These mechanical design documents detail the infrastructure upgrade plans for the Brooklyn VA Medical Center's Electronic Health Record Modernization (EHRM) project, specifically focusing on mechanical systems for multiple buildings. The project involves comprehensive mechanical system replacements including VRF/VRV heat pump systems, fan coil units, CRAC units for data centers, clean agent fire suppression systems, and dehumidification equipment across Buildings 001, 002, 004, 014, and 015.
Key technical specifications include installing LG brand heat pump systems with R32 and R410A refrigerants, implementing precise temperature and humidity control for sensitive areas like data centers, and incorporating advanced monitoring systems with PLC controllers and building management system integrations. The design documents provide detailed phased renovation plans, equipment schedules, control diagrams, and installation notes for each building, with particular emphasis on maintaining precise environmental conditions in telecommunications rooms and data center spaces. The project number is 630A4-22-700, and the design documents are dated 05/05/2025, indicating a future infrastructure modernization effort for the Brooklyn VA Medical Center.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION WET
PIPING SYSTEMS
FPW
PIPING SYMBOLS
PL4
PL7
A
26-P 3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
FIRE PROTECTION DRYFPD
FIRE PROTECTION OTHERFPO
ABBREVIATIONS
CONTINUATION
DROP IN PIPE
ELBOW
TEE
UNION
TOP CONNECTION
BOTTOM CONNECTION
TOP CONNECTION, 45(DEG) OR 90° (DEG)
BOTTOM CONNECTION, 45(DEG) OR 90° (DEG)
PIPE UP
PIPE DOWN
VALVE (AS INDICATED OR SPECIFIED)
CHECK VALVE
BACKFLOW PREVENTER
ZONE CONTROL VALVE
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
LIMIT OF DEMOLITION
FIRE PROTECTION GENERAL NOTES
PENDENT SPRINKLER
UPRIGHT SPRINKLER WITH GUARD
FIRE PROTECTION SYMBOLS
1. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE CURRENT VA
GUIDES AND LOCAL FIRE PROTECTION CODES AND ORDINANCES.
2. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS. IN CASES OF CONFLICT BETWEEN
MANUFACTURER REQUIREMENTS, DRAWINGS, OR SPECIFICATIONS, THE MORE
STRINGENT REQUIREMENT SHALL GOVERN.
3. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND VA COR PRIOR TO
ANY CUTTING OF WALLS AND ROOF.
4. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING PENETRATIONS OF
FIRE RATED ASSEMBLIES AS REQUIRED.
5. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END OF
THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE
INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE
SPREAD THROUGH THE UNSEALED PENETRATION.
6. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES,
TRAPS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED IN
ACCORDANCE WITH THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION
WITH FIRE PROTECTION INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT
SERVED.
7. ROOMS THAT DO NOT HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER HEAD UPRIGHT. PROVIDE
SPRINKLER PROTECTION CAGE. ALL EXPOSED FIRE PROTECTION LINES SHALL BE
PAINTED RED.
8. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
9. HAZARD CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN ACCORDANCE WITH
THE LATEST VERSIONS OF NFPA 13 AND THE VA FIRE PROTECTION DESIGN GUIDE.
10. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMITS OF CONTRUCTION TO COMPLY
WITH NFPA 13. PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS TO PROTECT SPACES
WHERE CEILINGS ARE REMOVED FOR CONSTRUCTION UNTIL THE NEW CEILING IS
INSTALLED AND NEW DROPS TO NEW PENDENT SPRINKLERS ARE INSTALLED.
TEMPORARY SPRINKLERS ARE NOT REQUIRED IF NEW OR EXISTING CEILING IS IN PLACE
AT THE END OF THE WORK SHIFT.
11. NFPA STANDARDS: FIRE-SUPPRESSION-SYSTEM,SPECIALTIES, ACCESSORIES,
INSTALLATION, AND TESTING SHALL COMPLY WITH THE LATEST EDITION OF NFPA 13
"INSTALLATION OF SPRINKLER SYSTEMS."
12. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN DRAWINGS OR A LICENSED
FIRE PROTECTION ENGINEER STAMP ON ALL SHOP DRAWINGS.
13. SEE MECHANICAL DRAWINGS FOR TELECOM ROOM FIRE PROTECTION
FIRE PROTECTION DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A) PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT AND
SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.
B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING
DURING DEMOLITION.
C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.
D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
E) REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION IMMEDIATELY
AFTER THE DAMAGE OCCURS.
F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING FIRE PROTECTION EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
ADDITIONAL SYMBOLS
A/E: ARCHITECT/ENGINEER
AFF: ABOVE FINISH FLOOR
AFG: ABOVE FINISH GRADE
AI: ANALOG INPUT
AO: ANALOG OUTPUT
ASJ: ALL SERVICE JACKET
BACNET: BUILDING AUTOMATION AND
CONTROL NETWORK
BAS: BUILDING AUTOMATION
SYSTEM
BFP: REDUCED PRESSURE
BACKFLOW PREVENTER
BHP: BRAKE HORSEPOWER
COR: CONTRACTING OFFICER'S
REPRESENTATIVE
CV: CONTROL VALVE
CXA: COMMISSIONING AGENT
DDC: DIRECT DIGITAL CONTROL
DOE: DEPARTMENT OF ENERGY
DWG: DRAWING
E: EXISTING
ECC: ENGINEERING CONTROL
CENTER AKA BAS
EL: ELEVATION
EPA: ENVIRONMENTAL
PROTECTION AGENCY
F: FAHRENHEIT
FDC: FIRE DEPARTMENT (HOSE)
CONNECTION
FS: FLOW SWITCH
GAL: GALLON
GPD: GALLONS PER DAY
GPH: GALLONS PER HOUR
GPM: GALLONS PER MINUTE
HP: HORSEPOWER
HZ: HERTZ
ID: INSIDE DIAMETER
INV: INVERT
KW: KILOWATT
KWH: KILOWATT HOUR
LB: POUND
MAX: MAXIMUM
MFG: MANUFACTURER
MIN: MINIMUM
NC: NORMALLY CLOSED
NO: NORMALLY OPEN
NOM: NOMINAL
NPS: NOMINAL PIPE SIZE
NTS: NOT TO SCALE
OC: ON CENTER
OD: OUTSIDE DIAMETER
OR: OPERATING ROOM
PD: PRESSURE DROP OR
DIFFERENCE
PG: PRESSURE GAUGE
PID: PROPORTIONAL-INTEGRAL-
DIFFERENTIAL
PLC: PROGRAMMABLE LOGIC
CONTROLLERS
PPB: PARTS PER BILLION
PPM: PARTS PER MILLION
PRV: PRESSURE REDUCING VALVE
PSI: POUNDS PER SQUARE INCH
PSIA: POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG: POUNDS PER SQUARE INCH
GAUGE
RAD: RADIANS
RPM: REVOLUTIONS PER MINUTE
SF: SQUARE FEET
SPEC: SPECIFICATION
SQFT: SQUARE FEET
STD: STANDARD
TDH: TOTAL DYNAMIC HEAD
TYP: TYPICAL
V: VOLT
VA: VETERANS ADMINISTRATION
VAMC: VETERANS ADMINISTRATION
MEDICAL CENTER
VA TIL:
WWW.CFM.VA.GOV/TIL/INDEX.ASP
VHA: VETERANS HEALTH
ADMINISTRATION
VSD: VARIABLE SPEED DRIVE
YCO: YARD CLEANOUT
YH: YARD HYDRANT
ZCV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/5
/2
:1
:5
P M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/R
C O
V E
R S
H E
E T
M
-0
M
E S
D B
.r v t
F-001
FIRE PROTECTION ABBREVIATIONS,
LEGENDS, AND GENERAL NOTES
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
Revisions: Date: 5/5/25
PROJECT
NORTH
SHOWN AREA
A
B
D
G
H
I
9 10
F
E
C
ENLARGED AREA
A
B
D
G
H
I
9 10
F
E
C
3 33
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/5
/2
:3
:4
P M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/V A
B K
M
E S
D B
.r v t
014-FX100
DATA CENTER FIRE PROTECTION -
DEMOLITION FLOOR PLAN PHASE 1
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
PROJECT
NORTH
1/8" = 1'-0"
RM 132 - FX MCR DEMOLITION FLOOR PLAN PHASE 1
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
CONCEALED IN WALLS, CHASES OR CEILING SPACES.
