Attchmt 7_Bird and Bird Guest Property Report.pdf
PDF 22 MB Posted
- Attached to
- Hazardous Materials Abatement, OLYM
- Solicitation number
- 140P8318Q0051
About this file
Not Listed
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1011 SW Klickitat Way, Suite 104, Seattle, Washington 98134
Phone 206-381-1128
Toll Free 800-666-2959
Fax 206-254-4279
Environmental Consulting
Hazardous Materials Management
Industrial Hygiene Services
Construction Management
Indoor Air Quality
LIMITED LEAD AND ASBESTOS SURVEY REPORT
NATIONAL PARK SERVICE - OLYMPIC NATIONAL PARK
LAKE CRESCENT - BIRD & BIRD GUEST PROPERTY
2461 East Beach Road
Port Angeles, Washington 98363
November 3rd, 2017
Prepared For:
Jeff Doryland
Deputy Chief of Facility Management
Olympic National Park
600 E. Park Avenue, Port Angeles, WA 98273 ii
Limited Lead and Asbestos Survey Report
National Park Service – Olympic National Park
Lake Crescent – Bird & Bird Guest Property
2461 East Beach Road
Port Angeles, Washington
EHSI Project No.: # 11035
The material and data in this report were prepared under the supervision and direction of the undersigned.
Rory Peterson
Lead AHERA Building Inspector
Derica Escamilla
Principal of Hazardous Materials
Services iii
TABLE OF CONTENTS
Acronym List .................................................................................... iv
1.0 EXECUTIVE SUMMARY
1.1 BACKGROUND
1.2 EXTENT OF CURRENT SURVEY
1.3 ACM MATERIALS FOUND
1.4 OPINIONS AND RECOMMENDATIONS
1.5 LIMITATIONS/DISCLAIMER
2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT
2.1 BACKGROUND
2.2 BUILDING DESCRIPTION
2.3 SAMPLING METHODOLOGY
2.3.1 Asbestos-Containing Materials
2.3.2 Lead-Containing Paint/Lead-Containing Materials
2.4 SAMPLING RESULTS
2.4.1 Asbestos-Containing Materials
2.4.2 Lead-Containing Paint and Building Materials
2.4.3 Toxicity Characteristic Leaching Procedure Sampling
2.4.4 Polychlorinated Biphenyls
2.4.5 Mercury-Containing Fluorescent Light Tubes and CFL Bulbs
3.0 LIMITATIONS
4.0 STANDARD OF CARE
5.0 CERTIFIED AHERA BUILDING INSPECTORS
APPENDICES
A........................ Asbestos Laboratory Reports and Field Data Forms
B........................ Lead Laboratory Reports and Field Data Forms
C........................ Certified AHERA Building Inspector Certificates
D ....................... Laboratory Certifications for Asbestos and Lead, Analysis
E ........................ Sample Location Drawings for Asbestos, Lead, and TCLP
F ........................ Lead TCLP Laboratory Reports and Field Data Forms
G ....................... Abatement Cost Estimate iv
ACRONYM LIST
ACM.......................Asbestos-Containing Material
AHERA ................... Asbestos Hazard Emergency Response Act AIHA ...................... American Industrial Hygiene Association
CFL ........................ Compact Fluorescent Light CFR ....................... Code of Federal Regulations
DOSH.....................Washington State Department of Labor and Industries, Division of
Occupational Safety and Health EA ......................... Each
Ecology .................. Washington State Department of Ecology EHSI ...................... EHS-International, Inc.
ELLAP .....................Environmental Lead Laboratory Accreditation Program GWB ...................... Gypsum Wall Board
Hg ......................... Mercury JC..........................Joint Compound
LCM ....................... Lead-Containing Material
LCP........................Lead-Containing Paint LF..........................Linear Feet
L&I ........................ Washington State Department of Labor and Industries mg/cm2 .................. Milligrams Per Square Centimeter mg/L......................Milligrams Per Liter N/A ........................Not Applicable
ND.........................None Detected NVL ....................... NVL Laboratories, Inc.
NVLAP .................... National Voluntary Laboratory Accreditation Program
OSHA ..................... US Occupational Safety and Health Administration ORCAA ................... Olympic Clean Air Agency
Pb ......................... Lead PCBs ...................... Polychlorinated Biphenyls
PLM ....................... Polarized Light Microscopy ppm.......................Parts per Million
QA ......................... Quality Assurance RCW ...................... Revised Code of Washington
SAT ....................... Seattle Asbestos Test, LLC
SF ......................... Square Feet TCLP ...................... Toxicity Characteristic Leaching Procedure
WAC ...................... Washington Administrative Code WT ........................ Weight w/ ......................... With XRF ....................... x-ray fluorescence
NPS – Lake Crescent - Bird Property
EHSI Project 11035 November 3rd, 2017
1.0 EXECUTIVE SUMMARY
1.1 BACKGROUND
The National Parks Service (NPS) plans to demolish the existing structures at the Bird Property located on Lake Crescent at 2461 East Beach Road, Port Angeles, Washington. The NPS has contracted EHS-International, Inc. (EHSI), a hazardous materials and industrial hygiene consulting firm, to conduct a Limited Lead and Asbestos Survey of the Bird Property in preparation for this project. The intent of the survey is to specifically identify and quantify asbestos-containing building materials (ACM), lead-containing paint (LCP), other lead-containing building materials (LCM), to collect a lead toxicity characteristic leaching procedure
(TCLP) sample representative of all materials that may be in the assumed waste stream, to inspect and quantify fluorescent light fixtures that may contain polychlorinated biphenyl
(PCB)-containing ballasts, and mercury (Hg)-containing fluorescent light tubes, compact fluorescent light (CFL) bulbs, and high intensity discharge (HID) lamps, that may be impacted by the demolition.
1.2 EXTENT OF CURRENT SURVEY
EHSI inspected all accessible interior and exterior materials potentially impacted by the proposed project. Accessible suspect materials were sampled including, but not limited to:
interior and exterior wall systems, window systems, and mechanical systems. EHSI accomplished a representative destructive inspection.
