This file contains detailed telecommunications infrastructure design drawings for the Brooklyn VA Medical Center Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project. The drawings specify comprehensive telecommunications infrastructure improvements across multiple buildings (Buildings 002, 004, 014, 015), including demolition of existing systems and installation of new Category 6A cabling, fiber optic backbone networks, wireless access points, data racks, patch panels, and associated infrastructure.
Key technical specifications include replacing existing telecommunications cabling with CAT6A cables, installing new work area outlets (WAOs), implementing diverse A-side and B-side fiber routing, establishing telecommunications rooms (TRs) with standardized rack configurations, and integrating new network switching equipment. The design emphasizes strict cable management, fire stopping, labeling standards, and adherence to ANSI/TIA telecommunications infrastructure guidelines. The project involves multiple construction phases across different building levels, with careful consideration of existing conditions, architectural features, and precise routing requirements through mechanical spaces and ceiling environments.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B
1 2 3 4 5 6 7 8 9 10 11
C
PORCH
BEDROOM
CLOSET
404A
CLOSET
406B
BEDROOM
BEDROOM
CLOSET
407A
CLOSET
410B
CLOSET
410A
BATHROOM
LIVING
ROOM
DINING
AREA
KITCHEN
LAUNDRY
ROOM
BATHROOM
415B
TOILET
FOYER
CLOSET
414A
CLOSET
415A
CLOSET
411A
PORCH
CLOSET
416A
ELEVATOR
400A
PUBLIC
HALL
H.A.C.
DINING
AREA
CORRIDOR
LIVING
ROOM
426A
BEDROOM
CLOSET
427A
CLOSET
427B
BEDROOM
CLOSET
429B
CLOSET
423A
CLOSET
429A
CLOSET
421A
TR
CLOSET
406A
STAIRWAY
418B
CLOSET
425A
CORRIDOR
BEDROOM
DR. ROOM
BATHROOM
KITCHEN
CLOSET
429D
LAUNDRY
RM
429C
A
D
002TN404a
002TN404a
002TN404a
002TN404a
002TN404b
002TN404b (2) 1" EMT CONDUIT SLEEVE
FROM TR 323 BELOW
A
B
BLDG 02
KEY AREA SHOWN
A SIDE FIBER WORK
B SIDE FIBER WORK
FIBER-OPTIC BACKBONE CABLING
REFERENCE NOTES ON THIS SHEET REGARDING VERTICAL AND
HORIZONTAL FIBER-OPTIC CABLING ROUTING. CONTRACTOR
SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL.
SHEET SHALL BE PRINTED IN COLOR TO INDICATE ALL REQUIRED
INFORMATION.
LEGEND:
CONTRACTOR SHALL FIELD VERIFY QUANTITY OF
TELECOMMUNICATIONS EQUIPMENT REQUIRED PRIOR TO
PURCHASE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
CABLE TRAY, WAOS, CAT6A CABLING, J-HOOKS, AND PATCH
PANELS: VA SHALL NOT BE RESPONSIBLE FOR ANY SUPLUS OR
OTHERSTOCKING FEES FOR SAID EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
8/
:5 7:
a m
Au to de sk
D oc s:
//6
A4
-2 2-
VA
N
Y Br oo kl yn E
H R
M
IU
/V
AB
K_
_E L_
SD
B.
rv t
002TN104
BLDG 002 - LEVEL 04 - TELECOMMUNICATIONS
PLAN
KG JGD/KDB
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
- 1/8" = 1'-0"
1 BLDG 002 - LEVEL 04 - TELECOMMUNICATIONS PLAN
TELECOMM DESIGN
4'0 8' 16'
PROJECT
NORTH
KEY PLAN
GENERAL NOTES
TRUE
NORTH
DATA OUTLETS AND DEVICES IN THIS AREA SHALL
BE SERVED FROM TELECOMMUNICATIONS ROOM 421.
Revisions: Date:
KEY NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL DEVICES
AND ASSOCIATED CABLING AS REQUIRED. ALL RACEWAYS
AND CABLING ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO ITS SOURCE,
UNLESS OTHERWISE NOTED.
CONTRACTOR TO PROVIDE ALL CORE DRILLING THROUGH
CONCRETE FLOORS TO ACCOMMODATE COMMUNICATIONS
CABLE ROUTING.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING.
COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND
BELOW SHALL BE REMOVED AND REPLACED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN
EXISTING PATHWAY VACATED BY EXISTING CABLING AS
CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
TELECOMMUNICATIONS WAO UPGRADE SHALL INCLUDE,
BUT IS NOT LIMITED TO REMOVING AND DISPOSING OF
EXISTING CABLING, JACKS AND FACEPLATES AS REQUIRED;
PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST
INSTRUMENTS, AND CONSUMABLES REQUIRED FOR
INSTALLATION, TERMINATION, TESTING, LABELING, AND
CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A
OUTLET WITH PORT QUANTITY INDICATED.
WHEN PROVIDING A WAO IN LOCATIONS WHERE AN
EXISTING WAO CURRENTLY DOES NOT EXIST, PROVIDE (1) 4-
INCH SQUARE BACKBOX WITH SINGLE-GANG REDUCING
MUD RING AND (1) 1-1/4" CONDUIT EXTENDING FROM
BACKBOX TO ACCESSIBLE CEILING SPACE. ONCE IN
ACCESSIBLE CEILING SPACE, CABLING SHALL EXTEND TO
ITS ASSOCIATED TR VIA CABLE TRAY; UTILIZE J-HOOKS
EVERY 48” WHEN TRANSITIONING TO OR FROM CABLE TRAY.
IF CABLE TRAY IS NON-EXISTENT, EXTEND HORIZONTAL
CABLING FROM WAO TO TR VIA J-HOOKS ONLY.
PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT
INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT
CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR
ROUTING AND INSTALLATION OF HORIZONTAL AND
BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO
SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND
WALL HEIGHTS.
OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT
LOCATIONS IN FIELD; DOCUMENT VARIANCES BASED ON AS-
BUILT DRAWINGS.
FIBER-OPTIC CABLING ROUTES AND ASSOCIATED
RACEWAYS/CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK,
PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS
PRIOR TO INSTALLATION.
THE CONTRACTOR SHALL BID AND INSTALL CAT6A CABLE
WITH AN OD NOT GREATER THAN 0.250" (6.35mm) (4) CAT6A CABLES WITH AN 0.250" (6.35mm) OD OR SMALLER CAN BE
INSTALLED IN A 3/4” CONDUIT SUPPORTING A 40% FILL
RATIO.
CONTRACTOR TO PROVIDE SLEEVES AS INDICATED WITH
REQUIRED FIRESTOPPING AND SEALING.