3. PAINT ALL EXPOSED FIRE PROTECTION PIPING RED
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,
EXISTING WORK TO REMAIN SHOWN LIGHT.
KEYNOTES #
1/8" = 1'-0"
RM 132 - FX MCR DEMOLITION RCP PHASE 1
PROJECT
NORTH
1 EXISTING CLEAN AGENT FIRE SUPPRESSION DIFFUSERS
TO REMAIN.
EXISTING CLEAN AGENT TANK LOCATION TO REMAIN.
DEMOLISH RECESSED PENDANT SPRINKLER HEAD.
SHOWN AREA
A
B
D
G
H
I
9 10
F
E
C
LOBBY
101RECEPTION
PUMP ROOM
OFFICE
131B
STAIR
TOILET
MCR
OFFICE
131C
1 1
1 1 1
FIRE SPRINKLER
ROOM
131E
ENLARGED AREA
A
B
D
G
H
I
9 10
F
E
C
TOILET
MCR
WORK AREA
LOBBY
RECEPTION
5 5 5
5 5 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/5
/2
:3
:4
P M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/V A
B K
M
E S
D B
.r v t
014-FX101
DATA CENTER FIRE PROTECTION - FLOOR
PLAN PHASE 1
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
PROJECT
NORTH
1/8" = 1'-0"
RM 132 - MCR FLOOR PLAN - FX PHASE 1
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. PAINT ALL EXPOSED FIRE PROTECTION PIPING RED
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,
EXISTING WORK TO REMAIN SHOWN LIGHT.
KEYNOTES #
1/8" = 1'-0"
RM 132 - MCR RCP - FX PHASE 1
PROJECT
NORTH
1 INSTALL NEW UPRIGHT FUSIBLE LINK SPRINKLER HEAD.
PROVIDE MECHANICAL GUARD
NEW SINGLE FEED SUPERVISED CONTROL VALVE. VALVE
AND PIPING MAIN SHALL BE SIZED TO SERVE RENOVATED
MCR.
NEW FIRE PROTECTION LINE TO FIRE RISER ROOM
CAP MAIN IN PHASE 1. LINE SHALL CONTINUE TO SERVE
NEW SPRINKLER HEADS IN PHASE 2 AND 3.
DEMOLISH RECESSED PENDANT SPRINKLER HEAD AND
BRANCH PIPING THAT SERVE HEADS. CAP DEMOLISHED
PIPING BACK TO MAIN.
NEW FIRE PROTECTION PIPING. SIZING SHALL BE
DETERMINED BY HYDRAULIC CALCULATIONS AND IN
ACCORDANCE WITH NFPA 13.
LOCATION OF EXISTING DATA CENTER PRE ACTION FIRE
RISER. SYSTEM SHALL BE MODIFIED TO BE A WET
SPRINKLER SYSTEM MEANING REMOVAL OF THE PRE
ACTION VALVE, AND INSTALLATION OF A NEW WET
SPRINKLER FIRE RISER.
SHOWN AREA
A
B
D
G
H
I
9 10
F
E
C
ENLARGED AREA
A
B
D
G
H
I
9 10
F
E
C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/5
/2
:3
:3
P M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/V A
B K
M
E S
D B
.r v t
014-FX102
DATA CENTER FIRE PROTECTION - FLOOR
PLAN PHASE 2
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
PROJECT
NORTH
1/8" = 1'-0"
RM 132 - MCR FLOOR PLAN - FX PHASE 2
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. PAINT ALL EXPOSED FIRE PROTECTION PIPING RED
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,
EXISTING WORK TO REMAIN SHOWN LIGHT.
KEYNOTES #
1/8" = 1'-0"
RM 132 - MCR RCP - FX PHASE 2
PROJECT
NORTH
1 INSTALL NEW UPRIGHT FUSIBLE LINK SPRINKLER HEAD.
PROVIDE MECHANICAL GUARD
DEMOLISH RECESSED PENDANT SPRINKLER HEAD AND
BRANCH PIPING THAT SERVE HEADS.
NEW FIRE PROTECTION PIPING SHALL CONNECT UPSTREAM
OF SUPERVISED CONTROL VALVE.SIZING SHALL BE
DETERMINED BY HYDRAULIC CALCULATIONS AND IN
ACCORDANCE WITH NFPA 13.
NEW FIRE PROTECTION PIPING TO SUPERVISED VALVE .
SIZING SHALL BE DETERMINED BY HYDRAULIC
CALCULATIONS AND IN ACCORDANCE WITH NFPA 13.
SHOWN AREA
A
B
D
G
H
I
9 10
F
E
C
1 1 1
1 1
ENLARGED AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/5
/2
:5
:5
P M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/V A
B K
M
E S
D B
.r v t
014-FX103
DATA CENTER FIRE PROTECTION - FLOOR
PLAN PHASE 3
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
PROJECT
NORTH
1/8" = 1'-0"
RM 132 - MCR FLOOR PLAN - FX PHASE 3
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. PAINT ALL EXPOSED FIRE PROTECTION PIPING RED
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,
EXISTING WORK TO REMAIN SHOWN LIGHT.
KEYNOTES #
1 INSTALL NEW UPRIGHT FUSIBLE LINK SPRINKLER HEAD.
PROVIDE MECHANICAL GUARD
NEW FIRE PROTECTION PIPING. SIZING SHALL BE
DETERMINED BY HYDRAULIC CALCULATIONS AND IN
ACCORDANCE WITH NFPA 13.
DEMOLISH EXISTING CLEAN AGENT CANISTERS AND
ASSOCIATED PIPING IN THIS LOCATION AND WITHIN THE
MCR. FURNISH AND INSTALL CLEAN AGENT FIRE
SUPPRESSION SYSTEM PER SPECIFICATION 21 22 00.
DISTRIBUTION DESIGN OF GASEOUS SUPPRESSION PIPING
TO BE COMPLETED BY DELEGATED LICENSED FIRE
PROTECTION ENGINEER. FINAL QUANTITY OF CYLINDERS
TO BE DETERMINED BY CONTRACTOR DURING DELEGATED
DESIGN.