1.3 ACM MATERIALS FOUND
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
CRESCENT LAKE – BIRD & BIRD GUEST PROPERTY
ASBESTOS MATERIAL DESCRIPTION LOCATION
PRIMARY RESIDENCE
Non-ACM brown leather stair rail cap on ACM brown fibrous material w/ ACM brown/green mastic on wood [Sample # 31]
Main Floor, Livingroom
ACM black sink undercoat [Sample 39] w/ ACM light brown sink drain putty with non-ACM black rubber sink drain gasket [Sample # 40] (on 2’x3’ metal double sink)
Main Floor, Kitchen
ACM tan/light yellow sink drain putty on non-ACM yellow/clear sealant on non-ACM black rubber sink drain gasket (on metal sink) [Sample # 43]
2nd Floor, Bathroom
ACM black asphaltic waterproofing (on concrete foundation)
[Sample # 65]
Exterior/Building
Foundation
3’x3’x3’ air conditioning unit w/ assumed ACM internal components
Exterior, NE Corner
1’x2’6” Electrical panel w/ assumed ACM internal components Exterior, NE Corner
6”x8” Electrical panels w/ assumed ACM internal components Exterior, NE Corner and SE side of Deck
EHSI Project 11035 November 3rd, 2017
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
CRESCENT LAKE – BIRD & BIRD GUEST PROPERTY
ASBESTOS MATERIAL DESCRIPTION LOCATION
2’x3’x9’ Gas Furnace w/ assumed ACM internal components Main Floor, Under Stairs
GUEST HOUSE
6”x8” Electrical panel w/ assumed ACM internal components Exterior, Shed on NE side
1’x2” Electrical panel w/ assumed ACM internal components 1st Floor, Room 3 KEY: ACM = asbestos containing material, bold = bold text indicates asbestos-containing layer, w/ = with
1.4 OPINIONS AND RECOMMENDATIONS
The project includes demolition of the existing structures at the Bird Property; therefore, EHSI recommends that all impacted ACM and assumed ACM identified in paragraph 1.3 be removed and disposed of prior to renovation and demolition activities.
Any suspect materials not identified as having been surveyed in this report must be treated as an ACM until determined otherwise by a Certified Asbestos Building Inspector and NVLAP certified laboratory.
Washington State Department of Labor and Industries (L&I) Division of Occupational Safety and Health (DOSH) and the US Occupational Safety and Health Administration (OSHA) require employers to conduct a hazard assessment and take appropriate worker protection precautions whenever building materials are disturbed that have detectable quantities of lead. Since the type of work planned (e.g., demolition) will disturb the LCP, the contractor should perform an initial exposure assessment to determine if the additional personal protective measures and work practices are required beyond that of initial assessment. Special care should be taken to reduce potential employee exposure to lead when demolishing ceramic tile, porcelain bathroom fixtures and painted metal, including reducing airborne dust (eq., water misting and use of hand tools, and/or local exhaust ventilation).
Fluorescent light fixtures inspected have magnetic ballasts which are assumed to contain greater than two parts per million (> 2 ppm) PCB-dielectric fluid. Magnetic ballasts must be removed from fixtures and disposed of as Washington Department of Ecology (Ecology)
Dangerous Waste. All fluorescent tubes and bulbs contain mercury; any fluorescent tubes/bulbs to be disturbed during the project must be recycled as (Ecology) Universal Waste.
1.5 LIMITATIONS/DISCLAIMER
This report does not represent a comprehensive hazardous materials investigation for the subject property. This investigation has been conducted by EHSI under a specific scope of work authorized by the NPS for a specific purpose. Energized electrical panels, an air conditioner, and gas furnace were not sampled but were assumed to have ACM internal components based on the inspector’s experience with similar systems on other projects. This report and accompanying appendices include the supporting information for this executive summary.
EHSI Project 11035 November 3rd, 2017
2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT
2.1 BACKGROUND
The NPS plans to demolish the existing structures at the Bird Property. In conjunction with the planned demolition, the NPS has contracted EHSI to accomplish a pre-demolition limited lead and asbestos survey of the existing structures and to collect a lead-TCLP sample representative of the anticipated demolition debris. For the limited lead and asbestos survey, EHSI was tasked to use applicable federal, state, and local guidelines in the accomplishment of its survey. EHSI was further tasked to provide a written survey report including:
identification of all suspect materials; a determination of whether suspect materials were:
ACM, LCP, and LCM, and to provide analytical reports indicating the presence and quantity of the hazardous materials.
On September 25th and 27th, 2017, EHSI conducted a Limited Lead and Asbestos Survey Report which meets the Washington State “Good Faith Survey” requirements as cited in
Revised Code of Washington (RCW) 49.26.016 and implemented by L&I DOSH regulation, Washington Administrative Code (WAC) 296-62-07721, and Regulation Section 570 of the
Northwest Clean Air Agency (NWCAA).
2.2 BUILDING DESCRIPTION
The Bird Property is located on Lake Crescent at 2461 East Beach Road, Port Angeles, Washington. Structures on the property include a two-story single occupancy house used as a primary residence and a smaller two-story single occupancy guest house.
The primary residence building is a wood-framed structure with a concrete foundation. The building’s roof has wood shingles and the building exterior is made of wood siding. Interior floor finishes include: carpet and some tile. The interior wall finish is primarily wood paneling but a few locations have GWB walls. Interior ceiling finishes include: wood panels and GWB.
Windows are metal-framed and operable. Hot water is provided by an electric domestic hot water tank. Heating is provided by a gas furnace and the living room fireplace. Interior lighting consists of incandescent and fluorescent ceiling fixtures and natural light from the windows.
The guest house building is a wood-framed structure with a concrete foundation. The building’s roof has wood shingles and building exterior is made of wood siding. Interior floor finishes include: carpet and hardwood. The interior wall finishes include GWB w/ wood veneer, wall papers, & texturing over GWB and also decorative wood panels w/ mirrored strips on wall. One room’s walls are covered by built in book shelves. Interior ceiling finishes include:
GWB either with wall paper or painted, and one room has a drop ceiling w/ GWB above.
Windows are wood framed and mostly inoperable. Hot water is provided by an electric domestic hot water tank. Heating is provided by electric wall heaters. Interior lighting consists of incandescent and fluorescent ceiling fixtures and natural light from the windows.
EHSI Project 11035 November 3rd, 2017
2.3 SAMPLING METHODOLOGY
2.3.1 Asbestos-Containing Materials
The EHSI field inspectors are asbestos Building Inspectors, certified under the requirements of the United States Environmental Protection Agency (USEPA) AHERA regulation 40 Code of Federal Regulations (CFR) 763, Subpart E. Copies of their certificates are provided in Appendix
C. The number of bulk samples collected and their locations are based on the AHERA regulation and the guidelines provided by the USEPA Document 560/5-85-030a, October
1985, Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials.
