Attachment_36_Amendment_No__0005_0005.pdf

PDF 1 MB Posted

Attached to
FKC Middle Reach Capacity Correction Project Phase Federal contract opportunity
Solicitation number
140R2020R0009
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document contains plans and specifications for the Friant-Kern Canal Middle Reach Capacity Correction Project Phase 1. The project involves constructing a concrete-lined parallel canal to increase capacity, including segments from Stations 4774+21 to 6090+00. Key details include concrete lining the existing canal from Stations 4774+21 to 5166+36 and raising the lining from Stations 6181+54 to 6438+78. From Stations 5171+28 to 6090+00, a new concrete bypass canal will be constructed with dimensions ranging from 24 to 40 feet bottom width and 1.25:1 to 2:1 side slopes. The project is solicited under Solicitation Number 140R2020R0009 from the Department of the Interior Bureau of Reclamation.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_8_Amendment__0006_0006.pdf PDF
Attachment_3_Amendment_0006_0006.pdf PDF
Attachment_44_Amendment_0005_0005.pdf PDF
Attachment_41_Amendment_0005_0005.pdf PDF
Attachment_40_Amendment_No_0005_0005.pdf PDF
Attachment_30_Amendment_No__0005_0005.pdf PDF
Attachment_27_Amendment_No__0005_0005.pdf PDF
Attachment_17_Amendment_No__0005_0005.pdf PDF
Attachment_15_Amendment_No__0005_0005.pdf PDF
Attachment_9_Amendment_No_0005_0005.pdf PDF
Attachment_12_Amendment_No__0005_0005.pdf PDF
Attachment_1_Amendment_No_0005_0005.pdf PDF
Attachment_29_Amendment_No_0004_0004.pdf PDF
Attachment_28_Amendment_No__0004_0004.pdf PDF
Attachment_23_Amendment_No__0004_0004.pdf PDF
Attachment_22_Amendment_No__0004_0004.pdf PDF
Attachment_20_Amendment_No__0004_0004.pdf PDF
Attachment_16_Amendment_No__0004_0004.pdf PDF
Attachment_13_Amendment_No__0004_0004.pdf PDF
Attachment_12_Amendment_No_0004_0004.pdf PDF
Attachment_6_Amendment_No_0004_0004.pdf PDF
Attachment_5_Amendment_No_0004_0004.pdf PDF
Attachment_25_Amendment_No__0004_0004.pdf PDF
Attachment_21_Amendment_No__0004_0004.pdf PDF
Attachment_19_Amendment_No__0004_0004.pdf PDF
Attachment_15_Amendment_No__0004_0004.pdf PDF
Attachment_7_Amendment_No_0004_0004.pdf PDF
Drawing_GC-15_Attachment_20_Amendment_No__0003_0003.pdf PDF
Drawing_G-13_Attachment_17__Amendment_No__0003_0003.pdf PDF
Drawing_C-506_Attachment_15_Amendment_No__0003_0003.pdf PDF
Drawing_C-215_Attachment_12_Amendment_No__0003_0003.pdf PDF
Drawing_C-214_Attachment_11_Amendment_No__0003_0003.pdf PDF
Drawing_C-204_Attachment_7_Amendment_No__0003_0003.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_1_Amendment_No_0003_0003.pdf PDF
FKC_31_30_00-12_Att_7_Amendment_0002_0002.pdf PDF
FKC_01_14_00-12_Att_6__Amendment_0002_0002.pdf PDF
GC-10-REV-1_Att_5_Amendment_No__0002_0002.pdf PDF
Attachment_No__2_-_FKC_Pre-Proposal_Presentation_Sign_in_Sheet_0002.pdf PDF
Attachment 13 - Drawing Part 1 of 5.pdf PDF
Attachment 9 - Experience and Management.pdf PDF
Attachment 4 - Offeror Responsibility Information.pdf PDF
Attachment 2 - Subcontracting Plan.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARALLEL CANAL TYPICAL SECTION

SEGMENTS 2, 3, AND 4A

SCALE: NOT TO SCALE

SHEET KEYNOTES

A. COMPACTED EMBANKMENT PER SPECIFICATION SECTION 31 30 00.

B. EXISTING CONCRETE LINER @ 1

TO 1. SAW CUT AND REMOVE LINING AT ELEVATION OF

ORIGINAL GROUND TO ACCESS BANK MATERIAL AFTER PARALLEL CANAL IS OPERATIONAL

AND EXISTING CANAL IS DECOMMISSIONED, REFER TO DWG CD-1 FOR ADDITIONAL

REQUIREMENTS.