VTR
FD
CO
WH
WCO
CO
AC: ALTERNATING CURRENT
A/E: ARCHITECT/ENGINEER
AFF: ABOVE FINISH FLOOR
AFG: ABOVE FINISH GRADE
AG: AIR GAP
AI: ANALOG INPUT
AO: ANALOG OUTPUT
ASHRAE: AMERICAN SOCIETY OF HEATING
REFRIGERATION, AIR
CONDITIONING ENGINEERS
ASJ: ALL SERVICE JACKET
ASME: AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
ASPE: AMERICAN SOCIETY OF
PLUMBING ENGINEERS
ASR: AUTOMATIC SPRINKLER RISER
BACNET: BUILDING AUTOMATION AND
CONTROL NETWORK
BAS: BUILDING AUTOMATION SYSTEM
BFP: REDUCED PRESSURE
BACKFLOW PREVENTER
BHP: BRAKE HORSEPOWER
BTU: BRITISH THERMAL UNIT
BTU/H: BRITISH THERMAL UNIT PER
HOUR
CFM: CUBIC FEET PER MINUTE
CO: CLEANOUT
COR: CONTRACTING OFFICER'S
REPRESENTATIVE
CV: CONTROL VALVE
CXA: COMMISSIONING AGENT
DB: DECIBELS
DB(A): DECIBELS (A WEIGHTED)
DDC: DIRECT DIGITAL CONTROL
DFU: DRAINAGE FIXTURE UNITS
DI: DIGITAL INPUT
DI: DEIONIZED WATER
DN: DIAMETER NOMINAL
DO: DIGITAL OUTPUT
DOE: DEPARTMENT OF ENERGY
DW: DISHWASHER
DWG: DRAWING
DWV: DRAINAGE, WASTE AND VENT
E: EXISTING
ECC: ENGINEERING CONTROL
CENTER AKA BAS
EL: ELEVATION
EPA: ENVIRONMENTAL PROTECTION
AGENCY
F: FAHRENHEIT
FCO: FLOOR CLEANOUT
FD: FLOOR DRAIN
FDC: FIRE DEPARTMENT (HOSE)
CONNECTION
FOP: FUEL OIL PUMP
FOR: FUEL OIL RETURN
FOS: FUEL OIL SUPPLY
FOV: FUEL OIL VENT
FS: FLOW SWITCH
FSK: FOIL-SCRIM-KRAFT FACING
FU: FIXTURE UNITS
GAL: GALLON
GCO: GRADE CLEANOUTS
GPD: GALLONS PER DAY
GPH: GALLONS PER HOUR
GPM: GALLONS PER MINUTE
GPR: GAS PRESSURE REGULATOR
GRS: GAS REGULATOR STATION
GT: GREASE TRAP
GVTR: GAS VENT THROUGH ROOF
H&CW: HOT AND COLD WATER
HB: HOSE BIB
HD: HUB DRAIN
HEX: HEAT EXCHANGER
HG: MERCURY
HOA: HANDS-OFF-AUTOMATIC
HP: HORSEPOWER
HVE: HIGH VOLUME EVACUATION
HWCP: HOT WATER CIRCULATING PUMP
HZ: HERTZ
ID: INSIDE DIAMETER
INV: INVERT
IPC: INTERNATIONAL PLUMBING
CODE
KW: KILOWATT
KWH: KILOWATT HOUR
LAV: LAVATORY
LB: POUND
LBS/HR: POUNDS PER HOUR
PIPING SYMBOLS
OIL LADEN WASTE
OXYGEN
NITROUS OXIDE
ORAL EVACUATION
FIRE PROTECTION
NATURAL GAS
NITROGEN
PIPING SYSTEMS
D
OA
N2
NG
O
N2O
F
ADDITIONAL SYMBOLS
PL4
PL7
A
26-P 3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
DOMESTIC COLD WATER, COLD WATER
DOMESTIC HOT WATER, HOT WATER
LABORATORY VACUUM
MEDICAL VACUUM
MEDICAL AIR
DOMESTIC HOT WATER RETURN, HOT WATER RETURN
LABORATORY AIR
LV
LA
MA
MV
VENT (SANITARY)
CONDENSATE DRAIN
SOIL, WASTE, OR SANITARY SEWERSS
STORM WATERSD
FUEL OIL RETURN
FUEL OIL SUPPLYFOS
FOR
PIPING VALVES ABBREVIATIONS
MA: MEDICAL AIR
MAV: MEDICAL AIR VENT
MAX: MAXIMUM
MBH: 1000 BTU PER HOUR
MFG: MANUFACTURER
MG: MILLIGRAM
MIN: MINIMUM
MV: MEDICAL VACUUM
N2: NITROGEN
N20: NITROGEN OXIDE
NC: NORMALLY CLOSED
NG: NATURAL GAS
NO: NORMALLY OPEN
NOM: NOMINAL
NPS: NOMINAL PIPE SIZE
NTS: NOT TO SCALE
O2: OXYGEN
OC: ON CENTER
OD: OUTSIDE DIAMETER
OR: OPERATING ROOM
OSD: OPEN SIGHT DRAIN
OS&Y: OUTSIDE STEM AND YOKE
OXY: OXYGEN
PA: PASCAL
PD: PRESSURE DROP OR
DIFFERENCE
PG: PRESSURE GAUGE
PID: PROPORTIONAL-INTEGRAL-
DIFFERENTIAL
PLC: PROGRAMMABLE LOGIC
CONTROLLERS
PPB: PARTS PER BILLION
PPM: PARTS PER MILLION
PRV: PRESSURE REDUCING VALVE
PSI: POUNDS PER SQUARE INCH
PSIA: POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG: POUNDS PER SQUARE INCH
GAUGE
PVC: POLYVINYL CHLORIDE
PW: POTABLE WATER
RAD: RADIANS
RD: ROOF DRAIN
RO: REVERSE OSMOSIS
RPM: REVOLUTIONS PER MINUTE
SAN: SANITARY SEWER
SCFM: STANDARD CUBIC FEET PER
MINUTE
SF: SQUARE FEET
SMACNA: SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SPEC: SPECIFICATION
SPS: STERILE PROCESSING SERVICES
SQFT: SQUARE FEET
SS: STAINLESS STEEL
STD: STANDARD
SW: STORM WATER
SWP: STEAM WORKING PRESSURE
TCV: TEMPERATURE CONTROL VALVE
TD: TRENCH DRAIN
TDH: TOTAL DYNAMIC HEAD
TEMP: TEMPERATURE
TMV: THERMOSTATIC MIXING VALVE
T/P: TEMPERATURE AND PRESSURE
TP: TRAP PRIMER
TSTAT: THERMOSTAT
TYP: TYPICAL
V: VOLT
VA: VETERANS ADMINISTRATION
CSS: SERVICE
VAC: VACUUM
VAMC: VETERANS ADMINISTRATION
MEDICAL CENTER
VA TIL: WWW.CFM.VA.GOV/TIL/INDEX.ASP
VHA: VETERANS HEALTH
ADMINISTRATION
VSD: VARIABLE SPEED DRIVE
VTR: VENT THROUGH ROOF
W: WASTE
WAGD: WASTE ANESTHESIA GAS
DISPOSAL
WC: WATER CLOSET
WCO: WATER CLEANOUT
WG: WATER GAUGE
WH: WALL HYDRANT
WOG: WATER, OIL, GAS
WPD: WATER PRESSURE DROP
WS: WASTE STACK
WSFU: WATER SUPPLY FIXTURE UNITS
YCO: YARD CLEANOUT
YH: YARD HYDRANT
ACID LADEN WASTE
GREASE WASTE
NON POTABLE WATER
EXISTING PIPE TO BE REMOVEDX
OW
ACID
GW
NPW
GATE VALVE
GLOBE VALVE
GATE VALVE WITH 3/4"
HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
PRESSURE
REGULATING VALVE
PRESSURE SAFETY VALVE
CALIBRATED BALANCING
VALVE
CONTINUATION
DROP IN PIPE
VALVE IN RISER
ELBOW
TEE
UNION
TOP CONNECTION
BOTTOM CONNECTION
DIRECTION OF PIPE PITCH (DOWN)
VENT THRU ROOF
PRESSURE REDUCING VALVE
BALL JOINT
FLEXIBLE CONNECTOR
TOP CONNECTION,
45(DEG) OR 90° (DEG)
BOTTOM CONNECTION,
45(DEG) OR 90° (DEG)
CAPPED OUTLET
PIPE UP
PIPE DOWN
STRAINER
FLOOR DRAIN WITH TRAP
FLOOR DRAIN WITH CLEANOUT
FLOOR SINK WITH HALF GRATE
FLOOR SINK WITH FULL GRATE
DIRECTION OF FLOW
FLOOR PENETRATION
FREEZE-PROOF WALL HYDRANT
WALL CLEANOUT
HOSE BIB
WATER HAMMER
ARRESTOR/ACCESS
THERMOMETER
THERMOMETER WELL
STRAINER WITH
BLOW-OFF AND
HOSE CONNECTION
PRESSURE GAUGE
FLOW METER
CLEAN OUT
FLOOR CLEANOUT
P-TRAP
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
LIMIT OF DEMOLITION
SAN
RISER SYSTEM
RISER NUMBER FCO
T
M
SOFTENED WATERSW
PUMPED SEWAGEPSS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/8
/2
:0
:5
A
M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/R
C O
V E
R S
H E
E T
M
-0
M
E S
D B
.r v t
P-001
PLUMBING ABBREVIATIONS, LEGENDS, AND
GENERAL NOTES
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A) PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT AND
SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.
B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING
DURING DEMOLITION.
C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.
D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
E) REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION IMMEDIATELY
AFTER THE DAMAGE OCCURS.
F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT
FIRST OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING PLUMBING EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING PLUMBING
EQUIPMENT THAT IS TO REMAIN.
