About this file

This document provides measurement and payment terms for solicitation number 140R2020R0009 from the Department of the Interior Bureau of Reclamation for the FKC Middle Reach Capacity Correction Project Phase 1. Key details include measurement and payment for various contract line item numbers (CLINs) involving construction of a new canal including excavation and compacting embankments between station 5314+31.35 to 5848+71.99. Payment will be made on a cubic yard basis for excavation quantities and lump sums for items like traffic controls, dewatering, pre-wetting, and construction of various canal segments between specified stations. Ancillary items associated with canal excavation and embankments are also included in payment. Materials from identified borrow areas are provided at no cost with hauling included in payment.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_10_Amendment_No_0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_25_Amendment_No__0004_0004.pdf PDF
Attachment_21_Amendment_No__0004_0004.pdf PDF
Attachment_19_Amendment_No__0004_0004.pdf PDF
Attachment_15_Amendment_No__0004_0004.pdf PDF
Attachment_7_Amendment_No_0004_0004.pdf PDF
Attachment_14_Amendment_No__0004_0004.pdf PDF
Attachment_26_Amendment_No__0004_0004.pdf PDF
Attachment_18_Amendment_No__0004_0004.pdf PDF
Attachment_17_Amendment_No__0004_0004.pdf PDF
Attachment_11_Amendment_No_0004_0004.pdf PDF
Attachment_9_Amendment_No_0004_0004.pdf PDF
Attachment_4_Amendment_No_0004_0004.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_1_Amendment_No_0003_0003.pdf PDF
Drawing_C-302_Attachment_13_Amendment_No__0003_0003.pdf PDF
Drawing_C-208_Attachment_10_Amendment_No__0003_0003.pdf PDF
Drawing_C-207_Attachment_9_Amendment_No__0003_0003.pdf PDF
Drawing_C-206_Attachment_8_Amendment_No__0003_0003.pdf PDF
Sol_140R2020R0009_Amd_0003.pdf PDF
GC-09-REV-1_Att_4_Amendment_No__0002_0002.pdf PDF
Attachment_No__1_-_FKC_Pre-Proposal_Presentation_Slides_0002.pdf PDF
Solicitation No.140R2020R0009 Amendment No 0001_0001.pdf PDF
Sol_140R2020R0009_Amd_0001.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Attachment 1 - General Decision Number CA CA2021000.pdf PDF
Attachment B.1 Schedule of Prices.xlsx XLSX spreadsheet
Attachment 13 - Drawing Part 5 of 5.pdf PDF
Attachment 10 Electronic Proposal Submission.pdf PDF
Attachment 6 - RAC 15-13 Invoicing Documents.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

STANTEC/184031016 MEASUREMENT AND PAYMENT

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 01 29 00 - 3

This item includes compliance with Specification Section 01 30 00 – Environmental Mitigation and Compliance.

1. STA 5314+31.35 to STA 5661+44.08 (Avenue 136 to Avenue 88) (CLIN 7)

2. STA 5664+48.58 to STA 5848+71.99 (Avenue 88 to Avenue 64) (CLIN 8)

1.10 TRAFFIC CONTROLS (CLIN 9)

A. No measurement shall be made for this item.

B. Payment for traffic controls WORK will be made at the lump sum price named in the Price Schedule under CLIN 9, which price shall constitute full compensation for, and shall include, all items identified by Specification Section 01 55 00 – Site Access and Storage, and Section 01 14 00 – Construction Constraints and Sequencing. This item includes compliance with Specification Section 01 30 00 – Environmental Mitigation and Compliance.

1.11 DEWATER FOR CANAL CONSTRUCTION (CLIN 10)

A. No measurement shall be made for this item.

B. Payment for groundwater dewatering WORK for all structures and canal will be made at the lump sum price named in the Price Schedule under CLIN 10, which price shall constitute full compensation for, and shall include, furnishing and maintaining dewatering systems, temporary dikes for dewatering at creeks as needed, and all items identified by Specification Section 31 23 19 – Dewatering. This item includes compliance with Specification Section 01 30 00 – Environmental Mitigation and Compliance.