C. INSIDE BANK ZONE: IF EXISTING BANK MATERIAL IS USED AS A BORROW SOURCE, A

TEMPORARY BENCH SHALL REMAIN DURING OPERATION OF EXISTING CANAL. MATERIAL

TO BE REMOVED TO ESTIMATED ORIGINAL GROUND ELEVATION AFTER PARALLEL CANAL

BECOMES OPERATIONAL AND EXISTING CANAL IS DECOMMISIONED.

D. TRAPEZOIDAL DITCH FOR DRAINAGE EAST SIDE OF CANAL ONLY.

E. OUTSIDE BANK ZONE 2: CONTRACTOR MAY USE EXISTING CANAL BANK MATERIAL AS A

BORROW SOURCE. IF USED, EXCAVATE EXISTING CANAL EMBANKMENT TO ORIGINAL

GROUND. SEE SPECIFICATION SECTION 01 14 00 CONSTRUCTION CONSTRAINTS AND

SEQUENCING FOR LIMITS AND TIMING RELATED TO USE OF CANAL BANK MATERIAL FOR

CONSTRUCTION OF NEW CANAL BANKS.

F. 4" GRAVEL BASE WITH SEAL COAT CANAL RIGHT BANK UNLESS NOTED OTHERWISE PER

SPECIFICATION SECTION 31 30 00.

G. EXISTING GRADE SHOWN REPRESENTS GROUND SURFACE ELEVATION SURVEYED IN 2018.

PREPARE EMBANKMENT SUBGRADE PER SPECIFICATION SECTION 31 30 00.

H. PLANNED SUBSIDENCE BANK TRANSITIONS CONSIST OF VERTICAL TRANSITIONS IN THE

EMBANKMENT HEIGHT, SEE PLAN AND PROFILE DRAWINGS FOR TRANSITION LOCATIONS.

I. OUTSIDE BANK ZONE 1: REGARDLESS OF BORROW SOURCE, THE CONTRACTOR SHALL

EXCAVATE AND RECOMPACT ALL MATERIAL ABOVE THE ORIGINAL GRADE WITHIN THE

FOOTPRINT OF THE CONSTRUCTED CANAL EMBANKMENT.

J. THE CONTRACTOR SHALL REPLACE CANAL O&M PAVING WHERE REMOVED FOR USE OF

BANK MATERIAL, REFER TO DWG GC-15 FOR ADDITIONAL REQUIREMENTS. REPLACEMENT

ROAD SHALL BE 12-FT WIDE WITH 4" GRAVEL BASE AND SEAL COAT PER SPECIFICATION

SECTION 31 30 00.

K. CONTRACTOR SHALL REPLACE DRIVEABLE EARTH SURFACE WHERE REMOVED FOR USE

OF BANK MATERIAL. REFER TO DWG GC-15 FOR ADDITIONAL REQUIREMENTS.

L. IN SOME LOCATIONS, THERE IS AN OVERLAP BETWEEN THE AREAS DESCRIBED IN

KEYNOTE I AND KEYNOTE C. IT IS ACCEPTABLE TO LEAVE THE EXISTING MATERIAL IN

PLACE, AND THE COMPACTED EMBANKMENT CAN BE PLACED AGAINST THE EXISTING

EMBANKMENT IN THESE AREAS. PLACEMENT SHALL BE IN ACCORDANCE WITH SECTION 31

30 00 EARTHWORK, PARAGRAPH 3.2.C BENCHING. THE CONTRACTOR SHALL PROVIDE

SURVEY STAKES AT THE TOE OF THE SLOPE FOR THE NEW EMBANKMENT CATCH POINT

PRIOR TO BEGINNING WORK TO ALLOW THE COR TO IDENTIFY THE AMOUNT OF THE

OVERLAP BETWEEN EXISTING AND NEW EMBANKMENTS AND TO ENSURE OVERLAP AREAS

ARE BENCHED PROPERLY.