PLUMBING DEMOLITION GENERAL NOTES
PLUMBING GENERAL NOTES
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT
BEFORE BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA
STANDARDS, AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS. IN CASES OF CONFLICT BETWEEN
MANUFACTURER REQUIREMENTS, DRAWINGS, OR SPECIFICATIONS, THE
MORE STRINGENT REQUIREMENT SHALL GOVERN.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER
TRADES.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND VA
COR PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE
END OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF
MINERAL WOOL SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE
PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED
PENETRATION.
8. INSTALL ALL GRAVITY CONDENSATE DRAIN PIPING WITH A MINIMUM OF 1/8"
PER LINEAR FOOT (1%) SLOPE.
9. INSTALL ALL SANITARY SEWER LINES WITH A SLOPE OF 1/4" PER LINEAR
FOOT (2%) OF RUN. WHERE INDICATED ON PLANS, SANITARY SEWER LINES
CAN BE INSTALLED WITH A MINIMUM SLOPE OF 1/8" PER LINEAR FOOT (1%) OF
RUN. CONTRACTOR MAY INSTALL PIPING WITH A SLOPE GREATER THAN THAT
SPECIFIED ABOVE, BUT NEVER LESS.
10. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A
FURRED CHASE, ABOVE HARD SUSPENDED CEILING, OR ABOVE AN
ACOUSTICAL CEILING UNLESS EXPLICITLY NOTED ON THE DRAWINGS AS
BEING ROUTED EXPOSED IN A FINISHED ROOM OR SPACE.
11. ACCESS PANELS IN HARD SUSPENDED CEILINGS AND WALLS (NOT INCLUDING
ACCESSIBLE WET WALLS) ARE REQUIRED FOR ALL VALVES, TRAPS,
CLEANOUTS, CONTROLS, WATER HAMMER ARRESTORS ETC. ACCESS
PANELS SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE
ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH PLUMBING
INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.
12. ALL PRESSURES LISTED ARE GAUGE PRESSURE UNLESS OTHERWISE NOTED.
13. CONTRACTOR SHALL INSTALL DRIP PANS AND SUBMERSIBLE PUMPS IN ALL
TELECOM AND DATA CENTER LOCATIONS WHERE EXISTING HYDRONIC,
STEAM, DOMESTIC WATER, OR OTHER UTILITIES PRESENT A RISK OF WATER
INFILTRATION. LOCATIONS SHOWN ON THE DRAWINGS ARE NOT
EXHAUSTIVE. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND
ADDRESSING ALL SUCH CONDITIONS. DRIP PANS SHALL BE INSTALLED
BENEATH THESE UTILITIES, AND DISCHARGE PIPING SHALL BE ROUTED TO
THE NEAREST MOP SINK, SINK TAILPIECE, OR FLOOR DRAIN, AVOIDING
WALKWAYS.
Revisions: Date:
REVISION 1 8-29-2025
5/5/25
BFP
NORTH
SHOWN AREA
A
B
D
G
H
I
9 10
F
E
C
14-BFP-01
1" CW
1" CW
D
D
3/4"
14-CRAC-02-132
14-DH-01-132
14-DH-02-132
14-CRAC-01-132
14-CRAC-03-132
ENLARGED AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/5
/2
:5
:5
P M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/V A
B K
M
E S
D B
.r v t
014-PL100
DATA CENTER PLUMBING - FLOOR PLAN
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
PROJECT
NORTH
1/8" = 1'-0"
RM 132 - PL MCR FLOOR PLAN
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR
CLARITY.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT
PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR
UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING
SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING
CONCEALED IN WALLS, CHASES OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED,
EXISTING WORK TO REMAIN SHOWN LIGHT.
KEYNOTES #
1 INSTALL BACKFLOW DEVICE 5' AFF OR LESS, SEE DETAIL ON
M-500. DRAIN SHALL TERMINATE TO THE EXTERIOR WALL.
BFP SHALL BE INSTALLED IN PHASE 1. INSTALL STUB WITH
VALVE AT CRAC IN PHASE 1 FOR THE FOLLOWING PHASED
WORK.
CONNECT NEW 1" CW LINE TO EXISTING DOMESTIC WATER
SYSTEM WITHIN RESTROOM
CONNECT 3/4" CW LINE TO CRAC HUMIDIFIER IN PHASE 1
CONNECT 3/4" CW LINE TO CRAC HUMIDIFIER IN PHASE 2
CONNECT 3/4" CW LINE TO CRAC HUMIDIFIER IN PHASE 3
CONDENSATE LINE TO BE ROUTED TO THE EXISTING SINK
SANITARY LINE. SEE "INDIRECT SINK DRAIN DETAIL" ON
SHEET M-501.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/8
/2
:0
:5
A
M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/R
C O
V E
R S
H E
E T
M
-0
M
E S
D B
.r v t
M-001
MECHANICAL GENERAL NOTES
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A) PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT AND
SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.
B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING
DURING DEMOLITION.
C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.
D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
E) REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION IMMEDIATELY
AFTER THE DAMAGE OCCURS.
F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
MECHANICAL DEMOLITION GENERAL NOTES MECHANICAL GENERAL NOTES
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT
BEFORE BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA
STANDARDS, AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS. IN CASES OF CONFLICT
BETWEEN MANUFACTURER REQUIREMENTS, DRAWINGS, OR
SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT SHALL GOVERN.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER
TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR
ELECTRONIC EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND VA
COR PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT
THE END OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF
MINERAL WOOL SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE
PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED
PENETRATION.
8. INSTALL GRAVITY CONDENSATE DRAIN PIPING WITH A MINIMUM OF 1/8" PER
LINEAR FOOT (1%) SLOPE.
9. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE
CONCEALED IN A FURRED CHASE, ABOVE HARD SUSPENDED CEILING, OR
ABOVE AN ACOUSTICAL CEILING.
10. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN
OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
11. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL
VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS
SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE
ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH
MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT
SERVED.
12. DIFFUSER, REGISTER, AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE
NECK SIZES.
13. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE
MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
14. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT
LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
15. ALL PRESSURES LISTED ARE GAUGE PRESSURE UNLESS OTHERWISE
NOTED.
16. CONTRACTOR SHALL INSTALL DRIP PANS AND SUBMERSIBLE PUMPS IN ALL
TELECOM AND DATA CENTER LOCATIONS WHERE EXISTING HYDRONIC,
STEAM, DOMESTIC WATER, OR OTHER UTILITIES PRESENT A RISK OF
WATER INFILTRATION. LOCATIONS SHOWN ON THE DRAWINGS ARE NOT
EXHAUSTIVE. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND
ADDRESSING ALL SUCH CONDITIONS. DRIP PANS SHALL BE INSTALLED
BENEATH THESE UTILITIES, AND DISCHARGE PIPING SHALL BE ROUTED TO
THE NEAREST MOP SINK, SINK TAILPIECE, OR FLOOR DRAIN, AVOIDING
WALKWAYS.
