of the apparent conflicts.
1.10. BID SUBMISSION
1.10.A. Submission of a bid shall be conclusive evidence that the Bidder has reviewed, investigated, and acknowledged all items detailed in FAR 52.236-3 and listed below.
1. Conditions bearing upon transportation, disposal, handling, and storage of materials.
2. The availability of labor, water, electric power, and roads.
3. Uncertainties of weather and similar physical conditions at the site.
4. The conformation and conditions of the ground.
5. The security and safety conditions at and around the site.
6. The character of equipment and facilities needed preliminary to and during work performance.
Instructions to Bidders April 7, 2025 00.21.13-Page 4 USIBWC Solicitation 191BWC25B0003
1.10.B. Submission of a bid shall be conclusive evidence that the Bidder has reviewed all Contract documents.
1.10.C. Submission of a bid shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, the character, quality, and scope of work to be performed, and the quantities of materials to be furnished.
1.10.D. Submission of a bid constitutes agreement that Bidder has provided written notice of all discrepancies, omissions, conflicts, defects, errors, ambiguities, or items that are open to interpretation discovered in the
Contract documents, that responses to these written notices are acceptable to Bidder, and that Contract documents are sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing required work.
1.10.E. Bidder has the sole responsibility to make such independent instigation and examination as they deem necessary in order to satisfy themselves as to the conditions to be encountered in the performance of work and the quantities required to complete the work in accordance with the Contract documents. The
Government will not award a modification or additional funds for conditions that were observable but not considered by Bidder.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
3.1. REQUESTS FOR INTERPRETATION (DUTY TO INQUIRE)
3.1.A. Bidders shall submit requests for interpretation, questions, and other concerns about the Solicitation and
Contract documents including, but not limited to, Technical Specifications, Contract Drawings, USIBWC provided data, referenced items, attachments, etc. to the Contracting Officer identified on SF-1442.
3.1.B. Such requests shall be made even if the question and answer period identified in the Solicitation has passed.
3.1.C. Failure to request interpretation prior to providing a bid shall result in the Bidder being fully responsible for any cost or time impacts involved to perform the work required.
April 7, 2025 Existing Condition Information USIBWC Solicitation 191BWC25B0003 00.31.19-Page 1
SECTION 00.31.19
EXISTING CONDITION INFORMATION
00.31.19 Existing Condition Information 00.31.19-Existing Condition Information
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.3. Measurement and Payment
1.4. General
1.5. Existing Structures
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2. RELATED REQUIREMENTS
1.2.A. Section 00.73.73-Requirements for Sensitive But Unclassified Information
1.3. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4. GENERAL
1.4.A. Reports on the Existing Condition Information
1. An inspection of Penstock 5 was performed by the US Army Corps of Engineers. The findings were and available in a report, entitled "Trip Report: Inspections and Technical Oversight on Penstock 5
Hydraulic System Repairs," dated June 10, 2019.
2. A study to repair Penstock #4 was performed by the US Army Corps of Engineers. Since Penstock
#4 and Penstock #5 are the same, their report entitled "Amistad Dam Project, Del Rio Texas, Irrigation Penstock Gate Study," dated October 2006 has been included for reference.
3. Since Penstock #4 and Penstock #5 are the same, instructions for opening the gates for Penstock #4 are provided for reference. The memorandum is entitled "Opening of Gate in Penstock No. 4," dated
May 6, 1986.
1.4.B. The original construction specifications: Volume I and Volume II of the "Specifications for Construction
Allocated to United States, Embankment, Non-Overflow, Power Intake, and Spillway" for solicitation
UDA 65-3 dated August 1964.
1.4.C. Applicable original construction drawings are listed in Table 2.
1.4.D. The original "Amistad Dam, Rio Grande, Operation & Maintenance Manual," dated 1971 includes operations of the penstock and irrigation gates.
1.4.E. The "Report on Control Changes to Penstock Gates 4 and 5" explains some of the original gate operations.
1.4.F. SBU items will be provided via a Sharepoint link to each Bidder requesting access to this data. The
Bidders shall provide an email address along with IBWC Form 358 to the CO for this link.
1. No more than 2 Sharepoint links will be provided to each Bidder. To use Sharepoint, a user must have a valid Microsoft account.
Existing Condition Information April 7, 2025 00.31.19-Page 2 USIBWC Solicitation 191BWC25B0003
2. All unsuccessful Bidders shall provide IBWC Form 358A to the CO within 7 days of being notified of their unsuccessful offer.