1.12 PRE-WETTING CANAL EXCAVATION (CLIN 11)

A. No measurement shall be made for this item.

B. Payment for applying water for pre-wetting canal excavation will be made at the lump sum price named in the Price Schedule under CLIN 11 for pre-wetting for new canal excavation, which price shall constitute full compensation for labor, materials and equipment to apply water by means of temporary sprinkler irrigation systems as identified by Specification Section 31 30 00 – Earthwork, paragraph 3.1.E.2. This item includes compliance with Specification Section 01 30 00 – Environmental Mitigation and Compliance.

1.13 CONSTRUCT NEW CANAL INCLUDING EXCAVATION AND COMPACTING

EMBANKMENTS (CLIN 12 THROUGH 20)

A. Measurement for payment for new canal excavation and compacting embankments WORK will be based upon the number of cubic yards of canal embankment volume based upon the neat line depicted on Drawing GC-8, all in accordance with the requirements of the Contract Documents.

B. Payment for construction of new canal excavation and compacting embankments will be made at the unit price named in the Price Schedule under the following CLINs, swolfert Text Box and GC-9 swolfert Polygon swolfert Line

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

STANTEC/184031016 MEASUREMENT AND PAYMENT

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 01 29 00 - 4

which price shall constitute full compensation for canal excavation, hauling material to required embankments, applying water to moisture condition materials placed in embankments if required, placing the material in the embankment, scarifying of refill at the top of canal lining, refilling the additional excavation between the bottom of the excavation required and the depth needed, excavating toe drainage ditch along the east bank, partial excavation of material on the existing canal banks down to original ground (while existing canal is in operation and prior to existing canal decommissioning) and re-compaction, final excavation of existing canal banks down to original ground (after existing canal decommissioning), and of all WORK necessary to maintain the excavations and embankments in good order during construction.

The material excavated from the TBID off-site borrow area will be provided at no cost, however, the CONTRACTOR shall be responsible for meeting the requirements depicted on Drawing GC-12 and in the specifications for use of the borrow area. The hauling cost for transporting material from this borrow area is included in this item.

The costs associated with use of the existing canal embankments as a borrow source shall include but not be limited to replacement of existing canal operation and maintenance roads, sawcut and removal of existing concrete lining and other reconstruction items depicted on Drawings GC-08, CD-1, and GC-15 and are included in this item. The hauling cost for transporting material from this borrow area is included in this item.

This item includes ancillary items associated with the canal excavation and embankments, including, but not limited to removal and replacement of existing irrigation pipelines, miscellaneous civil site and basin improvements, drainage culvert installations below the canal, as depicted in the Contract Drawings. This item includes compliance with Specification Section 01 30 00 – Environmental Mitigation and Compliance.

The cost for pre-wetting for canal excavation is not included in this item. The cost for over excavation/ground improvement is not included in this item.

1. STA. 5314+31.35 TO 5360+58.15 (Avenue 136 to Avenue 128) (CLIN 12)

2. STA. 5363+00.39 TO 5482+30.10 (Avenue 128 to Avenue 112) (CLIN 13)

3. STA. 5484+68.40 TO 5537+65.21 (Avenue 112 to Deer Creek Check Inlet Transition) (CLIN 14)

4. STA. 5541+62.43 TO 5588+90.00 (Deer Creek Check Outlet Transition to Terra Bella Avenue) (CLIN 15)

5. STA. 5591+37.30 TO 5599+37.98 (Terra Bella Avenue to Road 208)(CLIN 16)

6. STA. 5602+47.88 TO 5661+44.08 (Road 208 to Avenue 88) (CLIN 17)

7. STA. 5664+48.58 TO 5725+66.02 (Avenue 88 to Avenue 80) (CLIN 18)

8. STA. 5728+74.32 TO 5825+72.73 (Avenue 80 to Road 192) (CLIN 19)

9. STA. 5828+53.75 TO 5848+71.99 (Road 192 to Avenue 64) (CLIN 20)

Attachment 4 Amendment No 0004 swolfert Cross-Out swolfert Text Box 5829+53.75 swolfert Polygon swolfert Line swolfert Cross-Out swolfert Text Box at the top of canal lining swolfert Polygon swolfert Line swolfert Cross-Out swolfert Text Box swolfert Polygon swolfert Line