EHSI collected samples and obtained analytical data for suspect ACM identified on the property. Once collected, each bulk sample was sealed in an unadulterated plastic bag to eliminate the possibility of cross-contamination. “Chain-of-Custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, and
Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with USEPA Method 600/R-93/116. Samples were analyzed for asbestos content by Seattle Asbestos Test, LLC (SAT) located in Seattle, Washington. SAT participates in the National Institute for Standards and Technology (NIST) National Voluntary
Laboratory Accreditation Plan (NVLAP). Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on USEPA, state, and local regulations.
Samples in the report labeled as ##QA are quality assurance (QA) samples. Split samples were taken from the same location and they were sent to separate laboratories. QA samples were submitted to, NVL Laboratories, Inc. (NVL) in Seattle, WA, another NVLAP laboratory.
Copies of both laboratories’ NVLAP certifications are included in Appendix D.
2.3.2 Lead-Containing Paint/Lead-Containing Materials
EHSI used an Olympus Delta-Pro x-ray fluorescence (XRF) Spectrum Analyzer to measure lead content on interior and exterior paint coatings and other suspect LCM. Measurements were representative of all layers of paint and/or LCM. A summary of Lead Paint XRF results is provided in Table 3. Bulk quality assurance samples were taken for a representative number of LBP and LCM and were sent to NVL located in Seattle, Washington, an accredited laboratory for Atomic Absorption Spectroscopy (USEPA Method-7000B) by the American Industrial
Hygiene Association (AIHA) under the Environmental Lead Laboratory Accreditation Program (ELLAP). Copies of laboratory reports and field data forms for lead are in Appendix B.
2.4 SAMPLING RESULTS
2.4.1 Asbestos-Containing Materials
Sixty-seven (67) bulk samples of suspect ACM were collected as part of the survey of the primary residence and forty-eight (48) bulk samples of suspect ACM were collected as part of the survey of the guest house. Four (4) of those samples from the primary residence and three (3) of those samples from the guest house were split for quality assurance analyses.
Limited destructive inspection was conducted to identify hidden and/or concealed materials.
EHSI Project 11035 November 3rd, 2017
Copies of the asbestos analytical laboratory results are included in Appendix A. Asbestos and lead sample location drawings are provided in Appendix E. Asbestos sampling information including: sample number, material description, sample location, and analytical results are summarized in Table 1. The ACM and assumed ACM identified during this survey, including the quantity and location, is summarized in Table 2. Suspect materials not sampled were assumed to be ACM.
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
Bird Primary Residence
11035-BIR-
Main Floor, Livingroom
Layer 1: Off-white carpet Layer 2: Yellow mastic
Layer 3: Brown carpet backing
Layer 4: Brown carpet pad Layer 5: Red mastic (on plywood)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
N/A N/A
N/A
N/A N/A
11035-BIR-
Main Floor, Livingroom near
Fireplace
Layer 1: White woven carpet Layer 2: Beige mastic
Layer 3: Brown mesh backing Layer 4: Multi-color foam carpet pad Layer 5: Red mastic
Layer 6: Brown fibrous carpet pad
Layer 7: Red mastic (on plywood)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
L7: ND
N/A N/A
N/A N/A
N/A
N/A
N/A
11035-BIR-
Main Floor, Livingroom near fireplace
Layer 1: Plywood
Layer 2: Black asphaltic vapor barrier Layer 3: Wood subfloor
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-BIR-
Main Floor, Livingroom
Layer 1: Plywood
Layer 2: Black asphaltic vapor barrier
Layer 3: Wood subfloor
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-BIR-
05QA
Main Floor, Kitchen Closet
Layer 1: 8”x8” Brown/orange ceramic floor tile
Layer 2: Gray mortar Layer 3: Maroon/dark red grout
Layer 4: Tan mastic (on wood)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A N/A
N/A
11035-BIR-
06QAX1
Main Floor, Bathroom
Layer 1: Green/off-white ceramic coating
Layer 2: 4”x8” Red ceramic floor tiles
Layer 3: Red grout Layer 4: Green/gray mastic (on wood)
L1: ND
L2: ND
L3: ND
L4: 0.25%
N/A
N/A
N/A Chrysotile
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-BIR-
Main Floor, Master
Bathroom
Layer 1: Brown ceramic coating Layer 2: 4”x8” Red ceramic floor tile Layer 3: Maroon/dark red grout
Layer 4: Off-white mastic Layer 5: Wood subfloor
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
N/A N/A
N/A
N/A N/A
11035-BIR-
2nd Floor, Bathroom
Layer 1: Off-white ceramic coating Layer 2: 6”x8” Tan ceramic floor tile
Layer 3: Maroon/dark red grout Layer 4: Green/gray mastic (on wood)
L1: ND
L2: ND
L3: ND
L4: 0.25%
N/A
N/A
N/A Chrysotile
11035-BIR-
Main Floor, Master Bathroom
Layer 1: Light brown leaf pattern wall paper
Layer 2: Trace white skim coat w/ paper
Layer 3: GWB wall w/ paper (mid-wall)
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-BIR-
Main Floor, Master Bathroom
Layer 1: Light brown leaf pattern wall paper Layer 2: Off-white paper
Layer 3: Off-white skim coat/JC w/ paint
Layer 4: GWB wall w/ paper
(corner)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A
N/A
11035-BIR-
Main Floor, Master Bathroom
Layer 1: Light brown leaf pattern wall paper
Layer 2: Off-white paper Layer 3: GWB wall w/ paint w/ paper (mid-wall)
L1: ND
L2: ND
L3: ND
N/A
N/A N/A
11035-BIR-
Main Floor, Master
Bedroom, Washer
Dryer Closet
Layer 1: White texturing skim coat w/ paint and paper
Layer 2: Light gray GWB ceiling w/ paper (corner)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Main Floor, Master
Bedroom, Washer
Dryer Closet
Layer 1: Trace white texturing skim coat w/ paint
Layer 2: GWB wall w/ paper
(mid-wall)
L1: ND
L2: ND
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-BIR-
Main Floor, Master
Bedroom, Washer
Dryer Closet
Layer 1: Trace white texturing skim coat w/ paint
Layer 2: GWB wall w/ paper