TABLE I - CANAL DIMENSIONS AND HYDRAULIC PROPERTIES

STATION LENGTH AREA (A) VELOCITY (V) MAX FLOW

(Qm)

MANNING'S

COEFFICIEN

T (n) SLOPE (s) BOTTOM

WIDTH (b)

MAX

FLOW

DEPTH

(dm)

LINING

HEIGHT

(H)

SIDE SLOPE

(s:s)

HYDRAULIC

RADIUS (r)

WETTED

PERIMETER

(wp)

TOP WIDTH

(tw)

SEGMENT SURFACE IMPROVEMENT BEGIN END (FT) (SQ FT) (FT/S) (CFS) - (FT/FT) (FT) (FT) (FT) (FT) (FT) (FT) (FT)

5TH AVE CHECK 4774+21

1* LINING RAISE 4774+21 5166+36 39,215 976.39 4.61 4500 0.014 0.000082 36 17.04 17.3 1.25:1 10.78 90.55 78.60

TULE RIVER CHECK AND SIPHON 5166+36 5171+35 499 4000

2 CONCRETE BYPASS CANAL 5171+28 5284+00 11,272 1121.63 3.57 4000 0.016 0.00006 24 20.25 22.37 1.5:1 10.16 87.56 76.89

2 CONCRETE BYPASS CANAL 5284+00 5294+00 1,000 1121.63 3.57 4000 0.016 0.00006 24 20.25 22.37 1.5:1 10.16 87.56 76.89

2 CONCRETE BYPASS CANAL 5294+00 5492+00 19,800 1121.63 3.57 4000 0.016 0.00006 24 20.25 23.37 1.5:1 10.16 87.56 76.89

2 CONCRETE BYPASS CANAL 5492+00 5502+00 1,000 1121.63 3.57 4000 0.016 0.00006 24 20.25 23.37 1.5:1 10.16 87.56 76.89

2 CONCRETE BYPASS CANAL 5502+00 5537+65 3,565 1121.63 3.57 4000 0.016 0.00006 24 20.25 26.37 1.5:1 10.16 87.56 76.89

DEER CREEK CHECK AND SIPHON 5537+65 5541+62 397 4000

3 CONCRETE BYPASS CANAL 5541+62 5611+00 6,938 1121.63 3.57 4000 0.016 0.00006 24 20.25 26.37 1.5:1 10.16 87.56 76.89

3 CONCRETE BYPASS CANAL 5611+00 5621+00 1,000 1121.63 3.57 4000 0.016 0.00006 24 20.25 25.37 1.5:1 10.16 87.56 76.89

3 CONCRETE BYPASS CANAL 5621+00 5875+00 25,400 1121.63 3.57 4000 0.016 0.00006 24 20.25 25.37 1.5:1 10.16 87.56 76.89

3 CONCRETE BYPASS CANAL 5875+00 5885+00 1,000 1121.63 3.57 4000 0.016 0.00006 24 20.25 24.37 1.5:1 10.16 87.56 76.89

3 CONCRETE BYPASS CANAL 5885+00 6024+00 13,900 1121.63 3.57 4000 0.016 0.00006 24 20.25 24.37 1.5:1 10.16 87.56 76.89

3 CONCRETE BYPASS CANAL 6024+00 6034+00 1,000 1121.63 3.57 4000 0.016 0.00006 24 20.25 23.37 1.5:1 10.16 87.56 76.89

3 CONCRETE BYPASS CANAL 6034+00 6082+97 4,897 1121.63 3.57 4000 0.016 0.00006 24 20.25 23.37 1.5:1 10.16 87.56 76.89

WHITE RIVER CHECK AND SIPHON 6082+97 6086+14 318 3500

4A CONCRETE BYPASS CANAL 6086+14 6090+00 386 776.98 3.22 3500 0.016 0.00006 24 18.99 22.07 1.5:1 9.46 82.14 72.37

4A CONCRETE BYPASS CANAL 6090+00 6100+00 1,000 776.98 3.22 3500 0.016 0.00006 24 18.99 21.07 1.5:1 9.46 82.14 72.37

