14-01 INFORMATION FOR BIDDERS.pdf

PDF 199 KB Posted

Attached to
IFB - THUNDER JUNCTION PARK - PHASE 2
Solicitation number
26-299
Issued by
Washington County, Utah

About this file

Summary

This is an Information for Bidders document issued by the City of St. George, Utah, for the construction of Thunder Junction Park Phase 2, located at 1851 South Dixie Drive. Bids are due by September 10, 2026, at 2 PM MDT via sgcity-utah.bonfirehub.com, with a bid opening scheduled for August 12, 2026, at 4 PM MDT. A non-mandatory pre-bid meeting is scheduled for August 18, 2026, at 9 AM MDT at the project site. Questions from bidders must be submitted by September 3, 2026, at 2 PM MDT. The project encompasses park construction work including clearing and grubbing, site grading, drainage, utilities, concrete work, fencing, pavilions, shade structures, playground equipment, and faux rock installation. Construction must commence no later than October 13, 2026, and be completed by June 14, 2027. Bidders must submit a detailed construction schedule prepared using spreadsheet or scheduling software showing all main work categories and demonstrate their ability to meet these timeline commitments.

All bids must be accompanied by a bid bond equal to 5 percent of the total bid amount, payable to the City of St. George and issued by a surety company licensed in Utah. The successful bidder will be required to provide performance and payment bonds, each in the amount of 100 percent of the contract price. The city will award the contract to the lowest responsible bidder as determined by established city ordinances, and the selected bidder must execute the agreement and provide all required bonds, insurance certificates, and proof of legal work status within ten calendar days of notification. Bidders must possess the proper contractor's license prior to submission and are responsible for verifying their qualifications, examining the project site, and reviewing all contract documents and addenda.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Information for Bidders Page 1 of 4 Thunder Junction Park Phase 2, 26-299

INFORMATION FOR BIDDERS

The City of St. George, hereinafter called “CITY,” shall receive BIDS for the following:

Project: Thunder Junction Park Phase 2, 26-299

Project Address: 1851 South Dixie Drive, St. George, UT 84770

1. BID TIMELINE:

BID OPENING DATE: August 12, 2026, 4 PM MDT

PRE-BID MEETING DATE, TIME & LOCATION: August 18, 2026, 9 AM MDT

1851 South Dixie Drive, St. George, UT 84770 (Thunder Junction Park Phase 2 Area)

MANDATORY: YES X NO

Failure to attend a mandatory Pre-Bid meeting will result in automatic disqualification

QUESTIONS DUE DATE: September 3, 2026, 2 PM MDT

SUBMISSION CLOSE DATE: September 10, 2026, 2 PM MDT

2. All BIDS must be submitted via sgcity-utah.bonfirehub.com. Any BID may be edited or withdrawn prior to the above scheduled time for the opening of BIDS. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the CITY and the BIDDER.

3. BIDS shall be based on the BID SCHEDULE UNIT PRICES and shall include all work called for by the plans and specifications and bidding documents. In the case of a discrepancy in the extension of a line item, the unit price shall govern. In the case of a difference between the amount written in words and the amount written in figures, the written words shall govern. BIDDERS must satisfy themselves of the accuracy of the estimated quantities, where given, by examination of the site and a review of the drawings and specifications including ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning the quantities of WORK or of the nature of the WORK to be done. UNIT PRICES as called for in the BID Schedule shall be submitted to cover all additions and deductions in the scope of the WORK. CITY has the right to reduce or remove items from the project.

https://sgcity-utah.bonfirehub.com/

Information for Bidders Page 2 of 4

4. Bid Schedules are included in the Requested Information for a Base Bid and any alternates. It is the CITY'S intent to award this contract based upon the Base Bid. The CITY, in consultation with the ENGINEER, shall add bid items at the City’s sole discretion. The low bid shall be considered to be the bid which has the lowest base bid items selected by the CITY for inclusion in the final Agreement.

5. The CONSTRUCTION SCHEDULE is particularly important to the CITY. The BID shall include a construction schedule prepared using spreadsheet or scheduling software, showing all main work categories, including at least clearing and grubbing, removals, earthwork, site grading, drainage, utilities, building construction, concrete work, fencing, pavilions, shade structures, playground, and faux rock installation.

6. It is the CITY'S intention to commence construction no later than October 13, 2026 and to complete the project no later than June 14, 2027 . BIDDER'S must be able to commit to these dates if submitting a Bid.

7. The CITY shall provide to BIDDERS prior to BIDDING, all information which is pertinent to, and delineates and describes, the land owned, and rights-of-way acquired or to be acquired.

CONTRACT DOCUMENTS INCLUDING BONDS:

1. The CONTRACT DOCUMENTS contain the provisions required for the construction of the project. Information obtained from an officer, agent, or employee of the CITY or any other person shall not affect the risks or obligations assumed by the CONTRACTOR or relieve him from fulfilling any of the conditions of the contract.

2. Each BID must be accompanied by a BID bond payable to the CITY for five percent of the total amount of the BID. As soon as the BID prices have been compared, the CITY will return the BONDS of all except the three lowest responsible BIDDERS. The BID BOND of the successful BIDDER will be retained until the payment BOND and performance BOND have been executed and approved and the Notice to Proceed has been issued, after which the BID BOND will be returned. A certified check may be used in lieu of a BID BOND.

3. A performance BOND and a payment BOND, each in the amount of 100 percent of the CONTRACT PRICE, with a corporate surety approved by the CITY, will be required for the faithful performance of the contract.

4. Attorneys-in-fact who sign BID BONDS, payment BONDS or performance BONDS must file with each BOND a certified copy of their power of attorney with the effective date.

Information for Bidders Page 3 of 4

AWARDING CONTRACT:

1. The CITY may waive any informalities, minor defects, or reject any and all BIDS.

2. The CITY may make such investigations as it deems necessary to determine the ability of the BIDDER to perform the WORK, and the BIDDER shall furnish to the CITY all such information and data for this purpose as the CITY may request. The CITY reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the CITY that such BIDDER is properly qualified to carry out the obligations of the Agreement and to complete the Agreement and to complete the WORK contemplated therein.

3. The BIDDER, by evidence of the submission of the BID, acknowledges that BIDDER and BIDDER’S subcontractors meet or exceed the specified requirements for related project experience and insurances, and that should the CITY discover at any time evidence to the contrary, BIDDER agrees to withdraw BIDDER’S BID and to allow the CITY to award the CONTRACT to the next lowest responsible BIDDER. BIDDER must have the proper contractor’s license for this type of project prior to bidding on the project. It is solely BIDDER’S responsibility to comply with all applicable federal, state, and local laws, regulations, and ordinances that affect this project.

4. Award will be made to the lowest responsible BIDDER as determined by the City using the criteria contained in City ordinances governing the award of contracts. The BID shall be awarded on the condition that the BIDDER provides all required documents prior to the NOTICE TO PROCEED being issued. Failure to provide the required documents shall be considered a default on the Contract and may result in the CITY awarding the Contract to another BIDDER in addition to other legal remedies.

5. The party to whom the contract is awarded will be required to execute the Agreement and obtain the performance BOND, the payment BOND, the Certificate of Legal Work Status for the BIDDER and all Subcontractors and the certificate of insurance within ten (10) calendar days from the date when NOTICE OF AWARD is delivered to the BIDDER. The NOTICE OF AWARD shall be accompanied by the necessary Agreement and BOND forms.

The bid shall be awarded on the condition that the BIDDER provides all required documents prior to the NOTICE TO PROCEED being issued. Failure to provide the required documents shall be considered a default on the Contract and may result in the City Awarding the CONTRACT to another BIDDER in addition to other legal remedies.

6. In case of failure of the BIDDER to execute the Agreement or is found to be ineligible or becomes ineligible to meet all the requirements for the project, the CITY may at its option consider the BIDDER in default, in which case the BID BOND accompanying the proposal shall become the property of the CITY.

7. Upon receipt of acceptable performance BOND, payment BOND, insurance certificates and Agreement signed by the party to whom the Agreement was awarded, the CITY shall sign the Agreement and return to such party an executed duplicate of the Agreement. Should the CITY not execute the Agreement, the BIDDER may by WRITTEN NOTICE withdraw the

Information for Bidders Page 4 of 4

BIDDER’S signed Agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the CITY.

8. The NOTICE TO PROCEED shall be issued immediately upon the following occurring:

providing the executed Agreement to the CITY, providing the performance and payment BONDS to City, and providing the insurance certificates to City. Should there be reasons why the City wants to delay and the NOTICE TO PROCEED cannot be issued within such period the time may be extended by mutual agreement between the CITY and CONTRACTOR. If the NOTICE TO PROCEED has not been issued within the ten (10) day period or within the period mutually agreed upon, the CONTRACTOR may terminate the Agreement without further liability on the part of either party.

9. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout.

10. Each BIDDER is responsible for inspecting the site and for reading and being thoroughly familiar with the CONTRACT DOCUMENTS. Failure or omission of any BIDDER to do any of the foregoing shall in no way relieve any BIDDER from any obligation in respect to his BID.

File details come from the government source that posted it. Updated .