Attachment_B_1_Amendment_No_0005_0005.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
FKC Middle Reach Capacity Correction Project Phase
Solicitation number
140R2020R0009
Issued by

About this file

This document is a schedule of prices for solicitation 140R2020R0009, the Friant-Kern Canal Middle Reach Capacity Correction Project Phase 1. The schedule lists 66 contract line item numbers for supplies or services required for the project, including mobilization, sheeting and shoring, stormwater pollution prevention, dewatering, excavation and embankment construction, concrete lining installation, joint construction, tie-ins, structures, safety features, restoration, and abandonment. Pricing is to be provided by the contractor for evaluation by the Department of the Interior Bureau of Reclamation, which is the contracting agency. However, all prices in the sample schedule are listed as $0.00, indicating this is a template to be filled in by offerors rather than actual offered or awarded pricing.

View the file

Other files

File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Attachment_1_Amendment_0008_0008.pdf PDF
Amendment_0008_for_Solicitation_140R2020R0009_0008.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_1_Amendment_0007_0007.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Attachment_4_Amendment_0006_0006.pdf PDF
Attachment_10_Amendment_0006_0006.pdf PDF
Amendment_0006_for_Solicitation_140R2020R0009_0006.pdf PDF
Attachment_3_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_8_Amendment__0006_0006.pdf PDF
Attachment_9_Amendment_0006_0006.pdf PDF
Attachment_6_Amendment_0006_0006.pdf PDF
Attachment_5_Amendment__0006_0006.pdf PDF
Attachment_2_Amendment_0006_0006.pdf PDF
Attachment_1_Amendment_0006_0006.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_29_Amendment_No__0005_0005.pdf PDF
Attachment_8_Amendment_No_0005_0005.pdf PDF
Attachment_19_Amendment_No__0005_0005.pdf PDF
Attachment_5_Amendment_No_0005_0005.pdf PDF
Attachment_24_Amendment_No__0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_16_Amendment_No__0005_0005.pdf PDF
Attachment_39_Amendment_No_0005_0005.pdf PDF
Attachment_15_Amendment_No__0005_0005.pdf PDF
Attachment_41_Amendment_0005_0005.pdf PDF
Attachment_17_Amendment_No__0005_0005.pdf PDF
Attachment_22_Amendment_No__0005_0005.pdf PDF
Attachment_18_Amendment_No__0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Sol_140R2020R0009_Amd_0005.pdf PDF
Attachment_13_Amendment_No__0005_0005.pdf PDF
Attachment_31_Amendment_No__0005_0005.pdf PDF
Attachment_40_Amendment_No_0005_0005.pdf PDF
Attachment_27_Amendment_No__0005_0005.pdf PDF
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_12_Amendment_No__0005_0005.pdf PDF
Attachment_44_Amendment_0005_0005.pdf PDF
Attachment_10_Amendment_No_0005_0005.pdf PDF
Attachment_2_Amendment_No_0005_0005.pdf PDF
Attachment_38_Amendment_No__0005_0005.pdf PDF
Attachment_21_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Attachment_30_Amendment_No__0005_0005.pdf PDF
Show 40 more

Latest 50 of 155 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Amendment No 0005
Friant-Kern Canal Middle Reach Capacity Correction Project Phase 1Solicitation 140R2020R0009
Section B, Schedule of Prices
CLINSupplies or ServicesQuantityUnitUnit PriceTOTAL
1Mobilization and Preparatory WorkFor the lump sum of:$0.00
2Sheeting, shoring, and bracing or

equivalent method conforming to

applicable safety orders.For the lump sum of:$0.00
3Stormwater Pollution Prevention Plan
(SWPPP)For the lump sum of:$0.00
4Government Field Office and
Laboratory FacilitiesFor the lump sum of:$0.00
5Contract Document Management
SystemFor the lump sum of:$0.00
6Clearing and GrubbingFor the lump sum of:$0.00
Dust Abatement and Maintenance of Haul Roads
7STA. 5314+32.35 TO STA.

5661+44.08 (Avenue 136 to Avenue

88)82MG$0.00$0.00
8STA. 5664+48.58 TO STA.

5848+71.99 (Avenue 88 to Avenue

64)39MG$0.00$0.00
9Traffic ControlsFor the lump sum of:$0.00
10Dewater for Canal ConstructionFor the lump sum of:$0.00
11Pre-wetting Canal ExcavationFor the lump sum of:$0.00
Construct New Canal including Excavation and Compacting Embankments
12STA. 5314+31.35 TO 5360+58.15
(Avenue 136 to Avenue 128)253,300CY$0.00$0.00
13STA. 5363+00.39 TO 5482+30.10
(Avenue 128 to Avenue 112)668,600CY$0.00$0.00
14STA. 5484+68.40 TO 5537+65.21

(Avenue 112 to Deer Creek Check

Inlet Transition)384,400CY$0.00$0.00
15STA. 5541+62.43 TO 5588+90.00

(Deer Creek Check Outlet Transition

to Terra Bella Avenue)349,200CY$0.00$0.00
16STA. 5591+37.30 TO 5599+37.98
(Terra Bella Avenue to Road 208)41,500CY$0.00$0.00
17STA. 5602+47.88 TO 5661+44.08
(Road 208 to Avenue 88)478,600CY$0.00$0.00
18STA. 5664+48.58 TO 5725+66.02
(Avenue 88 to Avenue 80)510,900CY$0.00$0.00
19STA. 5728+74.32 TO 5825+72.73
(Avenue 80 to Road 192)777,100CY$0.00$0.00
20STA. 5829+53.75 TO 5848+71.99
(Road 192 to Avenue 64)108,600CY$0.00$0.00
21Over excavation for Canal and
Structures294,000CY$0.00$0.00
Trimming Earth Foundation for Canal Lining
22STA. 5314+31.35 TO STA.

