Attachment_1_Amendment_No_0005_0005.pdf

PDF 659 KB Posted

Attached to
FKC Middle Reach Capacity Correction Project Phase
Solicitation number
140R2020R0009
Issued by

About this file

This document is an amendment to the specifications for the FKC Middle Reach Capacity Correction Project Phase 1 solicitation issued by the Department of the Interior Bureau of Reclamation. The amendment revises the requirements for work to be conducted in Deer Creek, requiring restoration of the stream channel contours and conditions within 60 days of completing siphon construction. It also provides details on the conditions and permitting requirements from the U.S. Army Corps of Engineers, including employing a wetland scientist to monitor construction activities near waters, using mats or other measures to minimize soil disturbance from heavy equipment, maintaining erosion and sediment controls, stabilizing exposed soils at the earliest date, and stockpiling and replacing topsoil when installing siphon trenches. The amendment informs bidders of the letter of permission issued by the Corps for work in Deer Creek as required by the solicitation.

View the file

Other files

File Type Posted
Attachment_8_Amendment_0008_0008.pdf PDF
Sol_140R2020R0009_Amd_0008.pdf PDF
Attachment_1_Amendment_0008_0008.pdf PDF
Amendment_0008_for_Solicitation_140R2020R0009_0008.pdf PDF
Sol_140R2020R0009_Amd_0007.pdf PDF
Attachment_1_Amendment_0007_0007.pdf PDF
Amendment_0007_for_Solicitation_140R2020R0009_0007.pdf PDF
Attachment_7_Amendment_0006_0006.pdf PDF
Attachment_4_Amendment_0006_0006.pdf PDF
Attachment_10_Amendment_0006_0006.pdf PDF
Amendment_0006_for_Solicitation_140R2020R0009_0006.pdf PDF
Attachment_3_Amendment_0006_0006.pdf PDF
Sol_140R2020R0009_Amd_0006.pdf PDF
Attachment_8_Amendment__0006_0006.pdf PDF
Attachment_9_Amendment_0006_0006.pdf PDF
Attachment_6_Amendment_0006_0006.pdf PDF
Attachment_5_Amendment__0006_0006.pdf PDF
Attachment_2_Amendment_0006_0006.pdf PDF
Attachment_1_Amendment_0006_0006.pdf PDF
Attachment_35_Amendment_No__0005_0005.pdf PDF
Attachment_29_Amendment_No__0005_0005.pdf PDF
Attachment_8_Amendment_No_0005_0005.pdf PDF
Attachment_19_Amendment_No__0005_0005.pdf PDF
Attachment_5_Amendment_No_0005_0005.pdf PDF
Attachment_24_Amendment_No__0005_0005.pdf PDF
Attachment_4_Amendment_No_0005_0005.pdf PDF
Attachment_16_Amendment_No__0005_0005.pdf PDF
Attachment_39_Amendment_No_0005_0005.pdf PDF
Attachment_15_Amendment_No__0005_0005.pdf PDF
Attachment_41_Amendment_0005_0005.pdf PDF
Attachment_17_Amendment_No__0005_0005.pdf PDF
Attachment_22_Amendment_No__0005_0005.pdf PDF
Attachment_18_Amendment_No__0005_0005.pdf PDF
Attachment_37_Amendment_No__0005_0005.pdf PDF
Sol_140R2020R0009_Amd_0005.pdf PDF
Attachment_13_Amendment_No__0005_0005.pdf PDF
Attachment_31_Amendment_No__0005_0005.pdf PDF
Attachment_40_Amendment_No_0005_0005.pdf PDF
Attachment_27_Amendment_No__0005_0005.pdf PDF
Attachment_42_Amendment_0005_0005.pdf PDF
Attachment_12_Amendment_No__0005_0005.pdf PDF
Attachment_44_Amendment_0005_0005.pdf PDF
Attachment_B_1_Amendment_No_0005_0005.xlsx XLSX spreadsheet
Attachment_10_Amendment_No_0005_0005.pdf PDF
Attachment_2_Amendment_No_0005_0005.pdf PDF
Attachment_38_Amendment_No__0005_0005.pdf PDF
Attachment_21_Amendment_No__0005_0005.pdf PDF
Attachment_26_Amendment_No__0005_0005.pdf PDF
Attachment_33_Amendment_No__0005_0005.pdf PDF
Attachment_32_Amendment_No__0005_0005.pdf PDF
Show 40 more

Latest 50 of 155 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

CONSTRUCTION CONSTRAINTS

STANTEC/184031016 AND SEQUENCING

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 01 14 00 - 9

This Amendment 0005 change revises the original text for Subpart 1.9 B. 3.

only. No other Subparts of this Section are revised as part of this change.

3. United States Army Corps of Engineers (USACE) 404 Permit for WORK in Deer Creek. The GOVERNMENT has worked with the USACE to determine that a Letter of Permission will be required and the application package has been submitted to the USACE in February 2021. The GOVERNMENT expects this permit to be issued prior to WORK in Deer Creek. Within 60 days of completion of siphon construction at Deer Creek, the contours of the stream channel shall be restored as close as possible to their original contour and conditions.

United States Army Corps of Engineers (USACE) Section 404 Permit for WORK in Deer Creek. The GOVERNMENT has received a Letter of Permission and it is provided as an attachment to this specification after the Permits flysheet. The CONTRACTOR shall comply with the conditions and requirements of the permit, including the following:

a. Within 60 days of completion of siphon construction at Deer Creek, the contours of the stream channel and adjacent upland areas within 50-feet shall be restored as close as possible to their original contour and conditions.

b. The GOVERNMENT shall employ a wetland scientist who is familiar with the project site, to continuously monitor all initial construction grading activities in the vicinity of waters of the United States to ensure against unauthorized activity during construction. This scientist shall educate the construction workers about the sensitivities of the wetlands on-site, and the rare species of the area before work begins. This monitor shall make random visits to the project site while the construction is occurring. The monitor shall ensure no unauthorized activities occur during project implementation, and that the project is constructed as designed. If unauthorized activities do occur into waters of the United States, the GOVERNMENT shall have the authority to stop work within waters of the United States immediately and notify the USACE at once.

c. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats or other measures must be taken to minimize soil disturbance.

d. Soil erosion and sediment controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. CONTRACTOR is encouraged to perform work within waters of the U.S. during periods of low-flow or no-flow.

e. Siphon installation. Trenches constructed must be backfilled and returned to pre-activity contours and elevations, During construction, the top 6-12 inches of topsoil must be removed and stockpiled separately. Following installation, the stockpiled topsoil will be replaced on top, and seeded with appropriate native vegetation. Material resulting from trench excavation may be temporarily sidecast into waters of the U.S for no more that three months, provided the material is not placed in such a manner that it may be dispersed by currents or other forces.

Attachment 1 Amendment No 0005 swolfert Cross-Out swolfert Polygon