ABBREVIATIONS
A/E: ARCHITECT / ENGINEER
AAHX: AIR TO AIR HEAT EXCHANGER
AAV: AUTOMATIC AIR VENT
AB: AIR BLENDER
ACC: AIR COOLED CONDENSER
ACCH: AIR COOLED CHILLER
ACCU: AIR COOLED CONDENSING UNIT
ACD: AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP: AUTOMATIC CONTROL DAMPER,
TWO POSITION
ACU: AIR CONDITIONING UNIT
AFF: ABOVE FINISHED FLOOR
AFMS: AIR FLOW MEASURING STATION
AHU: AIR-HANDLING UNIT
AMP: AMPERE
AP: ACCESS PANEL
APD: AIR PRESSURE DROP
AQST: AQUASTAT
AS: AIR SEPARATOR
ASHRAE: AMERICAN SOCIETY OF HEATING REFRIGERATION
AIR CONDITIONING ENGINEERS
B: BOILER
BDD: BACKDRAFT DAMPER
BFP: BACKFLOW PREVENTER
BHP: BRAKE HORSEPOWER
BT: BLOWOFF TANK
BTC: BLOWOFF TANK CONTROL VALVE
BTU: BRITISH THERMAL UNIT
BTUH: BRITISH THERMAL UNIT PER HOUR
CAV: CONSTANT AIR VOLUME
CC: COOLING COIL
CCD: COOLING COIL CONDENSATE DRAIN
CD: CEILING DIFFUSER
CD-1: CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2: CONSTRUCTION DOCUMENTS (SUBMISSION2)
CFH: CUBIC FEET PER HOUR
CFM: CUBIC FEET PER MINUTE
CH: CHILLER
CHP: CHILLED WATER PUMP
CHW: CHILLER WATER
CHR: CHILLED WATER RETURN
CHS: CHILLED WATER SUPPLY
CM: CARBON MONOXIDE
CO: CLEAN OUT
CO2: CARBON DIOXIDE
COMP: COMPRESSOR UNIT
COP: COEFFICIENT OF PERFORMANCE
CP: CONDENSATE PUMP
CS: CONDENSATE STORAGE TANK
CSG: CLEAN STEAM GENERATOR
CT: COOLING TOWER
CU: CONDENSING UNIT
CUH: CABINET UNIT HEATER
CV: CONSTANT VOLUME
CW: COLD WATER (POTABLE)
CWCC: CHILLED WATER COOLING COIL
CWP: CONDENSER WATER PUMP
CWR: CONDENSER WATER RETURN (TO
COOLING TOWER)
CWS: CONDENSER WATER SUPPLY (FROM
COOLING TOWER)
Db: DRY-BULB TEMPERATURE
DB: DECIBELS
DCW: DOMESTIC COLD WATER
DD-1: DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2: DESIGN DEVELOPMENT (SUBMISSION 2)
DDC: DIRECT DIGITAL CONTROLS
DEG: DEGREE
DHW: DOMESTIC HOT WATER
DHWR: DOMESTIC HOT WATER RETURN
DIA: DIAMETER
DIW: DEIONIZED WATER
DP: DEW POINT TEMPERATURE
DPS: DIFFERENTIAL PRESSURE SENSOR
DX: DIRECT EXPANSION
DXCC: DIRECT EXPANSION COOLING COIL
EA: EXHAUST AIR
EAT: ENTERING AIR TEMPERATURE
EC: EVAPORATIVE COOLER
ECC: ENGINEERING CONTROL CENTER
EDH: ELECTRIC DUCT HEATER
EER: ENERGY EFFICIENCY RATIO
EF: EXHAUST FAN
EG: EXHAUST GRILLE
EGS: EMERGENCY GAS SHUTOFF
EH: EXHAUST HOOD
EJ: EXPANSION JOINT
ENT: ENTERING
ER: EXHAUST REGISTER
ERC: ELECTRIC REHEAT COIL
ERP: ELECTRIC RADIANT PANEL
ESP: EXTERNAL STATIC PRESSURE
ET: EXPANSION TANK
EUH: ELECTRIC UNIT HEATER
EWC: EVAPORATIVE WATER COOLER
EWT: ENTERING WATER TEMPERATURE
EX: EXISTING
F: FAHRENHEIT
F&T: FLOAT AND THERMOSTATIC
F/SDPR: COMBINATION FIRE SMOKE DAMPER
FA: FREE AREA
FC: FLEXIBLE CONNECTION
FCU: FAN COIL UNIT (4 PIPE)
FCUC: FAN COIL UNIT COOLING ONLY
FCUH: FAN COIL UNIT HEATING ONLY
FCW: FORWARD CURVED WHEEL (FAN)
FD: FLOOR DRAIN
FD: FIRE DAMPER
FF: FINAL FILTER
FM: FLOW METER
FOP: FUEL OIL PUMP
FOT: FUEL OIL TANK
FOHX: FUEL OIL HEAT EXCHANGER
FPM: FEET PER MINUTE
FPS: FEET PER SECOND
FPTU: FAN POWERED TERMINAL UNIT
FR: FLOOR REGISTER
FS: FLOW SWITCH
FSTAT: FREEZESTAT
FT: FEET
FT WC: FEET OF WATER COLUMN
FT-LB: FOOT-POUND
FV: FACE VELOCITY
GA: GAUGE
GAL: GALLONS
GPD: GALLONS PER DAY
GPH: GALLONS PER HOUR
GPM: GALLONS PER MINUTE
GPR: GAS PRESSURE REGULATOR
H: HUMIDIFIER
HAC: HOUSEKEEPING AID CLOSET
HB: HOSE BIB
HC: HEATING COIL
HD: HOOD
HOA: HAND/OFF/AUTOMATIC
HP: HEAT PUMP
HP: HORSEPOWER
HPDT: HIGH PRESSURE DRIP TRAP
HPR: HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS: HIGH PRESSURE SUPPLY (STEAM)
HRC: HEAT RECOVERY COIL
HRD: HEAT RECOVERY DEVICE
HRP: HYDRONIC RADIANT (CEILING) PANEL
HRW: HEAT RECOVERY WHEEL
HSTAT: HUMIDISTAT
HW: HOT WATER
HWC: HOT WATER COIL
HWHC: HOT WATER HEATING COIL
HWP: HEATING HOT WATER PUMP
HWR: HEATING HOT WATER RETURN
HWS: HEATING HOT WATER SUPPLY
HWUH: HOT WATER UNIT HEATER
HX: HEAT EXCHANGER
HZ: HERTZ
I/O: INPUT/OUTPUT
IAQ: INDOOR AIR QUALITY
IBT: INVERTED BUCKET TRAP
ICU: INTENSIVE CARE UNIT
ID: INSIDE DIAMETER
IFB: INTEGRAL FACE BYPASS
IN: INCHES
IN HG: INCHES OF MERCURY
IN WC: INCH WATER COLUMN
IN WG: INCH WATER GAUGE
IN-LB: INCH-POUND
IRH: INTRARED HEATER
IU: INDUCTION UNIT
KW: KILOWATT
KWH: KILOWATT HOUR
LAT: LEAVING AIR TEMPERATURE
LBS/HR: POUNDS PER HOUR
LF: LINEAR FOOT (FEET)
LH: LATENT HEAT
LPG: LIQUEFIED PETROLEUM GAS
LPR: LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC: LOW PRESSURE STEAM RETURN (CLEAN)
LLHX: LIQUID TO LIQUID HEAT EXCHANGER
LPS: LOW PRESSURE STEAM
LPSC: LOW PRESSURE STEAM (CLEAN)
LSD: LINEAR SLOT DIFFUSER
LVG: LEAVING
LVR: LOUVER
LWT: LEAVING WATER TEMPERATURE
MA: MIXED AIR
MAT: MIXED AIR TEMPERATURE
MAU: MAKE-UP AIR UNIT
MAV: MANUAL AIR VENT
MAX: MAXIMUM
MB: MIXING BOX
MBH: 1,000 BTUH
MCA: MINIMUM BRANCH CIRCUIT AMPACITY
MERV: MINIMUM EFFICIENCY REPORTING VALUE
MIN: MINIMUM
MOV: MOTOR OPERATED VALVE
MPR: MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS: MEDIUM PRESSURE STEAM
MRI: MAGNETIC RESONANCE IMAGING
MVD: MANUAL VOLUME DAMPER
NA: NOT APPLICABLE
NC: NOISE CRITERIA
NC: NORMALLY CLOSED
NG: NATURAL GAS
NGFM: NATURAL GAS FLOWMETER
NO: NORMALLY OPEN
NOM: NOMINAL
NPLV: NON-STANDARD PART LOAD VALUE
NPSH: NET POSITIVE SUCTION HEAD
