Replacement of Hydraulic System for Penstock #5
Solicitation number
191BWC25B0003
Issued by

About this file

This document is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) for Solicitation Number 191BWC25B0003, issued by the International Boundary and Water Commission (IBWC) on May 12, 2025. The amendment's primary purpose is to provide answers to previously received questions, with changes included in Technical Specifications Section 00.91.16 and revised Specifications dated June 24, 2025. Specifically, the amendment notes changes related to Paragraph 1.4 in the April 7, 2025 version when compared to the June 24, 2025 document.

The solicitation is for the Replacement of Penstock 5 Hydraulic System at Amistad Dam, with an estimated project value between $1,000,000 and $5,000,000. The project involves fully inspecting and replacing the hydraulic system to restore Penstock #5 to full functionality, with work to be completed within 485 calendar days after the Notice to Proceed (including 365 days for construction and 120 days for final paperwork). The contract will be firm-fixed price, performed under NAICS Code 237990, and located in Val Verde County, Texas, with specific site access and operational constraints detailed in the original solicitation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Number: 191BWC25B0003 PROCESSED Page 1 of 3

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

05/12/2025

4. REQUISITION/PURCHASE REQ. NUMBER

FY25S4221001

5. PROJECT NUMBER (If applicable)

IBWC_CODE

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4191 NORTH MESA ST

EL PASO, TX 79902-1441

US

Adrian I Knights

NAME

(915)832-4723

TEL.

knightsai@state.gov

EMAIL

6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

191BWC25B0003

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

06/10/2025

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide answers to questions received.

Questions and answers are included in Technical Specifications Section 00.91.16. See revised Specifications dated June 24, 2025.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Seone M Jones

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

05/12/2025

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV.

11/2016) Prescribed by GSA FAR (48 CFR) 53.243

CGFS // CGFS

À

Document Number: 191BWC25B0003 PROCESSED Page 2 of 3

Table of Contents

Section Description Page Number

Document Number: 191BWC25B0003 PROCESSED Page 3 of 3

Line Item Summary

Solicitation Number:

191BWC25B0003

Contract Number: Title:

Replacement of Penstock 5 Hydraulic System

Date of Solicitation:

06/25/2025

CLIN Funding: Cost:

Base Totals: Original: $0.00

Change: $0.00

Current: $0.00

Original: $0.00

Change: $0.00

Current: $0.00

Exercised Options Totals: Original: $0.00

Change: $0.00

Current: $0.00

Original: $0.00

Change: $0.00

Current: $0.00

Unexercised Options Totals: Original: $0.00

Change: $0.00

Current: $0.00

Original: $0.00

Change: $0.00

Current: $0.00

Base and Options Totals: Original: $0.00

Change: $0.00

Current: $0.00

Original: $0.00

Change: $0.00

Current: $0.00

191BWC25B0003_Penstock_5_Specs_20250624.pdf
Front Cover
Table of Contents
Division 00-Procurement and Contracting Requirements
Section 00.01.10
Section 00.21.13
Part 1 - General
1.1. Section Includes
1.2. Reference Standards
1.2.A. Federal Acquisition Regulation (FAR)
1. FAR 52.236-3, Site Investigation and Conditions Affecting the Work
1.3. Measurement and Payment
1.4. Definitions
1.4.A. Within this Section, the following terms are used interchangeably.
1. Bid - Offer - Proposal
2. Solicitation - Request for Proposal - RFP
3. Bidder - Offeror - Contractor
1.5. Technical Specification Reference Protocols
1.5.A. Use the reference protocols in Table 1 to refer to items within Technical Specifications.
1.5.B. Every Section has three Parts with multiple paragraphs. Always include the section number with the full paragraph number when referencing any item within these Technical Specifications.
1. For example, the proper reference to this paragraph is Section 00.21.13 Paragraph 1.5.B.1.
1.6. Duty to Inquire
1.6.A. Bidders shall review the full Solicitation and all Contract documents including, but not limited to, Technical Specifications, Contract Drawings, USIBWC provided data, referenced items, attachments, etc. to determine the full scope of work requ...
1.6.B. If during review of these items, the Bidder finds discrepancies, omissions, conflicts, defects, errors, or ambiguities, they have a duty to inquire. The Bidder shall also inquire about items that are open to interpretation.
1.6.C. The Bidder shall inquire about items as soon as they are discovered, whether before deadline for submission of bidder questions, whether after deadline for submission of bidder questions, whether after submission of bids, or whether after Contr...
1.6.D. If the Bidder fails to inquire, they forfeit their right to any claim based upon said discrepancies, omissions, conflicts, defects, errors, ambiguities, or items that are open to interpretation. The Bidder shall be proceeding at their own risk ...
1.6.E. The Bidder shall take no advantage of any item of which they have a duty to inquire.
1.7. Investigation of Site Conditions
1.7.A. The Bidder, as well as their subcontractors, is urged to visit the worksite and project area to become fully aware as to the existing conditions affecting the work to be performed under the Contract documents. A site visit will be announced dur...
1.7.B. The Bidder shall be responsible for ensuring that all of its suppliers, manufactures and subcontractors have reviewed all applicable Contract documents relative to their work. The Bidder shall provide all labor, material, equipment, and service...
1.7.C. Bidder has the sole responsibility to make such independent investigation and examination as they deem necessary in order to satisfy themselves as to the conditions to be encountered in the performance of work and the quantities required to com...
1.7.D. The Government assumes no responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of the Bidder's officers or agents before the execution of this Contract, unless that understan...
1.7.E. Any failure of the Bidder to take the actions described and acknowledged in this Section will not relieve the Bidder from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to s...
1.8. Bid Items
1.8.A. The Contract Line Item Numbers (CLIN) that shall be bid upon are identified in Section B (bid schedule) of the Solicitation.
1.8.B. The Bidder shall include all work related costs within its bid unit prices even if not specifically listed in the bid schedule.
1.8.C. If an error exists on the bid schedule between the CLIN total cost provided and the resultant value of the CLIN quantity multiplied by the bid unit price, the bid unit price provided shall govern.
1.8.D. If the bid schedule includes CLINs entitled Receiving Lines, No Cost Receiving Lines, No Cost Receiving Lines for IBWC Use Only, Receiving Lines for Internal Use Only, or similarly, then the Bidder shall not provide a bid price for this CLIN. R...
1.9. Specifications
1.9.A. The Government does not implicitly warrant performance specifications for complete accuracy or adequacy. Typical performance type specifications set forth an objective or standard to be achieved, and the successful Bidder is expected to exercis...
1.9.B. When a particular product or manufacturer is identified by name, but permits substitution of ‘an approved equal,’ such a specification is ‘performance’ in nature and, as a result, carries no implied warranty.
1.9.C. The Technical Specifications are written in imperative and abbreviated form. This imperative language is directed at the Contractor, unless specifically noted otherwise. Incomplete sentences shall be completed by inserting "shall", "the Contrac...
1.9.D. All equipment and facilities shall be furnished, installed, and constructed by the Contractor to provide the Government with complete, ready to use components, systems, and facilities. All necessary materials and work required to accomplish thi...
1.9.E. The various Sections of the Technical Specifications may contain references to standards, other specification sections, or items that do not apply to the work covered in this project. These references are to be considered for information only a...
1.10. Bid Submission
1.10.A. Submission of a bid shall be conclusive evidence that the Bidder has reviewed, investigated, and acknowledged all items detailed in FAR 52.236-3 and listed below.
1. Conditions bearing upon transportation, disposal, handling, and storage of materials.
2. The availability of labor, water, electric power, and roads.
3. Uncertainties of weather and similar physical conditions at the site.
4. The conformation and conditions of the ground.
5. The security and safety conditions at and around the site.
6. The character of equipment and facilities needed preliminary to and during work performance.
1.10.B. Submission of a bid shall be conclusive evidence that the Bidder has reviewed all Contract documents.
1.10.C. Submission of a bid shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, the character, quality, and scope of work to be performed, and the quantities of materials to be furnished.
1.10.D. Submission of a bid constitutes agreement that Bidder has provided written notice of all discrepancies, omissions, conflicts, defects, errors, ambiguities, or items that are open to interpretation discovered in the Contract documents, that res...
1.10.E. Bidder has the sole responsibility to make such independent instigation and examination as they deem necessary in order to satisfy themselves as to the conditions to be encountered in the performance of work and the quantities required to comp...
Part 2 - Products (Not Used)
Part 3 - Execution
3.1. Requests for Interpretation (Duty to Inquire)