Table 2 - Amistad Dam and Penstock #5 Drawings
IBWC Dwg# Description Date
(YYYY-MM-DD)
18129-000-02 Amistad Dam US Power Intake Elevations Revision #2 1964-10-23
18129-000-03 Amistad Dam US Power Intake Elevations Revision #3 1965-11
18130-000-01 Amistad Dam US Power Intake Plan and Section Revision #1 1964-10-12
18131-000-01 Amistad Dam US Power Intake Horizontal Sections I Revision #1 1964-10-08
18132-000-03 Amistad Dam US Power Intake Horizontal Sections II Revision #3 1964-10-23
18135-000-00 Amistad Dam US Power Intake Monolith 11 Longitudinal Section 1964-08
18135-000-01 Amistad Dam US Power Intake Monolith 11 Longitudinal Section Revision #1 1965-06
18142-000-00 Amistad Dam US Power Intake Operations Deck Reinforcing 1964-08
18143-000-00 Amistad Dam US Power Intake Operations and Service Deck Reinforcing 1964-08
18144-000-00 Amistad Dam US Power Intake Operations and Service Deck Wall Reinforcing 1964-08
18148-000-01 Amistad Dam US Power Intake Penstock Tunnels Details II Revision #1 1964-10-12
18149-000-00 Amistad Dam US Power Intake Penstock Tunnels Details III 1964-08
18150-000-00 Amistad Dam US Power Intake Penstock Tunnels Steel Liner 1964-08
18151-000-01 Amistad Dam US Power Intake Mod of Penstock No 5 for Irrigation Details I Revision #1 1964-10-12
18152-000-01 Amistad Dam US Power Intake Mod of Penstock No 5 for Irrigation Details II Revision #1 1964-10-23
18211-000-00 Amistad Dam Penstock Gates Penstock and Irrigation Gate Assembly 1964-08
18212-000-00 Amistad Dam Penstock Gates Penstock and Irrigation Gates Details I 1964-08
18213-000-01 Amistad Dam Penstock Gates Penstock and Irrigation Gates Details II Revision #1 1964-10-23
18214-000-02 Amistad Dam Penstock Gates Penstock Gates Frame and Guides Revision #2 1964-10-23
18215-000-02 Amistad Dam Penstock Gates Irrigation Gate Frame and Guide Revision #2 1964-10-23
18216-000-01 Amistad Dam Penstock Gates Roller Assembly Details I Revision #1 1964-09-30
18217-000-01 Amistad Dam Penstock Gates Roller Assembly Details II Revision #1 1964-09-30
18218-000-01 Amistad Dam Penstock Gates Roller Assembly Details III Revision #1 1964-09-30
18219-000-00 Amistad Dam Penstock Gates Seal Valve Installation 1964-08
18220-000-01 Amistad Dam Penstock Gates Seal Valve Details I Revision #1 1964-10-23
18221-000-00 Amistad Dam Penstock Gates Seal Valve Details II 1964-08
18222-000-00 Amistad Dam Penstock Gates Seals Details I 1964-08
18223-000-00 Amistad Dam Penstock Gates Seals Details II 1964-08
18224-000-00 Amistad Dam Penstock Gates Seals Details III 1964-08
18225-000-02 Amistad Dam Penstock Gates Power Intake Gate Hoist Assembly Revision #2 1964-10-23
18226-000-02 Amistad Dam Penstock Gates Irrigation Gate Hoist Assembly Revision #2 1964-10-23
18227-000-00 Amistad Dam Penstock Gates Hoist Drum Details 1964-08
18228-000-00 Amistad Dam Penstock Gates Indicator Assembly Details 1964-08
18229-000-00 Amistad Dam Penstock Gates Sheave Details 1964-08
18230-000-00 Amistad Dam Penstock Gates Gear Guard Details 1964-08
18231-000-00 Amistad Dam Penstock Gates Lifting Beam Details 1964-08
18232-000-00 Amistad Dam Penstock Gates Hoist Machinery Base Details 1964-08
18233-000-00 Amistad Dam Penstock Gates Irrigation Gate Hoist Machinery Base Plan & Section 1964-08
18234-000-00 Amistad Dam Penstock Gates Irrigation Gate Hoist Machinery Base Details 1964-08
18235-000-00 Amistad Dam Penstock Gates Air Vent Details 1964-08
18241-000-00 Amistad Dam Penstock Gates Bulkhead Details 1964-08
18242-000-00 Amistad Dam Penstock Gates Bulkhead Frames and Guides 1964-08
18243-000-00 Amistad Dam Penstock Gates Bulkhead Lifting Beam Details 1964-08
18273-000-02 Amistad Dam Electrical One Line Diagram Monolith 7 thru 21 Revision #2 1964-10-23
18274-000-01 Amistad Dam Circuit Schedule No 1 Monolith 7 thru 21 Revision #1 1964-10-23