W
X
S
C
W
X
360°
WAP
WAP
B
8 9
C
D
B
8 9
C
D
TR
106 SF
CORRIDOR
97 SFPUBLIC HALL
123 SF
DIARE
44 SF
TOILET
32 SF
2-DOOR ACCESS
CONTROL PANEL
002-126A002-126B
C
TN503
TN502 DATA RACK
CABLE PATH FROM OUTSIDE DUCT BANK
SECONDARY
BONDING
BUSBAR
B
8 9
C
D
B
8 9
C
D
TR
106 SF
CHILDREN
PLAYROOM
477 SF
PUBLIC HALL
123 SF
DIARE
44 SF
TOILET
32 SF
TN501TYP.
TN501 TYP.
A
B
DATA RACK
TN504
CABLE PATH TO TR 226 ABOVE
LOUNGE
106 SF
CORRIDOR
97 SF
CHILDREN
PLAYROOM
477 SF
DIARE
44 SF
TOILET
32 SF
PUBLIC HALL
123 SF
VESTIBULE
80 SF
LOUNGE
106 SF
CORRIDOR
97 SF
CHILDREN
PLAYROOM
477 SF
DIARE
44 SF
TOILET
32 SF
PUBLIC HALL
123 SF
VESTIBULE
80 SF
KEY AREA SHOWN
A SIDE FIBER WORK
B SIDE FIBER WORK
FIBER-OPTIC BACKBONE CABLING
REFERENCE NOTES ON THIS SHEET REGARDING VERTICAL AND
HORIZONTAL FIBER-OPTIC CABLING ROUTING. CONTRACTOR
SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL.
SHEET SHALL BE PRINTED IN COLOR TO INDICATE ALL REQUIRED
INFORMATION.
LEGEND:
CONTRACTOR SHALL FIELD VERIFY QUANTITY OF
TELECOMMUNICATIONS EQUIPMENT REQUIRED PRIOR TO
PURCHASE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
CABLE TRAY, WAOS, CAT6A CABLING, J-HOOKS, AND PATCH
PANELS: VA SHALL NOT BE RESPONSIBLE FOR ANY SUPLUS OR
OTHERSTOCKING FEES FOR SAID EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
8/
:5 8:
a m
Au to de sk
D oc s:
//6
A4
-2 2-
VA
N
Y Br oo kl yn E
H R
M
IU
/V
AB
K_
_E L_
SD
B.
rv t
002TN401a
BLDG 002 - LEVEL 01 - ENLARGED
TELECOMMUNICATIONS PLANS
KG JGD/KDB
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
1/4" = 1'-0"002TN101
1 RM 126 - DEMO FLOOR PLAN
1/4" = 1'-0"002TN101
3 RM 126 - TELECOMMUNICATIONS PLAN
1/4" = 1'-0"002TN101
2 RM 126 - DEMO OVERHEAD PLAN
1/4" = 1'-0"002TN101
4 RM 126 - OVERHEAD PLAN
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL DEVICES
AND ASSOCIATED CABLING AS REQUIRED. ALL RACEWAYS
AND CABLING ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO ITS SOURCE,
UNLESS OTHERWISE NOTED.
PROTECT ALL EXISTING WORK FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS,
COMPONENTS, AND FINISHES SHALL BE REPAIRED OR
REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING.
COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND
BELOW SHALL BE REMOVED AND REPLACED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN
EXISTING PATHWAY VACATED BY EXISTING CABLING AS
CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
TELECOMMUNICATIONS WAO UPGRADE SHALL INCLUDE,
BUT IS NOT LIMITED TO REMOVING AND DISPOSING OF
EXISTING CABLING, JACKS AND FACEPLATES AS REQUIRED;
PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST
INSTRUMENTS, AND CONSUMABLES REQUIRED FOR
INSTALLATION, TERMINATION, TESTING, LABELING, AND
CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A
OUTLET WITH PORT QUANTITY INDICATED.
WHEN PROVIDING A WAO IN LOCATIONS WHERE AN
EXISTING WAO CURRENTLY DOES NOT EXIST, PROVIDE (1) 4-
INCH SQUARE BACKBOX WITH SINGLE-GANG REDUCING
MUD RING AND (1) 1-1/4" CONDUIT EXTENDING FROM
BACKBOX TO ACCESSIBLE CEILING SPACE. ONCE IN
ACCESSIBLE CEILING SPACE, CABLING SHALL EXTEND TO
ITS ASSOCIATED TR VIA CABLE TRAY; UTILIZE J-HOOKS
EVERY 48” WHEN TRANSITIONING TO OR FROM CABLE TRAY.
IF CABLE TRAY IS NON-EXISTENT, EXTEND HORIZONTAL
CABLING FROM WAO TO TR VIA J-HOOKS ONLY.
PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT
INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT
CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR
ROUTING AND INSTALLATION OF HORIZONTAL AND
BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO
SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND
WALL HEIGHTS.
OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT
LOCATIONS IN FIELD; DOCUMENT VARIANCES BASED ON AS-
BUILT DRAWINGS.
ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER
SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN
ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE
ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED
THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY,
CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH
TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS
FROM ONE ANOTHER.
FIBER-OPTIC CABLING ROUTES AND ASSOCIATED
RACEWAYS/CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK,
PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS
PRIOR TO INSTALLATION.
PROVIDE RIGID CONDUIT SLEEVES FOR HORIZONTAL
CABLING WITH FIRE PROOFING AS REQUIRED. SIDE 'A' AND
SIDE 'B' SLEEVES SHALL BE SEPARATED BY
AT LEAST 10-FT.
PROVIDE WIRE BASKET CABLE TRAY AS INDICATED.
EXISTING WIRELESS ACCESS POINT TO BE RE-FED WITH (1)
CAT6A CABLE.
(1) 1" CABLE SLEEVE WITH 1-HOUR MINIMUM BARRIER.
PROJECT
NORTH
Revisions: Date:
KEY NOTES
KEY PLAN
GENERAL NOTES
WAPWAP
B
2 3
C
TELECOM
RACK
FIRE ALARM
PANEL
ELEC
103 SF
A
V2
V2
V2
TYP.
B
2 3
C
ELEC
103 SF
A
KEY AREA SHOWN
B
2 3
C
FIRE ALARM
PANEL
ELEC
103 SF
A
TYP.
A SIDE FIBER WORK
B SIDE FIBER WORK
FIBER-OPTIC BACKBONE CABLING
REFERENCE NOTES ON THIS SHEET REGARDING VERTICAL AND
HORIZONTAL FIBER-OPTIC CABLING ROUTING. CONTRACTOR
SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL.
SHEET SHALL BE PRINTED IN COLOR TO INDICATE ALL REQUIRED
INFORMATION.