(mid-wall)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Main Floor, Master
Bedroom, Washer
Dryer Closet
Layer 1: Trace white texturing skim coat w/ paint Layer 2: Light gray GWB ceiling w/ paper (mid-ceiling)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Main Floor, Bathroom
Layer 1: Tan/light green leaf pattern wall paper
Layer 2: Off-white paper
Layer 3: White JC w/ paint and paper
Layer 4: GWB wall w/ paper (corner)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A
N/A
11035-BIR-
Main Floor, Bathroom, Layer 1: Tan/light green leaf pattern wall paper Layer 2: Off-white paper
Layer 3: GWB wall w/ paint and paper (mid-wall)
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-BIR-
Main Floor, Corridor/
Stairwell
Layer 1: Black asphaltic vapor barrier Layer 2: Black asphaltic vapor barrier (behind wood siding on wood)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
2nd Floor Entry/
Stairwell
Layer 1: Black asphaltic vapor barrier Layer 2: Unfinished GWB w/ paper (behind wood siding on wood)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
2nd Floor, Bedroom
Layer 1: Unfinished GWB w/ paper
Layer 2: Silver foil Layer 3: Brown paper vapor barrier w/ black mastic Layer 4: Pink fiberglass batt insulation (behind wood ceiling on wood)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-BIR-
Main Floor, Bathroom
Layer 1: Tan/light green leaf pattern wall paper
Layer 2: Off-white paper Layer 3: GWB wall w/ paint and paper (mid-wall)
L1: ND
L2: ND
L3: ND
N/A
N/A N/A
11035-BIR-
Main Floor, Livingroom
Gray duct seam sealant ND N/A
11035-BIR-
Main Floor, Livingroom
Black rubber window glazing gasket (on 8’ sliding glass doors)
ND N/A
11035-BIR-
Main Floor, Livingroom
Layer 1: Black foam window glazing gasket Layer 2: Clear mastic (on 4’x6’, 3’x6’ & 5’x6’ metal-framed windows)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Main Floor, Livingroom
Layer 1: White foam window glazing gasket Layer 2: Trace tan mastic (on
3’x10’ metal-framed windows)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
2nd Floor, Bathroom
Layer 1: Tan/light green leaf pattern wall paper
Layer 2: Off-white paper
Layer 3: Trace White JC w/ paint
Layer 4: GWB wall w/ paper (corner)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A
N/A
11035-BIR-
2nd Floor, Bathroom
Layer 1: Tan/light green leaf pattern wall paper Layer 2: Off-white paper
Layer 3: White JC w/ paint and paper
Layer 4: GWB wall w/ paper (seam)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A
N/A
11035-BIR-
2nd Floor, Bathroom
Layer 1: Tan/light green leaf pattern wall paper Layer 2: Off-white paper
Layer 3: GWB wall w/ paint and paper (mid-wall)
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-BIR-
Main Floor, Kitchen
Black rubber window glazing gasket (on 5’x3’4” metal-framed windows)
ND N/A
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-BIR-
Main Floor, Livingroom
Layer 1: Black foam window glazing gasket
Layer 2: Yellow/clear mastic Layer 3: Wood skylight frame
(4’x11’)
L1: ND
L2: ND
L3: ND
N/A
N/A N/A
11035-
BIR-31
Main Floor, Livingroom
Layer 1: Brown leather stair rail cover
Layer 2: Brown fibrous material w/ brown/green mastic
Layer 3: Trace wood stair rail
L1: ND
L2: 50%
L3: ND
N/A
Chrysotile
N/A
11035-BIR-
Main Floor, Corridor/
Stairwell
Layer 1: Trace yellow/clear mastic
Layer 2: Yellow/clear double-sided tape
Layer 3: Yellow foam Layer 4: Wood (behind all decorative & large wall mirrors)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A N/A
11035-BIR-
2nd Floor, Bedroom
Black window glazing sealant (on 1’ OD port hole windows)
ND N/A
11035-BIR-
2nd Floor, Bedroom
Layer 1: White window glazing gasket Layer 2: Clear mastic (on 3’x3’ windows & 3’x6’ skylights)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Main Floor, Livingroom
Fireplace
White fibrous fireplace packing material (inside 3’x4’ fireplace)
ND N/A
11035-BIR-
Main Floor, Livingroom
Fireplace
Light gray firebrick (in 3’x4’ fireplace)
ND N/A
11035-BIR-
Main Floor, Livingroom
Fireplace
Gray/dark purple mortar (in 3’x4’ fireplace & on 8’x10’ mantle)
ND N/A
11035-BIR-
Main Floor, Livingroom
Closet
Layer 1: Translucent white/clear mastic
Layer 2: Wood
L1: ND
L2: ND
N/A
N/A
11035-
BIR-39QAX
Main Floor, Kitchen
Black sink undercoat (on 2’x3’ metal double sink)
3% Chrysotile
11035-
BIR-40
Main Floor, Kitchen
Layer 1: Light brown sink drain putty Layer 2: Black rubber sink drain gasket (on 2’x3’ metal double sink)
L1: 3%
L2: ND
Chrysotile
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-BIR-
Main Floor, Kitchen
Layer 1: Brown wood patterned vinyl shelf liner
Layer 2: Clear mastic (in closets on wood)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Main Floor, Master Bathroom
Dark green/brown bathtub caulking
ND N/A
11035-
BIR-43
2nd Floor, Bathroom
Layer 1: Tan/light yellow sink drain putty Layer 2: Yellow/clear sealant
Layer 3: Black rubber sink drain gasket (on metal sink)
L1: 3%
L2: ND
L3: ND
Chrysotile
N/A
N/A
11035-BIR-
Main Floor, Bathroom
Green/gray mastic (between ceramic sink and sink counter) 0.5% Chrysotile
11035-BIR-
Main Floor, Bathroom
Layer 1: Off-white sink drain caulking
Layer 2: Black rubber sink drain gasket (on ceramic sink)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Exterior, Roof on North Side
Layer 1: Silver foil
Layer 2: Black window glazing putty (on 4’x6’ skylights)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Exterior, Roof on North Side
Off-white window frame caulking (on 4’x6’ skylights)
ND N/A
11035-BIR-
Exterior, Roof on North Side
Layer 1: Beige nail hole sealant Layer 2: Trace wood
L1: ND
L2: ND
N/A N/A
11035-BIR-
Exterior, Roof on
North Side
Layer 1: Black asphaltic vapor barrier Layer 2: Black asphaltic tar
(beneath wood shingles on wood)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
50QA
Exterior, Roof on East Side
Layer 1: Black asphaltic vapor barrier
Layer 2: Black asphaltic tar (beneath wood shingles on wood)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Exterior, Roof on East
Side
Tan mastic (beneath wood fence post caps)