18275-000-01 Amistad Dam Circuit Schedule No 1 Monolith 7 thru 21 Revision #1 1964-10-23
18278-000-00 Amistad Dam Lighting and Wiring Diagram Monolith 1 thru 12 1964-08
April 7, 2025 Existing Condition Information USIBWC Solicitation 191BWC25B0003 00.31.19-Page 3
IBWC Dwg# Description Date
(YYYY-MM-DD)
18280-000-00 Amistad Dam Roadway and Galleries Power Electrical System 1964-08
18289-000-00 Amistad Dam Switchboard Monolith 13 1964-08
18300-000-00 Amistad Dam Intake Gate Control 1964-08
18301-000-00 Amistad Dam Intake Gate Details 1964-08
18302-000-00 Amistad Dam Intake Gates Conduit 1964-08
18305-000-00 Amistad Dam Intake Gates Cathodic Protection 1964-08
18364-000-00 Amistad Dam Regulating Gate General Assembly
18365-000-00 Amistad Dam Regulating Gate Leaf Details I
18366-000-00 Amistad Dam Regulating Gate Leaf Details II
18367-000-00 Amistad Dam Regulating Gate Frame General Assembly
18368-000-00 Amistad Dam Regulating Gate Frame-Upstream Sections and Details
18369-000-00 Amistad Dam Regulating Gate Frame-Middle Section Sections and Details
18370-000-00 Amistad Dam Regulating Gate Frame-Downstream Sections and Details
18371-000-00 Amistad Dam Regulating Gate Bonnet Assembly and Details
18372-000-00 Amistad Dam Regulating Gate Pedestal Assembly and Details
18373-000-00 Amistad Dam Regulating Gate Hydraulic Cylinder and Details I
18374-000-00 Amistad Dam Regulating Gate Hydraulic Cylinder and Details II
18375-000-00 Amistad Dam Regulating Gate Hydraulic System Layout & Details
18376-000-00 Amistad Dam Regulating Gate Hydraulic System Equipment Layout
18377-000-00 Amistad Dam Regulating Gate Selsyn Gate Position Indicator Details I
18378-000-00 Amistad Dam Regulating Gate Selsyn Gate Position Indicator Details II
18379-000-00 Amistad Dam Regulating Gate Modification to Penstock No 5
18380-000-00 Amistad Dam Regulating Gate Modification to Penstock No 5 Reinforcing
1.5. EXISTING STRUCTURES
1.5.A. Amistad Dam is the largest of the international multipurpose storage dams to be constructed on the Rio
Grande by the United States and Mexico, in accordance with the 1944 Water Treaty between the two countries. The dam is operated and maintained jointly by the United States and Mexican Sections of the
IBWC. Amistad Dam provides important flood control, water conservation, recreation, and electrical power production benefits. The Amistad Reservoir and Dam Project is located in Val Verde County, Texas and the State of Coahuila, Mexico, with the dam approximately 12.8 miles northwest of Del Rio, TX.
Construction started on December 1964 and was completed in June 1969.
1.5.B. Penstock #5 was originally designed to be a "dual gated" 15 foot irrigation outlet (penstock). Both gates were designed as tractor (cable operated) gates and weigh 48,000 pounds each. The dual gates are generally referred to as the penstock gate (aka head gate or upstream penstock gate) and the irrigation gate (aka operating or downstream penstock gate) and are positioned approximately 10 feet apart. The gates can be hung in the Penstock Service Bay which is 190 feet above their operating positions.
1.5.C. During construction, the irrigation (downstream) gate was replaced with a hydraulic slide gate. The penstock gate (upstream/head gate) was left as originally designed and is currently in the up (or open) position. Upstream of both Penstock #5 gates is a bulkhead gate slot.
1.5.D. The irrigation gate was in the closed position between approximately 2010 and 2018. In 2010 the following observations were made during the last, unsuccessful attempt to operate the gate:
1. Hydraulic Operating System
a. The hydraulic gate pump was completely operational and quickly built adequate pressure to the control valve.
b. When the control valve was moved to the open gate position, the hydraulic fluid was heard feeding the hydraulic feed lines; however pressure was quickly lost.
