Attachment_8_Amendment_No_0005_0005.pdf

PDF 639 KB Posted

Attached to
FKC Middle Reach Capacity Correction Project Phase
Solicitation number
140R2020R0009
Issued by

About this file

This document contains specifications for an earthwork project. The project involves FKC Middle Reach Capacity Correction Project Phase 1, with a solicitation number of 140R2020R0009 issued by the Department of the Interior Bureau of Reclamation. The specifications provide requirements for excavation work more than 5 feet deep, including submitting a detailed shoring plan signed and sealed by a professional engineer licensed in California. The plan must also include an excavation permit from the California Department of Industrial Safety. Materials used in filling and backfilling are specified to be clean earth, rock, gravel or sand free of vegetation and organic matter larger than 3 inches. Soils classified as peat, organic clay, organic silt, marsh, or organic soils under ASTM standards are deemed unsuitable.

View the file

Other files

File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Attachment_1_Amendment_0008_0008.pdf PDF
Amendment_0008_for_Solicitation_140R2020R0009_0008.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_1_Amendment_0007_0007.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Attachment_4_Amendment_0006_0006.pdf PDF
Attachment_10_Amendment_0006_0006.pdf PDF
Amendment_0006_for_Solicitation_140R2020R0009_0006.pdf PDF
Attachment_3_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_8_Amendment__0006_0006.pdf PDF
Attachment_9_Amendment_0006_0006.pdf PDF
Attachment_6_Amendment_0006_0006.pdf PDF
Attachment_5_Amendment__0006_0006.pdf PDF
Attachment_2_Amendment_0006_0006.pdf PDF
Attachment_1_Amendment_0006_0006.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_29_Amendment_No__0005_0005.pdf PDF
Attachment_19_Amendment_No__0005_0005.pdf PDF
Attachment_5_Amendment_No_0005_0005.pdf PDF
Attachment_24_Amendment_No__0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_16_Amendment_No__0005_0005.pdf PDF
Attachment_39_Amendment_No_0005_0005.pdf PDF
Attachment_15_Amendment_No__0005_0005.pdf PDF
Attachment_41_Amendment_0005_0005.pdf PDF
Attachment_17_Amendment_No__0005_0005.pdf PDF
Attachment_22_Amendment_No__0005_0005.pdf PDF
Attachment_18_Amendment_No__0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Sol_140R2020R0009_Amd_0005.pdf PDF
Attachment_13_Amendment_No__0005_0005.pdf PDF
Attachment_31_Amendment_No__0005_0005.pdf PDF
Attachment_40_Amendment_No_0005_0005.pdf PDF
Attachment_27_Amendment_No__0005_0005.pdf PDF
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_12_Amendment_No__0005_0005.pdf PDF
Attachment_44_Amendment_0005_0005.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_10_Amendment_No_0005_0005.pdf PDF
Attachment_2_Amendment_No_0005_0005.pdf PDF
Attachment_38_Amendment_No__0005_0005.pdf PDF
Attachment_21_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Attachment_30_Amendment_No__0005_0005.pdf PDF
Show 40 more

Latest 50 of 155 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

STANTEC/184031016 EARTHWORK

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 31 30 00 - 3

F. RSN 31 30 00-4 Detailed Shoring Plan:

1. The CONTRACTOR, prior to beginning any trench or structure excavation 5 feet deep or deeper, shall submit to the GOVERNMENT and shall be in receipt of the GOVERNMENT's written acceptance of the CONTRACTOR's detailed plan showing the design of shoring, bracing, sloping of the sides of excavation, or other provisions for worker protection against the hazard of caving ground during the excavation of such trenches or structure excavation.

2. The CONTRACTOR’s plan shall be prepared and signed and sealed by a Professional Engineer experienced in the field of geotechnical engineering and licensed in the State of California.

3. The GOVERNMENT’s acceptance of said plan will only be for verification of submittal of the plan with this requirement.

4. If such plan varies from the shoring system standards established in the Construction Safety Orders of the State of California, such alternative systems plans shall be prepared by a civil or structural engineer licensed in the State of California.

G. RSN 31 30 00-5, Excavation Permit:

1. Copy of the excavation permit issued by the California Department of Industrial Safety.

H. RSN 31 30 00-6, Sample Tests Results of Materials Proposed for the WORK:

1. The CONTRACTOR shall submit samples of materials proposed for the WORK in conformance with the requirements of Section 01 33 00 – Submittals.

2. Sample sizes shall be as determined by the testing laboratory and in accordance with applicable ASTM standards.

PART 2 -- PRODUCTS

2.1 MATERIAL REQUIREMENTS

A. General

1. Fill, backfill, and embankment materials shall be clean fine earth, rock, gravel, or sand, free from grass, roots, brush, other vegetation and organic matter.

2. Fill and backfill materials that are to be placed within 6 inches of any structure or pipe shall be free of rocks or unbroken masses of earth materials having a maximum dimension larger than 3 inches.

B. Unsuitable Materials

1. Soils which, when classified under ASTM D2487- Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System), fall in the classifications of Pt, OH, CH, MH, or OL shall be classified as unsuitable.

Attachment 8 Amendment No 0005 swolfert Text Box and soil with 3% and greater organic content swolfert Polygon swolfert Line

File details come from the government source that posted it. Updated .