LEGEND:
CONTRACTOR SHALL FIELD VERIFY QUANTITY OF
TELECOMMUNICATIONS EQUIPMENT REQUIRED PRIOR TO
PURCHASE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
CABLE TRAY, WAOS, CAT6A CABLING, J-HOOKS, AND PATCH
PANELS: VA SHALL NOT BE RESPONSIBLE FOR ANY SUPLUS OR
OTHERSTOCKING FEES FOR SAID EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
8/
:5 8:
a m
Au to de sk
D oc s:
//6
A4
-2 2-
VA
N
Y Br oo kl yn E
H R
M
IU
/V
AB
K_
_E L_
SD
B.
rv t
002TN401b
BLDG 002 - LEVEL 01 - ENLARGED
TELECOMMUNICATIONS PLANS
KG JGD/KDB
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
1/4" = 1'-0"002TN101
1 RM 106 - DEMO FLOOR PLAN
1/4" = 1'-0"002TN101
2 RM 106 - DEMO OVERHEAD PLAN
TELECOMM DESIGN
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL DEVICES
AND ASSOCIATED CABLING AS REQUIRED. ALL RACEWAYS
AND CABLING ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO ITS SOURCE,
UNLESS OTHERWISE NOTED.
PROTECT ALL EXISTING WORK FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS,
COMPONENTS, AND FINISHES SHALL BE REPAIRED OR
REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING.
COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND
BELOW SHALL BE REMOVED AND REPLACED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN
EXISTING PATHWAY VACATED BY EXISTING CABLING AS
CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
TELECOMMUNICATIONS WAO UPGRADE SHALL INCLUDE,
BUT IS NOT LIMITED TO REMOVING AND DISPOSING OF
EXISTING CABLING, JACKS AND FACEPLATES AS REQUIRED;
PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST
INSTRUMENTS, AND CONSUMABLES REQUIRED FOR
INSTALLATION, TERMINATION, TESTING, LABELING, AND
CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A
OUTLET WITH PORT QUANTITY INDICATED.
WHEN PROVIDING A WAO IN LOCATIONS WHERE AN
EXISTING WAO CURRENTLY DOES NOT EXIST, PROVIDE (1) 4-
INCH SQUARE BACKBOX WITH SINGLE-GANG REDUCING
MUD RING AND (1) 1-1/4" CONDUIT EXTENDING FROM
BACKBOX TO ACCESSIBLE CEILING SPACE. ONCE IN
ACCESSIBLE CEILING SPACE, CABLING SHALL EXTEND TO
ITS ASSOCIATED TR VIA CABLE TRAY; UTILIZE J-HOOKS
EVERY 48” WHEN TRANSITIONING TO OR FROM CABLE TRAY.
IF CABLE TRAY IS NON-EXISTENT, EXTEND HORIZONTAL
CABLING FROM WAO TO TR VIA J-HOOKS ONLY.
PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT
INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT
CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR
ROUTING AND INSTALLATION OF HORIZONTAL AND
BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO
SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND
WALL HEIGHTS.
OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT
LOCATIONS IN FIELD; DOCUMENT VARIANCES BASED ON AS-
BUILT DRAWINGS.
ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER
SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN
ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE
ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED
THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY,
CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH
TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS
FROM ONE ANOTHER.
FIBER-OPTIC CABLING ROUTES AND ASSOCIATED
RACEWAYS/CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK,
PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS
PRIOR TO INSTALLATION.
PROJECT
NORTH
Revisions: Date:
KEY NOTES GENERAL NOTES
KEY PLAN
EXISTING DATA RACKS AND ASSOCIATED EQUIPMENT TO BE
SALVAGED TO VA. ALL ASSOCIATED DATA CABLING TO BE
DEMOLISHED BACK TO SOURCE.
EXISTING CABLE TRAY AND ASSOCIATED CABLING TO BE
DEMOLISHED BACK TO SOURCE.
EXISTING WIRELESS ACCESS POINT TO BE RE-FED WITH (1)
CAT6A CABLE.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED
RACEWAYS AND CABLING SHALL BE DEMOLISHED BACK TO
SOURCE.
PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT
QUANTITY SHOWN TO REPLACE EXISTING
TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT
SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING;
REFERENCE DETAIL '1' ON SHEET TN501 AND THE GENERAL
NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION.
COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.
1/4" = 1'-0"002TN101
3 RM 106 - TELECOMMUNICATIONS PLAN
2'0 4' 8'
PROJECT
NORTH
WAP
B
CLOSET
120A
21 SF
HAC
11 SF
VEST
120B
13 SF
A
B
CLOSET
120A
21 SF
TOILET
61 SF
VEST
120B
13 SF HAC
11 SF
A
120A
KEY AREA SHOWN
A SIDE FIBER WORK
B SIDE FIBER WORK
FIBER-OPTIC BACKBONE CABLING
REFERENCE NOTES ON THIS SHEET REGARDING VERTICAL AND
HORIZONTAL FIBER-OPTIC CABLING ROUTING. CONTRACTOR
SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL.
SHEET SHALL BE PRINTED IN COLOR TO INDICATE ALL REQUIRED
INFORMATION.
LEGEND:
CONTRACTOR SHALL FIELD VERIFY QUANTITY OF
TELECOMMUNICATIONS EQUIPMENT REQUIRED PRIOR TO
PURCHASE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
CABLE TRAY, WAOS, CAT6A CABLING, J-HOOKS, AND PATCH
PANELS: VA SHALL NOT BE RESPONSIBLE FOR ANY SUPLUS OR
OTHERSTOCKING FEES FOR SAID EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
8/
:5 8:
a m
Au to de sk
D oc s:
//6
A4
-2 2-
VA
N
Y Br oo kl yn E
H R
M
IU
/V
AB
K_
_E L_
SD
B.
rv t
002TN401c
BLDG 002 - LEVEL 01 - ENLARGED
TELECOMMUNICATIONS PLANS
KG JGD/KDB
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
1/4" = 1'-0"002TN101
1 RM 120A - DEMO FLOOR PLAN
1/4" = 1'-0"002TN101
3 RM 120A - TELECOMMUNICATIONS PLAN
TELECOMM DESIGN
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL DEVICES
AND ASSOCIATED CABLING AS REQUIRED. ALL RACEWAYS
AND CABLING ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO ITS SOURCE,
UNLESS OTHERWISE NOTED.
PROTECT ALL EXISTING WORK FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS,
COMPONENTS, AND FINISHES SHALL BE REPAIRED OR
REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING.
COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND
BELOW SHALL BE REMOVED AND REPLACED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN
EXISTING PATHWAY VACATED BY EXISTING CABLING AS
CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
TELECOMMUNICATIONS WAO UPGRADE SHALL INCLUDE,
BUT IS NOT LIMITED TO REMOVING AND DISPOSING OF
EXISTING CABLING, JACKS AND FACEPLATES AS REQUIRED;
PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST
INSTRUMENTS, AND CONSUMABLES REQUIRED FOR
INSTALLATION, TERMINATION, TESTING, LABELING, AND
CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A
OUTLET WITH PORT QUANTITY INDICATED.
