Attachment_5_Amendment_No_0005_0005.pdf

PDF 653 KB Posted

Attached to
FKC Middle Reach Capacity Correction Project Phase Federal contract opportunity
Solicitation number
140R2020R0009
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document outlines demolition and removal requirements for a federal construction project. The solicitation is for the FKC Middle Reach Capacity Correction Project Phase 1 being conducted by the Department of the Interior Bureau of Reclamation. Work includes demolishing and disposing of existing roadway paving, irrigation water reservoir lining and perimeter fencing, buried irrigation pipelines and other utilities, small concrete irrigation structures and appurtenances, and agricultural storage barns located on the contractor staging area. Contract drawings provide further details on requirement limits and locations of existing infrastructure and facilities.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_10_Amendment_No_0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_2_Amendment_No_0005_0005.pdf PDF
Attachment_25_Amendment_No__0004_0004.pdf PDF
Attachment_21_Amendment_No__0004_0004.pdf PDF
Attachment_19_Amendment_No__0004_0004.pdf PDF
Attachment_15_Amendment_No__0004_0004.pdf PDF
Attachment_7_Amendment_No_0004_0004.pdf PDF
Attachment_14_Amendment_No__0004_0004.pdf PDF
Attachment_29_Amendment_No_0004_0004.pdf PDF
Attachment_28_Amendment_No__0004_0004.pdf PDF
Attachment_23_Amendment_No__0004_0004.pdf PDF
Attachment_22_Amendment_No__0004_0004.pdf PDF
Attachment_20_Amendment_No__0004_0004.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_1_Amendment_No_0003_0003.pdf PDF
Drawing_GC-15_Attachment_20_Amendment_No__0003_0003.pdf PDF
Drawing_G-13_Attachment_17__Amendment_No__0003_0003.pdf PDF
Drawing_C-506_Attachment_15_Amendment_No__0003_0003.pdf PDF
Drawing_C-215_Attachment_12_Amendment_No__0003_0003.pdf PDF
Drawing_C-214_Attachment_11_Amendment_No__0003_0003.pdf PDF
Drawing_C-204_Attachment_7_Amendment_No__0003_0003.pdf PDF
FKC_31_30_00-12_Att_7_Amendment_0002_0002.pdf PDF
FKC_01_14_00-12_Att_6__Amendment_0002_0002.pdf PDF
GC-10-REV-1_Att_5_Amendment_No__0002_0002.pdf PDF
Attachment_No__2_-_FKC_Pre-Proposal_Presentation_Sign_in_Sheet_0002.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Attachment 13 - Drawing Part 1 of 5.pdf PDF
Attachment 9 - Experience and Management.pdf PDF
Attachment 4 - Offeror Responsibility Information.pdf PDF
Attachment 2 - Subcontracting Plan.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

Item Description

Road Paving Existing roadway paving along multiple Tulare County roads and State Highway 190 will require demolition and disposal for construction of the roadway canal siphons and pipeline crossings. See the C-200 series Contract Drawings for further requirements and limits of pavement removal.

Reservoir Lining Existing irrigation water reservoirs in conflict with the new canal construction will require demolition and disposal of the reservoir lining (concrete and PVC) and perimeter fencing. See the canal plan and profile drawings for further requirements and locations of existing reservoirs in conflict with the work.

Irrigation Pipelines Irrigation pipelines and other buried utilities in conflict with construction will require demolition and disposal of existing pipe material and capping of existing irrigation systems if necessary. See the canal plan and profile drawings for further requirements and locations of known existing pipelines.

Small Irrigation Structures Miscellaneous small concrete irrigation structures such as ditch headwalls, vaults, and ditch lining will require demolition and disposal of the concrete materials and appurtenances such as perimeter fencing.

See the canal plan and profile drawings for further requirements and locations of existing structures.

Barns Multiple agricultural timber storage barns with sheet metal roofing, located on the south side of the 15 acre Contractor staging area (Fletcher Property) located west of Road 192 near Station 5836+00 may require demolition and disposal should the Contractor choose to use this area for staging and storage. See Contract Drawing G-13 for further details and requirements.

DEMOLITION, SALVAGE

STANTEC/184031016 AND ABANDONMENT

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 02 41 19 - 4

Attachment 5 Amendment No 0005 swolfert Cross-Out swolfert Polygon

File details come from the government source that posted it. Updated .