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-BIR-
Exterior, Roof on South Side
Layer 1: Brown door frame caulking
Layer 2: Wood door frame (on all metal covers over 1st floor doors & windows)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Exterior Shed, West
Side
Black asphaltic vapor barrier (beneath wood shingles on wood)
ND N/A
11035-BIR-
Exterior Shed, East
Side
Black asphaltic vapor barrier (beneath wood shingles on wood)
ND N/A
11035-BIR-
Exterior Shed, East
Side
Brown sealant (between wood support beam & roof trusts)
ND N/A
11035-BIR-
Exterior, Carport, South Side
Black asphaltic vapor barrier (beneath wood roof shingles on wood)
ND N/A
11035-BIR-
Exterior, Carport, West Side
Black asphaltic vapor barrier (beneath wood roof shingles on wood)
ND N/A
11035-BIR-
Exterior, Front
Entrance
Black asphaltic vapor barrier (between house foundation and concrete patio slab)
ND N/A
11035-BIR-
Exterior, Near Steps to Deck
Layer 1: Tan vapor barrier Layer 2: Clear plastic (around base of phone pole)
L1: ND
L2: ND
N/A N/A
11035-BIR-
Dock Light gray caulking w/ paint (on wood light posts on deck)
ND N/A
11035-BIR-
Exterior, Deck
Black foam gasket (on electrical outlets on wood deck)
ND N/A
11035-BIR-
62QA
Exterior, Fence Cap
Brown fence cap seam caulking ND N/A
11035-BIR-
Exterior, West Side
Black waterproofing (on concrete foundation)
ND N/A
11035-BIR-
Exterior West Side, South Corner
Black waterproofing (on concrete foundation)
ND N/A
11035-
BIR-65
Exterior
North Side
Black asphaltic waterproofing (on concrete foundation)
4% Chrysotile
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-BIR-
Exterior, Natural Gas
Generator
Shed
Layer 1: 6” OD Orange flange gasket material
Layer 2: Black/gray gasket material (associated w/ 2.5’x4’ generator)
L1: ND
L2: ND
N/A
N/A
11035-BIR-
Exterior, Natural Gas Generator
Shed
Layer 1: Silver plastic Layer 2: Dark green foam
Layer 3: Clear plastic Layer 4: Clear mastic
(associated w/ 2.5’x4’ generator)
L1: ND
L2: ND
L3: ND
L4: ND
N/A N/A
N/A N/A
Bird Guest House
11035-
BIRG-01
Main Floor, Livingroom
Layer 1: Multi-color carpet Layer 2: Brown/black mesh backing Layer 3: Trace blue coating
Layer 4: Brown fibrous carpet pad Layer 5: Trace red coating (on wood)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
N/A N/A
N/A
N/A
N/A
11035-
BIRG-02
Main Floor, Livingroom near Fireplace
Layer 1: Blue carpet Layer 2: Off-white mesh backing Layer 3: Yellow mastic
Layer 4: Wood
L1: ND
L2: ND
L3: ND
L4: ND
N/A N/A
N/A
N/A
11035-
BIRG-03
Main Floor, Livingroom near fireplace
Layer 1: Multi-color carpet Layer 2: Brown mesh backing
Layer 3: Light yellow mastic Layer 4: Wood fiberboard
Layer 5: Wood subfloor
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
N/A N/A
N/A N/A
N/A
11035-
BIRG-04
Main Floor, Livingroom
Layer 1: White carpet Layer 2: White mesh backing
Layer 3: White mastic Layer 4: Pink foam carpet pad
Layer 5: Green/blue mastic (on concrete)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
N/A N/A
N/A N/A
N/A
11035-
BIRG-05
Main Floor, Kitchen
Closet
Layer 1: Brown hardwood flooring
Layer 2: Green/blue mastic (on concrete)
L1: ND
L2: ND
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
BIRG-06QA
Main Floor, Bathroom
Layer 1: White carpet Layer 2: White mesh backing
Layer 3: White mastic Layer 4: Blue/multi-colored foam carpet pad Layer 5: Yellow/tan mastic (on concrete)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
N/A N/A
N/A N/A
N/A
11035-
BIRG-07
Main Floor, Master Bathroom
Layer 1: Blue ceramic floor tiles Layer 2: White mortar
Layer 3: Gray grout
Layer 4: Concrete
L1: ND
L2: ND
L3: ND
L4: ND
N/A N/A
N/A
N/A
11035-
BIRG-08
2nd Floor, Bathroom
Layer 1: 4” Blue ceramic wall tile
Layer 2: White mortar Layer 3: Gray grout
Layer 4: Gray mortar bed Layer 5: Brown GWB paper
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
N/A
N/A N/A
N/A N/A
11035-
BIRG-09
Main Floor, Master
Bathroom
Layer 1: Black foam window glazing gasket Layer 2: Clear mastic
Layer 3: Wood framed sliding glass door
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
BIRG-10
Main Floor, Master
Bathroom
Layer 1: Beige window glazing putty Layer 2: Wood (in wood framed windows)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-11
Main Floor, Master Bathroom
Layer 1: White JC w/ paint Layer 2: Yellow woven seam tape Layer 3: GWB wall w/ paper
(seam)
L1: ND
L2: ND
L3: ND
N/A N/A
N/A
11035-
BIRG-12
Main Floor, Master
Bedroom, Washer Dryer Closet
GWB wall w/ paint and paper (mid-wall)
ND N/A
11035-
BIRG-13
Main Floor, Master Bedroom, Washer Dryer Closet
Layer 1: White JC w/ paint
Layer 2: Yellow woven seam tape
Layer 3: GWB ceiling w/ paper (corner)
L1: ND
L2: ND
L3: ND
N/A
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
BIRG-14
Main Floor, Master
Bedroom, Washer
Dryer Closet
GWB ceiling w/ paint and paper
(mid-ceiling)
ND N/A
11035-
BIRG-15
Main Floor, Master
Bedroom, Washer
Dryer Closet
GWB wall w/ paint and paper (mid-wall)
ND N/A
11035-
BIRG-16
Main Floor, Bathroom
Layer 1: Navy blue, white & tan striped wall paper
Layer 2: Blue mastic
Layer 3: White paper (associated w/ Sample 11035-
BIRG-15)
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
BIRG-17
Main Floor, Bathroom, Layer 1: Off-white, white & tan striped wall paper
Layer 2: Off-white mastic Layer 3: White paper
(associated w/ Sample 11035-
BIRG-11,12,13)
L1: ND
L2: ND
L3: ND
N/A
N/A N/A
11035-
BIRG-18
Main Floor, Corridor/ Stairwell
Layer 1: Beige window glazing putty Layer 2: Wood window frame
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-19
2nd Floor
Entry/ Stairwell
Layer 1: Tan wall paper
Layer 2: Clear mastic (on wood shelves)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-20
2nd Floor, Bedroom
Layer 1: Black foam window glazing gasket Layer 2: Clear mastic (on
1’8”x3.5’ and 2’x3.5” skylights)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-21
Main Floor, Bathroom
Layer 1: White skim coat w/ paint and paper
Layer 2: GWB ceiling w/ paper (corner)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-22
Main Floor, Livingroom
