Attachment_10_Amendment_No_0005_0005.pdf

PDF 2 MB Posted

Attached to
FKC Middle Reach Capacity Correction Project Phase Federal contract opportunity
Solicitation number
140R2020R0009
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document provides construction specifications for Solicitation Number 140R2020R0009, the FKC Middle Reach Capacity Correction Project Phase 1. The project involves construction constraints and sequencing for improvements to roads and installation of storm drain lines and a new siphon crossing Road 192 in Tulare County, California. Road closures will require pre-approval from Tulare County and implementation of flagger controls or a temporary bypass road. Utility relocations will be performed by Southern California Edison, Southern California Gas Company, AT&T, Ducor Telephone Company, and Charter Communications in support of the project. The contractor must submit traffic control and construction sequencing plans for approval prior to the listed work affecting county roads and rights-of-way.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_2_Amendment_No_0005_0005.pdf PDF
Attachment_25_Amendment_No__0004_0004.pdf PDF
Attachment_21_Amendment_No__0004_0004.pdf PDF
Attachment_19_Amendment_No__0004_0004.pdf PDF
Attachment_15_Amendment_No__0004_0004.pdf PDF
Attachment_7_Amendment_No_0004_0004.pdf PDF
Attachment_14_Amendment_No__0004_0004.pdf PDF
Attachment_26_Amendment_No__0004_0004.pdf PDF
Attachment_18_Amendment_No__0004_0004.pdf PDF
Attachment_17_Amendment_No__0004_0004.pdf PDF
Attachment_11_Amendment_No_0004_0004.pdf PDF
Attachment_9_Amendment_No_0004_0004.pdf PDF
Attachment_4_Amendment_No_0004_0004.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_1_Amendment_No_0003_0003.pdf PDF
Drawing_C-302_Attachment_13_Amendment_No__0003_0003.pdf PDF
Drawing_C-208_Attachment_10_Amendment_No__0003_0003.pdf PDF
Drawing_C-207_Attachment_9_Amendment_No__0003_0003.pdf PDF
Drawing_C-206_Attachment_8_Amendment_No__0003_0003.pdf PDF
Sol_140R2020R0009_Amd_0003.pdf PDF
GC-09-REV-1_Att_4_Amendment_No__0002_0002.pdf PDF
Attachment_No__1_-_FKC_Pre-Proposal_Presentation_Slides_0002.pdf PDF
Solicitation No.140R2020R0009 Amendment No 0001_0001.pdf PDF
Sol_140R2020R0009_Amd_0001.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Attachment 1 - General Decision Number CA CA2021000.pdf PDF
Attachment B.1 Schedule of Prices.xlsx XLSX spreadsheet
Attachment 13 - Drawing Part 5 of 5.pdf PDF
Attachment 10 Electronic Proposal Submission.pdf PDF
Attachment 6 - RAC 15-13 Invoicing Documents.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications No. 20-C0907

CONSTRUCTION CONSTRAINTS

STANTEC/184031016 AND SEQUENCING

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 01 14 00 - 12

around closed roads for siphon construction require improvements prior to being placed into service as a temporary detour route. Refer to Drawings T- 6 and T-7 for details and locations of road improvements required. Tulare County requires continuous flow of traffic and only one lane can be closed at a time, with flaggers provided to complete these improvements. The CONTRACTOR shall submit traffic control plans to construct the detour road improvements for approval.

c. New siphon construction at Road 192. Road closure of Road 192 is not allowed by Tulare County for the construction of the siphon at this location.

A temporary roadway bypass, or “shoofly” shall be constructed in advance of starting WORK on the new siphon within the limits of Tulare County Road right-of-way. Refer to Drawings T-2 through T-5 for requirements of the Road 192 Shoofly. Upon completion of WORK within Road 192 Tulare County rights-of-way, all material of construction for the shoofly shall be completely removed. Restoration of the original grades within the limits of the temporary construction easement shall be done after construction in this area is completed. The CONTRACTOR shall submit a Road 192 Shoofly construction sequencing plan for review and approval.

d. Storm Drain Pump Station discharge lines crossing Tulare County road right-of-way. There are 12-inch diameter storm drain lines that cross Road 184 at two separate locations. For the drain line installation, only one lane of traffic shall be closed at one time to allow continuous flow of traffic, and flagger controls shall be provided. Any open trenches shall be trench plated at the end of the day in accordance with Tulare County requirements. The CONTRACTOR shall submit traffic control plans for these two locations for approval.

e. All WORK in the Tulare County right-of-way including traffic control phasing shall be included in the CPM construction schedule prepared by the

CONTRACTOR

2. Utility Relocation WORK By Others. Several utility companies have existing utilities in the Project area. The WORK requires temporary and permanent utility relocations that will be constructed by the individual utility company. Utilities and type of impact is listed below.

a. Southern California Edison (SCE) - Overhead Electrical Power Line Relocations.

b. Southern California Gas Company (SoCalGas) - Gas Line Relocations (permanent relocation only).

c. American Telephone and Telegraph (AT&T) - Overhead and Underground Communication Line Relocations.

d. Ducor Telephone Company (VARCOMM) - Underground Telephone Line Relocations.

e. Charter Communications - Overhead Communication Line Relocations.

Solicitation No: 140R2020R0009 Attachment 10 Amendment No 0005 swolfert Text Box

f. The following table summarizes the Average Daily Traffic (ADT) counts provided by Tulare County:

County RoadADT
Ave 136100
Ave 128630
Ave 120100
Ave 112100

Terra Bella

Ave (Ave 95)1150
Road 2081550
Ave 88180
Ave 80100
Road 1921750

swolfert Underline swolfert Polygon swolfert Line swolfert Cross-Out

File details come from the government source that posted it. Updated .