WHEN PROVIDING A WAO IN LOCATIONS WHERE AN
EXISTING WAO CURRENTLY DOES NOT EXIST, PROVIDE (1) 4-
INCH SQUARE BACKBOX WITH SINGLE-GANG REDUCING
MUD RING AND (1) 1-1/4" CONDUIT EXTENDING FROM
BACKBOX TO ACCESSIBLE CEILING SPACE. ONCE IN
ACCESSIBLE CEILING SPACE, CABLING SHALL EXTEND TO
ITS ASSOCIATED TR VIA CABLE TRAY; UTILIZE J-HOOKS
EVERY 48” WHEN TRANSITIONING TO OR FROM CABLE TRAY.
IF CABLE TRAY IS NON-EXISTENT, EXTEND HORIZONTAL
CABLING FROM WAO TO TR VIA J-HOOKS ONLY.
PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT
INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT
CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR
ROUTING AND INSTALLATION OF HORIZONTAL AND
BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO
SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND
WALL HEIGHTS.
OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT
LOCATIONS IN FIELD; DOCUMENT VARIANCES BASED ON AS-
BUILT DRAWINGS.
ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER
SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN
ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE
ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED
THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY,
CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH
TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS
FROM ONE ANOTHER.
FIBER-OPTIC CABLING ROUTES AND ASSOCIATED
RACEWAYS/CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK,
PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS
PRIOR TO INSTALLATION.
EXISTING WIRELESS ACCESS POINT TO BE RE-FED WITH (1)
CAT6A CABLE.
PROJECT
NORTH
Revisions: Date:
KEY NOTES
KEY PLAN
GENERAL NOTES
SW
X
W
C
360°
B
8 9
C
D
B
8 9
C
D
TR
161 SF
BATHROOM
50 SF
DINING AREA
321 SF 2-DOOR ACCESS
CONTROL PANEL
002-226B
002-226A
C
TN503
TN502
DATA RACK
A
B
TN504
CABLE PATH FROM TR 126
SECONDARY
BONDING
BUSBAR
B
8 9
C
D
B
8 9
C
D
TR
161 SF
BATHROOM
50 SF
FOYER
33 SF
DINING AREA
321 SF
3 3
TN501 TYP.
TN501TYP.
A
B
DATA RACK
CABLE PATH TO TR 326
CLOSET
231B
5 SF
CLOSET
223A
5 SF
BEDROOM
161 SF
PUBLIC HALL
127 SF
FOYER
33 SF
CLOSET
224A
5 SF
BATHROOM
50 SF
CLOSET
231B
5 SF
CLOSET
223A
5 SF
BEDROOM
161 SF
PUBLIC HALL
127 SF
FOYER
33 SF
CLOSET
224A
5 SF
BATHROOM
50 SF
KEY AREA SHOWN
A SIDE FIBER WORK
B SIDE FIBER WORK
FIBER-OPTIC BACKBONE CABLING
REFERENCE NOTES ON THIS SHEET REGARDING VERTICAL AND
HORIZONTAL FIBER-OPTIC CABLING ROUTING. CONTRACTOR
SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL.
SHEET SHALL BE PRINTED IN COLOR TO INDICATE ALL REQUIRED
INFORMATION.
LEGEND:
CONTRACTOR SHALL FIELD VERIFY QUANTITY OF
TELECOMMUNICATIONS EQUIPMENT REQUIRED PRIOR TO
PURCHASE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
CABLE TRAY, WAOS, CAT6A CABLING, J-HOOKS, AND PATCH
PANELS: VA SHALL NOT BE RESPONSIBLE FOR ANY SUPLUS OR
OTHERSTOCKING FEES FOR SAID EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
8/
:5 8:
a m
Au to de sk
D oc s:
//6
A4
-2 2-
VA
N
Y Br oo kl yn E
H R
M
IU
/V
AB
K_
_E L_
SD
B.
rv t
002TN402
BLDG 002 - LEVEL 02 - ENLARGED
TELECOMMUNICATIONS PLANS
KG JGD/KDB
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
1/4" = 1'-0"002TN102
1 RM 226 - DEMO FLOOR PLAN
1/4" = 1'-0"002TN102
3 RM 226 - TELECOMMUNICATIONS PLAN
1/4" = 1'-0"002TN102
2 RM 226 - DEMO OVERHEAD PLAN
1/4" = 1'-0"002TN102
4 RM 226 - OVERHEAD PLAN
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL DEVICES
AND ASSOCIATED CABLING AS REQUIRED. ALL RACEWAYS
AND CABLING ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO ITS SOURCE,
UNLESS OTHERWISE NOTED.
PROTECT ALL EXISTING WORK FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS,
COMPONENTS, AND FINISHES SHALL BE REPAIRED OR
REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING.
COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND
BELOW SHALL BE REMOVED AND REPLACED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN
EXISTING PATHWAY VACATED BY EXISTING CABLING AS
CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
TELECOMMUNICATIONS WAO UPGRADE SHALL INCLUDE,
BUT IS NOT LIMITED TO REMOVING AND DISPOSING OF
EXISTING CABLING, JACKS AND FACEPLATES AS REQUIRED;
PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST
INSTRUMENTS, AND CONSUMABLES REQUIRED FOR
INSTALLATION, TERMINATION, TESTING, LABELING, AND
CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A
OUTLET WITH PORT QUANTITY INDICATED.
WHEN PROVIDING A WAO IN LOCATIONS WHERE AN
EXISTING WAO CURRENTLY DOES NOT EXIST, PROVIDE (1) 4-
INCH SQUARE BACKBOX WITH SINGLE-GANG REDUCING
MUD RING AND (1) 1-1/4" CONDUIT EXTENDING FROM
BACKBOX TO ACCESSIBLE CEILING SPACE. ONCE IN
ACCESSIBLE CEILING SPACE, CABLING SHALL EXTEND TO
ITS ASSOCIATED TR VIA CABLE TRAY; UTILIZE J-HOOKS
EVERY 48” WHEN TRANSITIONING TO OR FROM CABLE TRAY.
IF CABLE TRAY IS NON-EXISTENT, EXTEND HORIZONTAL
CABLING FROM WAO TO TR VIA J-HOOKS ONLY.
PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT
INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT
CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR
ROUTING AND INSTALLATION OF HORIZONTAL AND
BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO
SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND
WALL HEIGHTS.
OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT
LOCATIONS IN FIELD; DOCUMENT VARIANCES BASED ON AS-
BUILT DRAWINGS.
ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER
SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN
ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE
ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED
THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY,
CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH
TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS
FROM ONE ANOTHER.