Layer 1: White skim coat w/ paint Layer 2: GWB ceiling w/ paper
(mid-ceiling)
L1: ND
L2: ND
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
BIRG-23
Main Floor, Livingroom
Layer 1: White skim coat w/ paint
Layer 2: Yellow woven seam tape
Layer 3: White GWB ceiling w/ paper (seam)
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
BIRG-24
Main Floor, Livingroom
Layer 1: Brown wood veneer
Layer 2: Clear/yellow mastic Layer 3: White GWB (mid-wall)
L1: ND
L2: ND
L3: ND
N/A
N/A N/A
11035-
BIRG-25
Main Floor, Livingroom
Layer 1: Green & tan leaf pattern wall paper Layer 2: Off-white paper
Layer 3: GWB wall w/ paper
(mid-wall)
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
BIRG-26
2nd Floor, Bathroom
Layer 1: Navy blue, w/ white & tan stripes wall paper
Layer 2: Blue mastic Layer 3: White paper
Layer 4: Off-white mastic Layer 5: White skim coat
Layer 6: GWB wall w/ paper (corner)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
N/A
N/A N/A
N/A N/A
N/A
11035-
BIRG-27
2nd Floor, Bathroom
Layer 1: Tan/off-white w/ white stripes wall paper Layer 2: Trace off-white mastic
Layer 3: White paper Layer 4: Off-white mastic
Layer 5: White skim coat w/ paper and paint Layer 6: GWB wall w/ paper
(corner)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
N/A
N/A
N/A N/A
N/A
N/A
11035-
BIRG-28
2nd Floor, Bathroom
Layer 1: Off-white/tan wall paper
Layer 2: Trace tan mastic Layer 3: Off-white woven backing Layer 4: Off-white mastic
Layer 5: White skim coat w/ paint
Layer 6: GWB wall w/ paper
(mid-wall)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
N/A
N/A N/A
N/A
N/A
N/A
11035-
BIRG-29
Main Floor, Kitchen
Tan pipe dope (on water pipe fittings to hot water heater)
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
BIRG-30
Main Floor, Livingroom
Layer 1: Beige pipe dope Layer 2: White plumber’s tape
(on water pipe fittings to pump)
L1: ND
L2: ND
N/A N/A
11035-
BIRG-31QA
Main Floor, Livingroom
Layer 1: Brown/tan paper vapor barrier w/ black mastic Layer 2: Pink fiberglass batt insulation (in wood framed walls)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-32
Main Floor, Corridor/ Stairwell
Layer 1: Gray plastic mirrored strips Layer 2: Clear mastic
Layer 3: Veneered particle board Layer 4: Wood framed wall
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A
N/A
11035-
BIRG-33
2nd Floor, Bedroom
Layer 1: White troweled on texturing w/ paint Layer 2: GWB wall w/ paper
(corner)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-34
2nd Floor, Bedroom
Layer 1: White troweled on texturing w/ paint
Layer 2: GWB wall w/ paper (mid-wall)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-35
Main Floor, Livingroom Fireplace
Layer 1: White troweled on texturing w/ paint Layer 2: GWB wall w/ paper
(mid-wall)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-36
Main Floor, Livingroom
Fireplace
Layer 1: Black asphaltic vapor barrier
Layer 2: Wood shingles (on wood)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-37
Main Floor, Livingroom Fireplace
Reddish brown seam sealant
(between wood door & window trim and wood siding)
ND N/A
11035-
BIRG-38
Main Floor, Livingroom
Closet
Layer 1: Black plastic window frame gasket Layer 2: Green/gray foam
Layer 3: Clear/green mastic
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
BIRG-39
Main Floor, Kitchen
Layer 1: Off-white caulking Layer 2: Wood (along seams of wood deck guard rail)
L1: ND
L2: ND
EHSI Project 11035 November 3rd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
BIRG-40
Main Floor, Kitchen
Layer 1: Black asphaltic vapor barrier
Layer 2: Black asphaltic vapor barrier (underneath wood shingles on wood)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-41
Main Floor, Kitchen
Black asphaltic vapor barrier (behind wood siding on wood)
ND N/A
11035-
BIRG-42
Main Floor, Master Bathroom
Black asphaltic vapor barrier
(behind wood siding on wood)
ND N/A
11035-
BIRG-43
2nd Floor, Bathroom
Black rubber gasket (on 1’ diameter metal port window in front door)
ND N/A
11035-
BIRG-44
Main Floor, Bathroom
Gray window glazing putty (on
1’ OD metal port window in front door)
ND N/A
11035-
BIRG-45QA
Main Floor, Bathroom
Layer 1: 3-tab black asphaltic roofing w/ red sand Layer 2: Black asphaltic tar
Layer 3: 3-tab black asphaltic roofing w/ orange sand
Layer 4: Black asphaltic tar
Layer 5: Clear plastic Layer 6: Black asphaltic vapor barrier (on wood)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
N/A
N/A
N/A
N/A
N/A N/A
11035-
BIRG-46
Exterior, Roof on
North Side
Light gray pipe dope (on pipe fittings on 3’ diameter 6’ long propane tank)
ND N/A
11035-
BIRG-47
Exterior, Roof on North Side
Layer 1: Black asphaltic deck sealant
Layer 2: Wood (between finished wood flooring & wood decking)
L1: ND
L2: ND
N/A
N/A
11035-
BIRG-48
Exterior, Roof on
North Side
Translucent amber/beige/clear seam sealant w/ paint (along seams between deck and house siding)
ND N/A
KEY: bold = bold text indicates asbestos-containing layer, GWB = gypsum wall board, JC = joint compound, ND = non-detect, N/A = not applicable, OD = outer diameter, w/ = with, X When QA lab and primary lab sample results differed, EHSI reported the most restrictive (e.g., highest % asbestos) in Table 1. Analytical results for all analyses are provided in
Appendix A.
EHSI Project 11035 November 3rd, 2017
1 Point Counted Results. Preliminary analytical reports indicated that three sample contained approximately 2% chrysotile asbestos (Sample #s 11035-BIR-06, 08, and 44). EHSI re-submitted the samples reported to have greater than 1% asbestos concentration for re-analysis using the more precise EPA “Point Count” method. The “Point Count” analytical method is recommended by the EPA for samples with less than 10% asbestos. Based on the results of that re-analysis, materials found to contain less than 1% (<1%) asbestos were determined to be a non-ACM (e.g., containing < 1% asbestos fibers) and are therefore not ACM. Only the “Point Count” re-analysis concentrations are listed in Table 1. Analytical results for all analyses are provided in Appendix A.