Existing Condition Information April 7, 2025 00.31.19-Page 4 USIBWC Solicitation 191BWC25B0003
c. Visual observation down the gate slot (maybe 40-50 feet down the slot) indicated a spray of hydraulic fluid being lost from the feed lines.
d. There was no indication of gate movement, probably due to the loss of hydraulic pressure.
2. Hydraulic Gate
a. The last time the gate was physically inspected is believed to be in the 1980's.
b. Access to the back side of the gate (downstream side) is 190 foot down the 4 foot by 24 foot penstock gate slot and through an approximate 2.5 foot opening behind the gate.
c. The current physical condition of the gate (wear, corrosion, etc.) is unknown.
d. Similarly the physical condition of the concrete portion of the penstock where the gate frame is embedded in the concrete, as well as that of the concrete/penstock liner interface is unknown.
e. The hydraulic gate was known to have a "chatter" problem at certain gate openings: and during normal operations in 1998 it was reported that the gate would "bleed off" and would not hold a gate opening.
f. The hydraulic gate is framed (and seals) to the upstream side of the penstock concrete.
1.5.E. In 2018 a contract was issued to repair the hydraulic lines. Work included removing and disposing of existing pipe connected to the cylinder on Penstock #5 and installing new ¾ inch 316 stainless steel, socket welded pipe and clamps. Following the replacement of the piping, the irrigation gate was lifted successfully, but the system would not generate sufficient pressure to lower the gate.
1.5.F. In 2019 a new hydraulic motor was installed.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
(Not Used)
April 7, 2025 Environmental Information USIBWC Solicitation 191BWC25B0003 00.31.24-Page 1
SECTION 00.31.24
ENVIRONMENTAL INFORMATION
00.31.24 Environmental Information 00.31.24-Environmental Information
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.3. Reference Standards
1.4. Measurement and Payment
1.5. General
1.6. Preservation of Cultural and Natural Resources and the Environment
1.7. Other Considerations
1.8. NEPA Documentation
1.9. Use of Geologic Materials on a Federally Funded Project
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2. RELATED REQUIREMENTS
1.2.A. Section 01.57.00-Temporary Controls for Work Areas
1.2.B. Section 01.57.19-Temporary Environmental Controls
1.3. REFERENCE STANDARDS
1.3.A. United States Code (USC)
1. Clean Air Act, 42 USC 7401 et seq.
2. Clean Water Act (CWA), 33 USC 1251 et seq.
3. Endangered Species Act (ESA), 16 USC 1531 et seq.
4. Migratory Bird Treaty Act (MBTA), 16 USC 703 - 712
5. National Environmental Policy Act (NEPA), 42 USC 4321-4347
6. National Historic Preservation Act (NHPA), 54 USC 300101 et seq.
7. National Wildlife Refuge System Improvement Act of 1997, 16 USC 668dd
8. Native American Graves Protection and Repatriation Act (NAGPRA), 25 USC 3001 et. seq.
9. Refuge Recreation Act, 16 USC 460k - 460k-4
1.4. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.5. GENERAL
1.5.A. Any staging areas or other use of USIBWC property at Amistad Dam requires the following.
1. Biological Resources
Work should be scheduled to occur outside of the bird breeding season whenever possible.
Migratory birds may be present within the project area; birds, nests, and eggs are to be protected and avoided during construction. The breeding and nesting season is identified in Section 01.57.19. If
Environmental Information April 7, 2025 00.31.24-Page 2 USIBWC Solicitation 191BWC25B0003 work continues into the bird breeding/nesting season the areas proposed for disturbance shall be surveyed in order to avoid the inadvertent destruction of nests and eggs.
1.5.B. Further details of environmental requirements are in Sections 01.57.00 and 01.57.19.
1.5.C. Amistad Reservoir is known to contain zebra mussels. The Contractor shall perform work in a manner to prevent the spread of the zebra mussels.
1.6. PRESERVATION OF CULTURAL AND NATURAL RESOURCES AND THE ENVIRONMENT
1.6.A. If the Contractor initiates changes to the Contract and USIBWC approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agencies.
1.6.B. Culturally Sensitive Areas
If a site, building, or location of historical, archaeological, educational, or scientific interest is discovered within the right of way, cease all work immediately, secure the site from further disturbance and possible vandalism, and notify USIBWC. The site, building, or location will be investigated and evaluated by
USIBWC.