FIBER-OPTIC CABLING ROUTES AND ASSOCIATED
RACEWAYS/CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK,
PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS
PRIOR TO INSTALLATION.
PROJECT
NORTH
Revisions: Date:
KEY NOTES GENERAL NOTES
KEY PLAN
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED
RACEWAYS AND CABLING SHALL BE DEMOLISHED BACK TO
SOURCE.
PROVIDE RIGID CONDUIT SLEEVES FOR HORIZONTAL
CABLING WITH FIRE PROOFING AS REQUIRED. SIDE 'A' AND
SIDE 'B' SLEEVES SHALL BE SEPARATED BY AT LEAST 10-FT.
CABLE TRAY SHALL BE INSTALLED 6" OFF WALL TO ALLOW
CONDUIT TO PASS BEHIND TRAY.
RACK NOT IN CONTRACT.
(2) 2" CABLE SLEEVE WITH 1 HOUR MINIMUM BARRIER.
X
S W
C
W
X
360°
B
8 9
C
D
TYP.
B
8 9
C
D
B
8 9
C
D
TR
162 SF
CLOSET
5 SF
CLOSET
331B
5 SF
CORRIDOR
75 SF
DINING AREA
320 SF
PUBLIC HALL
127 SF
FOYER
33 SF
002-326B
002-326A
2-DOOR ACCESS
CONTROL PANEL
C
TN503
TN502
DATA RACK
A
TN504
B
CABLE PATH FROM TR 226
SECONDARY
BONDING
BUSBAR
B
8 9
C
D
TR
162 SF
FOYER
33 SF
DINING AREA
320 SF
CORRIDOR
75 SF
CLOSET
5 SF
CLOSET
331B
5 SF
TN501 TYP.
TN501TYP.
A
B
DATA RACK
TN504
CABLE PATH TO TR 421
BEDROOM
162 SF
FOYER
33 SF
DINING AREA
320 SF
CORRIDOR
75 SF
CLOSET
331B
5 SF
CLOSET
5 SF
BATHROOM
47 SF
BEDROOM
162 SF
FOYER
33 SF
DINING AREA
320 SF
CORRIDOR
75 SF
CLOSET
331B
5 SF
CLOSET
5 SF
BATHROOM
47 SF
KEY AREA SHOWN
A SIDE FIBER WORK
B SIDE FIBER WORK
FIBER-OPTIC BACKBONE CABLING
REFERENCE NOTES ON THIS SHEET REGARDING VERTICAL AND
HORIZONTAL FIBER-OPTIC CABLING ROUTING. CONTRACTOR
SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL.
SHEET SHALL BE PRINTED IN COLOR TO INDICATE ALL REQUIRED
INFORMATION.
LEGEND:
CONTRACTOR SHALL FIELD VERIFY QUANTITY OF
TELECOMMUNICATIONS EQUIPMENT REQUIRED PRIOR TO
PURCHASE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
CABLE TRAY, WAOS, CAT6A CABLING, J-HOOKS, AND PATCH
PANELS: VA SHALL NOT BE RESPONSIBLE FOR ANY SUPLUS OR
OTHERSTOCKING FEES FOR SAID EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
8/
:5 8:
a m
Au to de sk
D oc s:
//6
A4
-2 2-
VA
N
Y Br oo kl yn E
H R
M
IU
/V
AB
K_
_E L_
SD
B.
rv t
002TN403a
BLDG 002 - LEVEL 03 - ENLARGED
TELECOMMUNICATIONS PLANS
KG JGD/KDB
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
1/4" = 1'-0"002TN103
1 RM 326 - DEMO FLOOR PLAN
1/4" = 1'-0"002TN103
2 RM 326 - DEMO OVERHEAD PLAN
1/4" = 1'-0"002TN103
3 RM 326 - TELECOMMUNICATIONS PLAN
1/4" = 1'-0"002TN103
4 RM 326 - OVERHEAD PLAN
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL DEVICES
AND ASSOCIATED CABLING AS REQUIRED. ALL RACEWAYS
AND CABLING ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO ITS SOURCE,
UNLESS OTHERWISE NOTED.
PROTECT ALL EXISTING WORK FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS,
COMPONENTS, AND FINISHES SHALL BE REPAIRED OR
REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING.
COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND
BELOW SHALL BE REMOVED AND REPLACED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN
EXISTING PATHWAY VACATED BY EXISTING CABLING AS
CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
TELECOMMUNICATIONS WAO UPGRADE SHALL INCLUDE,
BUT IS NOT LIMITED TO REMOVING AND DISPOSING OF
EXISTING CABLING, JACKS AND FACEPLATES AS REQUIRED;
PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST
INSTRUMENTS, AND CONSUMABLES REQUIRED FOR
INSTALLATION, TERMINATION, TESTING, LABELING, AND
CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A
OUTLET WITH PORT QUANTITY INDICATED.
WHEN PROVIDING A WAO IN LOCATIONS WHERE AN
EXISTING WAO CURRENTLY DOES NOT EXIST, PROVIDE (1) 4-
INCH SQUARE BACKBOX WITH SINGLE-GANG REDUCING
MUD RING AND (1) 1-1/4" CONDUIT EXTENDING FROM
BACKBOX TO ACCESSIBLE CEILING SPACE. ONCE IN
ACCESSIBLE CEILING SPACE, CABLING SHALL EXTEND TO
ITS ASSOCIATED TR VIA CABLE TRAY; UTILIZE J-HOOKS
EVERY 48” WHEN TRANSITIONING TO OR FROM CABLE TRAY.
IF CABLE TRAY IS NON-EXISTENT, EXTEND HORIZONTAL
CABLING FROM WAO TO TR VIA J-HOOKS ONLY.
PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT
INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT
CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR
ROUTING AND INSTALLATION OF HORIZONTAL AND
BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO
SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND
WALL HEIGHTS.
OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT
LOCATIONS IN FIELD; DOCUMENT VARIANCES BASED ON AS-
BUILT DRAWINGS.
ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER
SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN
ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE
ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED
THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY,
CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH
TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS
FROM ONE ANOTHER.
FIBER-OPTIC CABLING ROUTES AND ASSOCIATED
RACEWAYS/CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK,
PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS
PRIOR TO INSTALLATION.
PROJECT
NORTH
Revisions: Date:
KEY NOTES GENERAL NOTES
KEY PLAN
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED
RACEWAYS AND CABLING SHALL BE DEMOLISHED BACK TO
SOURCE.
PROVIDE RIGID CONDUIT SLEEVES FOR HORIZONTAL
CABLING WITH FIRE PROOFING AS REQUIRED. SIDE 'A' AND
SIDE 'B' SLEEVES SHALL BE SEPARATED BY AT LEAST 10-FT.
CABLE TRAY SHALL BE INSTALLED 6" OFF WALL TO ALLOW
CONDUIT TO PASS BEHIND TRAY.