Materials containing <1% asbestos fibers are considered a non-ACM and are not regulated for disposal purpose. However, removal of <1% asbestos materials are considered an unclassified asbestos operation by DOSH. As directed by WRD 23.30, for all other demolition of materials with <1% asbestos, employees shall have received at least two hours of asbestos awareness training as specified L&I DOSH Instruction WAC 296-62-07722(5).
Table 2 summarizes materials identified by EHSI as containing greater than 1% asbestos fibers during its survey, and un-sampled materials assumed to be ACM. The Table 2 Summary of Asbestos Containing Materials is for engineering cost estimating purposes and is not intended for bid quantifications.
TABLE 2
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY
PRIMARY RESIDENCE
Non-ACM brown leather stair rail cap on ACM brown fibrous material w/ ACM brown/green mastic on wood [Sample # 31]
Main Floor, Livingroom
35 SF
ACM black sink undercoat w/ ACM light brown sink drain putty with non-ACM black rubber sink drain gasket (on 2’x3’ metal double sink) [Sample #
39 and 40]
Main Floor, Kitchen 1 EA
ACM tan/light yellow sink drain putty on non- ACM yellow/clear sealant on non-ACM black rubber sink drain gasket (on metal sink) [Sample # 43]
2nd Floor, Bathroom 1 EA
ACM black asphaltic waterproofing (on concrete foundation) [Sample # 65]
Exterior/Building Foundation
900 SF
3’x3’x3’ air conditioning unit w/ assumed ACM internal components Exterior, NE Corner 1 EA
1’x2’6” Electrical panel w/ assumed ACM internal components
Exterior, NE Corner 2 EA
6”x8” Electrical panels w/ assumed ACM internal components
Exterior, NE Corner and SE side of Deck
3 EA
2’x3’x9’ Gas Furnace w/ assumed ACM internal components
Main Floor, Under
Stairs
1 EA
GUEST HOUSE
6”x8” Electrical panel w/ assumed ACM internal components
Exterior, Shed on NE side
2 EA
EHSI Project 11035 November 3rd, 2017
TABLE 2
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY
1’x2” Electrical panel w/ assumed ACM internal components 1st Floor, Room 3 1 EA
KEY: ACM = asbestos containing material, bold = bold text indicates asbestos-containing layer, EA = each, LF = linear feet, SF = square feet, w/ = with
ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contractors should be aware of the potential for concealed suspect ACM and have pre-planned contingencies for the handling of suspect
ACM discovered during renovation and/or demolition work. Any concealed suspect ACM material that was not sampled or was assumed to be ACM and included in this report, must be treated as ACM until proven otherwise by a Certified AHERA Building Inspector and a certified laboratory. Contingency plans should include stopping work on identification of concealed suspect ACM, evacuation of the area, and sampling by a Certified AHERA Building Inspector. Concealed suspect material may include, but is not limited to: non-fiberglass pipe or roof drain insulation; spray-applied coatings; cementitious board; asphalt or paper vapor barriers; vinyl floorings and mastics.
2.4.2 Lead-Containing Paint and Building Materials
In the primary residence, seventy-two (72) samples were analyzed for lead using the X-Ray fluorescence (XRF) analyzer and in the guest house, fifty-one (51) samples were analyzed for lead using the XRF. Results marked with “< LOD” are less than the limit of detection. XRF paint sample results in the primary residence ranged from 5 milligrams of lead per square centimeter (mg Pb/cm2) to <LOD. In the guest house all XRF paint sample results were <LOD.
Bolded results indicate materials coated with “lead-based paint” (e.g., >1.0 mg/cm2) as defined by USEPA regulation 40CFR745 and Washington State Commerce regulation WAC 365-230. The results are provided in Table 3 of this report.
Note that within the primary residence, stained glass windows were observed as follows: one
(1) 4’x12’ window by entry/stairs, one (1) 21” diameter hanging light in living room, two (2) 6”x3’6” windows in kitchen pantry doors, six (6) 1’9” square windows in kitchen used as ceiling panels, and six (6) 1’6” square windows in master bathroom used as ceiling panels.
All stained-glass windows are assumed to contain lead cames and solder.
Table 3 summarizes XRF lead samples, including sample number, material description, substrate, color, location and analytical results.
EHSI Project 11035 November 3rd, 2017
TABLE 3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
Read
Component Substrate Color Building Room
Lead Conc.
(mg/cm2)
PRIMARY RESIDENCE
1 NIST Check Wood Red Primary Residence N/A 0.92
2 NIST Check Wood Red Primary Residence N/A 0.93
3 NIST Check Wood Red Primary Residence N/A 0.92
4 Wall Wood Light
Brown Primary Residence Entry <LOD
5 Door Wood Light
Brown Primary Residence Entry <LOD
6 Door Trim Wood Light
Brown Primary Residence Entry <LOD
7 Door Frame Wood Light
Brown Primary Residence Entry <LOD
8 Window Frame Wood Light
Brown Primary Residence Entry <LOD
9 Door Wood Light
Brown Primary Residence Entry <LOD
10 Stair Rail Leather Light
Brown Primary Residence Entry <LOD
11 Stair Rail Wood Light
Brown Primary Residence Entry <LOD
12 Structural Beam Wood Light
Brown Primary Residence Bedroom <LOD
13 Ceiling Wood Light
Brown Primary Residence Bedroom <LOD
14 Closet Door Wood Light
Brown Primary Residence Bedroom <LOD
15 Closet Shelf Wood Light
Brown Primary Residence Bedroom 0.08
16 Floor Wood Light
Brown Primary Residence Bedroom <LOD
17 Window Frame Wood Light
Brown Primary Residence Bedroom <LOD
18 Counter Wood Brown Primary Residence Bathroom <LOD
19 Backdrop Wood Brown Primary Residence Bathroom <LOD
20 Floor Ceramic Beige Primary Residence Bathroom 5
21 Door Trim Ceramic Light
Brown Primary Residence Shower 5
22 Floor Ceramic Tan Primary Residence Shower <LOD
23 Wall Ceramic Tan Primary Residence Shower 5
24 Wall Drywall Light
Brown Primary Residence Bathroom <LOD
25 Cabinet Wood Light
Brown Primary Residence Bathroom <LOD
EHSI Project 11035 November 3rd, 2017
TABLE 3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
Read
Component Substrate Color Building Room
Lead Conc.