1.7. OTHER CONSIDERATIONS
The Contractor is required to ensure that all Environmental Permits, Issues, and Comments (EPIC), which are included within the Contract documents are followed and implemented to ensure potential impacts are avoided.
1.8. NEPA DOCUMENTATION
The USIBWC shall complete appropriate NEPA documentation prior to the construction of the project. The
USIBWC will be responsible for compliance with National Environmental Policy Act (NEPA).
1.9. USE OF GEOLOGIC MATERIALS ON A FEDERALLY FUNDED PROJECT
1.9.A. To ensure preservation of historical and archaeological data, prior to use of any soil, rock, or gravel including aggregate in concrete, the source must first be compliance confirmed by the COR to ensure compliance with Section 106 of the National Historic Preservation Act (NHPA).
1.9.B. Take no action to use or alter the proposed location until written approval for site use is received from the
COR.
1.9.C. If the quarry or borrow site already provides materials for TxDOT, USACE, or other governmental agency, a copy of the environmental approvals from said agencies may be provided to the COR.
1.9.D. Include permission for Government access to any geological source locations.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
April 7, 2025 Existing Hazardous Material Information USIBWC Solicitation 191BWC25B0003 00.31.26-Page 1
SECTION 00.31.26
EXISTING HAZARDOUS MATERIAL INFORMATION
00.31.26 Existing Hazardous Material Information 00.31.26-Existing Hazardous Material Information
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.3. Measurement and Payment
1.4. General
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2. RELATED REQUIREMENTS
1.2.A. Section 00.31.24-Environmental Information
1.3. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4. GENERAL
1.4.A. The report "Amistad Dam Asbestos and Lead-Based Paint Survey," dated December 17, 2004 by Viva
Environmental, Inc. details many locations within the dam as having lead-based paint.
1.4.B. The report "Asbestos & Lead-Paint Survey Report USIBWC Amistad Dam Facility," dated March 19, 2014 by TRC Environmental Corporation details many locations within the dam as having lead-based paint.
1.4.C. The area around Penstock #5 was not tested, but based upon the age of the dam, it is assumed that some of worksite will contain lead-based paint.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
Existing Hazardous Material Information April 7, 2025 00.31.26-Page 2 USIBWC Solicitation 191BWC25B0003
April 7, 2025 Permit Application USIBWC Solicitation 191BWC25B0003 00.31.43-Page 1
SECTION 00.31.43
PERMIT APPLICATION
00.31.43 Permit Application 00.31.43-Permit Application
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Reference Standards
1.3. Measurement and Payment
1.4. General
1.5. Work in Waters of the United States
1.6. Responsibilities
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2. REFERENCE STANDARDS
1.2.A. Texas Commission on Environmental Quality (TCEQ)
1. Texas Pollutant Discharge Elimination System (TPDES)
2. TPDES 2018 Construction General Permit TXR150000 dated January 28, 2022
1.2.B. US Army Corps of Engineers (USACE)
1. Section 404 of Clean Water Act, 33 USC 1251 et seq.
1.3. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4. GENERAL
Prior to the beginning of construction, the Contractor shall be responsible for researching, coordinating, obtaining, and paying all applicable fees for all permits required by Federal, state, and local entities, including, but not limited to, a specific or general stormwater permit prepared in accordance with the requirements of Stormwater
Pollution Prevention Plan (SWPPP) and Texas Pollutant Discharge Elimination System (TPDES) 2018 General
Permit TXR150000.
1.5. WORK IN WATERS OF THE UNITED STATES
1.5.A. The US Army Corps of Engineers (USACE) has determined that a Section 404 permit will not be required for work within the currently defined Temporary Construction Limits (TCL).
1.5.B. For work in the right of way, USIBWC will obtain any required Section 404 permits from the US Army
Corps of Engineers before work begins.
1.5.C. The Contractor must adhere to all agreements, mitigation plans, and standard best management practices required by these permits.
1.5.D. If Contractor initiated changes in the construction method result in impacts to waters of the US, the
Contractor shall have sole responsibility to obtain all required new or revised Section 404 permit and shall adhere to all agreements, mitigation plans, and standard best management practices required by these permits.
Permit Application April 7, 2025 00.31.43-Page 2 USIBWC Solicitation 191BWC25B0003
1.6. RESPONSIBILITIES
1.6.A. The Contractor shall be responsible for providing the proposed location of the project staging areas for compliance confirmation of the COR prior to installation of stormwater pollution prevention (SWPP) measures.