3.1.A. Bidders shall submit requests for interpretation, questions, and other concerns about the Solicitation and Contract documents including, but not limited to, Technical Specifications, Contract Drawings, USIBWC provided data, referenced items, at...
3.1.B. Such requests shall be made even if the question and answer period identified in the Solicitation has passed.
3.1.C. Failure to request interpretation prior to providing a bid shall result in the Bidder being fully responsible for any cost or time impacts involved to perform the work required.
Section 00.31.19
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.2.A. Section 00.73.73-Requirements for Sensitive But Unclassified Information
1.3. Measurement and Payment
1.4. General
1.4.A. Reports on the Existing Condition Information
1. An inspection of Penstock 5 was performed by the US Army Corps of Engineers. The findings were and available in a report, entitled "Trip Report: Inspections and Technical Oversight on Penstock 5 Hydraulic System Repairs," dated June 10, 2019.
2. A study to repair Penstock #4 was performed by the US Army Corps of Engineers. Since Penstock #4 and Penstock #5 are the same, their report entitled "Amistad Dam Project, Del Rio Texas, Irrigation Penstock Gate Study," dated October 2006 has been i...
3. Since Penstock #4 and Penstock #5 are the same, instructions for opening the gates for Penstock #4 are provided for reference. The memorandum is entitled "Opening of Gate in Penstock No. 4," dated May 6, 1986.
1.4.B. The original construction specifications: Volume I and Volume II of the "Specifications for Construction Allocated to United States, Embankment, Non-Overflow, Power Intake, and Spillway" for solicitation UDA 65-3 dated August 1964.
1.4.C. Applicable original construction drawings are listed in Table 2.
1.4.D. The original "Amistad Dam, Rio Grande, Operation & Maintenance Manual," dated 1971 includes operations of the penstock and irrigation gates.
1.4.E. The "Report on Control Changes to Penstock Gates 4 and 5" explains some of the original gate operations.
1.4.F. SBU items will be provided via a Sharepoint link to each Bidder requesting access to this data. The Bidders shall provide an email address along with IBWC Form 358 to the CO for this link.
1. No more than 2 Sharepoint links will be provided to each Bidder. To use Sharepoint, a user must have a valid Microsoft account.
2. All unsuccessful Bidders shall provide IBWC Form 358A to the CO within 7 days of being notified of their unsuccessful offer.
1.5. Existing Structures
1.5.A. Amistad Dam is the largest of the international multipurpose storage dams to be constructed on the Rio Grande by the United States and Mexico, in accordance with the 1944 Water Treaty between the two countries. The dam is operated and maintaine...
1.5.B. Penstock #5 was originally designed to be a "dual gated" 15 foot irrigation outlet (penstock). Both gates were designed as tractor (cable operated) gates and weigh 48,000 pounds each. The dual gates are generally referred to as the penstock gat...
1.5.C. During construction, the irrigation (downstream) gate was replaced with a hydraulic slide gate. The penstock gate (upstream/head gate) was left as originally designed and is currently in the up (or open) position. Upstream of both Penstock #5 g...
1.5.D. The irrigation gate was in the closed position between approximately 2010 and 2018. In 2010 the following observations were made during the last, unsuccessful attempt to operate the gate:
1. Hydraulic Operating System
a. The hydraulic gate pump was completely operational and quickly built adequate pressure to the control valve.
b. When the control valve was moved to the open gate position, the hydraulic fluid was heard feeding the hydraulic feed lines; however pressure was quickly lost.
c. Visual observation down the gate slot (maybe 40-50 feet down the slot) indicated a spray of hydraulic fluid being lost from the feed lines.
d. There was no indication of gate movement, probably due to the loss of hydraulic pressure.
2. Hydraulic Gate
a. The last time the gate was physically inspected is believed to be in the 1980's.
b. Access to the back side of the gate (downstream side) is 190 foot down the 4 foot by 24 foot penstock gate slot and through an approximate 2.5 foot opening behind the gate.
c. The current physical condition of the gate (wear, corrosion, etc.) is unknown.
d. Similarly the physical condition of the concrete portion of the penstock where the gate frame is embedded in the concrete, as well as that of the concrete/penstock liner interface is unknown.
e. The hydraulic gate was known to have a "chatter" problem at certain gate openings: and during normal operations in 1998 it was reported that the gate would "bleed off" and would not hold a gate opening.
f. The hydraulic gate is framed (and seals) to the upstream side of the penstock concrete.
1.5.E. In 2018 a contract was issued to repair the hydraulic lines. Work included removing and disposing of existing pipe connected to the cylinder on Penstock #5 and installing new ¾ inch 316 stainless steel, socket welded pipe and clamps. Following ...
1.5.F. In 2019 a new hydraulic motor was installed.
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used)
Section 00.31.24
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.2.A. Section 01.57.00-Temporary Controls for Work Areas
1.2.B. Section 01.57.19-Temporary Environmental Controls
1.3. Reference Standards
1.3.A. United States Code (USC)
1. Clean Air Act, 42 USC 7401 et seq.
2. Clean Water Act (CWA), 33 USC 1251 et seq.
3. Endangered Species Act (ESA), 16 USC 1531 et seq.
4. Migratory Bird Treaty Act (MBTA), 16 USC 703 - 712
5. National Environmental Policy Act (NEPA), 42 USC 4321-4347
6. National Historic Preservation Act (NHPA), 54 USC 300101 et seq.
7. National Wildlife Refuge System Improvement Act of 1997, 16 USC 668dd
8. Native American Graves Protection and Repatriation Act (NAGPRA), 25 USC 3001 et. seq.
9. Refuge Recreation Act, 16 USC 460k - 460k-4
1.4. Measurement and Payment
1.5. General
1.5.A. Any staging areas or other use of USIBWC property at Amistad Dam requires the following.
1. Biological Resources
1.5.B. Further details of environmental requirements are in Sections 01.57.00 and 01.57.19.
1.5.C. Amistad Reservoir is known to contain zebra mussels. The Contractor shall perform work in a manner to prevent the spread of the zebra mussels.
1.6. Preservation of Cultural and Natural Resources and the Environment
1.6.A. If the Contractor initiates changes to the Contract and USIBWC approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agencies.
1.6.B. Culturally Sensitive Areas
1.7. Other Considerations
1.8. NEPA Documentation
1.9. Use of Geologic Materials on a Federally Funded Project
1.9.A. To ensure preservation of historical and archaeological data, prior to use of any soil, rock, or gravel including aggregate in concrete, the source must first be compliance confirmed by the COR to ensure compliance with Section 106 of the Natio...
1.9.B. Take no action to use or alter the proposed location until written approval for site use is received from the COR.