RACK NOT IN CONTRACT.
(2) 2" CABLE SLEEVE WITH 1 HOUR MINIMUM BARRIER.
CLOSET
320B
26 SF
ELEV
300C
42 SF
STAIRWAY
321A
92 SF
HAC
11 SF
A
B
CLOSET
320B
26 SF
ELEV
300C
42 SF
STAIRWAY
321A
92 SF
HAC
11 SF
A
320B
KEY AREA SHOWN
A SIDE FIBER WORK
B SIDE FIBER WORK
FIBER-OPTIC BACKBONE CABLING
REFERENCE NOTES ON THIS SHEET REGARDING VERTICAL AND
HORIZONTAL FIBER-OPTIC CABLING ROUTING. CONTRACTOR
SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL.
SHEET SHALL BE PRINTED IN COLOR TO INDICATE ALL REQUIRED
INFORMATION.
LEGEND:
CONTRACTOR SHALL FIELD VERIFY QUANTITY OF
TELECOMMUNICATIONS EQUIPMENT REQUIRED PRIOR TO
PURCHASE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
CABLE TRAY, WAOS, CAT6A CABLING, J-HOOKS, AND PATCH
PANELS: VA SHALL NOT BE RESPONSIBLE FOR ANY SUPLUS OR
OTHERSTOCKING FEES FOR SAID EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
8/
:5 8:
a m
Au to de sk
D oc s:
//6
A4
-2 2-
VA
N
Y Br oo kl yn E
H R
M
IU
/V
AB
K_
_E L_
SD
B.
rv t
002TN403b
BLDG 002 - LEVEL 03 - ENLARGED
TELECOMMUNICATIONS PLANS
KG JGD/KDB
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
1/4" = 1'-0"002TN103
1 RM 320B - DEMO FLOOR PLAN
1/4" = 1'-0"002TN103
3 RM 320B - TELECOMMUNICATIONS PLAN
TELECOMM DESIGN
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL DEVICES
AND ASSOCIATED CABLING AS REQUIRED. ALL RACEWAYS
AND CABLING ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO ITS SOURCE,
UNLESS OTHERWISE NOTED.
PROTECT ALL EXISTING WORK FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS,
COMPONENTS, AND FINISHES SHALL BE REPAIRED OR
REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING.
COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND
BELOW SHALL BE REMOVED AND REPLACED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN
EXISTING PATHWAY VACATED BY EXISTING CABLING AS
CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
TELECOMMUNICATIONS WAO UPGRADE SHALL INCLUDE,
BUT IS NOT LIMITED TO REMOVING AND DISPOSING OF
EXISTING CABLING, JACKS AND FACEPLATES AS REQUIRED;
PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST
INSTRUMENTS, AND CONSUMABLES REQUIRED FOR
INSTALLATION, TERMINATION, TESTING, LABELING, AND
CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A
OUTLET WITH PORT QUANTITY INDICATED.
WHEN PROVIDING A WAO IN LOCATIONS WHERE AN
EXISTING WAO CURRENTLY DOES NOT EXIST, PROVIDE (1) 4-
INCH SQUARE BACKBOX WITH SINGLE-GANG REDUCING
MUD RING AND (1) 1-1/4" CONDUIT EXTENDING FROM
BACKBOX TO ACCESSIBLE CEILING SPACE. ONCE IN
ACCESSIBLE CEILING SPACE, CABLING SHALL EXTEND TO
ITS ASSOCIATED TR VIA CABLE TRAY; UTILIZE J-HOOKS
EVERY 48” WHEN TRANSITIONING TO OR FROM CABLE TRAY.
IF CABLE TRAY IS NON-EXISTENT, EXTEND HORIZONTAL
CABLING FROM WAO TO TR VIA J-HOOKS ONLY.
PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT
INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT
CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR
ROUTING AND INSTALLATION OF HORIZONTAL AND
BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO
SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND
WALL HEIGHTS.
OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT
LOCATIONS IN FIELD; DOCUMENT VARIANCES BASED ON AS-
BUILT DRAWINGS.
ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER
SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN
ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE
ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED
THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY,
CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH
TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS
FROM ONE ANOTHER.
FIBER-OPTIC CABLING ROUTES AND ASSOCIATED
RACEWAYS/CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK,
PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS
PRIOR TO INSTALLATION.
PROJECT
NORTH
Revisions: Date:
KEY NOTES
KEY PLAN
GENERAL NOTES
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED
RACEWAYS AND CABLING SHALL BE DEMOLISHED BACK TO
SOURCE.
SW
X
C
360°
B
8 9
C
D
2A
B
8 9
C
D
B
8 9
C
D
TR
162 SF
CORRIDOR
115 SF
PUBLIC HALL
149 SF
C
2-DOOR ACCESS
CONTROL PANEL
002-421B
002-421A
TN502
TN503
DATA RACK
A
TN504
B
TN504
CABLE PATH FROM TR 326
SECONDARY
BONDING
BUSBAR
B
8 9
C
D
TR
162 SF CLOSET
421A
5 SF
CLOSET
429A
5 SF
CORRIDOR
115 SF
PUBLIC HALL
149 SF
TN502TYP.
TN501 TYP.
DATA RACK
TN504
A
B
PLAY ROOM
148 SF
PUCLIC HALL
149 SF
CORRIDOR
115 SF
CLOSET
5 SF
CLOSET
421A
5 SF PLAY ROOM
148 SF
PUCLIC HALL
149 SF
CORRIDOR
115 SF
CLOSET
5 SF
CLOSET
421A
5 SF
KEY AREA SHOWN
A SIDE FIBER WORK
B SIDE FIBER WORK
FIBER-OPTIC BACKBONE CABLING
REFERENCE NOTES ON THIS SHEET REGARDING VERTICAL AND
HORIZONTAL FIBER-OPTIC CABLING ROUTING. CONTRACTOR
SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL.
SHEET SHALL BE PRINTED IN COLOR TO INDICATE ALL REQUIRED
INFORMATION.
LEGEND:
CONTRACTOR SHALL FIELD VERIFY QUANTITY OF
TELECOMMUNICATIONS EQUIPMENT REQUIRED PRIOR TO
PURCHASE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
CABLE TRAY, WAOS, CAT6A CABLING, J-HOOKS, AND PATCH
PANELS: VA SHALL NOT BE RESPONSIBLE FOR ANY SUPLUS OR
OTHERSTOCKING FEES FOR SAID EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
8/
:5 8:
a m
Au to de sk
D oc s:
//6
A4
-2 2-
VA
N
Y Br oo kl yn E
H R
M
IU
/V
AB
K_
_E L_
SD
B.
rv t
002TN404a
BLDG 002 - LEVEL 04 - ENLARGED
TELECOMMUNICATIONS PLANS
KG JGD/KDB
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
1/4" = 1'-0"002TN104
1 RM 421 - DEMO FLOOR PLAN
1/4" = 1'-0"002TN104
2 RM 421 - DEMO OVERHEAD PLAN
1/4" = 1'-0"002TN104
3 RM 421 - TELECOMMUNICATIONS PLAN
1/4" = 1'-0"002TN104
4 RM 421 - OVERHEAD PLAN
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL DEVICES
AND ASSOCIATED CABLING AS REQUIRED. ALL RACEWAYS
AND CABLING ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO ITS SOURCE,
UNLESS OTHERWISE NOTED.