1.6.B. The Federal Government is not subject to local jurisdictions' building codes, nor is it required to obtain building permits from local jurisdictions for construction on real estate owned or controlled by the
USIBWC. However, borrow pits and other offsite locations are subject to local regulations. The
Contractor is responsible for researching and obtaining all necessary permits for offsite work.
1.6.C. The Contractor shall be responsible for obtaining all necessary permits and rights of entry for all work required under this Contract.
1. The Contractor will also be required to research the need for any other required permits, based on the information available from the Contract Drawings and Technical Specifications prior to the beginning of construction. For the work under this Contract, the Contractor shall be responsible for coordinating and obtaining all permits required by Federal, state, and local entities, unless otherwise specified within the Contract Provisions and these Technical Specifications.
1.6.D. The Contractor shall apply and pay for all required permits. The Government is not responsible for any existing or newly introduced permits required before, during and/or after construction.
1.6.E. The Contractor shall be responsible for and shall give and maintain any and all notices required by applicable regulations, laws, or permitting authorities pertaining to construction of this project.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
April 7, 2025 USIBWC Forms and Standard Documents USIBWC Solicitation 191BWC25B0003 00.60.00-Page 1
SECTION 00.60.00
USIBWC FORMS AND STANDARD DOCUMENTS
00.60.00 USIBWC Forms and Standard Documents 00.60.00-USIBWC Forms and Standard Documents
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Measurement and Payment
1.3. General
1.4. Forms
Part 2 - Products (Not Used) Part 3 - Execution
3.1. Using PDF Forms
3.2. Printing
--End of Section--
1.2. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.3. GENERAL
1.3.A. Standard items are available at USIBWC's website at www.ibwc.gov/resources-info/.
1. All forms are under the link entitled USIBWC Construction Forms.
2. Posters are under the link entitled Construction Contractor Posters.
3. Drawing standards and related files are under the link entitled USIBWC's Standard Drawings, CAD files, and Drawing and CAD Standards.
1.3.B. Contractor shall use the most current version of each form.
1.3.C. Form filenames contain a date. This date is the revision date of the form. Keeping the date in the filename can cause confusion when submitting files. Prior to submitting the forms, rename the file as suggested in these Technical Specifications or as agreed to with the COR.
1.4. FORMS
1.4.A. The following USIBWC forms shall be used:
1. Form 119 Pay Estimate-Construction
2. Form 119B Pay Estimate Breakdown
3. Form 146 Transmittal Form
4. Form 147 Submittal Register
5. Form 148 Log of Photographic Documentation
6. Form 149 Schedule Analysis
7. Form 150 Log of Deficiencies/Punch List
8. Form 152 Pay Item Breakdown
9. Form 153 Monthly Exposure & First Aid Report
10. Form 154 Subcontractor's Payment Breakdown https://www.ibwc.gov/resources-info/
USIBWC Forms and Standard Documents April 7, 2025 00.60.00-Page 2 USIBWC Solicitation 191BWC25B0003
11. Form 161 Actual Weather and Working Conditions Report
12. Form 162 Record of Preparatory Phase Meeting
13. Form 163 Daily Construction Quality Control Report
14. Form 163A Equipment Mobilization/Demobilization
15. Form 164A Activity Hazard Analysis
16. Form 166 Record of Initial Phase Meeting
17. Form 204 Use of USIBWC Logo
18. Form 207 Use of AutoCad Files
19. Form 225 Use of USIBWC Key
20. Form 227 Wage Deduction Authorization
21. Form 231 Truck Owner-Operator Certification of Ownership
22. Form 232 Owner-Operator Payroll Listing
23. Form 233 Request for Information
24. Form 233A Request for Information Log
25. Form 235 Concrete Test Results Summary
26. Form 238 Concrete Placement Card
27. Form 239 Schedule of Materials
28. Form 243 Release of Claims
29. Form 253 Construction Closeout Checklist
30. Form 255 Certificate of Substantial Completion
31. Form 265 Safety Inspection for Cranes
32. Form 358 Nondisclosure Agreement
33. Form 358A Nondisclosure Agreement Release
34. Form 359 Hand Receipt
1.4.B. The following forms are available for use, but are not required:
1. Form 119A Contractor Pay Estimate Inventory
2. Form 164 Weekly Toolbox Safety Meeting
3. Form 226 Statement of Labor Compliance
4. Form 228 Nonperformance Payroll Report
5. Form 237 Nuclear Gauge Test Results
6. Form 240 Nuclear Gauge Moisture Calibration
7. Form 241 Nuclear Gauge Standard Count
8. Form 264 Safety Inspection Mechanized Equipment
9. Form 266 Safety Inspection for On Highway Vehicles
April 7, 2025 USIBWC Forms and Standard Documents USIBWC Solicitation 191BWC25B0003 00.60.00-Page 3
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
3.1. USING PDF FORMS
3.1.A. Providing Fillable Forms to USIBWC
1. Fillable forms shall be "printed" prior to sending to USIBWC. Printing a fillable form to pdf fixes the form data permanently so it cannot be changed. It also allows the merging of multiple pdf files without compromising form data. See Figure 1 and Figure 2 as examples.