1.9.C. If the quarry or borrow site already provides materials for TxDOT, USACE, or other governmental agency, a copy of the environmental approvals from said agencies may be provided to the COR.
1.9.D. Include permission for Government access to any geological source locations.
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used)
Section 00.31.26
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.2.A. Section 00.31.24-Environmental Information
1.3. Measurement and Payment
1.4. General
1.4.A. The report "Amistad Dam Asbestos and Lead-Based Paint Survey," dated December 17, 2004 by Viva Environmental, Inc. details many locations within the dam as having lead-based paint.
1.4.B. The report "Asbestos & Lead-Paint Survey Report USIBWC Amistad Dam Facility," dated March 19, 2014 by TRC Environmental Corporation details many locations within the dam as having lead-based paint.
1.4.C. The area around Penstock #5 was not tested, but based upon the age of the dam, it is assumed that some of worksite will contain lead-based paint.
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used)
Section 00.31.43
Part 1 - General
1.1. Section Includes
1.2. Reference Standards
1.2.A. Texas Commission on Environmental Quality (TCEQ)
1. Texas Pollutant Discharge Elimination System (TPDES)
2. TPDES 2018 Construction General Permit TXR150000 dated January 28, 2022
1.2.B. US Army Corps of Engineers (USACE)
1. Section 404 of Clean Water Act, 33 USC 1251 et seq.
1.3. Measurement and Payment
1.4. General
1.5. Work in Waters of the United States
1.5.A. The US Army Corps of Engineers (USACE) has determined that a Section 404 permit will not be required for work within the currently defined Temporary Construction Limits (TCL).
1.5.B. For work in the right of way, USIBWC will obtain any required Section 404 permits from the US Army Corps of Engineers before work begins.
1.5.C. The Contractor must adhere to all agreements, mitigation plans, and standard best management practices required by these permits.
1.5.D. If Contractor initiated changes in the construction method result in impacts to waters of the US, the Contractor shall have sole responsibility to obtain all required new or revised Section 404 permit and shall adhere to all agreements, mitigat...
1.6. Responsibilities
1.6.A. The Contractor shall be responsible for providing the proposed location of the project staging areas for compliance confirmation of the COR prior to installation of stormwater pollution prevention (SWPP) measures.
1.6.B. The Federal Government is not subject to local jurisdictions' building codes, nor is it required to obtain building permits from local jurisdictions for construction on real estate owned or controlled by the USIBWC. However, borrow pits and oth...
1.6.C. The Contractor shall be responsible for obtaining all necessary permits and rights of entry for all work required under this Contract.
1.
1. The Contractor will also be required to research the need for any other required permits, based on the information available from the Contract Drawings and Technical Specifications prior to the beginning of construction. For the work under this Con...
1.6.D. The Contractor shall apply and pay for all required permits. The Government is not responsible for any existing or newly introduced permits required before, during and/or after construction.
1.6.E. The Contractor shall be responsible for and shall give and maintain any and all notices required by applicable regulations, laws, or permitting authorities pertaining to construction of this project.
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used)
Section 00.60.00
Part 1 - General
1.1. Section Includes
1.2. Measurement and Payment
1.3. General
1.3.A. Standard items are available at USIBWC's website at www.ibwc.gov/resources-info/.
1. All forms are under the link entitled USIBWC Construction Forms.
2. Posters are under the link entitled Construction Contractor Posters.
3. Drawing standards and related files are under the link entitled USIBWC's Standard Drawings, CAD files, and Drawing and CAD Standards.
1.3.B. Contractor shall use the most current version of each form.
1.3.C. Form filenames contain a date. This date is the revision date of the form. Keeping the date in the filename can cause confusion when submitting files. Prior to submitting the forms, rename the file as suggested in these Technical Specifications...
1.4. Forms
1.4.A. The following USIBWC forms shall be used:
1. Form 119 Pay Estimate-Construction
2. Form 119B Pay Estimate Breakdown
3. Form 146 Transmittal Form
4. Form 147 Submittal Register
5. Form 148 Log of Photographic Documentation
6. Form 149 Schedule Analysis
7. Form 150 Log of Deficiencies/Punch List
8. Form 152 Pay Item Breakdown
9. Form 153 Monthly Exposure & First Aid Report
10. Form 154 Subcontractor's Payment Breakdown
11. Form 161 Actual Weather and Working Conditions Report
12. Form 162 Record of Preparatory Phase Meeting
13. Form 163 Daily Construction Quality Control Report
14. Form 163A Equipment Mobilization/Demobilization
15. Form 164A Activity Hazard Analysis
16. Form 166 Record of Initial Phase Meeting
17. Form 204 Use of USIBWC Logo
18. Form 207 Use of AutoCad Files
19. Form 225 Use of USIBWC Key
20. Form 227 Wage Deduction Authorization
21. Form 231 Truck Owner-Operator Certification of Ownership
22. Form 232 Owner-Operator Payroll Listing
23. Form 233 Request for Information
24. Form 233A Request for Information Log
25. Form 235 Concrete Test Results Summary
26. Form 238 Concrete Placement Card
27. Form 239 Schedule of Materials
28. Form 243 Release of Claims
29. Form 253 Construction Closeout Checklist
30. Form 255 Certificate of Substantial Completion
31. Form 265 Safety Inspection for Cranes
32. Form 358 Nondisclosure Agreement
33. Form 358A Nondisclosure Agreement Release
34. Form 359 Hand Receipt
1.4.B. The following forms are available for use, but are not required:
1. Form 119A Contractor Pay Estimate Inventory
2. Form 164 Weekly Toolbox Safety Meeting
3. Form 226 Statement of Labor Compliance
4. Form 228 Nonperformance Payroll Report
5. Form 237 Nuclear Gauge Test Results
6. Form 240 Nuclear Gauge Moisture Calibration
7. Form 241 Nuclear Gauge Standard Count
8. Form 264 Safety Inspection Mechanized Equipment
9. Form 266 Safety Inspection for On Highway Vehicles
Part 2 - Products (Not Used)
Part 3 - Execution
3.1. Using PDF Forms
3.1.A. Providing Fillable Forms to USIBWC
1. Fillable forms shall be "printed" prior to sending to USIBWC. Printing a fillable form to pdf fixes the form data permanently so it cannot be changed. It also allows the merging of multiple pdf files without compromising form data. See Figure 1 and...
a. Printing resolution shall not be less than 400 dpi. 1200 dpi is preferred and easily handled by Adobe Acrobat.
3.1.B. Providing Adobe Electronic Signatures to USIBWC
3.1.C. Unless otherwise allowed by the COR or this Section, the electronic version all forms shall be used. This means that forms shall not be printed and then filled out by hand. Instead they shall be filled out electronically and then printed to pdf.
3.1.D. The following forms are allowed to be filled out by hand: 162, 164, 166, 227, 231, 237, 238, 358, and 359. Once completed by hand, they shall be scanned at no less than 400 dpi resolution and provided to USIBWC in a pdf document.

