18-05 BID SCHEDULE PER ADDENDUM NO. 3.pdf
PDF 29 KB Posted
- Attached to
- IFB - THUNDER JUNCTION PARK - PHASE 2
- Solicitation number
- 26-299
- Issued by
- Washington County, Utah
About this file
This is a Unit Cost Base Bid Schedule prepared under Addendum No. 3 for the City of St. George's Thunder Junction Park Phase 2 construction project, located at 1851 South Dixie Drive in Tonaquint Park, Utah. The bid schedule encompasses a comprehensive range of construction services organized into four distinct bid sections: the base bid and three additive alternates. The base bid includes 63 line items covering site mobilization and demobilization, site security, clearing and grubbing, landscape and hardscape construction (including colored and stamped concrete, retaining walls, and concrete steps totaling approximately 16,000 square feet), playground surfacing and equipment installation, GFRC faux rock and snow surfacing (totaling 12,200 square feet across multiple types), the Snowy Mountain Buildings complex with shade structures, site electrical and audiovisual systems, and drainage and utility infrastructure. Additive Alternate 1 addresses parking and entry area improvements with 28 line items, Additive Alternate 2 covers Cemetery Road removal with 17 line items, and Additive Alternate 3 includes additional mist systems for the Asteroid and playground areas.
All bids must be accompanied by a bid bond equal to 5% of the total bid amount, issued by a surety company licensed in Utah and acceptable to the City of St. George. The project will require 100% payment and performance bonds upon award. Pricing is requested on a unit cost basis for each line item, with space provided for contractors to enter both unit costs and extended amounts for the base bid and each additive alternate. The City of St. George reserves the right to reject any or all proposals, waive any formality or technicality, and make an award determination based on the submitted bids. No specific response deadline, site visit schedule, or bidder's conference information is included in this bid schedule document.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST. GEORGE CITY
THUNDER JUNCTION PHASE 2
UNIT COST BASE BID SCHEDULE
ITEM
NO.
SPECIFICATION
REFERENCE
ITEM DESCRIPTION EST QTY UNIT UNIT COST AMOUNT
1 01 71 13 S Mobilization & Demobilization 1 LS $ $
2 01 78 39 S, 2.4 Project Sign & Record Documents 1 LS $ $
2.5, 01 71 13 S, 01 66 00 S Site Security & Pedestrian Control 1 LS $ $
4 01 57 00 S Temporary Controls 1 LS $ $
02 41 13 S, 4.3, 32 91 00 S
6" Clearing, Grubbing, Irrigation
Removal, & Salvage Furniture
1 LS $ $
6 02 41 13 S Existing Tree & Root Protection w/
Temporary Fencing & Watering
1 LS $ $
7 02 41 13 S Cover & Abandon Existing Skylight 3 EA $ $
8 33 05 14 S Adjust Existing Manhole to Grade 1 EA $ $
9 Manufacturer Spec. Adjust Tracks to Grade 200 LF $ $
10 32 91 00 S, 4.3 Site Grading 1 LS $ $
11 4.7 6"x12" Colored Flush Landscape Curb 470 LF $ $
12 4.7 4" Concrete Flatwork w/ Base 960 SF $ $
13 4.7 4" Colored & Stamped Concrete w/
Base
14,050 SF $ $
14 4.7 5" Reinforced Colored & Stamped
Concrete w/ Base
870 SF $ $
15 4.7 8" Reinforced Colored & Stamped
Concrete w/ Base
1,000 SF $ $
16 4.4 Landscape Rockery Wall 230 LF $ $
17 4.4 Rockery Slope 635 SF $ $
18 4.7 Concrete Retaining Wall 3,200 SF $ $
19 4.7 18" Colored Planter Seat Wall 45 LF $ $
20 4.7 18" Colored Retaining Seat Wall 60 LF $ $
21 4.7 18" Retaining Seat Wall 36 LF $ $
22 4.7 Colored Concrete Steps 350 SF $ $
23 C Series Sheets Hand Rail 380 LF $ $
24 C Series Sheets Pedestrian Rail 185 LF $ $
25 C Series Sheets Wall Hand Rail 215 LF $ $
26 C Series Sheets Pedestrian Guard Rail 310 LF $ $
27 C Series Sheets Perimeter Safety Fencing 770 LF $ $
28 C Series Sheets Perimeter Safety Single Gate 1 EA $ $
29 C Series Sheets Perimeter Safety Double Gate 1 EA $ $
30 32 18 16 S Playground Surfacing w/ Base 12,320 SF $ $
31 32 18 16 S Playground Surfacing w/ Concrete 330 SF $ $
32 32 91 00 S Soil Overexcavate 24" and Replace w/
Approved Topsoil
90 SF $ $
33 32 91 00 S 24" Utelite Root Zone Mix Material 100 SF $ $
34 11 68 13 S Playground Equipment & Shade Sails -
Install Only
1 LS $ $
35 Manufacturer Spec. Swinging Bench - Install Only 4 EA $ $
36 Manufacturer Spec.
28' Hexagon Shade Structure - Install
Only
2 EA $ $
37 Manufacturer Spec. 8'x12' Overhang Pavilion - Install Only 2 EA $ $
38 03 49 00 S Asteroid Play Area 1 LS $ $
39 03 49 00 S Type A GFRC Faux Rock & Snow
Surfacing
1,500 SF $ $
40 03 49 00 S Type B GFRC Faux Rock & Snow
Surfacing
3,850 SF $ $
41 03 49 00 S Type C GFRC Faux Rock & Snow
Surfacing
4,300 SF $ $
42 03 49 00 S Type D GFRC Faux Rock & Snow
Surfacing
2,550 SF $ $
43 A & S Series Sheets Snowy Mountain Buildings 1 LS $ $
44 A & S Series Sheets Roof Shade Canopy - Snowy
Mountain Building
1 LS $ $
45 Sheet E003 Site Electrical Connection 1 LS $ $
46 27 41 00 S Site Audiovisual 1 LS $ $
47 27 41 00 S Volcano Fog Pumping System
Replacement
1 LS $ $
48 Sheet E003 Site Lighting 1 LS $ $
49 Sheet E003 Area Lighting Pole 9 EA $ $
50 4.5 12" Nyloplast Drain Basin with
Concrete Collar & Pedestrian Grate
4 EA $ $
51 4.5 15" Nyloplast Drain Basin with
Concrete Collar & Pedestrian Grate
1 EA $ $
52 4.5 24" Nyloplast Drain Basin with
Concrete Collar & Pedestrian Grate
3 EA $ $
53 4.5 6" Storm Drain Corrugated HDPE
Pipe
85 LF $ $
54 4.5 12" Storm Drain Corrugated HDPE
Pipe
334 LF $ $
55 4.5 18" Storm Drain Corrugated HDPE
Pipe
67 LF $ $
56 4.5 Storm Drain Connection to Existing
Inlet
1 EA $ $
57 4.5 6" Perforated HDPE Pipe Subdrain 4 EA $ $
58 4.5 4" PVC Sewer Lateral & Connection w/ Cleanout
2 EA $ $
59 4.5 1 1/4" Water Service Lateral &
Connection
130 LF $ $
60 4.5 Solid Manhole Lid w/ Rain Pan 2 EA $ $
61 Sheet P701 Water Feature Tank and Plumbing 1 LS $ $
62 13 96 50 S Building Mist System 1 LS $ $
63 4.5 4" Irrigation Sleeves 1,200 LF $ $
TOTAL AMOUNT $
UNIT COST ADDITIVE ALTERNATE 1 BID SCHEDULE - PARKING AND ENTRY AREA
ITEM
NO.
SPECIFICATION
REFERENCE
ITEM DESCRIPTION EST QTY UNIT UNIT COST AMOUNT
02 41 13 S, 4.3, 32 91 00 S
6" Clearing, Grubbing, Irrigation
Removal, & Salvage Furniture
1 LS $ $
65 02 41 14 S Remove Curb & Gutter 235 LF $ $
66 02 41 14 S Remove Concrete Flatwork 4,650 SF $ $
67 02 41 14 S Remove Asphalt Pavement 3,300 SF $ $
68 02 41 13 S Existing Tree & Root Protection w/
Temporary Fencing & Watering
1 LS $ $
69 02 41 13 S Relocate Stegosaurus Bike Rack 1 EA $ $
70 Sheet E003 Relocate Light Pole 1 EA $ $
71 32 91 00 S, 4.3 Site Grading 1 LS $ $
72 4.7 Curb & Gutter (Type HB30-7)
(Modified - Release)
215 LF $ $
73 4.7 ADA Pedestrain Access Ramp 600 SF $ $
74 4.6 Asphalt Pavement 825 SF $ $
75 4.7 4" Concrete Flatwork w/ Base 5,770 SF $ $
76 4.4 4' Max Boulder Rockery Wall 50 LF $ $
77 C Series Sheets Perimeter Safety Fencing 190 LF $ $
78 C Series Sheets Perimeter Safety Single Gate 1 EA $ $
79 C Series Sheets Perimeter Safety Double Gate 1 EA $ $
80 S Series Sheets Container Entrance Building
Foundation
1 LS $ $
81 Sheet E003 Container Building Electrical
Connection
1 LS $ $
82 Sheet E003 Relocate Underground Electric Line 1 LS $ $
83 4.5 Variable Sloped Trench Drain w/
Metal Grate
60 LF $ $
84 4.5 6" Storm Drain Corrugated HDPE
Pipe
40 LF $ $
85 4.5 Inserta Tee Riser Connection to
Existing 18" Pipe
1 EA $ $
86 4.5 4" PVC Sewer Lateral & Connection w/ Cleanout
1 EA $ $
87 4.5 3/4" Water Meter & Connection 1 EA $ $
88 4.5 1" Water Service 75 LF $ $
89 4.5 2" Communication Sleeves 40 LF $ $
90 4.5 4" Irrigation Sleeves 330 LF $ $
91 5.3 Pavement Markings 1 LS $ $
UNIT COST ADDITIVE ALTERNATE 2 BID SCHEDULE - CEMETERY ROAD REMOVAL
NO.
SPECIFICATION
REFERENCE
ITEM DESCRIPTION EST QTY UNIT UNIT COST AMOUNT
02 41 13 S, 4.3, 32 91 00 S
6" Clearing, Grubbing, Irrigation
Removal, & Salvage Furniture
1 LS $ $
93 02 41 14 S Remove Curb & Gutter and Base 435 LF $ $
94 02 41 14 S Remove Concrete Flatwork and Base 355 SF $ $
95 02 41 14 S Remove Asphalt Pavement and Base 5,250 SF $ $
96 02 41 13 S Existing Tree & Root Protection w/
Temporary Fencing & Watering
1 LS $ $
97 02 41 13 S Remove Stop Sign, Post and Base 2 EA $ $
98 33 05 14 S Adjust Irrigation Valve and Collar to
Grade
4 EA $ $
99 33 05 14 S Adjust Existing Manhole to Grade 1 EA $ $
100 33 05 14 S Relocate Irrigation Valve Box 1 EA $ $
101 32 91 00 S, 4.3 Site Grading 1 LS $ $
102 4.7 Curb & Gutter (Type HB30-7) 100 LF $ $
103 4.7 Curb & Gutter (RU 30) 86 LF $ $
104 4.7 ADA Pedestrain Access Ramp 175 SF $ $
105 4.6 Asphalt Pavement w/ Base 440 SF $ $
106 4.7 4" Concrete Flatwork w/ Base 2,140 SF $ $
107 4.5 4" Irrigation Sleeves 90 LF $ $
108 5.3 Pavement Markings 1 LS $ $
UNIT COST ADDITIVE ALTERNATE 3 BID SCHEDULE - ADDITIONAL MIST SYSTEMS
NO.
SPECIFICATION
REFERENCE
ITEM DESCRIPTION EST QTY UNIT UNIT COST AMOUNT
109 13 96 50 S Asteriod Mist System 1 LS $ $
110 13 96 50 S Playground Mist Pole System 1 LS $ $