(mg/cm2)
26 Stair Rail Wood Brown Primary Residence Loft <LOD
27 Closet Shelf Wood Brown Primary Residence Loft <LOD
28 Guard Rail Wood Brown Primary Residence Loft <LOD
29 Floor Mortar Gray Primary Residence Entry <LOD
30 Floor Ceramic Brown Primary Residence Kitchen 5
31 Counter Wood Brown Primary Residence Kitchen <LOD
32 Floor Ceramic Off
White Primary Residence Bathroom 5
33 Wall Drywall Light
Brown Primary Residence Bathroom <LOD
34 Wall Mortar Light
Gray Primary Residence Livingroom <LOD
35 Fireplace Mantle Wood Dark
Brown Primary Residence Livingroom <LOD
36 Closet Ceramic Brown Primary Residence Livingroom 5
37 Door Wood Brown Primary Residence Livingroom 0.01
38 Floor Ceramic Light
Brown Primary Residence
Master
Bedroom
39 Wall Drywall Light
Brown Primary Residence
Master
Bedroom
<LOD
40 Wall Drywall White Primary Residence Master
Bedroom
<LOD
41 Window Frame Metal Brown Primary Residence Master
Bedroom 0.01
42 Rolldown Guard Metal Tan Primary Residence Exterior <LOD
43 Rolldown Guard Metal Dark
Brown Primary Residence Exterior <LOD
44 Bench Wood Dark
Brown Primary Residence Exterior <LOD
45 Wall Trim Wood Dark
Brown Primary Residence Exterior <LOD
46 Wall Wood Brown Primary Residence Exterior <LOD
47 Soffit Wood Brown Primary Residence Exterior <LOD
48 Door Wood Brown Primary Residence Exterior <LOD
49 Door Trim Wood Brown Primary Residence Exterior <LOD
50 Fasia Wood Dark
Brown Primary Residence Exterior <LOD
51 Gutter Metal Dark
Brown Primary Residence Exterior 0.02
52 Downspout Metal Brown Primary Residence Exterior <LOD
EHSI Project 11035 November 3rd, 2017
TABLE 3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
Read
Component Substrate Color Building Room
Lead Conc.
(mg/cm2)
53 Stair Rail Wood Beige Primary Residence Exterior <LOD
54 Electrical Box Metal Brown Primary Residence Exterior 0.02
55 Electrical Box Plastic Light
Gray Primary Residence Exterior <LOD
56 Stairs Wood Beige Primary Residence Exterior <LOD
57 Closet Door Wood Dark
Brown Primary Residence Exterior <LOD
58 Door Trim Wood Dark
Brown Primary Residence Exterior <LOD
59 Deck Wood Beige Primary Residence Exterior <LOD
60 Deck Railing Wood Dark
Brown Primary Residence Exterior <LOD
61 Awning Supports Metal Beige Primary Residence Exterior <LOD
62 Wall Concrete Dark
Brown Primary Residence Exterior <LOD
63 Wall Concrete Brown Primary Residence Exterior <LOD
64 Deck Skirt Wall Concrete Beige Primary Residence Exterior <LOD
65 Hot Tub Fiber Board Light
Green Primary Residence Exterior <LOD
66 Dock Stair Rail Metal Dark
Brown Primary Residence Exterior 0.36
67 Dock Trim Wood Dark
Brown Primary Residence Exterior <LOD
68 Dock Wood Beige Primary Residence Exterior <LOD
69 Structural Beam Wood Dark
Brown Primary Residence
Detached
Shelter
<LOD
70 Structural Beam Wood Gray Primary Residence Detached
Shelter
<LOD
71 Window Trim Wood Dark
Brown Primary Residence Exterior <LOD
72 Window Trim Metal Black Primary Residence Exterior <LOD
73 Window Trim Metal Dark
Brown Primary Residence Exterior <LOD
74 Structural Beam Wood Light
Brown Primary Residence
Detached
Shelter
<LOD
75 Floor Concrete Black Primary Residence Detached
Shelter
<LOD
76 NIST Check Wood Red Primary Residence N/A 0.91
77 NIST Check Wood Red Primary Residence N/A 0.92
78 NIST Check Wood Red Primary Residence N/A 0.92
EHSI Project 11035 November 3rd, 2017
TABLE 3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
Read
Component Substrate Color Building Room
Lead Conc.
(mg/cm2)
GUEST HOUSE
1 NIST Check Wood Red Guest House N/A 0.91
2 NIST Check Wood Red Guest House N/A 0.93
3 NIST Check Wood Red Guest House N/A 0.93
4 Door Wood Light
Brown Guest House Entry <LOD
5 Door Frame Wood Light
Brown Guest House Entry <LOD
6 Door Trim Wood Light
Brown Guest House Entry <LOD
7 Floor Wood Light
Brown Guest House Entry <LOD
8 Wall Wood Light
Brown Guest House Bathroom <LOD
9 Ceiling Wood Light
Brown Guest House Bathroom <LOD
10 Wall Drywall Light
Green Guest House Bathroom <LOD
11 Wall Drywall Tan Guest House Bathroom <LOD
12 Wall Ceramic Light
Gray Guest House Bathroom <LOD
13 Window Wood Light
Brown Guest House Room 2 <LOD
14 Window Trim Wood Light
Brown Guest House Room 2 <LOD
15 Window Frame Wood Light
Brown Guest House Room 2 <LOD
16 Cabinet Wood Brown Guest House Room 2 <LOD
17 Ceiling Drywall White Guest House Room 2 <LOD
18 Cabinet Drywall Light
Brown Guest House Room 3 <LOD
19 Wall Drywall Tan Guest House Room 3 <LOD
20 Cabinet Wood White Guest House Room 1 <LOD
21 Stair Rail Wood Light
Brown Guest House Entry <LOD
22 Stairs Wood Light
Brown Guest House Entry <LOD
23 Baseboard Wood Light
Brown Guest House Entry <LOD
24 Guard Rail Wood Light
Brown Guest House Room 4 <LOD
25 Ceiling Drywall White Guest House Room 4 <LOD
EHSI Project 11035 November 3rd, 2017
TABLE 3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
LAKE CRESCENT – BIRD & BIRD GUEST PROPERTY
Read
Component Substrate Color Building Room
Lead Conc.
(mg/cm2)
26 Structural Beam Wood Brown Guest House Room 4 <LOD
27 Soffit Wood Dark
Brown Guest House Exterior <LOD
28 Fascia Wood Dark
Brown Guest House Exterior <LOD
29 Wall Wood Pinkish
Brown Guest House Exterior <LOD
30 Wall Wood Light
Brown Guest House Exterior <LOD
31 Window Frame Wood Pinkish
Brown Guest House Exterior <LOD
32 Window Trim Wood Dark
Brown Guest…