3.2. Printing

Section 00.70.00
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.2.A. Section 01.32.33-Photographic Documentation
1.3. Reference Standards
1.3.A. Federal Risk and Authorization Management Program (FedRAMP)
1.4. Measurement and Payment
1.5. General
1.5.A. USIBWC will perform most document transfer communications via email.
1.5.B. The Contractor shall send all files electronically via email whenever possible. USIBWC's email system can accept files up to 20 MB. Large files shall be transferred via online cloud servers or SharePoint.
1. Online cloud servers shall be FedRAMP compliant.
2. Files transferred through a download link via email will be treated the same as receiving the file via email.
3. Files made available via download shall be grouped in folders or zipped to allow for easy download of a large group of files at one time. However, no zipped file or folder shall exceed 500 MB in size.
1.5.C. USIBWC cannot accept USB thumb drives, CD/DVD, and portable hard drives unless the COR allows their use for transfer of final closeout items. Any drives thus provided to the Government become US Government property.
1.5.D. Placing documents on an online management system (e.g. Owner Insite or ProjectWise) is unacceptable as a delivery method.
1.5.E. Direct delivery via drop off, US Postal Service, FedEx, UPS, etc. is acceptable.
1. No delivered boxes shall exceed 40 pounds.
1.5.F. Items are considered received when provided to USIBWC prior to 4:00 pm on a business day (COR's local time zone). Items received after 4:00 pm, or received on a non-business day, will be marked as being received on the next business day.
1.5.G. During the last 2 weeks of the calendar year (i.e. December 16 through December 31), Contractor should expect longer than usual review times. Submittal reviews, RFI responses, answers to questions, and requests for meetings may not be accommoda...
1.5.H. Electronic files shall be provided in their native format (MSWord, Excel, Primavera, etc.) as well as Adobe pdf.
1. The entire filename shall not exceed 30 characters, excluding extension.
2. Filenames shall not contain periods (i.e. ".") except to separate the file extension.
3. All dates within the project documentation and in the filenames shall have years shown with four digits.
1.5.I. Software Requirements
1. Text Files
MS Word 2016 or newer for text documents
2. Presentation Files
MS PowerPoint 2016 or newer for presentations
3. Spreadsheet Files
MS Excel 2016 or newer for spreadsheets
1.5.J. Document files shall not be "locked" or otherwise blocked from changes. If it is imperative that a document be password protected, the password shall be provided to USIBWC.
1.5.K. Hard copies shall not be provided in 3-ring binders (except for O&M manuals, if required). Large, lengthy hard copies shall be grouped in expandable folders. Folders shall not exceed 3.5 inches in width.
1.6. Adobe PDF Files
1.6.A. All reports, submittals, record documents, and other deliverables, unless specifically noted to use a different filetype in these Technical Specifications, shall be provided as pdf documents.
1.6.B. Whenever possible, files shall be saved/printed as pdfs instead of scanned as pdfs.
1. "Print" to pdf with a minimum resolution of 600 dpi, but 1200 or 2400 dpi is preferred for text documents.
1.6.C. Pdf files that contain form fields shall be "printed" to pdf prior to submittal to USIBWC. Printing the file to pdf locks the data and prevents the form field from being changed.
1. Pdfs shall include valid electronic signatures, or they shall be scans of the original documents.
a. Valid electronic signatures include digital signatures created through the pdf program or inserted scans of a true signature. By submitting an item using either of these items, the Contractor is certifying that the signature is valid.
1.6.D. Embed all fonts used in the pdf files.
1.6.E. Per USIBWC's "Drawing and CAD Standards" the minimum resolution for drawings generated from AutoCAD is 1200 dpi.
1.6.F. Color documents shall be scanned in color. NCR pages that are other than white (e.g. all yellow or all pink) are not considered color documents and shall be scanned in grayscale or black and white. Black and white is preferred.
1.6.G. The minimum scanning resolution shall be:
1. 400 dpi for color and grayscale
2. 600 dpi for black and white
1.6.H. Provide data/information within the pdf itself. Do not use "attachments" within a pdf file. Do not use a pdf portfolio.
1.6.I. Pdfs shall be sized at ANSI A (8 ½" x 11"), ANSI B (11" x 17"), or ANSI D (22" x 34") unless the original is another size, then the pdf shall be the size of the original document.
1.6.J. Reports and plans (e.g. Safety Plan, QC Plan, Stormwater Pollution Prevention Plan) provided to the Government as submittals shall be provided in pdfs with recognizable text (i.e. searchable pdf). Recognizable text is searchable by character or...
1.6.K. The Contractor shall ensure that the electronic copy is legible.