NPSHA: NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR: NET POSITIVE SUCTION HEAD REQUIRED
NTS: NOT TO SCALE
OA: OUTSIDE AIR
OAD: OUTDOOR AIR DAMPER
OAG: OUTSIDE AIR GRILLE
OAI: OUTSIDE AIR INTAKE
OD: OUTSIDE DIAMETER
OR: OPERATING ROOM
P: PUMP
Pa: PASCAL
PC: PUMPED CONDENSATE
PCF: POUNDS PER CUBIC FOOT (FEET)
PD: PRESSURE DROP
PF: PRE-FILTER
PG: PRESSURE GAUGE
PHC: PREHEAT COIL
PPM: PARTS PER MILLION
PRS: PRESSURE REGULATING (VALVE) STATION
PRV: PRESSURE REGULATING VALVE
PSI: POUNDS PER SQUARE INCH
PSIA: POUNDS PER SQUARE INCH – ABSOLUTE
PSIG: POUNDS PER SQUARE INCH – GAUGE
PTAC: PACKAGED TERMINAL AIR CONDITIONER
R/E: RETURN OR EXHAUST
RA: RETURN AIR
RAD: RETURN AIR DAMPER
RAT: RETURN AIR TEMPERATURE
RCCH: REMOTE CONDENSER CHILLER
RD: REFRIGERANT DISCHARGE
RDS: ROOM DATA SHEETS
REA: RELIEF AIR
RF: RETURN FAN
RG: RETURN GRILLE
RH: RELATIVE HUMIDITY
RHC: REHEAT COIL
RHG: REFRIGERANT HOT GAS
RL: REFRIGERANT LIQUID LINE
RLA: RUN LOAD AMPERE
RO: REVERSE OSMOSIS
RPM: REVOLUTIONS PER MINUTE
RR: RETURN REGISTER
RS: REFRIGERANT SUCTION
RTU: ROOF TOP UNIT
SA: SUPPLY AIR
SAD: SOUND ATTENUATING DEVICE
SAT: SUPPLY AIR TEMPERATURE
SCFM: STANDARD CUBIC FEET PER MINUTE
SD: SMOKE DETECTOR
SD-1: SCHEMATIC DESIGN (SUBMISSION1)
SD-2: SCHEMATIC DESIGN (SUBMISSION2)
SDPR: SMOKE DAMPER
SEN: SENSIBLE HEAT
SF: SUPPLY FAN
SG: SUPPLY AIR GRILLE
SH: STEAM HUMIDIFIER
SHC: STEAM HEATING COIL
SP: STATIC PRESSURE
SPD: SUPPLY PROCESS AND DISTRIBUTION
SPRV: STEAM PRESSURE REDUCING VALVE
SPS: STATIC PRESSURE SENSOR
SQ FT: SQUARE FOOT (FEET)
SR: SUPPLY AIR REGISTER
SS: STAINLESS STEEL
SSHX: STEAM TO STEAM HEAT EXCHANGER
SSR: SOLID SEPARATOR
ST: STEAM TRAP
SUH: STEAM UNIT HEATER
SV: STEAM PRESSURE REDUCING VALVE
SVS: STEAM VENT SILENCER
SW: SOFTWATER
SWHX: STEAM TO WATER HEAT EXCHANGER
T&PCV: TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB: TESTING, ADJUSTING, BALANCE
TD: TEMPERATURE DIFFERENCE
TDH: TOTAL DYNAMIC HEAD
TDS: TOTAL DISSOLVED SOLIDS
TG: TRANSFER GRILLE
TP: TRAP
TR: TOP REGISTER
TSP: TOTAL STATIC PRESSURE
TSTAT: THERMOSTAT
TU: TERMINAL UNIT
TWU: THRU-WALL UNIT
UH: UNIT HEATER
V: VALVE
VAV: VARIABLE AIR VOLUME
VD: VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD: VARIABLE FREQUENCY DRIVE
VP: VACUUM PUMP
VPS: VARIABLE PRIMARY SYSTEM
VR: VACUUM (STEAM CONDENSATE) RETURN
VSD: VARIABLE SPEED DRIVE
W: WATTS
WAG: WASTE ANESTHESIA GAS
WB: WET-BULB (TEMPERATURE)
WC: WATER COOLED
WCCH: WATER COOLED CHILLER
WCCU: WATER COOLED CONDENSING UNIT
WCHP: WATER COOLED HEAT PUMPS
WCPU: WATER COOLED PACKAGED UNIT
WF: WATER FILTER
WFCV: WATER FLOW CONTROL VALVE
WFM: WATER FLOWMETER
WFMD: WATER FLOW MEASURING DEVICE
WG: WATER GAUGE
WPD: WATER SIDE PRESSURE DROP
YR: YEAR
Revisions: Date:
SINGLE LINE DOUBLE LINE
DUCTWORK SYMBOLS
SINGLE LINE DOUBLE LINE
EXISTING PIPE TO BE REMOVED
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
CONDENSATE DRAIN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
NATURAL GAS (1/2 PSI OR LESS)
PIPING LEGEND
CEILING
DUCT MTD.
DIFF/GRILLE
BULLHEAD
SPLIT SUPPLY
TAKEOFF TO
DIFF/GRILLE
OR
HARD
ELBOW
SUPPLY DUCT DOWN
SUPPLY DUCT UP
OR R
w
BULLHEAD
CONVERGE
RETURN
/EXHAUST
90°F
TAP
TAKE-
OFF
FLEXIBLE
DUCT
OPEN END DUCT
W/ 1/4"x1/4" WMS
ACOUSTICALLY
LINED DUCT
CEILING
DUCT MTD.
DIFF/GRILLE
SIDEWALL
DUCT MTD.
REG./GRILLE
LD MF'R
BOOT BY
VD VD
VD VD
DUCTWORK OR
EQUIPMENT TO
BE REMOVED
TURNING VANES
ROUND DUCT UP
SUPPLY SIDEWALL
LINEAR DIFFUSER
(W/SHEET METAL
PLENUM W/1"
LINING & BRANCH
CONN FOR EVERY
4' OF LENGTH)
SUPPLY CEILING
LINEAR DIFFUSER
(W/SHEET METAL
PLENUM W/1"
LINING & BRANCH
CONN FOR EVERY
4' OF LENGTH)
STANDARD RADIUS
ELBOW (R= W)
SUPPLY/RETURN
/EXHAUST
ROUND DUCT DOWN
ROUND
TAP
ROUND
DUCT
RECT. TAP
90°F
TAP
TAKE-
OFF
ROUND TAKEOFF
RECTANGULAR MAIN DUCT
ROUND MAIN DUCT
RECT TAP
RISE/DROP RISE OR DROP
SUPPLY/RETURN
/EXHAUST
45°F TAP
TAKE-OFF
HORIZONTAL
OFFSET
SUPPLY/RETURN
/EXHAUST
RISE UP
RETURN DUCT UP
DROP DN
EXHAUST DUCT UP
RETURN DUCT DOWN
EXHAUST DUCT DOWN
HWR
HWS
G
CHS
CHR
CWR
CWS
D
W"/H" WIDTH AND HEIGHT IN INCHES
FOR FLAT OVAL DUCT
POINT OF CONNECTION BETWEEN NEW
AND EXISTING WORK
2-WAY BLOW SUPPLY DIFFUSER
STANDARD 4-WAY BLOW SUPPLY DIFFUSER
BD
OR
BACKDRAFT DAMPER
3-WAY BLOW SUPPLY DIFFUSER
1-WAY BLOW SUPPLY DIFFUSER
FIRE DAMPER
M MOTORIZED DAMPER
LIMIT OF DEMOLITION
ADDITIONAL SYMBOLS
H4
H7
A
26-SF 3
26-TU-1-1
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
AIR OUTLET CALLOUT
PENDENT SPRINKLER
UPRIGHT SPRINKLER WITH GUARD
FIRE PROTECTION
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HIGH PRESSURE STEAM CONDENSATE RETURN
CONDENSATE PUMP DISCHARGE
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
LOW PRESSURE STEAM CONDENSATE RETURN
PC
CR-15
S-30
CR-30
S-60
CR-60
S-15
GLYCOL-WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLYGHS
GHR
REFRIGERANT LIQUID/SUCTIONRL/RS
REFRIGERANT HOT GASRHG
CHILLED GLYCOL-WATER RETURN
CHILLED GLYCOL-WATER SUPPLYGCS
GCR
X GENERAL PIPING SYMBOLS
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE
& HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN
AND QUICK-COUPLE HOSE CONNECTOR
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL
VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
ROOM THERMOSTAT/TRANSMITTER – WALL
MOUNT
ROOM HUMIDISTAT
(MOISTURE)/TRANSMITTER – WALL MOUNT
TEMPERATURE TRANSMITTER
TEMPERATURE TRANSMITTER, AVERAGING
ELEMENT
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRANSMITTER
STATIC PRESSURE SENSOR
FLOW TRANSMITTER
CURRENT TRANSMITTER
CONDUCTIVITY TRANSMITTER
SMOKE DETECTOR
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE DIFFERENTIAL SWITCH
HAND SWITCH (HAND—OFF—AUTO SWITCH)
VALVE OR DAMPER POSITION CONTROLLER
LOCAL RECORDING TIME CLOCK (RUNTIME)
TEMPERATURE SWITCH, LOW
(FREEZESTAT)
TEMPERATURE SWITCH, HIGH
(FREEZESTAT)
LEVEL CONTROLLER
LEVEL TRANSMITTER
PRESSURE SWITCH HIGH
PRESSURE SWITCH LOW
ELECTRONIC TO PNEUMATIC TRANSDUCER
CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
OCCUPANCY SENSOR
LOCAL TEMPERATURE CONTROL PANEL
HVAC CONTROL PANEL
VARIABLE SPEED MOTOR CONTROLLER
INTEGRATE CONTROL POINT ON REMOTE
GRAPHICS
WORKSTATION AT ENERGY CONTROL
CENTER
TEMPERATURE CONTROLLER. SEE
SEQUENCE OF OPERATION
PRESSURE CONTROLLER. SEE SEQUENCE
OF OPERATION
SPEED CONTROLLER. SEE SEQUENCE OF
OPERATION
FLOW CONTROLLER. SEE SEQUENCE OF
OPERATION
FLOW SWITCH HIGH
FLOW SWITCH LOW
TIME CLOCK CONTROLLING EQUIPMENT ON
A SCHEDULE
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
SENSOR WITH AVERAGING ELEMENT TO
TRANSMIT TEMPERATURE TO EMCS
MOTOR STARTER
ELECTRIC OPERATED CONTROL DAMPER/OR
VALVE
VALVE SYMBOLS CONTROLS DIAGRAM SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION. 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING PIPING
ACCESSORIES SEE DETAIL
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
THERMOSTATIC TRAP SET INCLUDING PIPING
ACCESSORIES SEE DETAIL
THERMOMETER
PRESSURE GAUGE
VENTURI FLOW METER
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
TOP TAKEOFF
BOTTOM TAKEOFF
PIPE BREAK
BLIND FLANGE
AV
MV
LC
M
ADDITIONAL DUCTWORK SYMBOLS
T
M
TT
TT
MT
PT
SPS
FT
IT
CT
SD
PDT
PDS
HS
ZC
KR
TSL
SHT
LC
LT
PSH
PSL
EPT
AT
AT
AT
LTCP
HVAC
VSMC
ECC
TC
PC
SC
FC
FSH
KC
FSL
CO2
CO
OC
A
M
FLOOR PLAN CONTROL SYMBOLS
TEMPERATURE SENSOR
OR THERMOSTAT
T
H ROOM HUMIDISTAT
M
R
MOISTURE SENSOR
REFRIGERANT SENSOR
18X18[SD]
1 2
SIZE OF AIR OUTLET (IN)
TYPE
AIRFLOW (CFM)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/ DISCIPLINE
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/5
/2
:1
:5
P M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/R
C O
V E
R S
H E
E T
M
-0
M
E S
D B
.r v t
M-002
MECHANICAL LEGENDS
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
LEGEND
OUTDOOR DESIGN CONDITIONS
STATE COUNTY ALTITUDE (FT) CLIMATE ZONE
SUMMER WINTER
TEMP DB (°F) TEMP WB (°F) TEMP DB (°F)
NEW YORK KING 220 4 89.9 72.9 13.8
INDOOR DESIGN CONDITIONS
ROOM TYPE
SUMMER WINTER
TEMP DB (°F) REL HUM (%) TEMP DB (°F) REL HUM (%)
DATA CENTER 75 55 75 55
TR 75 55 75 55
M
J
L
K
2 3 4 5 6 7 8 9 10 13 14 15 16 17 18 19 20 21 22 23 24 251211
H
G
F
E
D
C
B
A
001-M-401
001-M-401
001-M-401
001-M-401
001-M-401
001-M-402
001-M-402
001-M-402
001-M-402
BLDG.
MANAGEMENT
SUPPLY RM.
B-122
ELEC. FEEDER
"C"
B-123
SPD STORAGE
RM.
B-124
STORAGE
B-125
CLOSET
B-126
ELEC. FEEDER
"D"
B-127
ANATOMY ROOM
B-128
ETO RM
B-107
CLEAN PREP
ROOM
B-108
CLEAN STERILE
AREA
B-109
SUPPLY RM.
NON-STERILE
AREA
B-110
STERILE
STORAGE AREA
B-111
STORAGE
B-112
TOILET
B-113
TOILET
B-114
CLEAN AREA
B-115
S.P.D. CLERICAL
B-116
STORAGE
B-116
DUMBWAITER
B-116A
ASST. CHIEF
OFFICE
B-116B
CHIEF OFFICE
B-116C
ENG. RM
B-116D
TRAINING RM
B-119
ELEC.
DISTRIBUTION
FEEDER
B-120
B-117
EMS EQUIPMENT
B-117A
ELEVATOR PIT
B-117B
SOILED LINEN
B-301
TR
B-302
LOCKER SHWR
B-303
LOCKER SHWR
B-304
SUPERVISOR
OFFICE
B-305
MECHANICAL
EQUIPMENT
B-306
CANTEEN
SUPPLY
B-307
FOOD STORAGE
B-307A
CANTEEN
RECEIVING
B-307B
BUILDING
MANAGEMENT
SUPPLY/STORAGE
B-300
CORRIDOR
SW
SERVICE ELEV.
CORRIDOR
W/C
CORRIDOR
SC
DIRTY AREA
B-115D
EXCHANGE
CART STORAGE
B- 200
LINEN CHUTE
ROOM
B- 201
ELEC. FEEDER
"A"
B- 200A
PROCESSING
AREA
2-460
LOOSE DRUG
STORAGE
B-1
SUPPLY AREA
B-2
PROCESSING
AREA
B-2A
SPD GAS
STERILIZER
B-108A
ELEVATOR
S-4
ELEVATOR
S-3
ELEVATOR
S-2
ELEVATOR
S-1
AIR
CONDITIONING
RM.
B-102
STUDIO
B-104
CORRIDOR
B-105
SUPPLY RM
B-501
FOOD STORAGE
RM.
B-502
RADIOACTIVE
WASTE
B-503
AUTOPSY AREA
B-504
ROOMS
B-505
ROOMS
B-506
ANIMALS
B-507
SMALL
B-508
SMALL
B-509
KITCHEN
B-510
LARGE DOGS
ROOM
B-511
PREP ROOM
B-512
X-RAY ROOM
B-513
STERILIZER RM
B-514A
OPERATING
ROOM
B-515
RADIO ISOTOPE
RM
B-516
OFFICE ANIMAL
SUPERVISOR
B-517
JANITOR
CLOSET
B-518
SHOWERS
B-519A
MECH. EQUIP.
RM.
B-520
CAGE
WASHROOM
B-521
SPF RABIIT
ROOM
B-522
ISOLATION RM
B-523
STORAGE RM
B-524
PREPARATION
RM.
B-33
GROSS
SPECIMEN STOR.
B-43
AUTOPSY ROOM
B-35
PHOTO AUDIO
B-104A
DRYING ROOM
B-104B
DARK ROOM
B-104C
DARK ROOM
B-104D
HOUSE STAFF
OFFICE
B-37
TOILET
B-38
WASTE RM
B-39
STAFF LOCKER
RM.
B-519
PROCEDURE
ROOM
B-514B
O.R. SUPPLY
ROOM
B-514C
SCRUB-UP RM.
B-514D LINEN CLOSET
B-514E
LARGE ANIMAL
RM
B-511A
MED. MEDIA
B-105A
MEDICAL MEDIA
B-105B
LOCKER ROOM
B-517A
MECH. EQUIP.
B-400
TRANS. ROOM
B-401
WORK AREA
N-60
STAIR
#4
TRANS. VAULT
TRANS. VAULT
TRANS. VAULT
TRANS. VAULT
REFIRG.