5661+44.08 (Avenue 136 to Avenue

88)422,000SY$0.00$0.00
23STA. 5664+48.58 TO STA.

5848+71.99 (Avenue 88 to Avenue

64)232,000SY$0.00$0.00
3.5-inch Thick Concrete Canal Lining
24STA. 5314+31.35 TO STA.

5661+44.08 (Avenue 136 to Avenue

88422,000SY$0.00$0.00
25STA. 5664+48.58 TO STA.

5848+71.99 (Avenue 88 to Avenue

64)232,000SY$0.00$0.00
Construct Transverse Canal Contraction Joints and Joint Seal
26STA. 5314+31.35 TO STA.

5661+44.08 (Avenue 136 to Avenue

88)271,000LF$0.00$0.00
27STA. 5664+48.58 TO STA.

5848+71.99 (Avenue 88 to Avenue

64)149,000LF$0.00$0.00
Construct Longitudinal Canal Contraction Joints and Joint Seal
28STA. 5314+31.35 TO STA.

5661+44.08 (Avenue 136 to Avenue

88)234,000LF$0.00$0.00
29STA. 5664+48.58 TO STA.

5848+71.99 (Avenue 88 to Avenue

64)126,000LF$0.00$0.00
Construct Transverse Canal Expansion Joints
30STA. 5314+31.35 TO STA.

5661+44.08 (Avenue 136 to Avenue

88)5,000LF$0.00$0.00
31STA. 5664+48.58 TO STA.

5848+71.99 (Avenue 88 to Avenue

64)1,500LF$0.00$0.00
Construct New Canal Tie-Ins to Existing Canal
32Avenue 136 Tie-In (STA. 5308+52.85
to STA. 5314+31.35)For the lump sum of:$0.00
33Avenue 64 Tie-In (STA. 5848+71.99
to STA. 5854+32.07)For the lump sum of:$0.00
34Construct New Deer Creek Check

Structure, Wasteway Turnout and

SiphonFor the lump sum of:$0.00
Construct New Siphon Structures
35Siphon 4, Avenue 128For the lump sum of:$0.00
36Siphon 5, Avenue 112For the lump sum of:$0.00
37Siphon 6, Terra Bella AvenueFor the lump sum of:$0.00
38Siphon 7, Road 208For the lump sum of:$0.00
39Siphon 8, Avenue 88For the lump sum of:$0.00
40Siphon 9, Avenue 80For the lump sum of:$0.00
41Siphon 10, Avenue 64/Road 192For the lump sum of:$0.00
Construct New Turnout Structures
42LTRID-Casa Blanca Ditch STA.
5321+93For the lump sum of:$0.00
43Tea Pot Dome STA. 5360+41For the lump sum of:$0.00
44SID-S1 STA. 5428+70For the lump sum of:$0.00
45TBID-DCRA Pits STA. 5535+44For the lump sum of:$0.00
46SID-S2 STA. 5536+05For the lump sum of:$0.00
47TBID-Terra Bella STA. 5588+32For the lump sum of:$0.00
48SID-S3 STA. 5661+24For the lump sum of:$0.00
49SID-S4 STA. 5786+24For the lump sum of:$0.00
50DEID-68 West STA. 5813+99For the lump sum of:$0.00
51Electrical, Instrumentation, and
Control SystemsFor the lump sum of:$0.00
Construct Irrigation and Drainage Siphon Extensions
52FWA Drainage Culvert Siphon –
STA. 5379+97For the lump sum of:$0.00
53FWA Drainage Culvert Siphon –
STA. 5618+65For the lump sum of:$0.00
Construct Storm Water Pump Stations
54SWPS-1 STA. 5534+50For the lump sum of:$0.00
55SWPS-2 STA 5721+75For the lump sum of:$0.00
Furnish and Install Canal Safety Ladders on the New Canal
56STA. 5314+31.35 TO STA.

5661+44.08 (Avenue 136 to Avenue

88)54EA$0.00$0.00
57STA. 5664+48.58 TO STA.

5848+71.99 (Avenue 88 to Avenue

64)26EA$0.00$0.00
Construct Operations and Maintenance Road on the New Canal
58STA. 5314+31.35 TO STA.

5662+96.33 (Avenue 136 to Avenue

88)63,000SY$0.00$0.00
59STA. 5662+96.33 TO STA.

5848+71.99 (Avenue 88 to Avenue

64)34,000SY$0.00$0.00
60Site RestorationFor the lump sum of:$0.00
61Furnish and Install Station Markers
and Canal SignsFor the lump sum of:$0.00
Furnish and Install Security Gates on the New Canal
62STA. 5314+31.35 TO STA.

5661+44.08 (Avenue 136 to Avenue

88)24EA$0.00$0.00
63STA. 5664+48.58 TO STA.

5848+71.99 (Avenue 88 to Avenue

64)8EA$0.00$0.00
64Safety Cables with FloatsFor the lump sum of:$0.00
65Abandonment and Salvage ItemsFor the lump sum of:$0.00
66Utility PotholingFor the lump sum of:$0.00
Grand Total:$0.00

File details come from the government source that posted it. Updated .