4A CONCRETE BYPASS CANAL 6100+00 6181+54 8,154 776.98 3.22 3500 0.016 0.00006 24 18.99 21.07 1.5:1 9.46 82.14 72.37

4B* CONCRETE LINING RAISE 6181+54 6438+78 25,724 888.72 3.94 3502 0.014 0.00006 30 17.24 17.5 1.25:1 10.43 85.19 73.10

4C* EARTH NONE 6438+78 6530+61 9,183 1207.73 2.90 3502 0.020 0.000055 40 17.22 NA 2:01 11.02 117.01 108.8

WOOLLOMES CHECK 6530+92

* PROPERTIES SHOWN ARE FROM ORIGINAL CANAL DESIGN

EXISTING GRADE

GC-8

TYPICAL CANAL

SECTIONS - 2

C. RIPPLER. RUCKERW. WEBER

Project No.:

Scale:

Revision:

Drawing No.

Title Dsgn. Chkd. YYYY.MM.DDDwn.

Th e

C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns

. D O

N O

T s ca le th e dr aw in g

- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay

Th e

C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec

. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.

File Name: FKC_GC-08

ORIGINAL SHEET - ANSI D

c:

\u se rs\ rru ck er \d oc um en ts\ pr oj ec ts\ fri an t w at er a ut ho rit y\ dr aw in gs

\c ivi l\ w or kin g ca d\ fk c_ gc

-0

.0 6.

:2 7:

P

M

Te l:

w w w .st an te c.

co m

St an te c

C S tre et

S ui te

Sa cr am en to , C

A

6.

4.

A

B

C

D

1 2 3 4 5

FR

IA

NT

-K

ER

N C

AN

AL

M

ID

DL

E

RE

AC

H

C

AP

AC

ITY

C

O

RR

EC

TIO

N

PR

O

JE

C T

PH

AS

E

Li nd sa y, C

A

YY

YY

.M

M .D

D Re vis io n By

Ap pd

Permit/Seal

Permit/Seal

YY

YY

.M M

.D D

Ac ce pt ed

: S co tt W ol fe rt

2021.02.05

184031016

.1 2.

Sheet: of 203 b

H d m

S = 0.035

A

O & M ROAD

20' TYP

ESTIMATED ORIGINAL GRADE

(PRIOR TO EXISTING CANAL CONSTRUCTION)

VARIES

SEE PLAN AND PROFILE DRAWINGS

C16 TO C-56

A

B

20.0'

MIN

D

LONGITUDINAL AND TRANSVERSE

JOINTS AT 14 FT OC

3.5" THICK CONCRETE LINER

E

E

B

GC-9

VARIES

SEE PLAN AND PROFILE DRAWINGS

C-16 TP C-56

F

LIMITS

OF

WORK

G

A

FRIANT-KERN

CANAL

C

L

EXISTING

CANAL

C

L

14.0'

MIN

C

VARIES

EXISTING

R/W

H

EAST BANK TOE DRAINAGE DITCH

SCALE: NOT TO SCALE

B

2.00'

COMPACTED EMBANKMENT

1.00'

B

BARE EARTH DRAINAGE DITCH

I

J

14.0'

MIN

C

K

B

2.5' BANK FREEBOARD

AM

EN

DM

EN

T #

RR

M C

.06 .17

L

Attachment 36 Amendment No. 0005

AutoCAD SHX Text C77436

AutoCAD SHX Text C66888

Sheets and Views
GC-08

File details come from the government source that posted it. Updated .