a. Printing resolution shall not be less than 400 dpi. 1200 dpi is preferred and easily handled by
Adobe Acrobat.
Figure 1 - Fillable Form (not printed)
Figure 2 - Printed Fillable Form
3.1.B. Providing Adobe Electronic Signatures to USIBWC
Whenever an Adobe digital signature is used, ensure that the file is printed to pdf afterwards. This ensures that the digital signature is locked and cannot change but is also allows the resulting file to be combined without pdf files without errors.
3.1.C. Unless otherwise allowed by the COR or this Section, the electronic version all forms shall be used. This means that forms shall not be printed and then filled out by hand. Instead they shall be filled out electronically and then printed to pdf.
3.1.D. The following forms are allowed to be filled out by hand: 162, 164, 166, 227, 231, 237, 238, 358, and
359. Once completed by hand, they shall be scanned at no less than 400 dpi resolution and provided to
USIBWC in a pdf document.
USIBWC Forms and Standard Documents April 7, 2025 00.60.00-Page 4 USIBWC Solicitation 191BWC25B0003
3.2. PRINTING
The Contractor is responsible for printing copies of items provided in electronic format for their own use.
April 7, 2025 Delivery of Data to USIBWC USIBWC Solicitation 191BWC25B0003 00.70.00-Page 1
SECTION 00.70.00
DELIVERY OF DATA TO USIBWC
00.70.00 Delivery of Data to USIBWC 00.70.00-Delivery of Data to USIBWC
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.3. Reference Standards
1.4. Measurement and Payment
1.5. General
1.6. Adobe PDF Files
1.7. Image Files
Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Section--
1.2. RELATED REQUIREMENTS
1.2.A. Section 01.32.33-Photographic Documentation
1.3. REFERENCE STANDARDS
1.3.A. Federal Risk and Authorization Management Program (FedRAMP)
1.4. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.5. GENERAL
1.5.A. USIBWC will perform most document transfer communications via email.
1.5.B. The Contractor shall send all files electronically via email whenever possible. USIBWC's email system can accept files up to 20 MB. Large files shall be transferred via online cloud servers or SharePoint.
1. Online cloud servers shall be FedRAMP compliant.
2. Files transferred through a download link via email will be treated the same as receiving the file via email.
3. Files made available via download shall be grouped in folders or zipped to allow for easy download of a large group of files at one time. However, no zipped file or folder shall exceed 500 MB in size.
1.5.C. USIBWC cannot accept USB thumb drives, CD/DVD, and portable hard drives unless the COR allows their use for transfer of final closeout items. Any drives thus provided to the Government become US
Government property.
1.5.D. Placing documents on an online management system (e.g. Owner Insite or ProjectWise) is unacceptable as a delivery method.
1.5.E. Direct delivery via drop off, US Postal Service, FedEx, UPS, etc. is acceptable.
1. No delivered boxes shall exceed 40 pounds.
Delivery of Data to USIBWC April 7, 2025 00.70.00-Page 2 USIBWC Solicitation 191BWC25B0003
1.5.F. Items are considered received when provided to USIBWC prior to 4:00 pm on a business day (COR's local time zone). Items received after 4:00 pm, or received on a non-business day, will be marked as being received on the next business day.
1.5.G. During the last 2 weeks of the calendar year (i.e. December 16 through December 31), Contractor should expect longer than usual review times. Submittal reviews, RFI responses, answers to questions, and requests for meetings may not be accommodated during this time period. Contractor shall properly plan the submission of items or requests for meetings well in advance of this time period to avoid delays to their schedule due to unavailability of staff during this period.
1.5.H. Electronic files shall be provided in their native format (MSWord, Excel, Primavera, etc.) as well as
Adobe pdf.