PROTECT ALL EXISTING WORK FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS,
COMPONENTS, AND FINISHES SHALL BE REPAIRED OR
REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING.
COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND
BELOW SHALL BE REMOVED AND REPLACED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN
EXISTING PATHWAY VACATED BY EXISTING CABLING AS
CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
TELECOMMUNICATIONS WAO UPGRADE SHALL INCLUDE,
BUT IS NOT LIMITED TO REMOVING AND DISPOSING OF
EXISTING CABLING, JACKS AND FACEPLATES AS REQUIRED;
PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST
INSTRUMENTS, AND CONSUMABLES REQUIRED FOR
INSTALLATION, TERMINATION, TESTING, LABELING, AND
CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A
OUTLET WITH PORT QUANTITY INDICATED.
WHEN PROVIDING A WAO IN LOCATIONS WHERE AN
EXISTING WAO CURRENTLY DOES NOT EXIST, PROVIDE (1) 4-
INCH SQUARE BACKBOX WITH SINGLE-GANG REDUCING
MUD RING AND (1) 1-1/4" CONDUIT EXTENDING FROM
BACKBOX TO ACCESSIBLE CEILING SPACE. ONCE IN
ACCESSIBLE CEILING SPACE, CABLING SHALL EXTEND TO
ITS ASSOCIATED TR VIA CABLE TRAY; UTILIZE J-HOOKS
EVERY 48” WHEN TRANSITIONING TO OR FROM CABLE TRAY.
IF CABLE TRAY IS NON-EXISTENT, EXTEND HORIZONTAL
CABLING FROM WAO TO TR VIA J-HOOKS ONLY.
PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT
INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT
CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR
ROUTING AND INSTALLATION OF HORIZONTAL AND
BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO
SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND
WALL HEIGHTS.
OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT
LOCATIONS IN FIELD; DOCUMENT VARIANCES BASED ON AS-
BUILT DRAWINGS.
ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER
SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN
ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE
ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED
THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY,
CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH
TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS
FROM ONE ANOTHER.
FIBER-OPTIC CABLING ROUTES AND ASSOCIATED
RACEWAYS/CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK,
PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS
PRIOR TO INSTALLATION.
PROJECT
NORTH
Revisions: Date:
KEY NOTES GENERAL NOTES
KEY PLAN
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED
RACEWAYS AND CABLING SHALL BE DEMOLISHED BACK TO
SOURCE.
PROVIDE RIGID CONDUIT SLEEVES FOR HORIZONTAL
CABLING WITH FIRE PROOFING AS REQUIRED. SIDE 'A' AND
SIDE 'B' SLEEVES SHALL BE SEPARATED BY AT LEAST 10-FT.
CABLE TRAY SHALL BE INSTALLED 6" OFF WALL TO ALLOW
CONDUIT TO PASS BEHIND TRAY.
RACK NOT IN CONTRACT.
(2) 2" CABLE SLEEVE WITH 1 HOUR MINIMUM BARRIER.
ELEVATOR
400A
36 SF
CLOSET
416A
20 SF
STAIRWAY
418B
88 SF
H.A.C.
11 SF
A
B
ELEVATOR
400A
36 SF
CLOSET
416A
20 SF
H.A.C.
11 SF
STAIRWAY
418B
88 SF
A
416A
KEY AREA SHOWN
A SIDE FIBER WORK
B SIDE FIBER WORK
FIBER-OPTIC BACKBONE CABLING
REFERENCE NOTES ON THIS SHEET REGARDING VERTICAL AND
HORIZONTAL FIBER-OPTIC CABLING ROUTING. CONTRACTOR
SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL.
SHEET SHALL BE PRINTED IN COLOR TO INDICATE ALL REQUIRED
INFORMATION.
LEGEND:
CONTRACTOR SHALL FIELD VERIFY QUANTITY OF
TELECOMMUNICATIONS EQUIPMENT REQUIRED PRIOR TO
PURCHASE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
CABLE TRAY, WAOS, CAT6A CABLING, J-HOOKS, AND PATCH
PANELS: VA SHALL NOT BE RESPONSIBLE FOR ANY SUPLUS OR
OTHERSTOCKING FEES FOR SAID EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
8/
:5 8:
a m
Au to de sk
D oc s:
//6
A4
-2 2-
VA
N
Y Br oo kl yn E
H R
M
IU
/V
AB
K_
_E L_
SD
B.
rv t
002TN404b
BLDG 002 - LEVEL 04 - ENLARGED
TELECOMMUNICATIONS PLANS
KG JGD/KDB
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
1/4" = 1'-0"002TN104
1 RM 416A - DEMO FLOOR PLAN
1/4" = 1'-0"002TN104
3 RM 416A - TELECOMMUNICATIONS PLAN
TELECOMM DESIGN
2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL DEVICES
AND ASSOCIATED CABLING AS REQUIRED. ALL RACEWAYS
AND CABLING ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO ITS SOURCE,
UNLESS OTHERWISE NOTED.
PROTECT ALL EXISTING WORK FROM DAMAGE DURING
CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS,
COMPONENTS, AND FINISHES SHALL BE REPAIRED OR
REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING.
COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND
BELOW SHALL BE REMOVED AND REPLACED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN
EXISTING PATHWAY VACATED BY EXISTING CABLING AS
CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
TELECOMMUNICATIONS WAO UPGRADE SHALL INCLUDE,
BUT IS NOT LIMITED TO REMOVING AND DISPOSING OF
EXISTING CABLING, JACKS AND FACEPLATES AS REQUIRED;
PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST
INSTRUMENTS, AND CONSUMABLES REQUIRED FOR
INSTALLATION, TERMINATION, TESTING, LABELING, AND
CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A
OUTLET WITH PORT QUANTITY INDICATED.
WHEN PROVIDING A WAO IN LOCATIONS WHERE AN
EXISTING WAO CURRENTLY DOES NOT EXIST, PROVIDE (1) 4-
INCH SQUARE BACKBOX WITH SINGLE-GANG REDUCING
MUD RING AND (1) 1-1/4" CONDUIT EXTENDING FROM
BACKBOX TO ACCESSIBLE CEILING SPACE. ONCE IN
ACCESSIBLE CEILING SPACE, CABLING SHALL EXTEND TO
ITS ASSOCIATED TR VIA CABLE TRAY; UTILIZE J-HOOKS
EVERY 48” WHEN TRANSITIONING TO OR FROM CABLE TRAY.