PIT
TR
B-106A
B-124
001-M-428
KEY AREA SHOWN
TRUE
NORTH
BLDG 001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/2
/2
:5
:5
P
M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/V A
B K
M
E S
D B
.r v t
001-M-101
BLDG 001 - LVL 00B - OVERALL PLAN
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN, NY 11209
1/16" = 1'-0"
BLDG 001 - LVL 00B - OVERALL PLAN
PROJECT
NORTH
0' 8' 16' 32'
SITE PLAN
Revisions: Date:
J
L
K
2 3 4 5 6 7 8 9 10 13 14 15 16 17 18 19 20 21 22 23 24 251211
H
G
F
E
D
C
B
A
001-M-403
001-M-403
001-M-403
001-M-403
WAITING AREA
G-204
NURSE WORK
G-205
SOCIAL WORK
G-206
HAC
G-207
TECH OFFICE
G-208
FILE VIEWING
G-209
FILES
G-210
STAFF LOUNGE
G-211
STAFF TOILET
G-212
A/C
MECHANICAL RM
G-213
CONFERENCE
ROOM
G-214
SECRETARY
G-215
ADMIN OFFICE
G-216
COPIER
G-215B
CHIEF
ONCOLOGIST
G-218
ATTENDING
ONCOLOGIST
G-220
RESIDENT
PHYSICIAN
G-221 STAFF
ONCOLOGIST
G-222
SOIL RM
G-223
EXAM 1
G-224
EXAM 2
G-225
EXAM 3
G-226
EXAM 4
G-227
WAITING MALE
G-229
WAITING
FEMALE
G-230
HC TOILET
G-231
ELECTRIC
CLOSET
G-232
REGISTRATION
G-204A
CORRIDOR
2-465
CORRIDOR SE
2-466
STAIR #1
2-467
LOUNGE
G-516C
TOILET
G-516A
LOCKER
G-516B
MECH RM
G-525
TOILET
G-514
DECONTAM
G-526
NURSE
G-515
ISOLATION
G-513
ISOLATION
G-512
ISO TOILET
G-512A
ISO TOILET
G-513A
OBSERVATION
ROOM
G-517
LINEN
G-518
TOILET
G-517A
NOUR.
G-519
STORAGE RM
G-519B
STABILIZATION
ROOM
G-521
STABILIZATION
ROOM
G-520
ELEC.
G-519A
CLINICIAN
STATION
G-511
CLEAN
SUPPLIES
G-508
SOIL
G-507
PSYCH. EXAM
G-506
PSYCHIATRIST
G-505
STAIR #4
2-468
REGISTRATION
G-501ATRIAGE
G-501B
TRIAGE
G-501C
MHN
G-504
DATA
G-502
HAC
G-503
TRIAGE
G-501E
TRIAGE
G-501D
WAITING ROOM
G-501
TR
G-100B
CONTD.
SUBSTANCE
G-102
ELIGIBILITY
G-100
SUPERVISOR
G-100A
REGISTRATION
EXAM RM
G-429
EXAM RM
G-428
OFFICE
G-427
MECHANICAL RM
2-470
SIMULATOR UNIT
G-103
EXAM RM
G-104
CONTROL
G-103A
DK RM
G-103B
DRESSING
G-136A
BATH ROOM
G-137
PHYSICIAN
G-138
WAITING
RECEPTIONIST
G-136
CORRIDOR
SE1
STORAGE
G-202
CLOSET
G-201
OFFICE
G-401
EXAM RM
G-402
TREATMENT RM
G-403
STOR
G-404 TREATMENT RM
G-405
EXAM RM
G-406
OFFICE
G-407
EXAM RM
G-408
TOILET
G-409
EXAM RM
G-410
EXAM RM
G-411
TOILET
G-412
OFFICE
G-413
CLOSET
G-414
OFFICE
G-415
EXAM RM
G-416
STAFF LOUNGE
G-417
TOILET
G-418OBSERVATION
RM
G-419
PATIENTS
SHOWER
G-420
WHEEL CHAIR
G-421
SWITCH GEAR
RM
G-422STABILIZATION
G-423
UTILITY
G-424
UTILTY
G-425
TOILET
G-426
ISOLATION
G-423A
SECURITY
G-153
TOILET
G-157
ELEV.
P-6
ELEV.
S-5
MAIL ROOM
G-146
COMPACTOR RM
G-147
OXYGEN STOR
G-149 OFFICE
G-150
FIRE ALARM
CONTROL RM
G-151
TOILET
G-154
TOILET
G-155
OXYGEN STOR
G-152
MORGUE VEST
G-159
MORGUE
PLATFORM
G-160
RECEIVING AREA
G-147A
J.C.
G-143
TOILET
G-144
TRASH
G-148
VEST
G-301
NON FOOD
SUPPLIES
G-302
STORAGE
G-303
REFRIGERATOR
G-304
REFRIGERATOR
G-305
TELEPHONE
SWITCH GEAR
ROOM
G-306
DRY FOODS
G-307
REFRIGERATOR
G-308
STORAGE
G-309
OFFICE
G-310
FOOD
RECEIVING
G-311
REFRIGERATOR
G-307A
REFRIGERATOR
G-307B
REFRIGERATOR
G-303A
STORAGE
G-25A
CORRIDOR
SW1A
J.C.
G-141
STOR
G-142
MACHINERY AND
SPRINKLER
G-145
LINEN
G-146
TR
G-140
STORAGE ROOM
G-140A
STAIR
#3A
ELEV.
S-7 STAIR
#2
VENDING
MACHINES
G-139A
CORRIDOR
SC
CORRIDOR
WC
CORRIDOR
N/C
STAIR
#6
ELEV.
P-1
ELEV.
P-2
ELEV.
P-3
ELEV.
S-2
ELEV.
S-3
ELEV.
P-4
ELEV.
P-5
ELEV.
S-4
ELEV.
S-1
ELEV.
S-6
ELEV.
S-9
ELEV.
S-10
ELEV.
S-11
ELEVATOR
LOBBY
SC 1A
CORRIDOR
N/W 1A
CORRIDOR
N/W
SCHEDULING
DEPOSITION
G-81
STOR
G-81A
PATIENT
WAITING AREA
CORRIDOR
EC
STAIR
#5
STAIR
#3
IT CLOSET
G-099
001-M-404
001-M-404
001-M-404
001-M-404
KEY AREA SHOWN
TRUE
NORTH
BLDG 001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
/5
/2
:5
:3
P
M
A u to d e s k D o c s
/6
A
-2
-7
V A
N Y
B ro o k ly n E
H R
M
IU
/V A
B K
M
E S
D B
.r v t
001-M-102
BLDG 001 - LVL 00G - OVERALL PLAN
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
05/05/2025
630A4-22-700EHRM INFRASTRUCTURE
UPGRADES - BROOKLYN
VA NEW YORK
800 POLY PLACE, BROOKLYN NY, 11209
1/16" = 1'-0"
BLDG 001 - LVL 00G - OVERALL PLAN
0' 8' 16' 32'
PROJECT
NORTH
SITE PLAN
J
L
K
2 3 4 5 6 7 8 9 10 13 14 15 16 17 18 19 20 21 22 23 24 251211
H
G
F
E
D
C
B
A
001-M-406
001-M-406
001-M-406
001-M-406
001-M-405
001-M-405
001-M-405
001-M-405
S.W.S.
1-201
SOCIAL WK
1-202
SOCIAL WK
1-203
SOCIAL WK
1-205
SEC TO DIR
1-206
PAT. REP.
1-207
PAT. REP
1-208
PAT. REP
1-209
ASS. DIR.
1-210
ASS. DIR.
1-211
COPY RM.
1-212
F. TOILET
1-213M. TOILET
1-214
DIR'S OFF
1-215
SEC. & WAIT.
1-216
CHF OF STF
1-218
SEC. & WAIT
1-219
COMPLIANCE
OFFICE
1-220
STAFF ASST.
1-221
SEC TO DIR
1-223
EEO. MGR.
1-224
MED. REC.
1-225
CONFER RM.
1-222A
CONFER RM
1-222B
STAIRWAY 1
1-214…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .