- INTERPRETIVE EXHIBIT FABRICATION & INSTALLATION
- Solicitation number
- 140R3022R0014
About this file
This document package includes construction drawings and specifications for interpretive exhibits at the Hoover Dam Visitor Center, as well as details of a related federal contract opportunity. The drawings depict pre-construction diversion tunnel exhibits including graphic panels, artifact cases, faux rockwork, and an interactive dynamite plunger. When pressed, the plunger will trigger explosion effects in an adjacent immersive exhibit. Specifications call for millwork, metal fabrication, and suspended area headers.
The federal contract opportunity is for interpretive exhibit fabrication and installation services. The solicitation was issued by the Department of the Interior Bureau of Reclamation for work at the Hoover Dam Visitor Center. Responses are due by the date specified in the solicitation. The successful offeror will be selected and awarded a firm-fixed-price contract to produce and install the exhibits depicted in the provided drawings, in accordance with the specifications.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X4.120
4.1.2 PRE-CONSTRUCTION /
DIVERSION TUNNELS - DETAIL
241 W. Charleston Blvd., Suite 107 Las Vegas, NV 89102 702.263.7111
LGAarchitecture.com
A
LW
AY
S
T H
IN
K
S A
FE
TY
C
AD
F
IL
EN
AM
E
C
AD
S
YS
TE
M
D
C
B
A
D
C
B
A
U .S
. D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
BU
R
EA
U O
F R
EC
LA
M
AT
IO
N
Managing Water in the West
H O
O V
E R
D A
M V
IS
IT
O R
C E
N
TE
R
E X
H
IB
IT
L
E V
E L
P R
O
JE
C T
OFFICE
AR
C
H
IC
AD
BI
M cl ou d:
b im .lg ai nc
.c om
BI
M cl ou d
Ba si c fo r A R
C H
IC
AD
5/
H oo ve r D am
V is ito r C en te r E xh ib it
Le ve l
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
All dimensions and on-site conditions are to be verified by the Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 09/06/22
M. BELANGER
T. STOTT
043820001PROJECT NO.:
(consultant)
(stamp)
B U
R E
A U
O F
R E
C
LA
M
AT
IO
N
B O
U
LD
E R
C
IT
Y N
V
All Drawings, Specifications and Copies thereof furnished by the Architect are to be used only with respect to this Project and are not to be used on any other Project with the exception of one contract set for each party to the building contract. Such Documents are to be returned or suitably accounted for to the Architect on request at the completion of the Project. Any use or reproduction of this Drawing in whole or in part by any means whatsoever is strictly prohibited except with the specific written consent of LG Architects, Inc., a Nevada Corporation. Copyright © LG Architects, Inc. all rights reserved. Submission or distribution to meet official regulatory requirements or for other purposes in connection with the project in not to be construed as publication in derogation of the Architects common law Copyrights or other reserved rights.
RECLAMATION
302 – 1930 Pandora Street Vancouver, BC V5L 0C7
604-669-7044
ALDRICHPEARS.com
1100 – 99 Wyse Road Dartmouth, NS B3A 4S5
902-700-9140
M. BELANGER
6" AFF
0" AFF
DN
SLOPE4.75%4.1.2 PRE-CONSTRUCTION / DIVERSION TUNNELS - PLAN
Scale: 3/8" = 1'-0"1
39'-10"
11'-2"
2'- 9"
5' -9
3'-2"
12'-4"
3' -8
5'-5"
4.1.0-1
4.1.2-12
4.1.1
4.1.6 3.1.4
3.1.1
4.1.5
4.1.2 PRE-CONSTRUCTION / DIVERSION TUNNELS - ELEVATION
Scale: 3/8" = 1'-0"2
4.1.2-5
4.1.2-2
4.1.2-1
4.1.2-4
4.1.2-3
4.1.2-8
4.1.2-6 4.1.2-7
4.1.0-1
4.1.2-94.1.2-10
'-0
2' -0
1' -6
5' -5
2' -5
1'-11"
10"
50' OD outside edge
3.1.1
4.1.5
3' -7
8' -5
7'-9"
'-0
MuralCeiling 1" thick millwork describing 50' OD of diversion tunnel
Passageway exit
Joe McGee platform Dynamite and case replica Plunger interactiveFaux rock base
Typical graphic panel Typical graphic panel
Typical graphic panel
Suspended area header
Tactile images Doorway
NOTE: The dynamite plunger, mechanical interactive is connected to exhibit 3.1.2.
When the plunger is depressed an explosion effect will be seen, heard and felt in 3.1.2 Passageway Immersive AV.
4.1.2-A1 ARTIFACT CASE - DETAIL
Scale: 1 1/2" = 1'-0"4
2'-2"
1' -8
6" 1'
-0
4.1.2 PRE-CONSTRUCTION / DIVERSION TUNNELS - PERSPECTIVE
Scale: NTS3
FRONT
SECTION
PLAN
4.1.2-A1
4.1.6-A1
4.1.2-A1
Graphic panel
Dynamite case replica
Powder can prop
Mural
Millwork, metallic brass
Suspended area header
4.1.1
Faux rockwork over concrete ramp
4.1.5
Plunger interactive
Blasting cap
Metal frame with airtight gasket. Fastened in place with security screws.
Mounting bracket
Desiccant chamber
Millwork
Artifact
Powder can
Wood crate piece
GL-01
Dynamite replica
Artifact case
FF-01
WD-01
REV 01
| X4.120-4.1.2 Pre-Construction/Diversion Tunnels |
| 1/X4.22 |
| 3/X4.20 |
| Section-1 |
| Viewport-19 |
| Viewport-20 |
| Viewport-21 |
File details come from the government source that posted it. Updated .