IF CABLE TRAY IS NON-EXISTENT, EXTEND HORIZONTAL
CABLING FROM WAO TO TR VIA J-HOOKS ONLY.
PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT
INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT
CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR
ROUTING AND INSTALLATION OF HORIZONTAL AND
BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO
SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND
WALL HEIGHTS.
OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT
LOCATIONS IN FIELD; DOCUMENT VARIANCES BASED ON AS-
BUILT DRAWINGS.
ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER
SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO,
SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN
ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE
ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED
THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY,
CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH
TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS
FROM ONE ANOTHER.
FIBER-OPTIC CABLING ROUTES AND ASSOCIATED
RACEWAYS/CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK,
PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS
PRIOR TO INSTALLATION.
PROJECT
NORTH
Revisions: Date:
KEY NOTES
KEY PLAN
GENERAL NOTES
CONTRACTOR TO PROVIDE SLEEVES AS INDICATED WITH
REQUIRED FIRESTOPPING AND SEALING.
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
JB JBD
E
F
G
H
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
004TN400
DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE
SERVED FROM TELECOMMUNICATIONS ROOM G-20A.
4" C FOR DATA OUTLETS IN LEVELS ABOVE
CONDENSER
PUMP
ROOM
S-1
RECEIVING
AND ISSUE
AREA
G-1A
WAREHOUSE
ANNEX
(STORAGE:GENERAL)
G-6
LOW LEVEL
RADIATION
STORAGE
ROOM
G-5
CORRIDOR
C-5
SPRINKLER
FOR
COOLING
TOWER
G-2
FLAMMABLE
LIQUID
STORAGE
ROOMS
G-3
FLAMMABLE
LIQUID
STORAGE
ROOMS
G-4
GARAGE
G-7
MER. PUMP
RM.
G-4A
HOSPITAL'S
PLAN
ROOM
G-32A
PLANNING
& DESIGN
ROOM
G-32
CHIEF
MOTORPOOL
G-8
SAFETY
SPECIALIST
G-9
BIOMED
ENGINEER
G-10
CHIEF
BIOMED
G-11
I.H. OFFICE
G-12
I.H. LAB
STORAGE
G-13
CLERICAL
FILES
G-31
SECRETARY
G-30
CONFERENCE
ROOM
G-33
MICROCOMPUTER
HARDWARE
SUPPORT &
I.R.M.
TRAINING
G-14E
OLD
LAUNDRY &
STORAGE
G-14
O.R. PACK
ROOM
G-21
TR
G-20A
LAUNDRY
MANAGERS
OFFICE
G-20
SEAMSTRESS
ROOM
G-18
LOADING
PLATFORM
G-15
TOILET
G-19
GENERATOR
ROOM
M-3
ENG.
STORAGE
ROOM
M-4
ENV. MGMT.
STORAGE
ROOM
M-5
A/C
LOCKER
ROOM
G-16A
ELECTRICAL
ROOM
A/C PLANT
G-16
OPC
CHILLER
PLANT
M-6
A/C
CONTROL
ROOM
M-7
NEW ROOM
G-20B
004TN400
004TN400
004TN400
N2
DD3
N2
DD3
N2
DD3
N2
DD3
N2
DD3
TYP.
2 2
N2
DD3
N2
DV2
N2
DD3
N2
DD3
N2
DD3
N2
DV2
N2
DD2
N2
DD3
N2
DD3
N2
DD3
N2
DD4
N2
DV2
N2
DD1
N2
DD3
N2DD3
N2DD3
N2DD3N2DD3
N2 N2
DD3
N2
DD3
N2
DD3
N2
DD3
DD2
DD2
DD2
N2
DD3N2 N2
DD3
N2
N2
DD3
N2 N2
N2
DD2
N4 N4
N2N2
N2N2
N2
N2
N2 N2
N2
USE EXISTING CONDUITS ALREADY IN PLACE FOR A&B
FIBER ROUTES FROM BUILDING 04 TO BUILDING 01.
B
A
BLDG 004
KEY AREA SHOWN
A SIDE FIBER WORK
B SIDE FIBER WORK
FIBER-OPTIC BACKBONE CABLING
REFERENCE NOTES ON THIS SHEET REGARDING VERTICAL AND
HORIZONTAL FIBER-OPTIC CABLING ROUTING. CONTRACTOR
SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL.
SHEET SHALL BE PRINTED IN COLOR TO INDICATE ALL REQUIRED
INFORMATION.
LEGEND:
CONTRACTOR SHALL FIELD VERIFY QUANTITY OF
TELECOMMUNICATIONS EQUIPMENT REQUIRED PRIOR TO
PURCHASE INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
CABLE TRAY, WAOS, CAT6A CABLING, J-HOOKS, AND PATCH
PANELS: VA SHALL NOT BE RESPONSIBLE FOR ANY SUPLUS OR
OTHERSTOCKING FEES FOR SAID EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
8/
:0 4:
a m
Au to de sk
D oc s:
//6
A4
-2 2-
VA
N
Y Br oo kl yn E
H R
M
IU
/V
AB
K_
_E L_
SD
B.
rv t
004TN100
BLDG 004 - LEVEL 00 - TELECOMMUNICATIONS
PLAN
KG JGD/KDB
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
- 1/16" = 1'-0"
1 BLDG 004 - LEVEL 00 - TELECOMMUNICATIONS PLAN
TELECOMM DESIGNER
PROJECT
NORTH
8'0 16' 32'
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR
CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL DEVICES
AND ASSOCIATED CABLING AS REQUIRED. ALL RACEWAYS
AND CABLING ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO ITS SOURCE,
UNLESS OTHERWISE NOTED.
CONTRACTOR TO PROVIDE ALL CORE DRILLING THROUGH
CONCRETE FLOORS TO ACCOMODATE COMMUNICATIONS
CABLE ROUTING.
SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO
MATCH EXISTING FIRE RATING OR NEW FIRE RATING.
COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND
BELOW SHALL BE REMOVED AND REPLACED WITH CAT6A
PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN
EXISTING PATHWAY VACATED BY EXISTING CABLING AS
CONDUIT FILL ALLOWS. PROVIDE ADDITIONAL RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
TELECOMMUNICATIONS WAO UPGRADE SHALL INCLUDE,
BUT IS NOT LIMITED TO REMOVING AND DISPOSING OF
EXISTING CABLING, JACKS AND FACEPLATES AS REQUIRED;
PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST
INSTRUMENTS, AND CONSUMABLES REQUIRED FOR
INSTALLATION, TERMINATION, TESTING, LABELING, AND
CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A
OUTLET…