1. The entire filename shall not exceed 30 characters, excluding extension.
2. Filenames shall not contain periods (i.e. ".") except to separate the file extension.
3. All dates within the project documentation and in the filenames shall have years shown with four digits.
1.5.I. Software Requirements
1. Text Files
MS Word 2016 or newer for text documents
2. Presentation Files
MS PowerPoint 2016 or newer for presentations
3. Spreadsheet Files
MS Excel 2016 or newer for spreadsheets
1.5.J. Document files shall not be "locked" or otherwise blocked from changes. If it is imperative that a document be password protected, the password shall be provided to USIBWC.
1.5.K. Hard copies shall not be provided in 3-ring binders (except for O&M manuals, if required). Large, lengthy hard copies shall be grouped in expandable folders. Folders shall not exceed 3.5 inches in width.
1.6. ADOBE PDF FILES
1.6.A. All reports, submittals, record documents, and other deliverables, unless specifically noted to use a different filetype in these Technical Specifications, shall be provided as pdf documents.
1.6.B. Whenever possible, files shall be saved/printed as pdfs instead of scanned as pdfs.
1. "Print" to pdf with a minimum resolution of 600 dpi, but 1200 or 2400 dpi is preferred for text documents.
1.6.C. Pdf files that contain form fields shall be "printed" to pdf prior to submittal to USIBWC. Printing the file to pdf locks the data and prevents the form field from being changed.
1. Pdfs shall include valid electronic signatures, or they shall be scans of the original documents.
a. Valid electronic signatures include digital signatures created through the pdf program or inserted scans of a true signature. By submitting an item using either of these items, the
Contractor is certifying that the signature is valid.
1.6.D. Embed all fonts used in the pdf files.
1.6.E. Per USIBWC's "Drawing and CAD Standards" the minimum resolution for drawings generated from
AutoCAD is 1200 dpi.
1.6.F. Color documents shall be scanned in color. NCR pages that are other than white (e.g. all yellow or all pink) are not considered color documents and shall be scanned in grayscale or black and white. Black and white is preferred.
April 7, 2025 Delivery of Data to USIBWC USIBWC Solicitation 191BWC25B0003 00.70.00-Page 3
1.6.G. The minimum scanning resolution shall be:
1. 400 dpi for color and grayscale
2. 600 dpi for black and white
1.6.H. Provide data/information within the pdf itself. Do not use "attachments" within a pdf file. Do not use a pdf portfolio.
1.6.I. Pdfs shall be sized at ANSI A (8 ½" x 11"), ANSI B (11" x 17"), or ANSI D (22" x 34") unless the original is another size, then the pdf shall be the size of the original document.
1.6.J. Reports and plans (e.g. Safety Plan, QC Plan, Stormwater Pollution Prevention Plan) provided to the
Government as submittals shall be provided in pdfs with recognizable text (i.e. searchable pdf).
Recognizable text is searchable by character or words.
1.6.K. The Contractor shall ensure that the electronic copy is legible.
1.7. IMAGE FILES
See Section 01.32.33 for requirements of photograph and video files.
PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
Delivery of Data to USIBWC April 7, 2025 00.70.00-Page 4 USIBWC Solicitation 191BWC25B0003
April 7, 2025 Project Data USIBWC Solicitation 191BWC25B0003 00.70.13-Page 1
SECTION 00.70.13
PROJECT DATA
00.70.13 Project Data 00.70.13-Project Data
PART 1 - GENERAL
1.1. SECTION INCLUDES
Part 1 - General
1.1. Section Includes
1.2. Reference Standards
1.3. Measurement and Payment
1.4. General
1.5. Definitions
Part 2 - Products (Not Used) Part 3 - Execution
3.1. Data First Produced in the Performance of this Contract
3.2. Data Not First Produced in the Performance of this Contract
3.3. Release and Use Restrictions
--End of Section--
1.2. REFERENCE STANDARDS
1.2.A. United States Code (USC)
1. 17 USC 401-402
1.3. MEASUREMENT AND PAYMENT
The work performed by the Contractor under this Section shall not be paid for directly but shall be included in the various Bid Items under this Contract.
1.4. GENERAL
1.4.A. The Government shall have unlimited rights in all data delivered under this Contract and in all data first produced in the performance of this Contract. The Government shall also have the right to limit assertion of copyright in data first produced in the performance of this Contract and to obtain assignment of copyright in that data. The Government has the right to limit the release and use of certain data.
1.4.B. All data, submittals, and…