1.7. Image Files

Part 2 - Products (Not Used)
Part 3 - Execution (Not Used)
Section 00.70.13
Part 1 - General
1.1. Section Includes
1.2. Reference Standards
1.2.A. United States Code (USC)
1. 17 USC 401-402
1.3. Measurement and Payment
1.4. General
1.4.A. The Government shall have unlimited rights in all data delivered under this Contract and in all data first produced in the performance of this Contract. The Government shall also have the right to limit assertion of copyright in data first prod...
1.4.B. All data, submittals, and pay estimates are required contractual documents and are in no way privileged nor confidential information. Contractor shall not state that these items are confidential business information nor state that they are not ...
1.5. Definitions
1.5.A. "Data" means recorded information, regardless of form or the media on which it may be recorded. The term includes all technical data and testing data. The term does not include information incidental to Contract administration, such as financia...
1. Data examples include, but are not limited to:
a. The production of audiovisual works, including motion pictures or television recordings with or without accompanying sound, or for the preparation of motion picture scripts, musical compositions, sound tracks, translation, adaptation, and the like.
b. Photographs, negatives, and slides.
c. Histories of the respective agencies, departments, services, or units thereof.
d. Surveys of Government establishments including any associated survey data and drawings produced from such surveys.
e. Works pertaining to the instruction or guidance of Government officers and employees in the discharge of their official duties.
f. The compilation of reports, books, studies, surveys, or similar documents.
g. The collection of data containing personally identifiable information such that the disclosure thereof would violate the right of privacy or publicity of the individual to whom the information relates.
h. Investigatory reports.
i. The development, accumulation, or compilation of data, the early release of which could prejudice follow-on acquisition activities or agency regulatory or enforcement activities.
j. Designs, models, reports, surveys, submittals, plans, specifications, and drawings.
k. Any other items provided in the performance of this Contract.
1.5.B. "Unlimited rights" means the rights of the Government to use, disclose, reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, in any manner and for any purpose, and to have or permit ot...
Part 2 - Products (Not Used)
Part 3 - Execution
3.1. Data First Produced in the Performance of this Contract
3.1.A. The Contractor shall not assert or authorize others to assert any claim to copyright subsisting in any data first produced in the performance of this Contract without prior written permission of the Contracting Officer.
3.1.B. The Contractor grants to the Government, and others acting on its behalf, a paid-up, nonexclusive, irrevocable, worldwide license for all delivered data to reproduce, prepare derivative works, distribute copies to the public, and perform public...
3.2. Data Not First Produced in the Performance of this Contract
3.3. Release and Use Restrictions
3.3.A. Except as otherwise specifically provided for in this Contract, the Contractor shall not use, release, reproduce, distribute, or publish any data first produced in the performance of this Contract, nor authorize others to do so, without written...
3.3.B. The Contractor shall indemnify the Government and its officers, agents, and employees acting for the Government against any liability, including costs and expenses, incurred as the result of:
1. The violation of trade secrets, copyrights, or right of privacy or publicity, arising out of the creation, delivery, publication, or use of any data furnished under this Contract.
2. Any libelous or other unlawful matter contained in such data. The provisions of this paragraph do not apply unless the Government provides notice to the Contractor as soon as practicable of any claim or suit, affords the Contractor an opportunity u...
Section 00.72.00
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.2.A. Section 00.21.13-Instructions to Bidders
1.2.B. Section 01.31.00-Project Coordination
1.2.C. Section 01.33.00-Submittal Procedures
1.3. Reference Standards
1.3.A. Federal Acquisition Regulation (FAR)
1. FAR Subpart 14.2
2. FAR 52.214-29 Order of Precedence-Sealed Bidding
3. FAR 52.236-21 Specifications and Drawings for Construction
1.4. Measurement and Payment
1.5. General
1.5.A. In following with FAR guidance, any inconsistency in the Solicitation or Contract shall be resolved by giving precedence in the following order:
1. The Schedule which refers to FAR 14.201-2 and includes Sections A through H of the Solicitation/Contract but excludes the specifications.
2. Representations and other instructions which refers to FAR 14.201-5 and includes Sections K, L, and M of the Solicitation.
3. Contract clauses which refers to FAR 14.201-3 and includes Section I of the Solicitation/Contract.
4. Other documents, exhibits, and attachments which refers to FAR 14.201-4 and includes Section J of the Solicitation/Contract but excludes the specifications.
5. This document (i.e. the Technical Specifications)
6. The Contract Drawings.
Part 2 - Products (Not Used)
Part 3 - Execution
3.1. Administration
3.1.A. As soon as an inconsistency is discovered, bring it to the Government's attention.
1. Minor inconsistencies can usually be resolved with the COR and are then noted on the Record Documents.
2. Inconsistencies affecting Contract time or money shall be brought to the CO's attention immediately.
3.1.B. Any inconsistency discovered prior to bidding shall follow Section 00.21.13.
3.1.C. Any inconsistency discovered after award shall be documented via a submittal (Section 01.33.00), an RFI (Section 01.31.00), or an official letter to the CO.
Section 00.73.63
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.2.A. Section 01.33.00-Submittal Procedures
1.2.B. Section 01.35.23-Safety
1.3. Submittals
1.3.A. Submittals shall be transmitted by the Contractor in accordance with the requirements of Section 01.33.00. The Contractor Quality Control (CQC) System Manager shall be responsible for certifying that all submittals are in compliance with the Co...
1.3.B. Required submittals in this Section include:
1. Armed security guard licenses, if required
1.4. Record Documents
1.4.A. Required documents to be provided to Government in this Section include:
1. Fingerprinting for all applicable personnel
1.5. Measurement and Payment
1.6. General
1.7. Security
1.7.A. The Contractor is responsible for securing the worksite, equipment, and materials from vandalism and theft.
1.7.B. The Contractor shall implement a security program that:
1. Protects the work, the existing premises, and the Government’s operations from theft, vandalism, and unauthorized entry.
2. Initiates a security program in coordination with Government’s existing security system at mobilization.
3. Maintains the security program throughout construction duration until Contract Closeout.
1.7.C. The Contractor shall implement entry control to the work area that notifies people of the construction area, of PPE required, and of the dangers of entry. Entry control shall document and log all personnel onsite.
1.7.D. The Government shall not be responsible for the security of any items within the work area and associated PSLs.
1.7.E. Armed Security
1. Prior to the use of any armed personnel onsite, the Contractor shall submit Texas Level III or Level IV Security Officer (Guard) License issued by the TX Department of Public Safety.
2. All vehicles used by armed security guards must have markings on both doors noting that they are "Armed Security."
3. Additionally, the APP in Section 01.35.23 must include the use of armed guards and an associated AHA must be provided and compliance confirmed.
1.8. Insurance
1.8.A. When not required by the Contract clauses, the Contractor has the right to purchase coverage for property insurance, builder's risk insurance (including perils of wind, collapse, vandalism/malicious mischief, and theft, including theft of mater...
1.8.B. The Contractor shall be held liable for all costs associated with losses, deductibles, and self-insurance for coverages not required by the Contract clauses.
1. Losses shall include architects' and engineers' fees that may be necessary to provide drawings and specifications for the repair and/or replacement of damaged property.
2. Losses shall include appropriate supervision and quality control of all work for the repair and/or replacement of damaged property.

1.8.C. Any insurance policies purchased for work or property related to this Contract for coverages not required by the Contract clauses shall list the International Boundary and Water Commission, United States Section, as an additional insured.

1.9. Department of Homeland Security
1.9.A. In any event the staff of the US Department of Homeland Security (also known as US Customs and Border Protection (CBP)) alerts and directs any field crews to stop work in for any security reasons in the area, the Contractor shall consider this ...
1.9.B. Access to the site is controlled by Border Patrol. All site work is anticipated to take place on the Mexican side of the DHS border fence. Gates through the border fence are located at both ends of the project site. Access through the border fe...
1.10. Personnel Working Onsite
1.10.A. All personnel regularly working onsite shall provide fingerprints so USIBWC can run a criminal background check.
1. Fingerprinting for each individual needs to be scheduled ahead of time.
2. The Contractor shall provide updates whenever employees are added or deleted from the work crews.
3. Personnel must pass the background checks/vetting to be allowed to work onsite. Checks will be rerun every 6 months but fingerprinting is only required once.
4. Workers with outstanding warrants or issues with their immigration paperwork are precluded from working onsite.
5. Workers with DUI convictions within the past year are precluded from operating any on-road or off-road equipment on this project.
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used)
Section 00.73.73
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.2.A. Section 01.33.00-Submittal Procedures
1.3. Reference Standards
1.3.A. Code of Federal Regulations (CFR)
1. 22 CFR 1101, International Boundary and Water Commission, Privacy Act of 1974
2. 22 CFR 1104, International Boundary and Water Commission, Protection of Archaeological Resources
1.3.B. Executive Order (EO)
1. Classified National Security Information, EO 13526
1.3.C. United States Code (USC)
1. Homeland Security Act, 6 USC 671(3)
1.4. Record Documents
1.4.A. Required documents to be provided to Government in this Section include:
1. Nondisclosure Agreements, IBWC Form 358
2. List of subcontractors and suppliers/vendors provided with SBU data
3. Nondisclosure Agreement Releases, IBWC Form 358A
4. Certification of destruction upon release of nondisclosure agreements
1.5. Measurement and Payment
1.6. General
1.6.A. The work on this project contains Sensitive But Unclassified (SBU) information. SBU is sometimes referred to as For Official Use Only or FOUO.
1.6.B. The Contractor is required to sign a nondisclosure agreement (IBWC Form 358) prior to receipt of any SBU data.
1. All companies, whether subcontractors, suppliers, or vendors, creating, reviewing, or using SBU data shall sign a nondisclosure agreement prior to being granted access.
2. The requirements of Form 358, Nondisclosure Agreement, are incorporated into and included as requirements in this Section.

1.6.C. SBU documents are to be disseminated only to those requiring the information necessary for design, construction bidding, construction coordination, or other project processes.

1.7. Sensitive But Unclassified (SBU) Information
1.7.A. SBU data includes, but is not limited to:
1. Information not customarily in the public domain and related to the protection of critical infrastructure assets, operations, or resources, whether physical or cyber, as defined in the Homeland Security Act, 6 USC 671(3).
2. Certain information relating to the design and construction of buildings, dams, and other facilities.
3. Information illustrating or disclosing infrastructure protection vulnerabilities, or threats against persons, systems, operations, or facilities, but not meeting the criteria for classification under Executive Order 13526.
1.7.B. Examples of Sensitive But Unclassified Information
1. Buildings
a. Location and details of security areas.
b. Risk assessments and information regarding security systems.
c. Camera locations.
d. Computer processing areas.
e. Location and details of secure functions or secure space. Examples include, but are not limited to:
(1) Heating, ventilation, air conditioning (HVAC)
(2) Information technology (IT) systems
(3) Air intake vents
(4) Water sources
(5) Gas lines
(6) Plumbing lines
(7) Building automation systems
(8) Power distribution systems
(9) Telephone and cable distribution systems
(10) Emergency generation equipment
(11) Uninterrupted power sources (UPS)
(12) Security and fire alarm systems
(13) Routes and annunciation panels
f. Location and type of structural framing.
g. Structural analysis, including:
(1) Progressive collapse
(2) Seismic
(3) Building security
(4) Blast mitigation
h. Load limits are not SBU.
i. Counterterrorism methods taken to protect the occupants and the building.
2. Dams and Other Facilities
a. Cross sections of dams and/or power plants.
b. Structural analysis and design details of international bridges.
(1) Load limits are not SBU.
c. Facility valve boxes or physical equipment that control input and output to facility.
d. SCADA systems.
3. Locations of cultural/archaeological sites.
4. Locations of endangered, threatened, or rare species.
1.8. Subcontractors, Suppliers, and Vendors
1.8.A. The Contractor shall insert this clause in all subcontracts as well as supplier/vendor agreements/contracts when the items produced by the supplier/vendor falls within SBU definition or if the supplier/vendor requires SBU information in order t...
1. Copies of all nondisclosure agreements (IBWC Form 358) shall be provided to the COR.
1.8.B. Subcontractors, suppliers, and vendors shall include any individual, partnership, company, or corporation performing work for the Contractor but not an employee of the Contractor.
1.8.C. The Contractor is responsible for subcontractor, supplier, and vendor control and use of SBU data.
1.8.D. The Contractor shall maintain a list of all subcontractors, suppliers, and vendors provided access to SBU data as well as a description of what data was provided.
1. This list shall be provided with each pay estimate submitted by the Contractor or when requested by the COR or CO.
Part 2 - Products (Not Used)
Part 3 - Execution
3.1. Marking SBU Data
3.1.A. Drawings and specifications classified as SBU shall be marked as noted below:
1. This mark must be affixed to the cover or first page of any document containing pages with SBU data:
2. Pages containing SBU information must have the following mark imprinted or affixed:
3. The previous two statements must be prominently labeled in bold type in a size appropriate for the document or portable electronic data storage device or both, if applicable. The statements must be in a minimum of 14 point (0.200 inch in AutoCAD) b...
3.1.B. Documents such as reports shall have the mark noted at 3.1.A.1. on their cover and shall have each individual page containing SBU data marked at the top of the page with "SENSITIVE BUT UNCLASSIFIED (SBU)."
1. Every page of the document is not required to be marked SBU. Only mark pages with SBU data.
3.1.C. Documents such as notes and drawings shall have the mark noted at 3.1.A.2. on each page.
3.1.D. The SBU markings must be used regardless of the medium through which the information appears or is conveyed.
3.1.E. If a submittal contains SBU data, only the pages containing SBU data are required to be marked. See Section 01.33.00 1.8.H.
3.2. Requests for Interpretation
3.2.A. If the Contractor is unclear if items should be marked SBU, they shall request an interpretation from the COR or CO. The Contractor may also request interpretation as to whether items shall be removed from SBU classification.
3.2.B. The decision issued by the COR or CO shall be binding.
3.3. Destruction of SBU Data
3.3.A. Upon completion of this Contract, the Contractor shall be released from the nondisclosure agreement using IBWC Form 358A.
3.3.B. The Prime Contractor shall release their subcontractors and suppliers/vendors using IBWC Form 358A.
1. The Contractor is responsible for releasing their subcontractors, suppliers, and vendors. Copies of these written release shall be provided as an information only submittal to the COR.
2. A copy of all Form 358As shall be provided to the COR.
3.3.C. Upon written release from the nondisclosure agreement, the Contractor shall certify to the CO that all data marked SBU, whether provided by USIBWC or created under this Contract, has been destroyed in a manner to preclude recognition or reconst...
1. If the Contractor or one of their subcontractors/suppliers/vendors is required to keep copies of SBU data due to state rules/regulations or due to one of the technical requirements of the Contract (i.e., building code, regulation, etc.), then permi...
2. The Contractor or any of their subcontractors, suppliers, or vendors may provide SBU that must be retained as records to USIBWC for storage. Such data will be included with the record construction files and stored permanently. A cover letter shall ...
3.3.A. SBU data must be destroyed in a manner that makes it unreadable, indecipherable, and irrecoverable. Use one of the following methods:
1. NIST SP 800-53
2. NIST SP 800-88
3. Any method of destruction approved for Classified National Security Information, as delineated in 32 CFR 2001.47.
Section 00.91.16
Part 1 - General
1.1. Section Includes
1.2. Measurement and Payment
1.3. General
1.4. First Round of Questions Received
1.4.A. Is IBWC fixed on the use of bladder-type breathers for this application? Response: Yes. Bladder breathers act as lung for the reservoir, allowing the bladder to expand and contract with the fluid volume changes without allowing air contaminatio...
1.4.B. If so, does IBWC have a specific bladder-type breather in mind? Response: No.
1.4.C. Would IBWC consider an alternative, equivalent solution that effectively prevents contaminants from entering the reservoir? Response: Flexible reservoir breathers are the preferred method of preventing or controlling the introduction of outside...
Part 2 - Products (Not Used)
Part 3 - Execution (Not Used)
Division 01-General Requirements
Section 01.11.00
Part 1 - General
1.1. Section Includes
1.2. Related Requirements
1.2.A. Section 01.32.16-Construction Progress Schedule
1.2.B. Section 01.32.33-Photographic Documentation
1.2.C. Section 01.33.00-Submittal Procedures
1.2.D. Section 01.35.23-Safety
1.2.E. Section 01.45.00-Quality Control
1.2.F. Section 01.51.00-Temporary Utilities
1.2.G. Section 01.52.13-Field Offices and Sheds